WR Determination ME20260051 5-18-2026 - Penobscot.pdf
PDF 1 MB Posted
- Attached to
- Z2DB--402-26-C09 Bangor Lewiston UPS Install
- Solicitation number
- 36C24126Q0607
About this file
This is a General Decision document (ME20260051) issued by the U.S. Department of Labor's Wage and Hour Division, establishing prevailing wage rates for federal construction contracts in Penobscot County, Maine. The decision covers building construction projects and applies to all contracts subject to the Davis-Bacon Act awarded on or after January 1, 2017.
The document specifies prevailing wage rates and fringe benefit rates for multiple trade classifications including carpenters ($30.56/hour with $19.96 fringes), electricians ($38.74/hour with $21.14 fringes), ironworkers ($33.65/hour with $26.27 fringes), laborers ($21.90/hour with $19.72 fringes), masons ($22.15/hour with $19.72 fringes), pipefitters ($43.76/hour with $25.44 fringes), plumbers ($40.00/hour with $24.71 fringes), and equipment operators/cement masons/bricklayers (ranging from $20.00 to $33.00/hour with varying fringes). Rates are identified by classification codes indicating whether they derive from union negotiations, weighted union averages, survey data, or state-adopted rates. The decision notes that Executive Orders 13706 and 13658 regarding paid sick leave apply to covered contracts. Unlisted classifications may be added after award in accordance with labor standards contract clauses. The document was initially published January 2, 2026, with a modification issued May 18, 2026, and includes procedures for wage determination appeals through the Department of Labor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24126Q0607 0002.docx | DOCX document | |
| Attachment 3 Bangor 1 Line Diagram REV A.pdf | ||
| Site Visit sign in sheet.pdf | ||
| Attachment 2 Lewiston 1 Line diagram REV A.pdf | ||
| 36C24126Q0607 0001.docx | DOCX document | |
| Attachment 5 Bangor Floor Plan.pdf | ||
| Attachment 6 Mitsubishi UPS.pdf | ||
| WR Determination ME20260004 5-18-2026 - Androscoggin.pdf | ||
| Attachment 2 Lewiston 1 line diagram.pdf | ||
| Attachment 3 Bangor 1 Line Diagram.pdf | ||
| 36C24126Q0607_Solicitation.docx | DOCX document | |
| PCRA.pdf | ||
| Attachment 4 Lewiston Floor Plan.pdf | ||
| 402-26-C09 Bangor Lewiston UPS replacement SOW.docx | DOCX document | |
| Attachmemt 1 Specifications.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .