This document is a Ground Penetrating Radar (GPR) and potholing utility investigation report prepared by Aragon Geotechnical, Inc. for the San Bernardino County Department of Public Works, Special Districts in support of the proposed Wildland Firefighting Helitanker Station project located at Glen Helen Regional Park Well 5 (Glen Helen Road and Forest Lane, San Bernardino, California 92407). The investigation was conducted on July 9 and 10, 2026, by 3 Thirteen Subsurface using GPR utility locating and potholing services. The scope of work identified the existing water service line's alignment, depth, size, direction of travel, and lateral connections. Six pothole locations (P1 through P6) were excavated to verify and document subsurface utilities, with depths ranging from 2.32 feet to 3.54 feet below existing ground surface. The water line was identified as a 10-inch diameter pipe constructed of both PVC and concrete thrust block materials, running in multiple directions (NE/SW, N/S, and NW/SE) across the project site. All potholed locations have been documented with photographs, cross-section diagrams, and precise GPS coordinates referenced to the ASCE 38-02 Standard Guideline for utility data classification.

The report classifies utility information using Utility Quality Level A (QL-A) for physically exposed utilities at pothole locations, providing the highest level of confidence for horizontal and vertical positioning. The investigation was performed under strict compliance with California Government Code Section 4216-4216.9 regarding safe location of underground utilities. The report includes a partial underground utility map with six sheets showing pothole locations, utility alignments, and related infrastructure features. The document explicitly disclaims that 3 Thirteen Subsurface provides utility mapping services only and does not offer engineering consultation, design, or construction services. Clients are advised to seek licensed engineering professionals for design and engineering-related inquiries and to conduct independent verification of utility locations, particularly for critical construction or excavation areas. The investigation deliverables support the design and construction planning phases of the helitanker station project by providing documented subsurface utility information to prevent damage during future excavation and construction activities.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A RAGÓN G EOTECHNICAL , INC .

Consultants in the Earth & Material Sciences

16801 Van Buren Blvd., Bldg. B Riverside, CA 92504 Tel: 951.776.0345 ● Fax: 951.776.0395 www.aragongeo.com

July 20, 2026 AGI Project No. 5291-TR

San Bernardino County Department of Public Works Special Districts 222 W. Hospitality Lane, 2nd Floor San Bernardino, CA 92415

Attention: Mr. Mauricio Rodriguez

Subject: Report of limited Water Line Investigation Wildland Firefighting Helitanker Station San Bernardino County, California.

Mr. Rodriguez:

Aragón Geotechnical, Inc. (AGI) is pleased to submit the attached utility investigation report prepared in support of the proposed Wildland Firefighting Helitanker Station project at Glen Helen Regional Park Well 5. The requested scope of work consisted of identifying the existing water service line, including its approximate alignment, depth, size, direction of travel, and laterals.

Ground penetrating radar (GPR) utility locating and potholing services were performed by

3 Thirteen Subsurface, on July 9 and 10, 2026. AGI personnel were present on July 10, 2026, to observe the potholing operations during the field investigation.

The attached report prepared by 3 Thirteen Subsurface summarizes the GPR survey, potholing activities, and the resulting utility information. AGI is transmitting the report as part of our project deliverables. The technical findings regarding utility locations, depths, and related observations are based on the work performed by 3 Thirteen Subsurface.

San Bernardino County Public Works July 20, 2026 Project No. 5291-TR Page No. 2

ARAGÓN GEOTECHNICAL, INC.

CLOSURE

This report has been prepared for San Bernardino County Public Works, Special Districts for the subject site described herein. This report may not be warranted for the use or purpose of other projects and parties. All professional services provided in connection with the testing herein reported have complied with generally accepted practice in the field of geotechnical and pavement engineering. This warranty is in lieu of all other warranties, either express or implied.

Thank you very much for the opportunity to be of service on this project. Please call us at (951) 776-0345 if we may be of further assistance.

Respectfully submitted, ARAGÓN GEOTECHNICAL, INC.

James Burling, C. Fernando Aragon, P.E., G.E.

Staff Engineer, E.I.T. 180061 Geotechnical Engineer, RGE 2994

Distribution: via email: Mauricio.Rodriguez@dpw.sbcounty.gov

Attachments: 3 Thirteen Subsurface Report

Mauricio.Rodriguez@dpw.sbcounty.gov Fernando Aragon

RCE 2028

Office: 888.988.1011

Pothole Investigation Report

26-10449

Date:

07/10/2026

Technician:

Cole Kurimay

Project No.:

26-10449

Project Name:

Wildland Firefighting Helitanker Station Project

Project Address:

Glen Helen Rd & Forest Ln

San Bernardino, CA, 92407

Client:

Aragon Geotechnical, Inc.

Comments: Depths are measured from exisitng ground surface at time of work, to the top of the utility. Potholes were completed at client-specified locations. Utility size and material are visually estimated and may vary.

PH No. Utility Size (in)

Material Top Depth (ft)

Direction Location Surface

P1 Water 10 Concrete Thrust Block

2.32 NE/SW North East Area of Jobsite at First

“45” From Pump Station

Soil

P2 Water 10 PVC 2.74 N/S North East Area of Jobsite South of First “45” From Pump Station

Soil

P3 Water 10 Concrete Thrust Block

3.04 N/S West Side of Jobsite at Second “45”

in Water Pipes Path Direction

Soil

P4 Water 10 PVC 3.18 NW/SE West Side of Jobsite South East of Second “45” in Water Pipes Path

Direction

Soil

P5 Water 10 PVC 3.54 NW/SE Approximate Middle Point of NW/ SE Water Pipe Run, Parallel to Glen

Helen Rd

Soil

P6 Water 10 PVC 3.24 NW/SE Furthest Point South of Property Where Water Pipe is Existing PL

Soil

Project No.: 26-10449 www.313subsurface.com 2

Project Name: Wildland Firefighting Helitanker Station Project

Project Address: Glen Helen Rd & Forest Ln, San Bernardino

Top:

Bottom:

Diameter:

Utility:

Material:

(feet)

(feet)

(in)

Surface Type:

www.313subsurface.com

Soil

3.32

Water

Concrete Thrust Block

Surface Thickness: (feet)N/A

Direction: NE/SW

Cross Section (not to scale) Measured Distance From Exisiting Surface

PH No.: P1

Approximate Location Coordinates:

(34.2199696, -117.4151343)

North East Area of Jobsite at First “45” From Pump Station

Location:

Project No.: 26-10449

2.32

Notes:

Exposed top of thrust block at “45” based on GPR markings. See P2

Report for pipe verification.

Date: 07/10/2026

Technician: Cole Kurimay Project No.: 26-10449

Project Name: Wildland Firefighting Helitanker Station Project

Client: Aragon Geotechnical, Inc.

Comments:

Photo 1 Photo 2

Photo 3 Photo 4 www.313subsurface.com 4Project No.: 26-10449

PH No. 1 Utility: Water

Diameter(in): 10

Material: Concrete Thrust Block

Top Depth(ft): 2.32 Direction: NE/SW

Diameter:

Utility:

Material:

(feet)

(feet)

(in)

Surface Type:

www.313subsurface.com

Soil

3.57

Water

PVC

Surface Thickness: (feet)N/A

Direction: N/S

Cross Section (not to scale) Measured Distance From Exisiting Surface

PH No.: P2

Approximate Location Coordinates:

(34.2199696, -117.4151343)

North East Area of Jobsite South of First “45” From Pump Station

Location:

Project No.: 26-10449

2.74

Notes:

Date: 07/10/2026

Technician: Cole Kurimay Project No.: 26-10449

Project Name: Wildland Firefighting Helitanker Station Project

Photo 3 Photo 4 www.313subsurface.com 6Project No.: 26-10449

PH No. 2 Utility: Water

Diameter(in): 10

Material: PVC

Top Depth(ft): 2.74 Direction: N/S

Diameter:

Utility:

Material:

(feet)

(feet)

(in)

Surface Type:

www.313subsurface.com

Soil

3.87

Water

Concrete Thrust Block

Surface Thickness: (feet)N/A

Direction: N/S

Cross Section (not to scale) Measured Distance From Exisiting Surface

PH No.: P3

Approximate Location Coordinates:

(34.2193578, -117.4150759)

West Side of Jobsite at Second “45” in Water Pipes Path Direction

Location:

Project No.: 26-10449

3.04

Notes:

Exposed top of thrust block at “45” based on GPR markings. See P2

Report for pipe verification.

Date: 07/10/2026

Technician: Cole Kurimay Project No.: 26-10449

Project Name: Wildland Firefighting Helitanker Station Project

Photo 3 Photo 4 www.313subsurface.com 8Project No.: 26-10449

PH No. 3 Utility: Water

Diameter(in): 10

Material: Concrete Thrust Block

Top Depth(ft): 3.04 Direction: N/S

Diameter:

Utility:

Material:

(feet)

(feet)

(in)

Surface Type:

www.313subsurface.com

Soil

4.01

Water

PVC

Surface Thickness: (feet)N/A

Direction: NW/SE

Cross Section (not to scale) Measured Distance From Exisiting Surface

PH No.: P4

Approximate Location Coordinates:

(34.2193578, -117.4150759)

West Side of Jobsite South East of Second “45” in Water Pipes Path Direction

Location:

Project No.: 26-10449

3.18

Notes:

Date: 07/10/2026

Technician: Cole Kurimay Project No.: 26-10449

Project Name: Wildland Firefighting Helitanker Station Project

Photo 3 Photo 4 www.313subsurface.com 10Project No.: 26-10449

PH No. 4 Utility: Water

Diameter(in): 10

Material: PVC

Top Depth(ft): 3.18 Direction: NW/SE

Diameter:

Utility:

Material:

(feet)

(feet)

(in)

Surface Type:

www.313subsurface.com

Soil

4.37

Water

PVC

Surface Thickness: (feet)N/A

Direction: NW/SE

Cross Section (not to scale) Measured Distance From Exisiting Surface

PH No.: P5

Approximate Location Coordinates:

(34.2178324, -117.4138445)

Approximate Middle Point of NW/SE Water Pipe Run, Parallel to Glen Helen Rd

Location:

Project No.: 26-10449

3.54

Notes:

Date: 07/10/2026

Technician: Cole Kurimay Project No.: 26-10449

Project Name: Wildland Firefighting Helitanker Station Project

Photo 3 Photo 4 www.313subsurface.com 12Project No.: 26-10449

PH No. 5 Utility: Water

Diameter(in): 10

Material: PVC

Top Depth(ft): 3.54

Diameter:

Utility:

Material:

(feet)

(feet)

(in)

Surface Type:

www.313subsurface.com

Soil

4.07

Water

PVC

Surface Thickness: (feet)N/A

Direction: NW/SE

Cross Section (not to scale) Measured Distance From Exisiting Surface

PH No.: P6

Approximate Location Coordinates:

(34.2162554, -117.4126294)

Furthest Point South of Property Where Water Pipe is Existing PL

Location:

Project No.: 26-10449

3.24

Notes:

Date: 07/10/2026

Technician: Cole Kurimay Project No.: 26-10449

Project Name: Wildland Firefighting Helitanker Station Project

Photo 3 Photo 4 www.313subsurface.com 14Project No.: 26-10449

PH No. 6 Utility: Water

Diameter(in): 10

Material: PVC

Top Depth(ft): 3.24

1 3 4 5 62

A

B

D

E

F

1 3 4 5 62

C

A

B

D

E

F

C

PARTIAL UNDERGROUND UTILITY MAP FOR:

WILDLAND FIREFIGHTING

HELITANKER STATION

GLEN HELEN RD. & FOREST LN.

SAN BERNARDINO, CA 92407

ARAGON GEOTECHNICAL, INC.

16801 VAN BUREN BLVD., BUILDING B

RIVERSIDE, CA 92504

3 thirteen, Inc.

4160 TEMESCAL CANYON RD

SUITE 401

CORONA, CA 92883

T / F - 1.888.899.1011 info@313subsurface.com www.313subsurface.com

The services performed by 3 thirteen, Inc. does not relieve the Client and/or property owner of their responsibility to comply with California Government Code §64216-4216.9. The Client and/or property owner acknowledges and agrees that the services provided by 3 thirteen, Inc. are not a substitute for, and do not replace, compliance with the requirements of California Government Code §64216-4216.9.

SHEET OF

WORK PERFORMED ON:

PROJECT NUMBER:

MAP PREPARATION

DATE:

QC CHECKED BY/DATE:

TECHNICIAN:

26-10449

JULY, 2026

C. KURIMAY 6

SCALE: 1" = 30'

JN 07/19/2026

UPDATES

NO DATE BY NOTES

07/17/2026

PROJECT NAME:LEGAL DISCLAIMER: CLIENT INFORMATION:

VICINITY MAP

NOT TO SCALE

NOTE:

BACKGROUND IMAGE IS FROM GOOGLE

EARTH AND IS FOR REFERENCE ONLY.

NO BACKGROUND HAS BEEN PROVIDED BY

CLIENT. ONCE BACKGROUND IS PROVIDED

U T I L I T Y M A P W I L L B E U P D A T E D

DRAWING SHEETS

SHEET NO. SHEET TITLE

KEY MAP

NOT TO SCALE

UNDERGROUND UTILITY MAP

WITHIN THE CITY OF SAN BERNARDINO, COUNTY OF SAN BERNARDINO, CALIFORNIA

Reference: American Society of Civil Engineers (ASCE) Standard 38-02 The utility information depicted on this map is classified in accordance with the ASCE 38-02 Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data. The quality levels defined below describe the method used to obtain the utility information and the relative reliability of the depicted data.

UTILITY QUALITY LEVEL A (QL-A)

Utility Quality Level A represents the highest Level of confidence for utility information. Information is obtained through the physical exposure of a utility at a specific location using non-destructive excavation methods such as vacuum excavation. This process confirms the precise horizontal and vertical position of the utility at the point of exposure.

Measurements are typically taken from the exposed facility and referenced to visible surface features. QL-A data represents conditions observed only at the exposed point and may not represent conditions between exposure locations.

UTILITY QUALITY LEVEL B (QL-B)

Utility Quality Level B information is obtained through the use of surface geophysical locating methods, such as electromagnetic locating equipment and ground penetrating radar, to determine the approximate horizontal position of subsurface utilities. The resulting markings represent the interpreted path of utilities based on instrument response and field conditions. These utilities are then transferred to the map based on surface markings and field observations. QL-B data represents approximate horizontal alignment only and should not be interpreted as precise excavation coordinates.

UTILITY QUALITY LEVEL C (QL-C)

Utility Quality Level C information is derived from visible above-ground utility features, such as valves, pedestals, meters, risers, or other surface indicators. These features are correlated through professional judgment and field interpretation to infer possible subsurface utility QL-C information is approximate and interpretive in nature.

UTILITY QUALITY LEVEL D (QL-D)

Utility Quality Level D information is obtained from existing records, drawings, maps, or verbal recollections. These sources may include utility owner records, as-built drawings, or other historical documentation. Accuracy and completeness may vary. QL-D information should be considered for reference purposes only.

IMPORTANT NOTICE

Conditions may vary, and additional utilities or variations in location may exist. This map does not guarantee the presence or absence of utilities and should not replace proper notification of utility owners or compliance with local excavation notification requirements.

SERVICE NOTES

Service Disclaimer and Limitations

3 THIRTEEN SUBSURFACE SPECIALIZES EXCLUSIVELY IN UTILITY MAPPING AND LOCATING SERVICES. WE DO NOT PROVIDE ENGINEERING, DESIGN, OR CONSTRUCTION SERVICES. OUR SERVICES FOCUS ON THE ACCURATE IDENTIFICATION AND

DOCUMENTATION OF SUBSURFACE UTILITIES USING ADVANCED TECHNIQUES, SUCH AS GROUND PENETRATING RADAR (GPR), ELECTROMAGNETIC LOCATORS, AND POTHOLING. ANY ENGINEERING ASSESSMENTS, DESIGNS, OR MODIFICATIONS ARE

OUTSIDE THE SCOPE OF OUR SERVICES AND SHOULD BE REFERRED TO A LICENSED ENGINEERING

PROFESSIONAL.

Utility Mapping and Locating Limitations

THE SERVICES PROVIDED BY 3 THIRTEEN SUBSURFACE ARE STRICTLY LIMITED TO UTILITY LOCATING AND MAPPING. 3 THIRTEEN SUBSURFACE DOES NOT OFFER ENGINEERING CONSULTATION, UTILITY SYSTEM DESIGN, OR CONSTRUCTION SERVICES. CLIENTS ARE ADVISED TO SEEK A LICENSED ENGINEER FOR ANY DESIGN OR ENGINEERING-RELATED INQUIRIES.

3 THIRTEEN SUBSURFACE SHALL NOT BE HELD RESPONSIBLE FOR ENGINEERING DECISIONS BASED ON THE INFORMATION

PROVIDED BY OUR UTILITY MAPPING SERVICES.

Regulatory Compliance

IN PROVIDING UTILITY MAPPING SERVICES, 3 THIRTEEN SUBSURFACE COMPLIES WITH CALIFORNIA GOVERNMENT CODE §§4216-4216.9, WHICH GOVERNS THE SAFE LOCATION OF UNDERGROUND UTILITIES. HOWEVER, IT IS EXPRESSLY UNDERSTOOD THAT 3 THIRTEEN SUBSURFACE IS NOT AN ENGINEERING FIRM, AND OUR SERVICES DO NOT REPLACE THE CLIENT'S RESPONSIBILITY TO ENSURE COMPLIANCE WITH ALL APPLICABLE CONSTRUCTION, DESIGN, OR PUBLIC SAFETY REGULATIONS. THE CLIENT REMAINS RESPONSIBLE FOR ENSURING THAT ALL REGULATORY REQUIREMENTS ARE MET.

Accuracy of Utility Mapping

UTILITY MAPS PROVIDED BY 3 THIRTEEN SUBSURFACE ARE BASED ON AVAILABLE DATA, SURFACE-LEVEL INDICATORS, AND UTILITY MARKINGS. WHILE WE USE THE BEST AVAILABLE TECHNOLOGIES AND METHODS TO LOCATE AND MAP UTILITIES, 3 THIRTEEN SUBSURFACE MAKES NO WARRANTY REGARDING THE ACCURACY OF UTILITY DEPTHS, THE PRECISE LOCATIONS OF UTILITIES, OR THE ABSENCE OF UNMARKED UTILITIES. CLIENTS ARE ENCOURAGED TO CONDUCT THEIR OWN DUE DILIGENCE AND CONSULT LICENSED PROFESSIONALS FOR FURTHER VERIFICATION OF UTILITY LOCATIONS OR DEPTHS, PARTICULARLY

IN CRITICAL CONSTRUCTION OR EXCAVATION AREAS.

UTILITY DRAFTING LINE TYPE

SHEET 2

SHEET 3 SHEET 4

SHEET 5 SHEET 6

AutoCAD SHX Text

POTHOLE 6 LOCATION AT 3.24 FT. - 10" PVC

AutoCAD SHX Text

POTHOLE 5 LOCATION AT 3.54 FT. - 10" PVC

AutoCAD SHX Text

POTHOLE 4 LOCATION AT 3.18 FT. - 10" PVC

AutoCAD SHX Text

POTHOLE 3 LOCATION AT 3.04 FT. - 10" PVC

AutoCAD SHX Text

POTHOLE 2 LOCATION AT 2.74 FT. - 10" PVC

AutoCAD SHX Text

POTHOLE 1 LOCATION AT 2.32 FT. - 10" PVC / THRUST BLCK

AutoCAD SHX Text

LINE[W] AT RISER

AutoCAD SHX Text

LINE[E] AT BUILDING

AutoCAD SHX Text

LINE[W] AT BUILDING

AutoCAD SHX Text #1

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

#2 TO #6

AutoCAD SHX Text

UTILITY MAP / POTHOLE LOCATIONS

AutoCAD SHX Text

LEGEND/SYMBOL

AutoCAD SHX Text UTILITY DEPICTION UNDERGROUND UTILITIES DEPICTED ON THIS MAP ARE REFERENCE TO LOCAL CONTROL AND/OR THE SMARTNET RTK NETWORK, UNLESS OTHERWISE NOTED.

AutoCAD SHX Text

BACKFLOW PREVENTER

AutoCAD SHX Text

CLEAN OUT

AutoCAD SHX Text

DEPTH FROM SURFACE

AutoCAD SHX Text

HYDRANT

AutoCAD SHX Text

LIGHT POLE

AutoCAD SHX Text

MANHOLE

AutoCAD SHX Text

POWER POLE

AutoCAD SHX Text

PULL BOX

AutoCAD SHX Text

VALVE

AutoCAD SHX Text

VAULT

AutoCAD SHX Text

TRAFFIC SIGNAL POLE

AutoCAD SHX Text

INVERT 1'-6"

AutoCAD SHX Text

BOTTOM DEPTH FROM TOP OF RIM OR GRATE

AutoCAD SHX Text UTILITY NOTES 1. Underground facilities shall be located and marked prior to Underground facilities shall be located and marked prior to any excavation activities. Contact Underground Service Alert (USA) at 811 or (888)899-1011 a minimum of two working days before excavation. 2. Contractor shall pothole/hand expose all utilities at conflict Contractor shall pothole/hand expose all utilities at conflict points prior to excavation. Exposure shall extend a minimum of each side of the facility to verify horizontal and vertical location, regardless of estimated depth. 3. Depths shown are approximate and provided for reference only. Depths shown are approximate and provided for reference only. Es mated depths are measured from the ground surface to the centerline of the facility, the invert of gravity lines, or the tracer wire where applicable. Actual depths may vary along the alignment of the facility. 4. Utility brackets indicate multiple facilities traveling within a Utility brackets indicate multiple facilities traveling within a common corridor, such as within a duct bank, trench, or bundled configuration. 5. This investigation does not verify facility size, material type, or This investigation does not verify facility size, material type, or the number of conduits within multi-conduit runs unless specifically noted. Irrigation systems are excluded from this survey unless otherwise stated. 6. The background site plan used to prepare this map was The background site plan used to prepare this map was provided by the client and prepared by others. 7. No representation is made regarding the accuracy or No representation is made regarding the accuracy or completeness of the background information. Field conditions may differ from those shown on this plan. If discrepancies are encountered, the locating provider shall be notified within 24 hours of discovery for review. 8. This utility depiction represents a professional interpretation of This utility depiction represents a professional interpretation of available evidence collected during the investigation. The absence of a depicted utility does not guarantee that additional underground facilities do not exist.

