AFRL RISE 2808a AOI: Facility Alteration & Space Optimization – Bombers Directorate Hallway Project (Bldg 556)

Open Solicitation Posted

Solicitation number
FA2396-27-9CTBD
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Ohio 45432, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Materiel Command Research Laboratory (Air Force Research Laboratory) is soliciting proposals for the Facility Alteration & Space Optimization Bombers Directorate Hallway Project, with Step 1 proposals due December 4, 2026 at 17:00 EST. The procurement is an Accelerated Two-Step Down-Select issued under the AFRL RISE parent notice FA8652279-RISE pursuant to 10 U.S.C. 2808a, and no set-aside is used. Mandatory qualifications require prior Wright-Patterson AFB experience. Step 1 requires a streamlined commercial proposal of no more than 5 pages, and Step 2 is direct award negotiation with the highest-ranked offeror toward a firm-fixed-price milestone payment award.

Work is performed in the 2nd Floor hallway of Building 556, Acquisition Management Complex, Wright-Patterson Air Force Base, with a place of performance listed as Kettering, OH 45432. Scope includes bomber-themed environmental wall graphics, heraldry shields, UV-resistant structural scale models of B-52, B-1, B-2, and B-21 aircraft, historical elements, painting, architectural finishes, and decals, using existing space and structures. The project must be completed within 90 calendar days of award across three stages: Design Plan (30 days), Sourcing & Fabrication (60 days), and Physical Implementation & Closeout (90 days). On-site installation may not exceed 30 calendar days from physical site commencement and may not restrict 2nd Floor restroom access for more than 30 contiguous minutes. Government-provided site utilities are at no cost.

Compliance requirements include a 100% U.S. citizenship requirement with Tier 1 background checks, a Buy American preference for non-COTS materials, Davis-Bacon wage rates under General Decision OH20260081 with certified payrolls, and CMMC Level 1 cybersecurity standards. The notice prohibits specified foreign equipment and software, including ByteDance/TikTok, Kaspersky Lab, Huawei, ZTE, Hytera, Dahua, Hikvision, and certain unmanned aircraft systems. Commercial general liability insurance is required at $1 million per occurrence and $2 million aggregate. Bonding and liquidated damages are waived.

Evaluation prioritizes mandatory qualifications and Wright-Patterson AFB experience, schedule execution risk, site logistics and disruption mitigation in an occupied military headquarters, safety and structural attachment methodology, and access, security, and public release compliance.

Submissions go to AFRL.2808a.inbox@us.af.mil, the same address used for a pre-proposal site walkthrough, available with 3 business days' notice. Agreements Officer Megan Rosenbeck (AFRL/RMZ) administers the action. The NAICS code is 236220, Commercial and Institutional Building Construction, and the PSC is Z1JZ, Maintenance of Miscellaneous Buildings.

Notice text

This Area of Interest (AOI) is issued under the Air Force Research Laboratory (AFRL) Rapid Infrastructure for Science and Experimentation ('RISE') parent notice FA8652279-RISE pursuant to 10 U.S.C. § 2808a. Refer to the attached AOI document and attachments for submission instructions, technical requirements, and assessment criteria.

To optimize the work environment and facility functionality for personnel in the 2nd Floor hallway of Building 556, Acquisition Management Complex, Wright-Patterson Air Force Base, Ohio. This project transforms an existing standard entrance hallway into a modern, motivating environment that reinforces the strategic deterrence mission and heritage of the USAF Bombers community through bomber-specific environmental wall graphics, heraldry shields, structural scale models, historical elements, painting, architectural finishes, decals, and visual enhancement using existing space and structures.

Target Timeline: The entire project must be completed within ninety (90) calendar days of award: Stage 1 Design Plan (30 days), Stage 2 Sourcing & Fabrication (60 days), and Stage 3 Physical Implementation & Closeout (90 days). On-site physical installation shall not exceed thirty (30) calendar days from physical site commencement and shall not restrict access to 2nd Floor restroom facilities for more than thirty (30) contiguous minutes.

Files

File Type Posted
2808a_OT_Articles_Bombers_Hallway_Project_FINAL.pdf PDF
Bombers Heritage Hall diagram.pptx PPTX presentation
AOI Final OT Bombers.pdf PDF
Bombers Heritage Hall PWS - 13 Nov 26.docx DOCX document

Similar open opportunities

Opportunity Agency Set-aside Responses due
Facility 30011 - Facility Signage Update Wright Patterson AFB, Ohio, United States · NAICS 339950 AFLCMC Wright Patterson AFB Total Small Business
Pioneering Aerospace Capabilities, Engineering and Research United States · NAICS 541715 Air Force Research Laboratory No set-aside
Progressive Design-Build (PDB) - RENOVATE HQ AFMC B/10262 PH 2 at WPAFB Wright Patterson AFB, Ohio, United States · NAICS 236220 ENDIST Louisville No set-aside
WWYK250063 - install react VII facility, B9001, post V19 Tinker AFB, Oklahoma 73145, United States · NAICS 236220 Air Force Sustainment Center Woman-Owned Small Business
Request for White Paper - ICD 705 Compliant Trailers Arnold AFB, Tennessee 37389, United States · NAICS 541330 Air Force Test Center No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors