127EAX24Q0005 – Coconino NF FSR 141/141H Haul and Spread Resurfacing Project
Closed Solicitation Posted
- Solicitation number
- 127EAX24Q0005
- Agency
-
Region 3 - Southwestern Region
Forest Service, Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Happy Jack, Arizona 86024, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of Agriculture Forest Service R3-Southwestern Region is seeking offers for a construction project to recondition and resurface approximately 5.34 miles of Forest Service Roads 141H and 123 in Arizona's Coconino National Forest. The work includes reconditioning ditches, shoulders, roadbeds, and aggregate surfaces, as well as cleaning and replacing culverts. The project will utilize government-sourced crushed aggregate from the Cinch Hook Pit. The government anticipates awarding a firm fixed-price contract using a best value tradeoff evaluation, considering price and technical factors. Offers are due by March 12, 2024, and questions must be submitted to the Contracting Officer by February 27, 2024.
This is a 100% small business set-aside under NAICS code 237310 for Highway, Street & Bridge Construction, with an estimated contract value between $500,000 and $1,000,000. Davis-Bacon prevailing wage rates apply, and payment and performance bonds are required. The project is located approximately 50 miles south of Flagstaff, Arizona, and the selected contractor will have a period of performance to complete the work.
Notice text
2 versions
Update #2 · Latest ·
127EAX24Q0005 – Coconino NF FSR 141/141H Haul and Spread Resurfacing Project
Description of Work: Construction
This project will consist of reconditioning and resurfacing with crushed aggregate approximately 5.34 miles of FSR 141H and 0.11 miles of FSR 123 with three options to recondition and resurface with crushed aggregate approximately 1.00 miles of FSR 141 and replace and install culverts within the FSR 141H and FSR 123 project bounds. Work will consist of reconditioning ditches, shoulders, roadbeds, aggregate surfaces, and the roadway. Cleaning culverts, culvert inlet and outlets, and lead off ditches. Removing and replacing corrugated metal pipe culvert. Installing corrugated metal pipe culvert at new locations. This project will utilize a government sourced crushed aggregate located at the Cinch Hook Pit, which is accessed from the junction of AZ-87 and AZ-260, on the south side of AZ-87.
Location:
This project is located within the Mogollon Rim Ranger District of Coconino National Forest. The project begins approximately 50 miles South of Flagstaff, from the AZ-87 State Highway to FSR 141 proceeding East and South to the 141H intersection. FSR 141H is an aggregate surfaced road used for recreational activities and timber sales. FSR 123 and FSR 141 are similarly surfaced and utilized.
Basis for Award: The Government Anticipates awarding a Firm Fixed-Price Contract using RFQ Best Value-Technically Acceptable: Award will be made to the offer that meets or exceeds the requirements contained herein, at the price that is most advantageous to the government will be determined to be the best value. Price reasonableness will be determined by using competitive solicitation process.
No Site Visit has been scheduled
Contact:
Contracting Officer Representative (COR): Taylor Connolly, Taylor.Connolly@usda.gov
This project is a 100% Small Business Set-Aside.
NAICS CODE 237310 Highway, Street & Bridge Construction
Magnitude of project is between $250,000 and $500,000 (corrected 2/7/202)
Davis-Bacon wages apply.
Payment and Performance bonds are required.
Send questions to: michelle.l.bahr@usda.gov no later than February 27, 2024, at 1:00 pm MT.
In order to be eligible for award of a Federal Contract, potential vendors need to be registered and active in the System for Award Management (SAM) www.sam.gov at the time of offer submission.
Offer Submissions: Offerors shall submit the Return Packet – including a Business Package and a Technical Package. The required information SF1442, Section B and K (business package) and Section M (technical Package) of the solicitation. Offers or responses to the solicitation (include the solicitation number in the name of the document 127EAX24Q0005) may be sent to the Contracting officer by email: michelle.l.bahr@usda.gov before the deadline.
The Deadline for receipt of responses to the RFQ shall be March 12, 2024 @ 1:00 pm MT.
No Further information is available at this time. The complete solicitation package will be attached and made available only through SAM.gov, https://sam.gov/content/home on or about 15 days of this notice (January 24, 2024). Anyone wishing to participate in this proposed procurement must obtain their copy from SAM.gov. Copies will not be mailed from the Contracting Office. All amendments will be posted on SAM.gov.
Update #1 ·
127EAX24Q0005 – Coconino NF FSR 141/141H Haul and Spread Resurfacing Project
Description of Work: Construction
This project will consist of reconditioning and resurfacing with crushed aggregate approximately 5.34 miles of FSR 141H and 0.11 miles of FSR 123 with three options to recondition and resurface with crushed aggregate approximately 1.00 miles of FSR 141 and replace and install culverts within the FSR 141H and FSR 123 project bounds. Work will consist of reconditioning ditches, shoulders, roadbeds, aggregate surfaces, and the roadway. Cleaning culverts, culvert inlet and outlets, and lead off ditches. Removing and replacing corrugated metal pipe culvert. Installing corrugated metal pipe culvert at new locations. This project will utilize a government sourced crushed aggregate located at the Cinch Hook Pit, which is accessed from the junction of AZ-87 and AZ-260, on the south side of AZ-87.
Location:
This project is located within the Mogollon Rim Ranger District of Coconino National Forest. The project begins approximately 50 miles South of Flagstaff, from the AZ-87 State Highway to FSR 141 proceeding East and South to the 141H intersection. FSR 141H is an aggregate surfaced road used for recreational activities and timber sales. FSR 123 and FSR 141 are similarly surfaced and utilized.
Basis for Award: The Government Anticipates awarding a Firm Fixed-Price Contract using RFQ Best Value-Technically Acceptable: Award will be made to the offer that meets or exceeds the requirements contained herein, at the price that is most advantageous to the government will be determined to be the best value. Price reasonableness will be determined by using competitive solicitation process.
No Site Visit has been scheduled
Contact:
Contracting Officer Representative (COR): Taylor Connolly, Taylor.Connolly@usda.gov
This project is a 100% Small Business Set-Aside.
NAICS CODE 237310 Highway, Street & Bridge Construction
Magnitude of project is between $500,000 and $1,000,000.
Davis-Bacon wages apply.
Payment and Performance bonds are required.
Send questions to: michelle.l.bahr@usda.gov no later than February 27, 2024, at 1:00 pm MT.
In order to be eligible for award of a Federal Contract, potential vendors need to be registered and active in the System for Award Management (SAM) www.sam.gov at the time of offer submission.
Offer Submissions: Offerors shall submit the Return Packet – including a Business Package and a Technical Package. The required information SF1442, Section B and K (business package) and Section M (technical Package) of the solicitation. Offers or responses to the solicitation (include the solicitation number in the name of the document 127EAX24Q0005) may be sent to the Contracting officer by email: michelle.l.bahr@usda.gov before the deadline.
The Deadline for receipt of responses to the RFQ shall be March 12, 2024 @ 1:00 pm MT.
No Further information is available at this time. The complete solicitation package will be attached and made available only through SAM.gov, https://sam.gov/content/home on or about 15 days of this notice (January 24, 2024). Anyone wishing to participate in this proposed procurement must obtain their copy from SAM.gov. Copies will not be mailed from the Contracting Office. All amendments will be posted on SAM.gov.
Files
| File | Type | Posted |
|---|---|---|
| 127EAX24Q0005 -141 - 141 H Haul and Spread - Award Notice - Pima Revised.pdf | ||
| 127EAX24Q0005 -141 - 141 H Haul and Spread - Award Notice - AGE.pdf | ||
| 127EAX24Q0005 Amendment I FSR 141 and 141H Haul and Spread Resurfacing.pdf | ||
| 127EAX24Q0005 - FSR 141 141H Haul and Spread Resurfacing Project - Solicitation.pdf | ||
| FSR 141 141H H and S Resurfacing Drawings.pdf | ||
| COF Industrial Fire Plan Guidelines.docx | DOCX document | |
| Wage Determination AZ20240008.docx | DOCX document | |
| SOW.docx | DOCX document | |
| FSSS 141 141H Haul and Spread Resurfacing.docx | DOCX document | |
| SOI.xlsx | XLSX spreadsheet | |
| BioPreferred.docx | DOCX document |
Show all 11
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business | |
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| AZ BL COLO 7528(1) Burro Creek Road | Federal Highway Administration | Total Small Business | |
| ID-kooskia NFH-gravel project | — | Total Small Business | |
| Chino Emergency Repairs | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity