Instructions
| TCAQ-D HTC71124RD002 |
| RFP -- Attachment 10 - AMP Staffing Matrix Task Order 01 |
GENERAL INFORMATION
Offerors shall complete the Government issued template as instructed:
1. Offerors shall complete Labor Category Descriptions, Transition, Base Year, Option Period 1, Option Period 2, Option Period 3, Option Period 4 and all Summary tabs.
2. Offerors shall enter the proposed labor category in the appropriate row four (4) of each tab and enter the corresponding hours for each task listed. Continue to insert columns as needed to accommodate the proposed Labor Categories for each Task being performed by the Prime offeror. If additional columns are added, add new columns above the "Total Hours by Task/Subtask" Column and recalculate the formulas for "Total Hours by Task/Subtask" and "Task Subtotal".
3. Offerors shall complete a separate subcontractor tab to calculate hours proposed for each task being performed by each subcontractor, if applicable. Two tabs per period of performance are included and offerors are authorized to add tabs for subcontractors when needed.
4. Offerors shall complete each Summary Tab to include the appropriate labor category in the appropriate row three (3) of each of the summary tabs and identify the corresponding hours for each task listed for the prime and all subcontractors.
5. Offerors shall list all labor category titles used in this matrix with their corresponding description, as it relates to the category listed in the "Labor Category Description" tab.
6. Offerors shall enter a value in the box below for hours representative of one (1) Full Time Equivalent (FTE).
Hours Representative of one (1) Full Time Equivalent (FTE):
Labor Category Descriptions
| | Source Selection Information - See FAR 2.101 and 3.104 - Source Selection Sensitive when filled in | | | |
| | IDIQ Labor Category Title | Labor Category Description | Minimum Education Requirements | Security |
| Clearance Level Required | Minimum Years of Experience | Required Certification(s) | Required Special Skills | | |
| 1 | | | | |
| 2 | | | | |
| 3 | | | | |
| 4 | | | | |
| 5 | | | | |
| 6 | | | | |
| 7 | | | | |
| 8 | | | | |
| 9 | | | | |
| 10 | | | | |
| 11 | | | | |
| 12 | | | | |
| 13 | | | | |
| 14 | | | | |
| 15 | | | | |
| 16 | | | | |
| 17 | | | | |
| 18 | | | | |
| 19 | | | | |
| 20 | | | | |
| 21 | | | | |
| 22 | | | | |
| 23 | | | | |
| 24 | | | | |
| 25 | | | | |
| 26 | | | | |
| 27 | | | | |
| 28 | | | | |
| 29 | | | | |
| 30 | | | | |
| 31 | | | | |
| 32 | | | | |
| 33 | | | | |
| 34 | | | | |
| 35 | | | | |
| 36 | | | | |
| 37 | | | | |
| 38 | | | | |
| 39 | | | | |
| 40 | | | | |
| | Source Selection Information - See FAR 2.101 and 3.104 - Source Selection Sensitive when filled in | | | |
Transition
| OFFEROR NAME: | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1.3 | Contract Transition (Optional) |
| | TOTAL HOURS |
Sub1 Transition
| OFFEROR NAME: | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1.3 | Contract Transition (Optional) |
| | TOTAL HOURS |
Sub2 Transition
| OFFEROR NAME: | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1.3 | Contract Transition (Optional) |
| | TOTAL HOURS |
