This solicitation package outlines requirements for a federal construction contract to recondition and resurface forest roads in Arizona. The solicitation seeks bids to recondition approximately 5.45 miles of FSR 141H and FSR 123 with crushed aggregate base course and perform compaction work. It includes three options to perform additional work on segments of FSR 141. The work will utilize government-sourced aggregate from the Cinch Hook Pit and involves roadbed, shoulder, ditch, and surface reconditioning along with culvert replacement and installation. The solicitation was issued by the USDA Forest Service Southwestern Region and has a performance period of 100% small business set-aside with an anticipated award value between $500,000 to $1,000,000. Offer submissions are due by March 12, 2024 and shall include completed Sections B, K, and M of the solicitation package. The solicitation number is 127EAX24Q0005. Davis-Bacon wage rates and payment and performance bonds are required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

estimate

MOGOLLON RIM RANGER DISTRICT/COCONINO NF
FSR 141/141H HAUL & SPREAD SURFACING PROJECT
WORKPLAN NO: 671085
SCHEDULE OF ITEMS
PROJECTNFSR 141H Recondititioning and Resurfacing
UNITMogollon Rim Ranger District
SOLICITATION #
BASE: FSR 141H & FSR 123
151MobilizationLSQ1.00LS
301Untreated Aggregate Course - 4" (compacted in place) aggregate base course, compaction method A per FSSS 301.05, material government sourced from Cinch Hook Pit.CQ5.45MI
303Road Reconditioning, Compaction Method 3 per FSSS 204.11CQ5.45MI
TOTAL BASE
Option 1: FSR 141H & FSR 123 Culvert Replacement and New Installations
Method ofEstimatedEstimated
Pay ItemDescriptionMeasureQuantityPay UnitUnit CostTotal
602(1)Culvert - Remove existing culvert. Install squash CMP culvert, 24" x 35' Galvanized, 16 Gauge. Compaction Method 6 per FSSS 209.10.CQ1.00EA
602(2)Culvert - Install squash CMP culvert, 24" x 32' Pipe Galvanized, 16 Gauge. Compaction Method 6 per FSSS 209.10.CQ2.00EA
602(3)Culvert - Remove existing culvert. Install Squash CMP culvert, 24" x 36' Galvanized, 16 Gauge. Compaction Method 6 per FSSS 209.10.CQ1.00EA
602(4)Culvert - Remove existing culvert. Install squash CMP culvert, 24" x 30' Pipe galvanized, 16 gauge. Compaction method 6 per FSSS 209.10CQ1.00EA
602(5)Culvert - Remove existing culvert. Install CMP culvert, 30" x 34' galvanized, 16 gauge. Compaction method 6 per FSSS 209.10.CQ1.00EA
602(6)Culvert - Install squash CMP culvert, 24" x 35' galvanized, 16 gauge. Compaction method 6 per FSSS 209.10CQ1.00EA
TOTAL OPTION 1
Option 2: FSR 141 (MP 7.48 to 141H Intersection)
Method ofEstimatedEstimated
Pay ItemDescriptionMeasureQuantityPay UnitUnit CostTotal
301Untreated Aggregate Course - 4" (compacted in place) aggregate base course, compaction method A per FSSS 301.05, material government sourced from Cinch Hook Pit.CQ0.50MI
303Road Reconditioning, Compaction Method 3 per FSSS 204.11CQ0.50MI
TOTAL OPTION 2
Option 3: FSR 141 (MP 6.98 to MP 7.48)
Method ofEstimatedEstimated
Pay ItemDescriptionMeasureQuantityPay UnitUnit CostTotal
301Untreated Aggregate Course - 4" (compacted in place) aggregate base course, compaction method A per FSSS 301.05, material government sourced from Cinch Hook Pit.CQ0.50MI
303Road Reconditioning, Compaction Method 3 per FSSS 204.11CQ0.50MI
TOTAL OPTION 2
TOTAL OPTIONS
TOTAL BASE + OPTIONS