Attachment 2 Lewiston 1 Line diagram REV A.pdf
PDF 469 KB Posted
- Attached to
- Z2DB--402-26-C09 Bangor Lewiston UPS Install
- Solicitation number
- 36C24126Q0607
About this file
This document is a one-line electrical system diagram for NESLA Section 2, titled "NESLA sec 2" and designated as drawing E4.01. The diagram illustrates the interconnected electrical architecture and component relationships within the system, featuring multiple subsystems and distribution points organized hierarchically from primary power sources through various switchgear, transformers, and load centers to individual circuits and equipment terminals.
The schematic includes sheet notes and revisions sections, standard electrical symbology for switches, breakers, transformers, and disconnect devices, and reference callouts linking to related electrical drawings and specifications. The diagram contains technical notations for wire gauges, voltage specifications, and equipment ratings throughout the distribution network. The document also features company branding and titling blocks in the lower right corner, indicating this is a formally prepared technical document prepared according to industry drafting standards. This appears to be a technical drawing provided as reference material rather than a solicitation document or contract opportunity specification.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NESLA sec 2
VHATOGBICKFS
Line
File details come from the government source that posted it. Updated .