Summary Transition Contract Type PWS Task Task Areas Labor Category Total Hours by Task/Subtask Task Subtotal
| CPFF | 1.4.1.3 | Contract Transition (Optional) |
| | TOTAL HOURS |
Base Yr
| OFFEROR NAME: | | | | | |
| Task Order 01 - Base Year (1 Oct 2024 - 30 Sep 2025) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.10.4 | AMP-Core Bulk Fuel Enhancements |
| CPFF | 1.4.10.5 | AMP-Core Contested Environment Operations Enhancements |
| CPFF | 1.4.10.6 | AMP-Core Planning/Scheduling Enhancements |
| CPFF | 1.4.10.7.1 | Tanker Employment Constraints |
| CPFF | 1.4.10.7.2 | Receiver Tanker Iterative Planning |
| CPFF | 1.4.10.7.3 | Raid Package Support |
| CPFF | 1.4.10.7.4 | Tankers with Multiple Capabilities |
| CPFF | 1.4.10.7.5 | Advanced Tanker on Tanker Refueling |
| CPFF | 1.4.10.7.6 | Tanker Susceptibility Reduction |
| CPFF | 1.4.10.7.7 | Receiver Flight Segment Customization and Controls |
| CPFF | 1.4.10.10 | AMP-TFA Enhancements - Aerial Refueling Phase 1 |
| | Task Area 10 Total |
| CPFF | 1.4.11.1.1.1 | Data Layer Year 1 |
| CPFF | 1.4.11.1.2.1 | AMP-PAT Cloud Development Year 1 |
| CPFF | 1.4.11.2.2 | AMP-PAT Network Modernization |
| CPFF | 1.4.11.2.3 | AMP-TFA Network Modernization |
| CPFF | 1.4.11.3.1 | End-to-End Modeling (ETEM) VII Transition Year 1 |
| CPFF | 1.4.11.3.2 | ARM Improved Tanker Scheduling Transition |
| CPFF | 1.4.11.5.1 | AMP-PAT Spatial Improvements |
| CPFF | 1.4.11.6.1 | Connection to ORION |
| CPFF | 1.4.11.6.2 | TPFDD Editing Functions |
| CPFF | 1.4.11.6.3 | Develop New Analytic Capabilities |
| CPFF | 1.4.11.6.4 | Develop New Modeling Capabilities |
| CPFF | 1.4.11.6.5 | Development Capability Estimator Tools |
| CPFF | 1.4.11.6.6 | Development Other Tools |
| CPFF | 1.4.11.6.7 | Develop Surface Operations |
| CPFF | 1.4.11.8.1 | Metrics Runner Analytics Table Merge |
| CPFF | 1.4.11.8.2 | Database Publishing Assistance |
| CPFF | 1.4.11.8.3.1 | AMP-PAT Input Refactor |
| CPFF | 1.4.11.8.3.2 | AMP-PAT Mid Run Data Output |
| CPFF | 1.4.11.8.3.3 | AMP-PAT Output Refactor |
| CPFF | 1.4.11.9 | Software Dissemination and User Access Controls |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Sub1 Base Yr
| OFFEROR NAME: | | | | | |
| Task Order 01 - Base Year (1 Oct 2024 - 30 Sep 2025) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.10.4 | AMP-Core Bulk Fuel Enhancements |
| CPFF | 1.4.10.5 | AMP-Core Contested Environment Operations Enhancements |
| CPFF | 1.4.10.6 | AMP-Core Planning/Scheduling Enhancements |
| CPFF | 1.4.10.7.1 | Tanker Employment Constraints |
| CPFF | 1.4.10.7.2 | Receiver Tanker Iterative Planning |
| CPFF | 1.4.10.7.3 | Raid Package Support |
| CPFF | 1.4.10.7.4 | Tankers with Multiple Capabilities |
| CPFF | 1.4.10.7.5 | Advanced Tanker on Tanker Refueling |
| CPFF | 1.4.10.7.6 | Tanker Susceptibility Reduction |
| CPFF | 1.4.10.7.7 | Receiver Flight Segment Customization and Controls |
| CPFF | 1.4.10.10 | AMP-TFA Enhancements - Aerial Refueling Phase 1 |
| | Task Area 10 Total |
| CPFF | 1.4.11.1.1.1 | Data Layer Year 1 |
| CPFF | 1.4.11.1.2.1 | AMP-PAT Cloud Development Year 1 |
| CPFF | 1.4.11.2.2 | AMP-PAT Network Modernization |
| CPFF | 1.4.11.2.3 | AMP-TFA Network Modernization |
| CPFF | 1.4.11.3.1 | End-to-End Modeling (ETEM) VII Transition Year 1 |
| CPFF | 1.4.11.3.2 | ARM Improved Tanker Scheduling Transition |
| CPFF | 1.4.11.5.1 | AMP-PAT Spatial Improvements |
| CPFF | 1.4.11.6.1 | Connection to ORION |
| CPFF | 1.4.11.6.2 | TPFDD Editing Functions |
| CPFF | 1.4.11.6.3 | Develop New Analytic Capabilities |
| CPFF | 1.4.11.6.4 | Develop New Modeling Capabilities |
| CPFF | 1.4.11.6.5 | Development Capability Estimator Tools |
| CPFF | 1.4.11.6.6 | Development Other Tools |
| CPFF | 1.4.11.6.7 | Develop Surface Operations |
| CPFF | 1.4.11.8.1 | Metrics Runner Analytics Table Merge |
| CPFF | 1.4.11.8.2 | Database Publishing Assistance |
| CPFF | 1.4.11.8.3.1 | AMP-PAT Input Refactor |
| CPFF | 1.4.11.8.3.2 | AMP-PAT Mid Run Data Output |
| CPFF | 1.4.11.8.3.3 | AMP-PAT Output Refactor |
| CPFF | 1.4.11.9 | Software Dissemination and User Access Controls |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Sub2 Base Yr
| OFFEROR NAME: | | | | | |
| Task Order 01 - Base Year (1 Oct 2024 - 30 Sep 2025) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.10.4 | AMP-Core Bulk Fuel Enhancements |
| CPFF | 1.4.10.5 | AMP-Core Contested Environment Operations Enhancements |
| CPFF | 1.4.10.6 | AMP-Core Planning/Scheduling Enhancements |
| CPFF | 1.4.10.7.1 | Tanker Employment Constraints |
| CPFF | 1.4.10.7.2 | Receiver Tanker Iterative Planning |
| CPFF | 1.4.10.7.3 | Raid Package Support |
| CPFF | 1.4.10.7.4 | Tankers with Multiple Capabilities |
| CPFF | 1.4.10.7.5 | Advanced Tanker on Tanker Refueling |
| CPFF | 1.4.10.7.6 | Tanker Susceptibility Reduction |
| CPFF | 1.4.10.7.7 | Receiver Flight Segment Customization and Controls |
| CPFF | 1.4.10.10 | AMP-TFA Enhancements - Aerial Refueling Phase 1 |
| | Task Area 10 Total |
| CPFF | 1.4.11.1.1.1 | Data Layer Year 1 |
| CPFF | 1.4.11.1.2.1 | AMP-PAT Cloud Development Year 1 |
| CPFF | 1.4.11.2.2 | AMP-PAT Network Modernization |
| CPFF | 1.4.11.2.3 | AMP-TFA Network Modernization |
| CPFF | 1.4.11.3.1 | End-to-End Modeling (ETEM) VII Transition Year 1 |
| CPFF | 1.4.11.3.2 | ARM Improved Tanker Scheduling Transition |
| CPFF | 1.4.11.5.1 | AMP-PAT Spatial Improvements |
| CPFF | 1.4.11.6.1 | Connection to ORION |
| CPFF | 1.4.11.6.2 | TPFDD Editing Functions |
| CPFF | 1.4.11.6.3 | Develop New Analytic Capabilities |
| CPFF | 1.4.11.6.4 | Develop New Modeling Capabilities |
| CPFF | 1.4.11.6.5 | Development Capability Estimator Tools |
| CPFF | 1.4.11.6.6 | Development Other Tools |
| CPFF | 1.4.11.6.7 | Develop Surface Operations |
| CPFF | 1.4.11.8.1 | Metrics Runner Analytics Table Merge |
| CPFF | 1.4.11.8.2 | Database Publishing Assistance |
| CPFF | 1.4.11.8.3.1 | AMP-PAT Input Refactor |
| CPFF | 1.4.11.8.3.2 | AMP-PAT Mid Run Data Output |
| CPFF | 1.4.11.8.3.3 | AMP-PAT Output Refactor |
| CPFF | 1.4.11.9 | Software Dissemination and User Access Controls |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Summary Base Yr
| Task Order 01 - Base Year (1 Oct 2024 - 30 Sep 2025) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.10.4 | AMP-Core Bulk Fuel Enhancements |
| CPFF | 1.4.10.5 | AMP-Core Contested Environment Operations Enhancements |
| CPFF | 1.4.10.6 | AMP-Core Planning/Scheduling Enhancements |
| CPFF | 1.4.10.7.1 | Tanker Employment Constraints |
| CPFF | 1.4.10.7.2 | Receiver Tanker Iterative Planning |
| CPFF | 1.4.10.7.3 | Raid Package Support |
| CPFF | 1.4.10.7.4 | Tankers with Multiple Capabilities |
| CPFF | 1.4.10.7.5 | Advanced Tanker on Tanker Refueling |
| CPFF | 1.4.10.7.6 | Tanker Susceptibility Reduction |
| CPFF | 1.4.10.7.7 | Receiver Flight Segment Customization and Controls |
| CPFF | 1.4.10.10 | AMP-TFA Enhancements - Aerial Refueling Phase 1 |
| | Task Area 10 Total |
| CPFF | 1.4.11.1.1.1 | Data Layer Year 1 |
| CPFF | 1.4.11.1.2.1 | AMP-PAT Cloud Development Year 1 |
| CPFF | 1.4.11.2.2 | AMP-PAT Network Modernization |
| CPFF | 1.4.11.2.3 | AMP-TFA Network Modernization |
| CPFF | 1.4.11.3.1 | End-to-End Modeling (ETEM) VII Transition Year 1 |
| CPFF | 1.4.11.3.2 | ARM Improved Tanker Scheduling Transition |
| CPFF | 1.4.11.5.1 | AMP-PAT Spatial Improvements |
| CPFF | 1.4.11.6.1 | Connection to ORION |
| CPFF | 1.4.11.6.2 | TPFDD Editing Functions |
| CPFF | 1.4.11.6.3 | Develop New Analytic Capabilities |
| CPFF | 1.4.11.6.4 | Develop New Modeling Capabilities |
| CPFF | 1.4.11.6.5 | Development Capability Estimator Tools |
| CPFF | 1.4.11.6.6 | Development Other Tools |
| CPFF | 1.4.11.6.7 | Develop Surface Operations |
| CPFF | 1.4.11.8.1 | Metrics Runner Analytics Table Merge |
| CPFF | 1.4.11.8.2 | Database Publishing Assistance |
| CPFF | 1.4.11.8.3.1 | AMP-PAT Input Refactor |
| CPFF | 1.4.11.8.3.2 | AMP-PAT Mid Run Data Output |
| CPFF | 1.4.11.8.3.3 | AMP-PAT Output Refactor |
| CPFF | 1.4.11.9 | Software Dissemination and User Access Controls |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
OP1
| OFFEROR NAME: | | | | | |
| Task Order 01 - Option Year 1 (1 Oct 2025 - 30 Sep 2026) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.1.2 | Data Layer Year 2: Capture Data Provenance |
| CPFF | 1.4.11.1.2.2 | AMP-PAT Cloud Development Year 2 |
| CPFF | 1.4.11.1.3 | Rapid Course of Action Tool (RCAT) Cloud Development |
| CPFF | 1.4.11.2.1 | AMP-Core Network Modernization |
| CPFF | 1.4.11.3.1.2 | End-to-End Modeling (ETEM) VII Transition Year 2 |
| CPFF | 1.4.11.3.2.2 | ARM Grid-Based Aircraft Routing Transition |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Sub1 OP1
| OFFEROR NAME: | | | | | |
| Task Order 01 - Option Year 1 (1 Oct 2025 - 30 Sep 2026) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.1.2 | Data Layer Year 2: Capture Data Provenance |
| CPFF | 1.4.11.1.2.2 | AMP-PAT Cloud Development Year 2 |
| CPFF | 1.4.11.1.3 | Rapid Course of Action Tool (RCAT) Cloud Development |
| CPFF | 1.4.11.2.1 | AMP-Core Network Modernization |
| CPFF | 1.4.11.3.1.2 | End-to-End Modeling (ETEM) VII Transition Year 2 |
| CPFF | 1.4.11.3.2.2 | ARM Grid-Based Aircraft Routing Transition |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Sub2 OP1
| OFFEROR NAME: | | | | | |
| Task Order 01 - Option Year 1 (1 Oct 2025 - 30 Sep 2026) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.1.2 | Data Layer Year 2: Capture Data Provenance |
| CPFF | 1.4.11.1.2.2 | AMP-PAT Cloud Development Year 2 |
| CPFF | 1.4.11.1.3 | Rapid Course of Action Tool (RCAT) Cloud Development |
| CPFF | 1.4.11.2.1 | AMP-Core Network Modernization |
| CPFF | 1.4.11.3.1.2 | End-to-End Modeling (ETEM) VII Transition Year 2 |
| CPFF | 1.4.11.3.2.2 | ARM Grid-Based Aircraft Routing Transition |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Summary OP1
| Task Order 01 - Option Year 1 (1 Oct 2025 - 30 Sep 2026) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.1.2 | Data Layer Year 2: Capture Data Provenance |
| CPFF | 1.4.11.1.2.2 | AMP-PAT Cloud Development Year 2 |
| CPFF | 1.4.11.1.3 | Rapid Course of Action Tool (RCAT) Cloud Development |
| CPFF | 1.4.11.2.1 | AMP-Core Network Modernization |
| CPFF | 1.4.11.3.1.2 | End-to-End Modeling (ETEM) VII Transition Year 2 |
| CPFF | 1.4.11.3.2.2 | ARM Grid-Based Aircraft Routing Transition |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
OP2
| OFFEROR NAME: | | | | | |
| Task Order 01 - Option Year 2 (1 Oct 2026 - 30 Sep 2027) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.1.3 | Data Layer 3: Capture Data Connections |
| CPFF | 1.4.11.1.2.3 | AMP-PAT Cloud Development Year 3 |
| CPFF | 1.4.11.1.4.1 | AMP-Core Cloud Development Year 1 |
| CPFF | 1.4.11.1.5.1 | ARM Cloud Development Year 1 |
| CPFF | 1.4.11.3.1.3 | End-to-End Modeling (ETEM) VII Transition Year 3 |
| CPFF | 1.4.11.3.2.3 | ARM Joint Receiver/Tanker Planning Optimization Transition |
| CPFF | 1.4.11.6.8 | AMP-TFA AR Modeling Phase 2 |
| CPFF | 1.4.11.10 | AMP Program Agile Review, Recommendations, and Plan |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Sub1 OP2
| OFFEROR NAME: | | | | | |
| Task Order 01 - Option Year 2 (1 Oct 2026 - 30 Sep 2027) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.1.3 | Data Layer 3: Capture Data Connections |
| CPFF | 1.4.11.1.2.3 | AMP-PAT Cloud Development Year 3 |
| CPFF | 1.4.11.1.4.1 | AMP-Core Cloud Development Year 1 |
| CPFF | 1.4.11.1.5.1 | ARM Cloud Development Year 1 |
| CPFF | 1.4.11.3.1.3 | End-to-End Modeling (ETEM) VII Transition Year 3 |
| CPFF | 1.4.11.3.2.3 | ARM Joint Receiver/Tanker Planning Optimization Transition |
| CPFF | 1.4.11.6.8 | AMP-TFA AR Modeling Phase 2 |
| CPFF | 1.4.11.10 | AMP Program Agile Review, Recommendations, and Plan |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Sub2 OP2
| OFFEROR NAME: | | | | | |
| Task Order 01 - Option Year 2 (1 Oct 2026 - 30 Sep 2027) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.1.3 | Data Layer 3: Capture Data Connections |
| CPFF | 1.4.11.1.2.3 | AMP-PAT Cloud Development Year 3 |
| CPFF | 1.4.11.1.4.1 | AMP-Core Cloud Development Year 1 |
| CPFF | 1.4.11.1.5.1 | ARM Cloud Development Year 1 |
| CPFF | 1.4.11.3.1.3 | End-to-End Modeling (ETEM) VII Transition Year 3 |
| CPFF | 1.4.11.3.2.3 | ARM Joint Receiver/Tanker Planning Optimization Transition |
| CPFF | 1.4.11.6.8 | AMP-TFA AR Modeling Phase 2 |
| CPFF | 1.4.11.10 | AMP Program Agile Review, Recommendations, and Plan |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Summary OP2
| Task Order 01 - Option Year 2 (1 Oct 2026 - 30 Sep 2027) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.1.3 | Data Layer 3: Capture Data Connections |
| CPFF | 1.4.11.1.2.3 | AMP-PAT Cloud Development Year 3 |
| CPFF | 1.4.11.1.4.1 | AMP-Core Cloud Development Year 1 |
| CPFF | 1.4.11.1.5.1 | ARM Cloud Development Year 1 |
| CPFF | 1.4.11.3.1.3 | End-to-End Modeling (ETEM) VII Transition Year 3 |
| CPFF | 1.4.11.3.2.3 | ARM Joint Receiver/Tanker Planning Optimization Transition |
| CPFF | 1.4.11.6.8 | AMP-TFA AR Modeling Phase 2 |
| CPFF | 1.4.11.10 | AMP Program Agile Review, Recommendations, and Plan |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
OP3
| OFFEROR NAME: | | | | | |
| Task Order 01 - Option Year 3 (1 Oct 2027 - 30 Sep 2028) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.3.1 | RCAT TPFDD Generation to AMP-Core |
| CPFF | 1.4.11.1.3.2 | RCAT Analysis of AMP-Core RLN |
| CPFF | 1.4.11.1.4.2 | AMP-Core Cloud Development Year 2 |
| CPFF | 1.4.11.1.4.5 | AMP-Core Analytic Investigation Task Year 1 |
| CPFF | 1.4.11.1.5.2 | ARM Cloud Development Year 2 |
| CPFF | 1.4.11.1.6 | JMCE Cloud Development |
| CPFF | 1.4.11.3.1.4 | End-to-End Modeling (ETEM) VII Transition Year 4 |
| CPFF | 1.4.11.3.2.4 | ARM Scenario Generation Transition |
| CPFF | 1.4.11.4.1 | AMP-Core Optimization in the Cloud Year 1 |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Sub1 OP3
| OFFEROR NAME: | | | | | |
| Task Order 01 - Option Year 3 (1 Oct 2027 - 30 Sep 2028) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.3.1 | RCAT TPFDD Generation to AMP-Core |
| CPFF | 1.4.11.1.3.2 | RCAT Analysis of AMP-Core RLN |
| CPFF | 1.4.11.1.4.2 | AMP-Core Cloud Development Year 2 |
| CPFF | 1.4.11.1.4.5 | AMP-Core Analytic Investigation Task Year 1 |
| CPFF | 1.4.11.1.5.2 | ARM Cloud Development Year 2 |
| CPFF | 1.4.11.1.6 | JMCE Cloud Development |
| CPFF | 1.4.11.3.1.4 | End-to-End Modeling (ETEM) VII Transition Year 4 |
| CPFF | 1.4.11.3.2.4 | ARM Scenario Generation Transition |
| CPFF | 1.4.11.4.1 | AMP-Core Optimization in the Cloud Year 1 |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Sub2 OP3
| OFFEROR NAME: | | | | | |
| Task Order 01 - Option Year 3 (1 Oct 2027 - 30 Sep 2028) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.3.1 | RCAT TPFDD Generation to AMP-Core |
| CPFF | 1.4.11.1.3.2 | RCAT Analysis of AMP-Core RLN |
| CPFF | 1.4.11.1.4.2 | AMP-Core Cloud Development Year 2 |
| CPFF | 1.4.11.1.4.5 | AMP-Core Analytic Investigation Task Year 1 |
| CPFF | 1.4.11.1.5.2 | ARM Cloud Development Year 2 |
| CPFF | 1.4.11.1.6 | JMCE Cloud Development |
| CPFF | 1.4.11.3.1.4 | End-to-End Modeling (ETEM) VII Transition Year 4 |
| CPFF | 1.4.11.3.2.4 | ARM Scenario Generation Transition |
| CPFF | 1.4.11.4.1 | AMP-Core Optimization in the Cloud Year 1 |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Summary OP3
| Task Order 01 - Option Year 3 (1 Oct 2027 - 30 Sep 2028) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.3.1 | RCAT TPFDD Generation to AMP-Core |
| CPFF | 1.4.11.1.3.2 | RCAT Analysis of AMP-Core RLN |
| CPFF | 1.4.11.1.4.2 | AMP-Core Cloud Development Year 2 |
| CPFF | 1.4.11.1.4.5 | AMP-Core Analytic Investigation Task Year 1 |
| CPFF | 1.4.11.1.5.2 | ARM Cloud Development Year 2 |
| CPFF | 1.4.11.1.6 | JMCE Cloud Development |
| CPFF | 1.4.11.3.1.4 | End-to-End Modeling (ETEM) VII Transition Year 4 |
| CPFF | 1.4.11.3.2.4 | ARM Scenario Generation Transition |
| CPFF | 1.4.11.4.1 | AMP-Core Optimization in the Cloud Year 1 |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
OP4
| OFFEROR NAME: | | | | | |
| Task Order 01 - Option Year 4 (1 Oct 2028 - 30 Sep 2029) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.4.3 | AMP-Core Experiment Management |
| CPFF | 1.4.11.1.4.4 | AMP-Core Advanced User Interface |
| CPFF | 1.4.11.1.4.6 | AMP-Core Analytic Investigation Task Year 2 |
| CPFF | 1.4.11.3.1.5 | End-to-End Modeling (ETEM) VII Transition Year 5 |
| CPFF | 1.4.11.4.1 | AMP-Core Optimization in the Cloud Year 2 |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Sub1 OP4
| OFFEROR NAME: | | | | | |
| Task Order 01 - Option Year 4 (1 Oct 2028 - 30 Sep 2029) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.4.3 | AMP-Core Experiment Management |
| CPFF | 1.4.11.1.4.4 | AMP-Core Advanced User Interface |
| CPFF | 1.4.11.1.4.6 | AMP-Core Analytic Investigation Task Year 2 |
| CPFF | 1.4.11.3.1.5 | End-to-End Modeling (ETEM) VII Transition Year 5 |
| CPFF | 1.4.11.4.1 | AMP-Core Optimization in the Cloud Year 2 |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Sub2 OP4
| OFFEROR NAME: | | | | | |
| Task Order 01 - Option Year 4 (1 Oct 2028 - 30 Sep 2029) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.4.3 | AMP-Core Experiment Management |
| CPFF | 1.4.11.1.4.4 | AMP-Core Advanced User Interface |
| CPFF | 1.4.11.1.4.6 | AMP-Core Analytic Investigation Task Year 2 |
| CPFF | 1.4.11.3.1.5 | End-to-End Modeling (ETEM) VII Transition Year 5 |
| CPFF | 1.4.11.4.1 | AMP-Core Optimization in the Cloud Year 2 |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Summary OP4
| Task Order 01 - Option Year 4 (1 Oct 2028 - 30 Sep 2029) | | | | | |
| Contract Type | PWS Task | Task Areas | Labor Category | Total Hours by Task/Subtask | Task Subtotal |
| CPFF | 1.4.1 | Contract and Program Management |
| CPFF | 1.4.1.1 | Kick-Off Meeting |
| CPFF | 1.4.1.2 | Monthly Status Report |
| CPFF | 1.4.1.4 | Data Protection |
| CPFF | 1.4.1.5 | Demonstration Support |
| CPFF | 1.4.1.6 | AMP Program Business Meeting |
| | Task Area 1 Total |
| CPFF | 1.4.2 | Technical Support for Studies and Analysis |
| | Task Area 2 Total |
| CPFF | 1.4.3 | Requirements Management Support |
| | Task Area 3 Total |
| CPFF | 1.4.4 | Software Design and Development Support |
| CPFF | 1.4.4.1 | Software Testing |
| CPFF | 1.4.4.1.1 | Software Integration Testing (SIT) and Test Readiness Review (TRR) |
| CPFF | 1.4.4.1.2 | Government Witness Testing (GWT)/Government Acceptance Testing (GAT) and Operational Readiness Review (ORR) |
| CPFF | 1.4.4.1.3 | User Acceptance Testing (UAT) and Production Readines Review (PRR) |
| CPFF | 1.4.4.2 | Software Release Process |
| CPFF | 1.4.4.3 | Data Governance |
| | Task Area 4 Total |
| FFP | 1.4.5.1 | Software Maintenance for AMP-CORE, AMP-PAT, RCAT, JMCE, and AMP-TFA |
| FFP | 1.4.5.2 | Software Maintenance for ARM |
| | Task Area 5 Total |
| CPFF | 1.4.6 | Application Administration Support |
| | Task Area 6 Total |
