waa-skaman92135-1_plan_IFB.pdf

PDF 27 MB Posted

Attached to
WA FLAP SKAMAN 92135(1), Wind River Road Slide Reconstruction
Solicitation number
69056725B000013
Issued by

About this file

This document is a comprehensive set of project plans and details for the Wind River Road Slide Reconstruction project (WA FLAP SKAMAN 92135(1)), an infrastructure improvement initiative by the Federal Highway Administration. The project involves roadway reconstruction, including approximately 17 kilometers of road improvements with multiple critical elements such as asphalt concrete pavement overlay, guardrail system installation, retaining wall construction (including mechanically stabilized earth and soldier pile walls), temporary traffic control, and erosion control measures.

Key technical specifications include a multi-phase construction approach with three distinct traffic management phases, roadway aggregate placement, asphalt concrete pavement milling and overlay, culvert lining, and specialized wall structures. The project requires detailed temporary traffic control with specific signage, lane closures, and detour plans. Estimated quantities include 1,610 tons of asphalt concrete pavement, 980 linear feet of guardrail removal and replacement, multiple retaining wall sections, and comprehensive erosion control implementations like silt fence, fiber rolls, and rolled erosion control products. The project is located in the Columbia River Gorge area and is scheduled for completion in late 2025.

View the file

Other files

File Type Posted
Bid Tabulation_Wind River Road Slide Reconstruction.pdf PDF
BidSum_WA FLAP SKAMAN 92135(1).pdf PDF
QandA_01-29-2026.pdf PDF
Amendment A006.pdf PDF
QandA_01-28-2026.pdf PDF
QandA_01-27-2026-3.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
QandA_01-27-2026-2.pdf PDF
Amendment A004.pdf PDF
QandA_01-27-2026.pdf PDF
QandA_01-26-2026.pdf PDF
Amendment A003.pdf PDF
QandA_01-23-2026.pdf PDF
Amendment A002.pdf PDF
Interested Vendors list.pdf PDF
QandA_01-22-2026.pdf PDF
QandA_01-14-2026.pdf PDF
Amendment A001.pdf PDF
QandA_01-12-2026.pdf PDF
waa-skaman92135-1_Project-Name-Change.pdf PDF
GM 16-24 Prelim Geotech Memo WA FLAP SKAMAN 92135-1.pdf PDF
waa-skaman92135-1_WindRiverRoad_SupplementalGeotechReport.pdf PDF
waa-skaman92135-1_construction-limits.pdf PDF
waa-skaman92135-1_XYZ_final.pdf PDF
waa-skaman92135-1_Physical Data.zip ZIP file
waa-skaman92135-1_proposed-alignment.pdf PDF
waa-skaman92135-1_XYZ_base.pdf PDF
WFLHD Construction Contract Administration.pdf PDF
IFB 69056725B000013.pdf PDF
waa-skaman92135-1_xs.pdf PDF
waa-skaman92135-1_clearing_limits.pdf PDF
waa-skaman92135-1_Earthwork.pdf PDF
waa-skaman92135-1_construction-staking-notes.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRENT L COE Digitally signed by BRENT L COE Date: 2025.09.10 12:20:12 -07'00'

:2

A

M

S e p te m b e r

S H

E E

T I

N D

E X c p w w o r k

\d

\w a a s k a m a n p ln g e n

.d g n

SHEET INDEX

PROJECT

NUMBER

SHEET

A.2

WA FLAP SKAMAN 92135(1)

BH

TP

CUYD

culv.

CUFT

cubic yard(s) culvert cubic foot (feet) mon.

min.

MGAL

max.

matl.

M.P.

M.L.

monument minimum thousand gallon maximum material mile post main line

W

RIP

DI

G W G WV

CP GPS

36 31

36 31

N

E

N 1000EL. 1234.56

TP

TP

SEC.

SEC.

θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.

AH

ADT

abut.

between bearing bridge balance point bench mark back face back btwn brg.

br.

BP

BM

b.f.

BK

ctrs.

CS

cont.

constr. jt.

conn.

conc.

col.

CMP

clr.

cc or c. to c.

centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center

NO SCALE

NOTE:

1.

on the appropriate plan sheet.

Other symbols used in the plans will be shown in a legend

W west drwg(s).

dist.

diaph.

dia.

DHV

D exp. jt.

exc.

EW

EQ or eq.

EOP

emb.

elev.

El. 94.16 e.f.

e E expansion joint excavation edge of water equation edge of pavement embankment elevation elevation in feet each face superelevation rate east drawing(s) distance diaphragm diameter design hourly volume diameter galv.

ga.

galvanized gage (gauge) jt.

IE

ID

joint invert elevation inside diameter ftg.

flg.

fin.

f.f.

footing flange finish front face

LW

lt. or LT Ls

LPSM

long.

LNFT

lat.

L low water left length of spiral lump sum longitudinal linear foot (feet) latitude length of curve rte.

rt. or RT reqd.

reinf.

rdwy.

R/W R.

R route right required reinforcement roadway right-of-way range radius typ.

Ts

TS

thd.

TBM

T.

T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance

VPI

vph V vertical point of intersection vehicles per hour design speed (velocity)

STS

struc.

stiff.

stgr.

std.

STA, Sta.

ST

SS

SRS

SQYD

SQFT

spa.

SLRY

shldr.

sect.

SC

SADT

S point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south

KSI

square inch thousand pounds per pvmt.

PT

PST

PSC

PSI

PSF

PS

POT

POS

POC

pl.

PI

PCS

PCC

PC

pavement point of tangent point of spiral to tangent point of spiral to curve pounds per square inch pounds per square foot point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve

OHWM

OG

OD

o. to o.

o.c.

ordinary high water mark original ground outside diameter out to out on center

NC

N normal crown north

A A

DI

National Boundary

State Boundary

County Boundary

City Boundary

Township or Range Line

Section Line

Section Corner (Found, Projected)

Control Point (Terrestrial and GPS)

Gas & Water Meter; Gas & Water Valve

Flagpole; Fire Hydrant

Cooking Grate; Garbage Can; Picnic Table

Boulder; Well; Antenna; Grave

Above Ground Tank; Underground Tank

Spot Elevation; Coordinate Grid Tick

Material Source; Bore Hole; Test Pit

Treeline; Individual Trees

Spring or Seep

Section Line 4

Section Corner (Found, Projected) 4

Section Line 16

Section Corner (Found, Projected)16

Property Line

Parcel Number

National Park Boundary

National Forest Boundary

National Wildlife Refuge Boundary

BLM Lands Boundary

Indian Reservation Boundary

Existing Roadway (Paved, Gravel)

Railroad

Trail

Fiber Roll

Silt Fence

Sandbag

Intermittent Drainage or Small Creek

Large Creek or River

Lake, Pond or Reservoir; Marshland

North Arrow

Slope Stake Limits Top of Cut

Toe of Fill

Construction Limits

Bottom of Ditch

Fence

Gate with Fence

Cattleguard

Guardrail

Concrete Barrier and Guard Wall

Retaining Wall wall face

Signs (single, double post; portable)

Delineators

Pipe Culvert (arrow shows flow)

Pipe Culvert with End Section

Pipe Culvert with Headwall

Pipe Culvert with Drop Inlet

Box Culvert

Underdrain

Overhead/Above Ground Utilities

Underground Utilities

Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features

Building

Right-of-Way Line

Permanent Easement

Construction Easement

Riprap

- no symbol -

Section A-A

EXISTING PROPOSED

STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, TP = telephone pedestal, TV = CATV pedestal,

- no symbol -

ABBREVIATIONS

PLAN SYMBOLS AND

101-1W

6/2022

WFLHD DETAIL

:0

P

O c to b e r

D e t W

-1 p w

-w o rk

\d \w a a -s k a m a n -1

W

-1 d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

APPROVED FOR USE

PROJECT

A.3

Scale in feet

500 0 500 1000 1500

N

WILLIE'S RDEND PROJECT

BEGIN PROJECT

to S ta b le r m il e s to te ve ns on m ile s

Columbia River

NATIONAL SCENIC AREA

COLUMBIA RIVER GORGE

HOME VALLEY

to Cook

±6 m iles

CARSON

HOT

M E

T Z

G E

R R

D

FREDRICKSON

SPRINGS AVE

AVE

S M I T

H B

E C

K O

N R

D

W

IN

D

R

IV

E R

RD.

LE

W

IS

AND CLARK

HWY.

GUE

LAN

R D

S P R

A

DING

Carson

Creek

GLUR RD.

C O

LU

M B

IA

D

R

OLD AIRPORT RD

M O

N A

G H

A N

R D

P E

Y R

O L

L A

Z R

D

C A

R S

O N D

E P

O T

CARSON CREEK RD

W in d

R iv e r

Little

R iv e r

W in d

R D to S ta g in g a r e a

.9 m il

"MAIN 01" 10+00.00

"MAIN 01" 27+08.00

:3

J u ly

V ic in it y M a p p w w o r k

\d

\w a a s k a m a n p ln g e n

.d g n

VICINITY MAP

PROJECT

A.4

Project Limits

0.5 1.000.250.5

Scale in miles

N

W

IN

D R

IV

E R R

D

ESTABROOK LOOP

ES

TABROOK LOOP

M A

T H

A N

Y R

D

J O

H N

S O

N R

D

W

IN

D R

IV

E R R

D

N

Scale in feet

100 0 100 200 300

© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS

(45°44'49.11"N, 121°49'21.22"W)

Staging Area (County stockpile area)

W

IN

D R

IV

E

R R

D

CO will mark area prior to use

(45°44'49.11"N, 121°49'21.22"W)

Staging Area (County stockpile area)

T R

A

IL

E R D

U M

P R

D

Staging Area Entrance

:0

J u n e

S ta g in g

A r p w w o r k

\d

\w a a s k a m a n p ln g e n

.d g n

STAGING AREA

PROJECT

A.5

Sheet and Description

SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K

Plan-Profile Approach Roads Drainage

Soil Erosion and Sediment

Control Walls Guardrail Temporary

Traffic Control Permanent

Traffic Control

BID

SCHEDULE

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL

A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0080 15401-0000 CONTRACTOR TESTING LPSM ALL

A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 627 33 660

A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1963 137 2100

A0160 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FILTER ROCK) EACH 6 6

A0180 20101-0000 CLEARING AND GRUBBING ACRE 0.9 0.1 1

A0200 20301-0700 REMOVAL OF DELINEATOR EACH 1 1

A0220 20301-2400 REMOVAL OF SIGN EACH 4 4

A0240 20302-1200 REMOVAL OF GUARDRAIL LNFT 950 30 980

A0260 20310-1000 PLUG, EXISTING PIPE EACH 1 1

A0280 20315-0000 SAWCUTTING PAVEMENT LNFT 1328 48 44 1420

A0300 20401-0000 ROADWAY EXCAVATION CUYD 428 42 60 530

A0320 25403-0000 SOLDIER PILE RETAINING WALL LPSM ALL

A0340 25502-0000 MECHANICALLY STABILIZED EARTH WALL LPSM ALL

A0360 25701-0000 CONTRACTOR PROVIDED RETAINING STRUCTURE DESIGN (MSE WALL) LPSM ALL

A0380 25701-0000 CONTRACTOR PROVIDED RETAINING STRUCTURE DESIGN (SOLDIER PILE

WALL) LPSM ALL

A0400 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 547 65 58 670

A0420 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 1488 44 78 1610

A0440 41201-0000 TACK COAT TON 7 0.3 0.7 8

A0460 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH SQYD 6862 138 7000

A0480 60707-0700 LINING 36-INCH PIPE CULVERT LNFT 168 12 180

A0500 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A, STEEL POSTS LNFT 775 25 800

A0520 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A, STEEL POSTS (8' POST) LNFT 425 25 450

A0540 61702-0000 TERMINAL SYSTEM (ANCHOR SYSTEM) EACH 4 4

A0560 61702-1500 TERMINAL SYSTEM, TYPE MGS TANGENT (TL-3) EACH 2 2

A0580 61702-1700 TERMINAL SYSTEM, TYPE MGS-BAT EACH 1 1

A0600 62101-0000 MONUMENT (CASE AND COVER RISER) EACH 6 6

A0620 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40

A0640 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 40

A0660 62201-3150 HYDRAULIC EXCAVATOR, 1.0 CUBIC YARD MINIMUM CAPACITY WITH

THUMB ATTACHMENT HOUR 40

A0680 62301-0000 GENERAL LABOR HOUR 40

A0700 62501-0000 TURF ESTABLISHMENT ACRE 0.7 0.2 0.1 1

A0720 62801-0000 TEMPORARY STREAM DIVERSION LPSM ALL

A0740 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 1174 56 1230

A0760 63316-1000 REMOVE AND RESET SIGN SYSTEM EACH 4 4

PAY ITEM

NUMBER

LINE

ITEM

NO.

c:

\p w -w or k\ d0 w aa -s ka m an

5-

1_ so q.

xl sm ]S he et

1- O ct -2

:5

A M

A M E N D

SUMMARY OF QUANTITIES

MileStone: 100% Date Completed: In Progress Report Date: 09/02/2025

Estimated Quantities

ALLOWANCEUNITPAY ITEM DESCRIPTION

PROJECT

B.1WA FLAP SKAMAN 92135(1)

Sheet and Description

SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K

Plan-Profile Approach Roads Drainage

Soil Erosion and Sediment

Control Walls Guardrail Temporary

Traffic Control Permanent

Traffic Control

BID

SCHEDULE

A0780 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID (WHITE) LNFT 3411 69 3480

A0800 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID (YELLOW) LNFT 3416 84 3500

A0820 63401-0800 PAVEMENT MARKINGS, TYPE D, BROKEN (WHITE) LNFT 1260 40 1300

A0840 63407-0000 RECESSED PAVEMENT MARKER EACH 64 6 70

A0860 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 (8 FEET WIDE) EACH 4 4