AutoCAD SHX Text

UTILITY QUALITY LEVEL NOTES

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

POSSIBLE LINE LOCATION, BASED ON GPR DETECTION

AutoCAD SHX Text

COMMUNICATION

AutoCAD SHX Text

WATER

AutoCAD SHX Text

SANITARY SEWER

AutoCAD SHX Text

STORM DRAIN

AutoCAD SHX Text

GAS

AutoCAD SHX Text

STREET LIGHT

AutoCAD SHX Text

AIR

AutoCAD SHX Text

TRAFFIC SIGNAL

AutoCAD SHX Text

FIRE WATER

AutoCAD SHX Text

CHILLED WATER

AutoCAD SHX Text

DOMESTIC WATER

AutoCAD SHX Text U

AutoCAD SHX Text

UTILITY QUALITY LEVEL B:

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

COMMUNICATION

AutoCAD SHX Text

WATER

AutoCAD SHX Text

SANITARY SEWER

AutoCAD SHX Text

STORM DRAIN

AutoCAD SHX Text

GAS

AutoCAD SHX Text

STREET LIGHT

AutoCAD SHX Text

AIR

AutoCAD SHX Text

TRAFFIC SIGNAL

AutoCAD SHX Text

CHILLED WATER

AutoCAD SHX Text

DOMESTIC WATER

AutoCAD SHX Text

HOT WATER

AutoCAD SHX Text

UTILITY QUALITY LEVEL C:

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text W

AutoCAD SHX Text

SS

AutoCAD SHX Text

SD

AutoCAD SHX Text

SL

AutoCAD SHX Text

AIR

AutoCAD SHX Text

TS

AutoCAD SHX Text

CHW

AutoCAD SHX Text

DW

AutoCAD SHX Text

HW

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

COMMUNICATION

AutoCAD SHX Text

WATER

AutoCAD SHX Text

SANITARY SEWER

AutoCAD SHX Text

STORM DRAIN

AutoCAD SHX Text

GAS

AutoCAD SHX Text

STREET LIGHT

AutoCAD SHX Text

AIR

AutoCAD SHX Text

TRAFFIC SIGNAL

AutoCAD SHX Text

FIRE WATER

AutoCAD SHX Text

CHILLED WATER

AutoCAD SHX Text

DOMESTIC WATER

AutoCAD SHX Text

UTILITY QUALITY LEVEL D:

AutoCAD SHX Text

HOT WATER

AutoCAD SHX Text

HOT WATER

AutoCAD SHX Text ABBREVIATIONS IN UTILITY MAP BFP BACKFLOW PEVENTER GVL GAS VALVE BACKFLOW PEVENTER GVL GAS VALVE GVL GAS VALVE GAS VALVE CAB CABINET ICV IRRIGATION CONTROL VALVE CABINET ICV IRRIGATION CONTROL VALVE ICV IRRIGATION CONTROL VALVE IRRIGATION CONTROL VALVE CB CURB DRAIN MH MANHOLE COVER CURB DRAIN MH MANHOLE COVER MH MANHOLE COVER MANHOLE COVER CO CLEAN OUT PLB PULL BOX CLEAN OUT PLB PULL BOX PLB PULL BOX PULL BOX [C] COMMUNICATION UTILITY LINE PIV POST INDICATOR VALVE COMMUNICATION UTILITY LINE PIV POST INDICATOR VALVE PIV POST INDICATOR VALVE POST INDICATOR VALVE DI DRAIN INLET RD ROOD DRAIN DRAIN INLET RD ROOD DRAIN RD ROOD DRAIN ROOD DRAIN DRK FT DRINKING FOUNTAIN [SD] STORM DRAIN UTILITY LINE DRINKING FOUNTAIN [SD] STORM DRAIN UTILITY LINE [SD] STORM DRAIN UTILITY LINE STORM DRAIN UTILITY LINE [E] ELECTRIC UTILITY LINE [SS] SEWER UTILITY LINE ELECTRIC UTILITY LINE [SS] SEWER UTILITY LINE UTILITY LINE [SS] SEWER UTILITY LINE [SS] SEWER UTILITY LINE SEWER UTILITY LINE FDC FIRE DEPARTMENT [U] UNKNOWN (POSSIBLE) LINE FIRE DEPARTMENT [U] UNKNOWN (POSSIBLE) LINE [U] UNKNOWN (POSSIBLE) LINE UNKNOWN (POSSIBLE) LINE CONNECTION [W] WATER UTILITY LINE [W] WATER UTILITY LINE WATER UTILITY LINE [G] GAS UTILITY LINE WVL WATER VALVEGAS UTILITY LINE WVL WATER VALVEWVL WATER VALVEWATER VALVE

MATCH LINE - SEE SHEET 3

A

B

D

E

F

1 3 4 5 62

C

A

B

D

E

F

C

PARTIAL UNDERGROUND UTILITY MAP FOR:

WILDLAND FIREFIGHTING

HELITANKER STATION

GLEN HELEN RD. & FOREST LN.

SAN BERNARDINO, CA 92407

ARAGON GEOTECHNICAL, INC.

16801 VAN BUREN BLVD., BUILDING B

RIVERSIDE, CA 92504

3 thirteen, Inc.

4160 TEMESCAL CANYON RD

SUITE 401

CORONA, CA 92883

T / F - 1.888.899.1011 info@313subsurface.com www.313subsurface.com

The services performed by 3 thirteen, Inc. does not relieve the Client and/or property owner of their responsibility to comply with California Government Code §64216-4216.9. The Client and/or property owner acknowledges and agrees that the services provided by 3 thirteen, Inc. are not a substitute for, and do not replace, compliance with the requirements of California Government Code §64216-4216.9.

SHEET OF

WORK PERFORMED ON:

PROJECT NUMBER:

MAP PREPARATION

DATE:

QC CHECKED BY/DATE:

TECHNICIAN:

26-10449

JULY, 2026

C. KURIMAY 6

SCALE: 1" = 30'

JN 07/19/2026

UPDATES

NO DATE BY NOTES

07/17/2026

PROJECT NAME:LEGAL DISCLAIMER: CLIENT INFORMATION:

NOTE:

BACKGROUND IMAGE IS FROM GOOGLE EARTH AND IS FOR REFERENCE ONLY.

NO BACKGROUND HAS BEEN PROVIDED BY CLIENT. ONCE BACKGROUND IS PROVIDED

UTILITY MAP WILL BE UPDATED

AutoCAD SHX Text

POTHOLE 4 LOCATION AT 3.18 FT. - 10" PVC

AutoCAD SHX Text

POTHOLE 3 LOCATION AT 3.04 FT. - 10" PVC

AutoCAD SHX Text

POTHOLE 2 LOCATION AT 2.74 FT. - 10" PVC

AutoCAD SHX Text

POTHOLE 1 LOCATION AT 2.32 FT. - 10" PVC / THRUST BLCK

AutoCAD SHX Text

LINE[W] AT RISER

AutoCAD SHX Text

LINE[E] AT BUILDING

AutoCAD SHX Text 1 inch = ft.

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MATCH LINE - SEE SHEET 5

A

B

D

E

F

1 3 4 5 62

C

A

B

D

E

F

C

PARTIAL UNDERGROUND UTILITY MAP FOR:

WILDLAND FIREFIGHTING

HELITANKER STATION

GLEN HELEN RD. & FOREST LN.

SAN BERNARDINO, CA 92407

ARAGON GEOTECHNICAL, INC.

16801 VAN BUREN BLVD., BUILDING B

RIVERSIDE, CA 92504

3 thirteen, Inc.

4160 TEMESCAL CANYON RD

SUITE 401

CORONA, CA 92883

T / F - 1.888.899.1011 info@313subsurface.com www.313subsurface.com

The services performed by 3 thirteen, Inc. does not relieve the Client and/or property owner of their responsibility to comply with California Government Code §64216-4216.9. The Client and/or property owner acknowledges and agrees that the services provided by 3 thirteen, Inc. are not a substitute for, and do not replace, compliance with the requirements of California Government Code §64216-4216.9.

SHEET OF

WORK PERFORMED ON:

PROJECT NUMBER:

MAP PREPARATION

DATE:

QC CHECKED BY/DATE:

TECHNICIAN:

26-10449

JULY, 2026

C. KURIMAY 6

SCALE: 1" = 30'

JN 07/19/2026

UPDATES

NO DATE BY NOTES

07/17/2026

PROJECT NAME:LEGAL DISCLAIMER: CLIENT INFORMATION:

MATCH LINE - SEE SHEET 2

M

AT

CH

L

IN

E

S

EE

S

HE

ET

AutoCAD SHX Text

POTHOLE 5 LOCATION AT 3.54 FT. - 10" PVC

AutoCAD SHX Text 1 inch = ft.

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MATCH LINE - SEE SHEET 6

A

B

D

E

F

1 3 4 5 62

C

A

B

D

E

F

C

PARTIAL UNDERGROUND UTILITY MAP FOR:

WILDLAND FIREFIGHTING

HELITANKER STATION

GLEN HELEN RD. & FOREST LN.

SAN BERNARDINO, CA 92407

ARAGON GEOTECHNICAL, INC.

