Atch 10 Staffing Matrix TO 1.xlsx

XLSX spreadsheet 101 KB Posted

Attached to
Analysis of Mobility Platform (AMP)
Solicitation number
HTC71124RD002
Issued by

About this file

This document contains a presolicitation notice and description for the Analysis of Mobility Platform (AMP) indefinite delivery indefinite quantity contract. The United States Transportation Command Directorate of Acquisition intends to solicit and award a single IDIQ contract to provide contract and program management, technical support, requirements management, software design and development, maintenance, administration, security, and cloud migration services for the AMP suite of transportation modeling and simulation tools. The five-year IDIQ ordering period runs from August 2024 to July 2029, with the potential for a six-month extension. Task Order 1 covers transition support from August to September 2024 and a one-year base period of performance from October 2024 to September 2025, with the option to extend annually for up to four additional one-year periods. The anticipated solicitation release date is March 1, 2024, with proposals due under solicitation number HTC71124RD002.

View the file

Other files

File Type Posted
Atch 11 TO1 Cost Price Template.xlsx XLSX spreadsheet
Atch 7 PP Ref Sheet.docx DOCX document
Atch 1 20240212 AMP IDIQ PWS v1 FINAL.pdf PDF
Atch 3 2024.01.17 AMP TO 01 QASP.pdf PDF
Atch 5 TDP-File_Name_List.pdf PDF
Atch 12 AMP SB_SubconPlan_Template.doc DOC document
Atch 8 PP Log.docx DOCX document
Atch 14 QA Template.xlsx XLSX spreadsheet
Atch 4 DD254 and Addendum.pdf PDF
Atch 2 20240212 AMP_PWS_TO01 - v1 FINAL.pdf PDF
Draft HTC71124RD002.pdf PDF
Atch 13 AMP GFE 20240207.pdf PDF
Atch 9 PP Questionnaire.doc DOC document
Atch 6 NDA TDP.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

TCAQ-D HTC71124RD002
RFP -- Attachment 10 - AMP Staffing Matrix Task Order 01

GENERAL INFORMATION

Offerors shall complete the Government issued template as instructed:

1. Offerors shall complete Labor Category Descriptions, Transition, Base Year, Option Period 1, Option Period 2, Option Period 3, Option Period 4 and all Summary tabs.

2. Offerors shall enter the proposed labor category in the appropriate row four (4) of each tab and enter the corresponding hours for each task listed. Continue to insert columns as needed to accommodate the proposed Labor Categories for each Task being performed by the Prime offeror. If additional columns are added, add new columns above the "Total Hours by Task/Subtask" Column and recalculate the formulas for "Total Hours by Task/Subtask" and "Task Subtotal".

3. Offerors shall complete a separate subcontractor tab to calculate hours proposed for each task being performed by each subcontractor, if applicable. Two tabs per period of performance are included and offerors are authorized to add tabs for subcontractors when needed.

4. Offerors shall complete each Summary Tab to include the appropriate labor category in the appropriate row three (3) of each of the summary tabs and identify the corresponding hours for each task listed for the prime and all subcontractors.

5. Offerors shall list all labor category titles used in this matrix with their corresponding description, as it relates to the category listed in the "Labor Category Description" tab.

6. Offerors shall enter a value in the box below for hours representative of one (1) Full Time Equivalent (FTE).

Hours Representative of one (1) Full Time Equivalent (FTE):

Labor Category Descriptions

Source Selection Information - See FAR 2.101 and 3.104 - Source Selection Sensitive when filled in
IDIQ Labor Category TitleLabor Category DescriptionMinimum Education RequirementsSecurity
Clearance Level RequiredMinimum Years of ExperienceRequired Certification(s)Required Special Skills
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Source Selection Information - See FAR 2.101 and 3.104 - Source Selection Sensitive when filled in

Transition

OFFEROR NAME:
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1.3Contract Transition (Optional)
TOTAL HOURS

Sub1 Transition

OFFEROR NAME:
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1.3Contract Transition (Optional)
TOTAL HOURS

Sub2 Transition

OFFEROR NAME:
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1.3Contract Transition (Optional)
TOTAL HOURS

Summary Transition Contract Type PWS Task Task Areas Labor Category Total Hours by Task/Subtask Task Subtotal

CPFF1.4.1.3Contract Transition (Optional)
TOTAL HOURS

Base Yr

OFFEROR NAME:
Task Order 01 - Base Year (1 Oct 2024 - 30 Sep 2025)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.10.4AMP-Core Bulk Fuel Enhancements
CPFF1.4.10.5AMP-Core Contested Environment Operations Enhancements
CPFF1.4.10.6AMP-Core Planning/Scheduling Enhancements
CPFF1.4.10.7.1Tanker Employment Constraints
CPFF1.4.10.7.2Receiver Tanker Iterative Planning
CPFF1.4.10.7.3Raid Package Support
CPFF1.4.10.7.4Tankers with Multiple Capabilities
CPFF1.4.10.7.5Advanced Tanker on Tanker Refueling
CPFF1.4.10.7.6Tanker Susceptibility Reduction
CPFF1.4.10.7.7Receiver Flight Segment Customization and Controls
CPFF1.4.10.10AMP-TFA Enhancements - Aerial Refueling Phase 1
Task Area 10 Total
CPFF1.4.11.1.1.1Data Layer Year 1
CPFF1.4.11.1.2.1AMP-PAT Cloud Development Year 1
CPFF1.4.11.2.2AMP-PAT Network Modernization
CPFF1.4.11.2.3AMP-TFA Network Modernization
CPFF1.4.11.3.1End-to-End Modeling (ETEM) VII Transition Year 1
CPFF1.4.11.3.2ARM Improved Tanker Scheduling Transition
CPFF1.4.11.5.1AMP-PAT Spatial Improvements
CPFF1.4.11.6.1Connection to ORION
CPFF1.4.11.6.2TPFDD Editing Functions
CPFF1.4.11.6.3Develop New Analytic Capabilities
CPFF1.4.11.6.4Develop New Modeling Capabilities
CPFF1.4.11.6.5Development Capability Estimator Tools
CPFF1.4.11.6.6Development Other Tools
CPFF1.4.11.6.7Develop Surface Operations
CPFF1.4.11.8.1Metrics Runner Analytics Table Merge
CPFF1.4.11.8.2Database Publishing Assistance
CPFF1.4.11.8.3.1AMP-PAT Input Refactor
CPFF1.4.11.8.3.2AMP-PAT Mid Run Data Output
CPFF1.4.11.8.3.3AMP-PAT Output Refactor
CPFF1.4.11.9Software Dissemination and User Access Controls
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Sub1 Base Yr

OFFEROR NAME:
Task Order 01 - Base Year (1 Oct 2024 - 30 Sep 2025)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.10.4AMP-Core Bulk Fuel Enhancements
CPFF1.4.10.5AMP-Core Contested Environment Operations Enhancements
CPFF1.4.10.6AMP-Core Planning/Scheduling Enhancements
CPFF1.4.10.7.1Tanker Employment Constraints
CPFF1.4.10.7.2Receiver Tanker Iterative Planning
CPFF1.4.10.7.3Raid Package Support
CPFF1.4.10.7.4Tankers with Multiple Capabilities
CPFF1.4.10.7.5Advanced Tanker on Tanker Refueling
CPFF1.4.10.7.6Tanker Susceptibility Reduction
CPFF1.4.10.7.7Receiver Flight Segment Customization and Controls
CPFF1.4.10.10AMP-TFA Enhancements - Aerial Refueling Phase 1
Task Area 10 Total
CPFF1.4.11.1.1.1Data Layer Year 1
CPFF1.4.11.1.2.1AMP-PAT Cloud Development Year 1
CPFF1.4.11.2.2AMP-PAT Network Modernization
CPFF1.4.11.2.3AMP-TFA Network Modernization
CPFF1.4.11.3.1End-to-End Modeling (ETEM) VII Transition Year 1
CPFF1.4.11.3.2ARM Improved Tanker Scheduling Transition
CPFF1.4.11.5.1AMP-PAT Spatial Improvements
CPFF1.4.11.6.1Connection to ORION
CPFF1.4.11.6.2TPFDD Editing Functions
CPFF1.4.11.6.3Develop New Analytic Capabilities
CPFF1.4.11.6.4Develop New Modeling Capabilities
CPFF1.4.11.6.5Development Capability Estimator Tools
CPFF1.4.11.6.6Development Other Tools
CPFF1.4.11.6.7Develop Surface Operations
CPFF1.4.11.8.1Metrics Runner Analytics Table Merge
CPFF1.4.11.8.2Database Publishing Assistance
CPFF1.4.11.8.3.1AMP-PAT Input Refactor
CPFF1.4.11.8.3.2AMP-PAT Mid Run Data Output
CPFF1.4.11.8.3.3AMP-PAT Output Refactor
CPFF1.4.11.9Software Dissemination and User Access Controls
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Sub2 Base Yr