A0880 63502-1200 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 28-INCH EACH 215 15 230

A0900 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 7 3 10

A0920 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C EACH 9 9

A0940 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 2 2

A0960 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION EACH 2 2

A0980 63503-0400 TEMPORARY TRAFFIC CONTROL, PORTABLE TRAFFIC BARRIER LNFT 262 13 275

A1000 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 247.75 22.25 270

A1020 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 725 725

A1040 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 135 5 140

1- O ct -2

:2

A M

MileStone: 100% Date Completed: In Progress Report Date: 09/02/2025

PAY ITEM

NUMBER PAY ITEM DESCRIPTION UNIT ALLOWANCE

Estimated Quantities c:

\p w -w or k\ d0 w aa -s ka m an

5-

1_ so q.

xl sm ]S he et

2)

SUMMARY OF QUANTITIES

A M E N D

LINE

ITEM

NO.

PROJECT

B.2WA FLAP SKAMAN 92135(1)

LC

C o n s tr u c ti o n l im it two 1.5" lifts with tack coat between lifts

3-inch compacted depth, placed in

Asphalt concrete pavement, type 1, Existing ground

Varies Varies

Existing grade

See overlay edge detail

Edge of pavement

30°

Existing pavement

Roadway aggregate, method 2

3-inch compacted depth, overlay

Asphalt concrete pavement, type 1, 12'

Varies, 1.2' min.

10+00.00 to 13+80.00

See Section I for details class A steel posts (8' Post)

Guardrail system MGS, type 2, 12' [1]

Varies (0'-12')

Match existing road section width Asphalt Pavement Milling, 2-Inch Depth

Varies

Existing ground

Varies

C o n s tr u c ti o n l im it

OVERLAY EDGE DETAIL

6" min.

Existing shoulder width

1:3

1.

Profile grade

Traveled lane Traveled lane Traveled lane

"MAIN 01"

Match existing Match existing Match existing

Shldr.Shldr.

Match existing

NOTE:

FOOTNOTE:

Match existing width [1] surface and proposed overlay

Apply tack coat between existing asphalt

:3 c to b e r

T y p ic a l

S e c ti o n

O v e rl y p w w o r k \d

\w a a s k a m a n p ln ty p .d g n

SHEET 1 OF 4

TYPICAL SECTION

PROJECT

NUMBER

C.1 with tack coat between lifts third lift = 1.5"; top lift = 1.5")

(bottom lift = 3"; second lift = 3";

9-inch compacted depth, placed in four lifts

Asphalt concrete pavement, type 1, Roadway aggregate, method 2, 6-inch compacted depth

Existing ground

Existing ground two 1.5" lifts with tack coat between lifts

3-inch compacted depth, placed in

Asphalt concrete pavement, type 1, ground

Existing with tack coat between lifts third lift = 1.5"; top lift = 1.5")

(bottom lift = 3"; second lift = 3";

9-inch compacted depth, placed in four lifts

Asphalt concrete pavement, type 1, Roadway aggregate, method 2, 6-inch compacted depth

[4]

Varies

Slope to drain

Excavate and backfill, 4'

4'

Tack coat at joint

See Safety Edge

Existing grade Sawcutting pavement two 1.5" lifts with tack coat between lifts

3-inch compacted depth, placed in

Asphalt concrete pavement, type 1, Existing ground detail, sheet C.1

See overlay edge

1'

Edge of pavement

Roadway aggregate, method 2

Asphalt concrete pavement, type 1

12' [1]

Varies 12'

C o n s tr u c ti o n l im it

Varies Shldr. (match existing)

[2] ment lim it

Varies

[3]

21+26.50 to 27+08.00, RT

See Section I for details class A steel posts

Guardrail system MGS, type 2, Turf establish

±10' ment limitTurf establish

Varies

Varies Shldr. (match existing)

Varies

See Section I for details class A steel posts

Guardrail system MGS, type 2, Asphalt Pavement Milling, 2-Inch Depth

2-Inch Depth Asphalt Pavement Milling, C o n s tr u c ti o n a n d

C le a r in g l im it

C o n s tr u c ti o n a n d

C le a r in g l im it

C o n s tr u c ti o n a n d

C le a r in g l im it

SAFETY EDGE

Profile grade

Traveled lane Traveled lane Traveled lane

13+80.00 to 15+40.00

17+06.00 to 18+36.25

20+31.00 to 27+08.00

"MAIN 01"

Match existing Match existing Match existing

Varies [4]

Shldr.

Shldr.

20+31.00 to 22+65.00, LT

17+06.00 to 17+61.00, LT

FOOTNOTE:

1V:2H "MAIN 01" 17+29 to 27+08

1V:3H to 1V:2H "MAIN 01" 17+09 to 17+29

1V:2H to 1V:3H "MAIN 01" 15+20 to 15+40

1V:2H "MAIN 01" 13+98 to 15+20

Safety edge foreslope varies as follows:

Match existing slope of adjacent traveled lane.

0.5' "MAIN 01" 21+33 to 27+08

4.52' "MAIN 01" 19+00 to 20+31

2.52' - 4.52' "MAIN 01" 18+36 to 19+00

1.52' "MAIN 01" 17+09 to 18+36

1.52' "MAIN 01" 13+98 to 15+40

Safety edge width varies as follows:

Match existing lane width. [1]

NOTE:

pavement edge.

guardrail posts are embedded in soil beyond station limits shown in the plans. Ensure

2. Omit paved safety edge within guardrail surface and proposed overlay.

1. Apply tack coat between existing asphalt

:1

S e p te m b e r

T y p ic a l

S e c ti o n p w w o r k \d

\w a a s k a m a n p ln ty p .d g n

SHEET 2 OF 4

TYPICAL SECTION

PROJECT

NUMBER

C.2

1:3

Existing ground two 1.5" lifts with tack coat between lifts

3-inch compacted depth, placed in

Asphalt concrete pavement, type 1, with tack coat between lifts third lift = 1.5"; top lift = 1.5")

(bottom lift = 3"; second lift = 3";

9-inch compacted depth, placed in four lifts

Asphalt concrete pavement, type 1, Roadway aggregate, method 2, 6-inch compacted depth

LC

Tack coat at joint

1:3

Existing ground

Existing grade

Sawcutting pavement two 1.5" lifts with tack coat between lifts

3-inch compacted depth, placed in

Asphalt concrete pavement, type 1, Existing ground detail, sheet C.1

See overlay edge

12'

Varies Shldr. (match existing) 4' Shldr.

1.52'

See Section I for details class A steel posts

Guardrail system MGS, type 2, 12' 12'

See Section H for details structure design (MSE Wall)

Contractor provided retaining

Mechanically stabilized earth wall, Varies per wall excavation

.7

Top of wall (Layout line)

Turf establishment limit

[1]

±5' o n s tr u c ti o n l im it

Varies

Varies Shldr. (match existing)

C o n s tr u c ti o n a n d

C le a r in g l im it

Varies

See Section I for details class A steel posts

Guardrail system MGS, type 2, 2-Inch Depth Asphalt Pavement Milling, Asphalt Pavement Milling, 2-Inch Depth

C o n s tr u c ti o n a n d

C le a r in g l im it

Profile grade

Traveled lane Traveled lane Traveled lane

15+40.00 to 17+06.00

"MAIN 01"

Match existing Match existing Match existing

16+28.00 to 17+06.00, LT

FOOTNOTE:

Match existing slope of adjacent traveled lane. [1]

NOTE:

pavement edge.

guardrail posts are embedded in soil beyond station limits shown in the plans. Ensure

2. Omit paved safety edge within guardrail surface and proposed overlay.

1. Apply tack coat between existing asphalt

:0 c to b e r

T y p ic a l

S e c ti o n

M

S E

W ll p w w o r k \d

\w a a s k a m a n p ln ty p .d g n

SHEET 3 OF 4

MSE WALL

TYPICAL SECTION

PROJECT

NUMBER

C.3

Existing ground

12" min. thickness concrete in place

Permanent fascia, LC

C o n s tr u c ti o n a n d C le a r in g l im it

6-inch compacted depth

Roadway aggregate, method 2, Approximate slip plane

Existing ground

Existing grade

Tack coat at joint two 1.5" lifts with tack coat between lifts

3-inch compacted depth, placed in

Asphalt concrete pavement, type 1, Turf establishment limits

Ground anchor

See Section I for details class A steel posts

Guardrail system MGS, type 2, Sawcutting pavement

Drilled shaft two 1.5" lifts with tack coat between lifts

3-inch compacted depth, placed in

Asphalt concrete pavement, type 1, Existing ground detail, sheet C.1

See overlay edge

See Section H for details

(Soldier Pile Wall) retaining structure design

Contractor provided

Soldier pile retaining wall, :1 .5 m a x

V aries

10' with tack coat between lifts third lift = 1.5"; top lift = 1.5")

(bottom lift = 3"; second lift = 3";

9-inch compacted depth, placed in four lifts

Asphalt concrete pavement, type 1, 80' max o n s tr u c ti o n li m it

Varies 4' [1]Varies

12'12' m in

6" min.

Varies

See Section I for details class A steel posts

Guardrail system MGS, type 2, Varies Shldr. (match existing)

Varies Shldr. (match existing)

Asphalt Pavement Milling, 2-Inch Depth

2-Inch Depth Asphalt Pavement Milling, C o n s tr u c ti o n a n d

C le a r in g l im it pavement edge.

guardrail posts are embedded in soil beyond station limits shown in the plans. Ensure

2. Omit paved safety edge within guardrail surface and proposed overlay.

1. Apply tack coat between existing asphalt

LC

Excavate and backfill

"MAIN 01"

18+36.25 to 20+31.00

Profile grade

Traveled lane

Match existing

Traveled lane Traveled lane

Match existing Match existing

Shldr.

19+90.00 to 20+31.00, LT

Match existing slope of adjacent traveled lane.

ane width. Match existing l

NOTE:

:0 c to b e r

T y p ic a l

S e c ti o n

S o ld ie r

P il p w w o r k \d

\w a a s k a m a n p ln ty p .d g n

SHEET 4 OF 4

SOLDIER PILE WALL

TYPICAL SECTION

PROJECT

NUMBER

C.4 elevations) by 100 feet.

(difference between the existing and overlaid the effective overlay thickness in inches less than the value obtained by multiplying

Provide a transition length in feet that is not

Existing asphalt pavement

Existing base course with tack coat between lifts third lift = 1.5"; top lift = 1.5")

(bottom lift = 3"; second lift = 3";

9-inch compacted depth, placed in four lifts

Asphalt concrete pavement, type 1, Roadway aggregate, method 2, 6-inch compacted depth

Existing asphalt pavement

Existing base course

Asphalt pavement milling (overlay transition)

OVERLAY TRANSITION DETAIL

(Final course)

Asphalt overlay

(Depth equals overlay thickness)

Saw cut

Overlaid elevation (e )

(Full depth of existing asphalt pavement) Saw cut

Transition length =100' * (e - e )

METHOD OF FEATHERING ACP AT GRAVEL APPROACHES

1 2

Tack coat at joint

Tack coat at joint Existing elevation (e )

Overlay

Existing gravel surfaceRoadway aggregate, method 2

E d g e o f p a v e d s h o u ld e r

(match existing asphalt limits) Varies 5' - 6' a p p r o a c h

E d g e o f a s p h lt

Approach taper 1" in 5'

Asphalt concrete pavement, type 1

NEW PAVEMENT

1.

See Note 1

LC

:3

S e p te m b e r

S h e t p w w o r k \d

\w a a s k a m a n P a v e m e n t-

T r a n s it io n .d g n

PAVEMENT TRANSITION

PROJECT

NUMBER

WA FLAP SKAMAN 92135(1) C.5

PROJECT UNITS : US SURVEY FOOT

STATE PLANE COORDINATES GEO COORDINATES

POINT

NUMBER

NORTH EAST ELEVATION LATITUDE LONGITUDE

ELLIPSOID

HEIGHT

COMBINED

FACTOR

DESCRIPTION NOTE:

22101 141939.850 1300723.835 282.222 45°42'52.952816"N 121°49'47.356658"W 211.335 1.0000189 5/8" ir w/fhwa alum cap 1.

22102 142121.687 1300977.798 293.739 45°42'54.789940"N 121°49'43.821355"W 222.859 1.000018215 5/8" ir w/fhwa alum cap

22103 142475.101 1301451.474 331.091 45°42'58.357133"N 121°49'37.230735"W 260.2242 1.00001617 5/8" ir w/fhwa alum cap

22104 142902.488 1301763.153 364.122 45°43'02.627517"N 121°49'32.940128"W 293.28 1.000014281 5/8" ir w/fhwa alum cap

22105 143058.438 1302261.375 386.699 45°43'04.249476"N 121°49'25.956456"W 315.8647 1.000013084 5/8" ir w/fhwa alum cap

22106 143499.176 1302840.089 403.310 45°43'08.695714"N 121°49'17.905669"W 332.4851 1.000011967 5/8" ir w/fhwa alum cap

22107 143751.051 1303065.076 408.643 45°43'11.219123"N 121°49'14.794666"W 337.8264 1.000011529 5/8" ir w/fhwa alum cap

PROJECT : Wind River Road slide Reconstruction DATE OF FIELD WORK :May 2022 DATE OF FINAL ADJUSTMENT : May 2022

COORDINATE SYSTEM : Washington South SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18

EPOCH DATE : 2010.000

CADD COORDINATE SYSTEM : WA83/2011-SF NSRS11(NAD83/2011) Washington, South Zone, US Foot

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

C

M yF ile s\

Pr oj ec ts

\W A F

LA

P

S K A M

A N

(1

W in d R iv er

R oa d S lid e

R ec on st ru ct io n \9

P S

E P ac ka g e\

D

-J u n -2

:5 P

M W

FL

H

D S u rv ey

W

FL

H

D S u rv ey

D es ig n ed b y:

C h ec ke d b y:

PROJECT

D.1

SHEET

NUMBER

SURVEY CONTROL

:3

S e p te m b e r

E

A R

T H

W O

R K

S U

M M

A R

Y T

A B

L p w w o r k

\d

\w a a s k a m a n p ln .d g n

SHEET 1 OF 2

TABULATION OF QUANTITIES

PROJECT

D.2

:1 c to b e r

Q

U A

N T

IT

IE

S T

A B p w w o r k

\d

\w a a s k a m a n p ln .d g n

SHEET 2 OF 2

TABULATION OF QUANTITIES

PROJECT

D.3

3 1/2" BRASS CAP

G

PS

22102

W

E S

T

E

A S

T

S P E

E D L I

M I T

W D

O

T PIN

K

CL LID

B E F I R

E S

A F E

CO

N C

M P

H

18" O U

TLET

R

O U

G H R

O A

D

M

P H

18" IN

LET

CL LID

C1

SLO

W

ER TRAFFIC KEEP RIG

H T

M O

T O

R C

Y C

L E S U

S E E

X T

R E

M E C

A U

T I O

N

W

ATER VAU

LT

3X3 CO

N

CRETE PO

ST

12" FIR

CP

22103

Y T I L I T U

D E I R U B

G N I N R A W

12" FIR

TP

12" FIR

JB+

8"

MONUMENT L

ID

(UNABLE

TO O

PEN)

POSS

IBLE

PT&PC P

OIN

TS

W

SD

O

T PK2

1873.82 3 1/2" CRASS CAPD

N

BEGIN PROJECT

"MAIN 01" Line to be constructed Adjust to grade

Monument (case and cover riser)

Edges of paved shoulder

Edges of traveled way

Protect existing culvert

13+70

Slope stake limit

Slope stake limit

Construction limit clearing limits

Construction and

Adjust to grade

Monument (case and cover riser)

Protect existing 3x3 concrete post

PI 14+11.96

Δ = 15°37'13" (LT)

R = 1,000.00' T = 137.16' L = 272.63'

N52°36'05"E

P C

.8

8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00

298 298

300 300

302 302

304 304

306 306

308 308

310 310

312 312

314 314

316 316

318 318

320 320

322 322

324 324

326 326

328 328

330 330

332 332

334 334

336 336

338 338

340 340

.2

+6.30

+6.04

+5.96

.7

.0

HLSD = INF'

K = 1,275

352' VC

WIND RIVER RD

"MAIN 01" 10+00.00"

LEGEND:

See Sheet C.5 for detail Gravel Transition

E=1301092.1188 N=142226.6619

14+97.00 to 17+36.00, RT

Removal of guardrail

See Sheet C.5 for pavement transition detail Overlay transition

Removal of guardrail

Guardrail system MGS, type 2, class A steel posts (8' Post)

10+00.00 to 14+23.75, RT class A steel posts Guardrail system MGS, type 2, 14+23.75 to 18+23.75, RT

10+00.00 to 11+00.00

10+00.00 to 14+25.00, RT asphalt milling, followed by 3" asphalt overlay. See Section C for details.

Profile is provided for information only. Final pavement elevation is based on 2"

No clearing and grubbing in this area. See Physical Data for clearing limits.

:0

S e p te m b e r

W

IN

D

R

IV

E R

P

L A p w

-w o rk

\d \w a a -s k a m a n -1 p ln

.d g n

PROJECT

D.4

O

U T

L E

T

3X 3 C

O N C R

ETE PO

S T

O

U T L E T

O

U T L E

T

3X 3 C

O N C R

ETE PO

S T

I

N L E

T

20" A

LD

ER

3X 3 C

O N C R

ETE PO

S T

B H

22-01 PR

O

PO

S

ED

8" M

ONUMENT L

ID

(UNABLE

TO O

PEN)

POSSI

BLE

PT&PC P

OIN

TS?

O

U T

L E

T

W S D

O

T PK

O

U T

L E

T

I

N L E

T

C

IN

L E T

G O

LF &

S

PA

R

ES

O

RT

TP

9118.9

Y T I L I T U

D E I R U B

G N I N R A W

JB

C A R S O

N M

IN

ER

A L H

O T S

PR

IN

G S

8" M

ONUMENT LI

D (U

NABLE T

O O

PEN) P

OSSI

BLE P

T&PC P

OIN

TS?