16801 VAN BUREN BLVD., BUILDING B

RIVERSIDE, CA 92504

3 thirteen, Inc.

4160 TEMESCAL CANYON RD

SUITE 401

CORONA, CA 92883

T / F - 1.888.899.1011 info@313subsurface.com www.313subsurface.com

The services performed by 3 thirteen, Inc. does not relieve the Client and/or property owner of their responsibility to comply with California Government Code §64216-4216.9. The Client and/or property owner acknowledges and agrees that the services provided by 3 thirteen, Inc. are not a substitute for, and do not replace, compliance with the requirements of California Government Code §64216-4216.9.

SHEET OF

WORK PERFORMED ON:

PROJECT NUMBER:

MAP PREPARATION

DATE:

QC CHECKED BY/DATE:

TECHNICIAN:

26-10449

JULY, 2026

C. KURIMAY 6

SCALE: 1" = 30'

JN 07/19/2026

UPDATES

NO DATE BY NOTES

07/17/2026

PROJECT NAME:LEGAL DISCLAIMER: CLIENT INFORMATION:

M

AT

CH

L

IN

E

S

EE

S

HE

ET

AutoCAD SHX Text

LINE[W] AT BUILDING

AutoCAD SHX Text 1 inch = ft.

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

A

B

D

E

F

1 3 4 5 62

C

A

B

D

E

F

C

PARTIAL UNDERGROUND UTILITY MAP FOR:

WILDLAND FIREFIGHTING

HELITANKER STATION

GLEN HELEN RD. & FOREST LN.

SAN BERNARDINO, CA 92407

ARAGON GEOTECHNICAL, INC.

16801 VAN BUREN BLVD., BUILDING B

RIVERSIDE, CA 92504

3 thirteen, Inc.

4160 TEMESCAL CANYON RD

SUITE 401

CORONA, CA 92883

T / F - 1.888.899.1011 info@313subsurface.com www.313subsurface.com

The services performed by 3 thirteen, Inc. does not relieve the Client and/or property owner of their responsibility to comply with California Government Code §64216-4216.9. The Client and/or property owner acknowledges and agrees that the services provided by 3 thirteen, Inc. are not a substitute for, and do not replace, compliance with the requirements of California Government Code §64216-4216.9.

SHEET OF

WORK PERFORMED ON:

PROJECT NUMBER:

MAP PREPARATION

DATE:

QC CHECKED BY/DATE:

TECHNICIAN:

26-10449

JULY, 2026

C. KURIMAY 6

SCALE: 1" = 30'

JN 07/19/2026

UPDATES

NO DATE BY NOTES

07/17/2026

PROJECT NAME:LEGAL DISCLAIMER: CLIENT INFORMATION:

MATCH LINE - SEE SHEET 3

M

AT

CH

L

IN

E

S

EE

S

HE

ET

AutoCAD SHX Text 1 inch = ft.

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MATCH LINE - SEE SHEET 4

A

B

D

E

F

1 3 4 5 62

C

A

B

D

E

F

C

PARTIAL UNDERGROUND UTILITY MAP FOR:

WILDLAND FIREFIGHTING

HELITANKER STATION

GLEN HELEN RD. & FOREST LN.

SAN BERNARDINO, CA 92407

ARAGON GEOTECHNICAL, INC.

16801 VAN BUREN BLVD., BUILDING B

RIVERSIDE, CA 92504

3 thirteen, Inc.

4160 TEMESCAL CANYON RD

SUITE 401

CORONA, CA 92883

T / F - 1.888.899.1011 info@313subsurface.com www.313subsurface.com

The services performed by 3 thirteen, Inc. does not relieve the Client and/or property owner of their responsibility to comply with California Government Code §64216-4216.9. The Client and/or property owner acknowledges and agrees that the services provided by 3 thirteen, Inc. are not a substitute for, and do not replace, compliance with the requirements of California Government Code §64216-4216.9.

SHEET OF

WORK PERFORMED ON:

PROJECT NUMBER:

MAP PREPARATION

DATE:

QC CHECKED BY/DATE:

TECHNICIAN:

26-10449

JULY, 2026

C. KURIMAY 6

SCALE: 1" = 30'

JN 07/19/2026

UPDATES

NO DATE BY NOTES

07/17/2026

PROJECT NAME:LEGAL DISCLAIMER: CLIENT INFORMATION:

M

AT

CH

L

IN

E

S

EE

S

HE

ET

AutoCAD SHX Text

POTHOLE 6 LOCATION AT 3.24 FT. - 10" PVC

AutoCAD SHX Text 1 inch = ft.

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

File details come from the government source that posted it. Updated .