OFFEROR NAME:
Task Order 01 - Base Year (1 Oct 2024 - 30 Sep 2025)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.10.4AMP-Core Bulk Fuel Enhancements
CPFF1.4.10.5AMP-Core Contested Environment Operations Enhancements
CPFF1.4.10.6AMP-Core Planning/Scheduling Enhancements
CPFF1.4.10.7.1Tanker Employment Constraints
CPFF1.4.10.7.2Receiver Tanker Iterative Planning
CPFF1.4.10.7.3Raid Package Support
CPFF1.4.10.7.4Tankers with Multiple Capabilities
CPFF1.4.10.7.5Advanced Tanker on Tanker Refueling
CPFF1.4.10.7.6Tanker Susceptibility Reduction
CPFF1.4.10.7.7Receiver Flight Segment Customization and Controls
CPFF1.4.10.10AMP-TFA Enhancements - Aerial Refueling Phase 1
Task Area 10 Total
CPFF1.4.11.1.1.1Data Layer Year 1
CPFF1.4.11.1.2.1AMP-PAT Cloud Development Year 1
CPFF1.4.11.2.2AMP-PAT Network Modernization
CPFF1.4.11.2.3AMP-TFA Network Modernization
CPFF1.4.11.3.1End-to-End Modeling (ETEM) VII Transition Year 1
CPFF1.4.11.3.2ARM Improved Tanker Scheduling Transition
CPFF1.4.11.5.1AMP-PAT Spatial Improvements
CPFF1.4.11.6.1Connection to ORION
CPFF1.4.11.6.2TPFDD Editing Functions
CPFF1.4.11.6.3Develop New Analytic Capabilities
CPFF1.4.11.6.4Develop New Modeling Capabilities
CPFF1.4.11.6.5Development Capability Estimator Tools
CPFF1.4.11.6.6Development Other Tools
CPFF1.4.11.6.7Develop Surface Operations
CPFF1.4.11.8.1Metrics Runner Analytics Table Merge
CPFF1.4.11.8.2Database Publishing Assistance
CPFF1.4.11.8.3.1AMP-PAT Input Refactor
CPFF1.4.11.8.3.2AMP-PAT Mid Run Data Output
CPFF1.4.11.8.3.3AMP-PAT Output Refactor
CPFF1.4.11.9Software Dissemination and User Access Controls
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Summary Base Yr

Task Order 01 - Base Year (1 Oct 2024 - 30 Sep 2025)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.10.4AMP-Core Bulk Fuel Enhancements
CPFF1.4.10.5AMP-Core Contested Environment Operations Enhancements
CPFF1.4.10.6AMP-Core Planning/Scheduling Enhancements
CPFF1.4.10.7.1Tanker Employment Constraints
CPFF1.4.10.7.2Receiver Tanker Iterative Planning
CPFF1.4.10.7.3Raid Package Support
CPFF1.4.10.7.4Tankers with Multiple Capabilities
CPFF1.4.10.7.5Advanced Tanker on Tanker Refueling
CPFF1.4.10.7.6Tanker Susceptibility Reduction
CPFF1.4.10.7.7Receiver Flight Segment Customization and Controls
CPFF1.4.10.10AMP-TFA Enhancements - Aerial Refueling Phase 1
Task Area 10 Total
CPFF1.4.11.1.1.1Data Layer Year 1
CPFF1.4.11.1.2.1AMP-PAT Cloud Development Year 1
CPFF1.4.11.2.2AMP-PAT Network Modernization
CPFF1.4.11.2.3AMP-TFA Network Modernization
CPFF1.4.11.3.1End-to-End Modeling (ETEM) VII Transition Year 1
CPFF1.4.11.3.2ARM Improved Tanker Scheduling Transition
CPFF1.4.11.5.1AMP-PAT Spatial Improvements
CPFF1.4.11.6.1Connection to ORION
CPFF1.4.11.6.2TPFDD Editing Functions
CPFF1.4.11.6.3Develop New Analytic Capabilities
CPFF1.4.11.6.4Develop New Modeling Capabilities
CPFF1.4.11.6.5Development Capability Estimator Tools
CPFF1.4.11.6.6Development Other Tools
CPFF1.4.11.6.7Develop Surface Operations
CPFF1.4.11.8.1Metrics Runner Analytics Table Merge
CPFF1.4.11.8.2Database Publishing Assistance
CPFF1.4.11.8.3.1AMP-PAT Input Refactor
CPFF1.4.11.8.3.2AMP-PAT Mid Run Data Output
CPFF1.4.11.8.3.3AMP-PAT Output Refactor
CPFF1.4.11.9Software Dissemination and User Access Controls
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