| CPFF | 1.4.7.1 | Security Engineering Requirements |
| CPFF | 1.4.7.2.1 | Risk Management Framework |
| CPFF | 1.4.7.2.2 | Risk Management Framework Process |
| CPFF | 1.4.7.3 | Cyber Security Requirements |
| | Task Area 7 Total |
| CPFF | 1.4.8 | Annual AMP Contingency Plan Review Support |
| | Task Area 8 Total |
| CPFF | 1.4.9 | Configuration Management |
| | Task Area 9 Total |
| CPFF | 1.4.11.1.4.3 | AMP-Core Experiment Management |
| CPFF | 1.4.11.1.4.4 | AMP-Core Advanced User Interface |
| CPFF | 1.4.11.1.4.6 | AMP-Core Analytic Investigation Task Year 2 |
| CPFF | 1.4.11.3.1.5 | End-to-End Modeling (ETEM) VII Transition Year 5 |
| CPFF | 1.4.11.4.1 | AMP-Core Optimization in the Cloud Year 2 |
| | Task Area 11 Total |
| CPFF | 1.4.12 | Cloud Migration Support |
| | Task Area 12 Total |
| | TOTAL HOURS |
Mapping
| Fund Type | Requirement | Analogous Effort | Complexity Factor |
| TWCF OPS | 1.3.2.1 - TFA Support Team On-Site Support | FY22 TO12 1.3.2.1 | 1.00 |
| TWCF OPS | 1.3.2.2 - Technical Support for Studies and Analyses/DESS Thread Test Support | FY22 TO13 1.3.3.2 | 1.00 |
| TWCF OPS | 1.3.3.1 - Requirements Management Plan | FY22 TO13 1.3.3.1 | 1.00 |
| TWCF OPS | 1.3.3.2 - Requirements Traceability | FY22 TO13 1.3.3.2 | 1.00 |
| TWCF OPS | 1.3.3.3 - Software Requirement Specification | FY22 TO13 1.3.3.3 | 1.00 |
| TWCF OPS | 1.3.4.1 - General Development Support | FY22 TO12 1.3.4.1 | 1.00 |
| TWCF OPS | 1.3.4.2.1 - Contractor's Test and Evaluation Process | FY22 TO12 1.3.4.2.1 | 1.00 |
| TWCF OPS | 1.3.4.2.2 - Contractor Support Government Participation in Test Events | FY22 TO12 1.3.4.2.2 | 1.00 |
| TWCF OPS | 1.3.4.2.3 - TRR and ORR Support | FY22 TO12 1.3.4.2.3 | 1.00 |
| TWCF OPS | 1.3.4.2.4 - Contractor Support during Government Testing | FY22 TO12 1.3.4.2.4 | 1.00 |
| TWCF OPS | 1.3.4.3 - Software Releases | FY22 TO12 1.3.4.3 | 1.00 |
| TWCF OPS | 1.3.5.1 - AMP TFA Software Maintenance | FY22 TO12 1.3.5.1 | 1.50 |
| TWCF OPS | 1.3.7.1 - Security Engineering Requirements | FY22 TO12 1.3.7.1 | 1.00 |
| TWCF OPS | 1.3.7.2.1 - Secure Software | FY22 TO12 1.3.7.2.1 | 1.00 |
| TWCF OPS | 1.3.7.2.2 - Security Testing | FY22 TO12 1.3.7.2.2 | 1.00 |
| TWCF OPS | 1.3.7.2.3 - DISA SRGs and STIGs Compliance | FY22 TO12 1.3.7.2.3 | 1.00 |
| TWCF OPS | 1.3.7.4 - Risk Management Framework Support | FY22 TO12 1.3.7.4 | 1.00 |
| TWCF OPS | 1.3.10.4 - Reports Enhancements | FY22 TO12 1.3.10.1 | 1.50 |
| TWCF OPS | 1.3.10.5 - Concurrent Editing | FY21 TO12 1.3.11.7 | 0.25 |
| TWCF OPS | 1.3.10.6 - Query Advanced | FY22 TO12 1.3.10.1 | 1.00 |
| TWCF CAP | 1.3.11.30 - TPFDD Editing Functions | FY22 TO12 1.3.11.26 | 0.75 |
| TWCF CAP | 1.3.11.31 - Modeling and Analysis | FY22 TO12 1.3.11.28 | 1.00 |
| TWCF CAP | 1.3.11.32 - Other Tools | FY22 TO12 1.3.11.28 | 0.75 |
| TWCF CAP | 1.3.11.33 - Airlift Operations | FY22 TO12 1.3.11.21 | 1.00 |
| TWCF CAP | 1.3.11.34 - Sealift Operations | FY22 TO12 1.3.11.22 | 2.00 |
| TWCF CAP | 1.3.11.35 - Surface Operations | FY22 TO12 1.3.11.25 | 0.50 |
| TWCF CAP | 1.3.11.36 - Sustainment | FY22 TO12 1.3.11.25 | 0.25 |
| TWCF CAP | 1.3.11.37 - Send Email via AMP-TFA Application | FY21 TO12 1.3.11.7 | 0.25 |