Attachment 2 Lewiston 1 line diagram.pdf

PDF 521 KB Posted

Attached to
Z2DB--402-26-C09 Bangor Lewiston UPS Install
Solicitation number
36C24126Q0607
Issued by

About this file

This document is a technical schematic diagram for a new facility project. The project involves construction of a community-based outpatient clinic located at 8519 West Greenfield Avenue in Wauwatosa, Wisconsin, with the owner listed as Summit Health Healthcare Facilities. The schematic shows the architectural and engineering layout of the facility, including multiple interconnected spaces, mechanical systems, electrical infrastructure, and plumbing configurations depicted through standard technical drawing symbols and notations. The diagram displays various building sections arranged vertically and horizontally, with detailed component specifications, connection points, and system routing throughout the facility footprint. This appears to be a preliminary design or bid document schematic intended to communicate the facility's technical requirements and spatial organization to potential contractors or stakeholders during the procurement or planning phase of the project.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .