WORK_DIRECTIVE_CHANGE.pdf
PDF 48 KB Posted
- Attached to
- 2026 Rock Salt for Drinking Water Softening
- Solicitation number
- IFB-2024-027
- Issued by
- Hamilton County, Indiana
About this file
This document is a Work Directive Change form from the City of Carmel's Board of Public Works and Safety, designed to authorize modifications to an existing contract or project. The form provides a template for documenting changes to project specifications, work scope, or contract terms, with designated spaces for detailing the specific work covered by the directive, reasons for the change, authorization details, potential contract change order amount, and potential impacts on project completion date. Signature lines are included for the owner's representative, city officials, and the city engineer.
The form is a standardized administrative document that allows flexible documentation of project modifications, with provisions for tracking changes through official channels. It includes signature lines for Laura Campbell (Presiding Officer), James Barlow and Alan Potasnik (Board Members), and Brad Pease (City Engineer), with an attestation line for Jacob Quinn (Clerk). The document is version dated 2024-09-23, suggesting it is a current administrative template for managing contract or project adjustments within the City of Carmel's municipal governance process.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: WORK DIRECTIVE CHANGE NO.______________
DATE: ______________________________________
PROJECT NAME:_____________________________
PROJECT NO.: _______________________________
Specification Reference
Drawing Reference:
DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE:
REASON FOR THIS ORDER:
AUTHORIZATION:
THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS
OUTLINED. A Contract Change Order in the amount of $______________ will be issued to you in the near future to cover this Work Directive Change.
PROJECT COMPLETION DATE: ADD/DEDUCT/UNCHANGED ___________ DAYS.
By:_______________________________ Approved By:
Owner’s Representative
CITY OF CARMEL
BOARD OF PUBLIC
WORKS AND SAFETY
By:__________________________
Laura Campbell, Presiding Officer
By:__________________________ James Barlow, Member
By:__________________________ Alan Potasnik, Member
By:__________________________ Brad Pease, PE, City Engineer
DATE:_______________________
ATTEST:
DATE:_______________________
Jacob Quinn, Clerk
Version 2024-09-23
File details come from the government source that posted it. Updated .