OP1

OFFEROR NAME:
Task Order 01 - Option Year 1 (1 Oct 2025 - 30 Sep 2026)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.1.2Data Layer Year 2: Capture Data Provenance
CPFF1.4.11.1.2.2AMP-PAT Cloud Development Year 2
CPFF1.4.11.1.3Rapid Course of Action Tool (RCAT) Cloud Development
CPFF1.4.11.2.1AMP-Core Network Modernization
CPFF1.4.11.3.1.2End-to-End Modeling (ETEM) VII Transition Year 2
CPFF1.4.11.3.2.2ARM Grid-Based Aircraft Routing Transition
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Sub1 OP1

OFFEROR NAME:
Task Order 01 - Option Year 1 (1 Oct 2025 - 30 Sep 2026)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.1.2Data Layer Year 2: Capture Data Provenance
CPFF1.4.11.1.2.2AMP-PAT Cloud Development Year 2
CPFF1.4.11.1.3Rapid Course of Action Tool (RCAT) Cloud Development
CPFF1.4.11.2.1AMP-Core Network Modernization
CPFF1.4.11.3.1.2End-to-End Modeling (ETEM) VII Transition Year 2
CPFF1.4.11.3.2.2ARM Grid-Based Aircraft Routing Transition
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Sub2 OP1

OFFEROR NAME:
Task Order 01 - Option Year 1 (1 Oct 2025 - 30 Sep 2026)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.1.2Data Layer Year 2: Capture Data Provenance
CPFF1.4.11.1.2.2AMP-PAT Cloud Development Year 2
CPFF1.4.11.1.3Rapid Course of Action Tool (RCAT) Cloud Development
CPFF1.4.11.2.1AMP-Core Network Modernization
CPFF1.4.11.3.1.2End-to-End Modeling (ETEM) VII Transition Year 2
CPFF1.4.11.3.2.2ARM Grid-Based Aircraft Routing Transition
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Summary OP1

Task Order 01 - Option Year 1 (1 Oct 2025 - 30 Sep 2026)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.1.2Data Layer Year 2: Capture Data Provenance
CPFF1.4.11.1.2.2AMP-PAT Cloud Development Year 2
CPFF1.4.11.1.3Rapid Course of Action Tool (RCAT) Cloud Development
CPFF1.4.11.2.1AMP-Core Network Modernization
CPFF1.4.11.3.1.2End-to-End Modeling (ETEM) VII Transition Year 2
CPFF1.4.11.3.2.2ARM Grid-Based Aircraft Routing Transition
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

OP2

OFFEROR NAME:
Task Order 01 - Option Year 2 (1 Oct 2026 - 30 Sep 2027)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.1.3Data Layer 3: Capture Data Connections
CPFF1.4.11.1.2.3AMP-PAT Cloud Development Year 3
CPFF1.4.11.1.4.1AMP-Core Cloud Development Year 1
CPFF1.4.11.1.5.1ARM Cloud Development Year 1
CPFF1.4.11.3.1.3End-to-End Modeling (ETEM) VII Transition Year 3
CPFF1.4.11.3.2.3ARM Joint Receiver/Tanker Planning Optimization Transition
CPFF1.4.11.6.8AMP-TFA AR Modeling Phase 2
CPFF1.4.11.10AMP Program Agile Review, Recommendations, and Plan
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Sub1 OP2

OFFEROR NAME:
Task Order 01 - Option Year 2 (1 Oct 2026 - 30 Sep 2027)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.1.3Data Layer 3: Capture Data Connections
CPFF1.4.11.1.2.3AMP-PAT Cloud Development Year 3
CPFF1.4.11.1.4.1AMP-Core Cloud Development Year 1
CPFF1.4.11.1.5.1ARM Cloud Development Year 1
CPFF1.4.11.3.1.3End-to-End Modeling (ETEM) VII Transition Year 3
CPFF1.4.11.3.2.3ARM Joint Receiver/Tanker Planning Optimization Transition
CPFF1.4.11.6.8AMP-TFA AR Modeling Phase 2
CPFF1.4.11.10AMP Program Agile Review, Recommendations, and Plan
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Sub2 OP2

OFFEROR NAME:
Task Order 01 - Option Year 2 (1 Oct 2026 - 30 Sep 2027)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.1.3Data Layer 3: Capture Data Connections
CPFF1.4.11.1.2.3AMP-PAT Cloud Development Year 3
CPFF1.4.11.1.4.1AMP-Core Cloud Development Year 1
CPFF1.4.11.1.5.1ARM Cloud Development Year 1
CPFF1.4.11.3.1.3End-to-End Modeling (ETEM) VII Transition Year 3
CPFF1.4.11.3.2.3ARM Joint Receiver/Tanker Planning Optimization Transition
CPFF1.4.11.6.8AMP-TFA AR Modeling Phase 2
CPFF1.4.11.10AMP Program Agile Review, Recommendations, and Plan
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Summary OP2

Task Order 01 - Option Year 2 (1 Oct 2026 - 30 Sep 2027)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.1.3Data Layer 3: Capture Data Connections
CPFF1.4.11.1.2.3AMP-PAT Cloud Development Year 3
CPFF1.4.11.1.4.1AMP-Core Cloud Development Year 1
CPFF1.4.11.1.5.1ARM Cloud Development Year 1
CPFF1.4.11.3.1.3End-to-End Modeling (ETEM) VII Transition Year 3
CPFF1.4.11.3.2.3ARM Joint Receiver/Tanker Planning Optimization Transition
CPFF1.4.11.6.8AMP-TFA AR Modeling Phase 2
CPFF1.4.11.10AMP Program Agile Review, Recommendations, and Plan
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

OP3

OFFEROR NAME:
Task Order 01 - Option Year 3 (1 Oct 2027 - 30 Sep 2028)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.3.1RCAT TPFDD Generation to AMP-Core
CPFF1.4.11.1.3.2RCAT Analysis of AMP-Core RLN
CPFF1.4.11.1.4.2AMP-Core Cloud Development Year 2
CPFF1.4.11.1.4.5AMP-Core Analytic Investigation Task Year 1
CPFF1.4.11.1.5.2ARM Cloud Development Year 2
CPFF1.4.11.1.6JMCE Cloud Development
CPFF1.4.11.3.1.4End-to-End Modeling (ETEM) VII Transition Year 4
CPFF1.4.11.3.2.4ARM Scenario Generation Transition
CPFF1.4.11.4.1AMP-Core Optimization in the Cloud Year 1
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Sub1 OP3

OFFEROR NAME:
Task Order 01 - Option Year 3 (1 Oct 2027 - 30 Sep 2028)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.3.1RCAT TPFDD Generation to AMP-Core
CPFF1.4.11.1.3.2RCAT Analysis of AMP-Core RLN
CPFF1.4.11.1.4.2AMP-Core Cloud Development Year 2
CPFF1.4.11.1.4.5AMP-Core Analytic Investigation Task Year 1
CPFF1.4.11.1.5.2ARM Cloud Development Year 2
CPFF1.4.11.1.6JMCE Cloud Development
CPFF1.4.11.3.1.4End-to-End Modeling (ETEM) VII Transition Year 4
CPFF1.4.11.3.2.4ARM Scenario Generation Transition
CPFF1.4.11.4.1AMP-Core Optimization in the Cloud Year 1
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Sub2 OP3

OFFEROR NAME:
Task Order 01 - Option Year 3 (1 Oct 2027 - 30 Sep 2028)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.3.1RCAT TPFDD Generation to AMP-Core
CPFF1.4.11.1.3.2RCAT Analysis of AMP-Core RLN
CPFF1.4.11.1.4.2AMP-Core Cloud Development Year 2
CPFF1.4.11.1.4.5AMP-Core Analytic Investigation Task Year 1
CPFF1.4.11.1.5.2ARM Cloud Development Year 2
CPFF1.4.11.1.6JMCE Cloud Development
CPFF1.4.11.3.1.4End-to-End Modeling (ETEM) VII Transition Year 4
CPFF1.4.11.3.2.4ARM Scenario Generation Transition
CPFF1.4.11.4.1AMP-Core Optimization in the Cloud Year 1
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Summary OP3

Task Order 01 - Option Year 3 (1 Oct 2027 - 30 Sep 2028)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.3.1RCAT TPFDD Generation to AMP-Core
CPFF1.4.11.1.3.2RCAT Analysis of AMP-Core RLN
CPFF1.4.11.1.4.2AMP-Core Cloud Development Year 2
CPFF1.4.11.1.4.5AMP-Core Analytic Investigation Task Year 1
CPFF1.4.11.1.5.2ARM Cloud Development Year 2
CPFF1.4.11.1.6JMCE Cloud Development
CPFF1.4.11.3.1.4End-to-End Modeling (ETEM) VII Transition Year 4
CPFF1.4.11.3.2.4ARM Scenario Generation Transition
CPFF1.4.11.4.1AMP-Core Optimization in the Cloud Year 1
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

OP4

OFFEROR NAME:
Task Order 01 - Option Year 4 (1 Oct 2028 - 30 Sep 2029)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.4.3AMP-Core Experiment Management
CPFF1.4.11.1.4.4AMP-Core Advanced User Interface
CPFF1.4.11.1.4.6AMP-Core Analytic Investigation Task Year 2
CPFF1.4.11.3.1.5End-to-End Modeling (ETEM) VII Transition Year 5
CPFF1.4.11.4.1AMP-Core Optimization in the Cloud Year 2
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Sub1 OP4

OFFEROR NAME:
Task Order 01 - Option Year 4 (1 Oct 2028 - 30 Sep 2029)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.4.3AMP-Core Experiment Management
CPFF1.4.11.1.4.4AMP-Core Advanced User Interface
CPFF1.4.11.1.4.6AMP-Core Analytic Investigation Task Year 2
CPFF1.4.11.3.1.5End-to-End Modeling (ETEM) VII Transition Year 5
CPFF1.4.11.4.1AMP-Core Optimization in the Cloud Year 2
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Sub2 OP4

OFFEROR NAME:
Task Order 01 - Option Year 4 (1 Oct 2028 - 30 Sep 2029)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.4.3AMP-Core Experiment Management
CPFF1.4.11.1.4.4AMP-Core Advanced User Interface
CPFF1.4.11.1.4.6AMP-Core Analytic Investigation Task Year 2
CPFF1.4.11.3.1.5End-to-End Modeling (ETEM) VII Transition Year 5
CPFF1.4.11.4.1AMP-Core Optimization in the Cloud Year 2
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Summary OP4

Task Order 01 - Option Year 4 (1 Oct 2028 - 30 Sep 2029)
Contract TypePWS TaskTask AreasLabor CategoryTotal Hours by Task/SubtaskTask Subtotal
CPFF1.4.1Contract and Program Management
CPFF1.4.1.1Kick-Off Meeting
CPFF1.4.1.2Monthly Status Report
CPFF1.4.1.4Data Protection
CPFF1.4.1.5Demonstration Support
CPFF1.4.1.6AMP Program Business Meeting
Task Area 1 Total
CPFF1.4.2Technical Support for Studies and Analysis
Task Area 2 Total
CPFF1.4.3Requirements Management Support
Task Area 3 Total
CPFF1.4.4Software Design and Development Support
CPFF1.4.4.1Software Testing
CPFF1.4.4.1.1Software Integration Testing (SIT) and Test Readiness Review (TRR)
CPFF1.4.4.1.2Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR)
CPFF1.4.4.1.3User Acceptance Testing (UAT) and Production Readines Review (PRR)
CPFF1.4.4.2Software Release Process
CPFF1.4.4.3Data Governance
Task Area 4 Total
FFP1.4.5.1Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA
FFP1.4.5.2Software Maintenance for ARM
Task Area 5 Total
CPFF1.4.6Application Administration Support
Task Area 6 Total
CPFF1.4.7.1Security Engineering Requirements
CPFF1.4.7.2.1Risk Management Framework
CPFF1.4.7.2.2Risk Management Framework Process
CPFF1.4.7.3Cyber Security Requirements
Task Area 7 Total
CPFF1.4.8Annual AMP Contingency Plan Review Support
Task Area 8 Total
CPFF1.4.9Configuration Management
Task Area 9 Total
CPFF1.4.11.1.4.3AMP-Core Experiment Management
CPFF1.4.11.1.4.4AMP-Core Advanced User Interface
CPFF1.4.11.1.4.6AMP-Core Analytic Investigation Task Year 2
CPFF1.4.11.3.1.5End-to-End Modeling (ETEM) VII Transition Year 5
CPFF1.4.11.4.1AMP-Core Optimization in the Cloud Year 2
Task Area 11 Total
CPFF1.4.12Cloud Migration Support
Task Area 12 Total
TOTAL HOURS

Mapping

Fund TypeRequirementAnalogous EffortComplexity Factor
TWCF OPS1.3.2.1 - TFA Support Team On-Site SupportFY22 TO12 1.3.2.11.00
TWCF OPS1.3.2.2 - Technical Support for Studies and Analyses/DESS Thread Test SupportFY22 TO13 1.3.3.21.00
TWCF OPS1.3.3.1 - Requirements Management PlanFY22 TO13 1.3.3.11.00
TWCF OPS1.3.3.2 - Requirements TraceabilityFY22 TO13 1.3.3.21.00
TWCF OPS1.3.3.3 - Software Requirement SpecificationFY22 TO13 1.3.3.31.00
TWCF OPS1.3.4.1 - General Development SupportFY22 TO12 1.3.4.11.00
TWCF OPS1.3.4.2.1 - Contractor's Test and Evaluation ProcessFY22 TO12 1.3.4.2.11.00
TWCF OPS1.3.4.2.2 - Contractor Support Government Participation in Test EventsFY22 TO12 1.3.4.2.21.00
TWCF OPS1.3.4.2.3 - TRR and ORR SupportFY22 TO12 1.3.4.2.31.00
TWCF OPS1.3.4.2.4 - Contractor Support during Government TestingFY22 TO12 1.3.4.2.41.00
TWCF OPS1.3.4.3 - Software ReleasesFY22 TO12 1.3.4.31.00
TWCF OPS1.3.5.1 - AMP TFA Software MaintenanceFY22 TO12 1.3.5.11.50
TWCF OPS1.3.7.1 - Security Engineering RequirementsFY22 TO12 1.3.7.11.00
TWCF OPS1.3.7.2.1 - Secure SoftwareFY22 TO12 1.3.7.2.11.00
TWCF OPS1.3.7.2.2 - Security TestingFY22 TO12 1.3.7.2.21.00
TWCF OPS1.3.7.2.3 - DISA SRGs and STIGs ComplianceFY22 TO12 1.3.7.2.31.00
TWCF OPS1.3.7.4 - Risk Management Framework SupportFY22 TO12 1.3.7.41.00
TWCF OPS1.3.10.4 - Reports EnhancementsFY22 TO12 1.3.10.11.50
TWCF OPS1.3.10.5 - Concurrent EditingFY21 TO12 1.3.11.70.25
TWCF OPS1.3.10.6 - Query AdvancedFY22 TO12 1.3.10.11.00
TWCF CAP1.3.11.30 - TPFDD Editing FunctionsFY22 TO12 1.3.11.260.75
TWCF CAP1.3.11.31 - Modeling and AnalysisFY22 TO12 1.3.11.281.00
TWCF CAP1.3.11.32 - Other ToolsFY22 TO12 1.3.11.280.75
TWCF CAP1.3.11.33 - Airlift OperationsFY22 TO12 1.3.11.211.00
TWCF CAP1.3.11.34 - Sealift OperationsFY22 TO12 1.3.11.222.00
TWCF CAP1.3.11.35 - Surface OperationsFY22 TO12 1.3.11.250.50
TWCF CAP1.3.11.36 - SustainmentFY22 TO12 1.3.11.250.25
TWCF CAP1.3.11.37 - Send Email via AMP-TFA ApplicationFY21 TO12 1.3.11.70.25

File details come from the government source that posted it. Updated .