IN

L E T

18" OUTLET

14" A

LD

ER

18" IN

LET

24" FIR

8" H

EM

LO

C K

C O

U N

T Y B

U I L

D I N

G P

E R

M I T S R

E Q

U I R

E D

" F

IR

6" H

EM

LO

C K

B H

22-02 PR

O

PO

S

ED

10" IN

LET

10" H

EM

LO

C K

C P

22104 W

D O T R

PC

B H

22-04 PR

O

PO

S

ED

18" OUTLET

18" INLET

8" MONUMENT LID (UNABLE TO OPEN) POSSIBLE PT&PC POINTS?

TP

TP

25309 122

8" MONUMENT LID (UNABLE TO OPEN) POSSIBLE PT&PC POINTS?

3X 3 C

O N C R

ETE PO

S T

Existing ground

Adjust to grade cover riser)

Monument (case and

Adjust to grade cover riser)

Monument (case and

Adjust to grade cover riser)

Monument (case and

Adjust to grade and cover riser)

Monument (case

Lining 36-inch pipe culvert 20+67 pavement Sawcutting "APPR 01"

Edges of traveled way

[5] Construction limit

Protect existing culvert 16+72 clearing limits

Construction and

Edges of paved shoulder limit

Slope stake

3x3 concrete post

Protect existing concrete post

Protect existing 3x3

See Section H for details structure design (MSE wall)

Contractor provided retaining

Protect existing 3x3 concrete post to be constructed

"MAIN 01" Line

Plug, existing pipe

16+78

Plug, existing pipe

16+78

See Section H for details structure design (soldier pile wall)

Contractor provided retaining limit

Slope stake clearing limits

Construction and clearing limits

Construction and

[4]Protect existing culvert

[5] Construction limit

PI 19+02.41

Δ = 31°55'59" (RT)

R = 750.00' T = 214.59' L = 418.00'

N36° 58'5

2"E

P T

.4

N68°54'51"E

P C

.2

P C

.8

P T

.8

9 2

15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50

336 336

338 338

340 340

342 342

344 344

346 346

348 348

350 350

352 352

354 354

356 356

358 358

360 360

362 362

364 364

366 366

368 368

370 370

372 372

374 374

376 376

+6.23

.7

.3

SSD = 743'

K = 256

801' VC

WIND RIVER RD

"APPR 01" 99+71.75

"MAIN 01" 21+44.45 =

14+23.75 to 18+23.75, RT

Guardrail system MGS, type 2, class A steel posts

15+40.00 to 17+06.00, RT

(MSE Wall), See Section H for details Contractor Provided Retaining Structure Design

Removal of guardrail

14+97.00 to 17+35.00, RT

19+00.00 to 19+51.25, RT type MGS tangent Terminal system, 19+51.25 to 21+14.25, RT

Guardrail system MGS, type 2, class A steel posts

Terminal system 21+14.25 to 21+26.50, RT

(anchor system)

LEGEND:

See Sheet C.5 for detail Gravel Transition

18+36.25 to 20+31.00, RT

Soldier Pile Retaining Wall, See Section H for details Contractor Provided Retaining Structure Design (Soldier Pile Wall)

Removal of guardrail

[1]16+37.25 to 17+48.00, LT

[1]19+90.00 to 21+49.00, LT

Removal of guardrail

[1]16+40.50 to 17+61.00, LT

Terminal system, type MGS-BAT(anchor system) Terminal system

[1]16+28.00 to 16+40.50, LT

(anchor system)

[1]19+90.00 to 20+02.50, LT

Guardrail system MGS, type 2, class A steel posts

[1]20+02.50 to 22+15.00, LT type MGS tangent

[1]22+15.00 to 22+65.00, LT avoid conflicts during installation of new guardrail posts.

Buried utility lines in the vicinity of guardrail. Locate lines and use caution to

Verify access to culvert ends with CO before beginning culvert lining work.

asphalt milling, followed by 3" asphalt overlay. See Section C for details.

Profile is provided for information only. Final pavement elevation is based on 2" terminal installation.

Ensure continued drainage through existing ditch and culvert after guardrail end

(anchor system) Terminal system

18+23.75 to 18+36.25, RT

No clearing and grubbing in this area. See Physical Data for clearing limits.

[5]

:0

S e p te m b e r

W

IN

D

R

IV

E R

P

L A

-2 p w

-w o rk

\d \w a a -s k a m a n -1 p ln

.d g n

PROJECT

D.5

8" MONUMENT LID (UNABLE TO OPEN) POSSIBLE PT&PC POINTS?

O

T O

R C

Y C

L E S U

S E E

X T

R E

M E C

A U

T I O

N

3X3 CONCRETE POST

R O

U G

H R

O A

D

18" OUTLET

18" INLET

CP

22105

WILLIES RD

TP

S P

E E

D L I

M I T

TP

TP

1/2" IR

END PROJECT

to be constructed

"MAIN 01" Line

Sawcutting pavement

"APPR 02"

clearing limits

Construction and

Slope stake limit

Edges of traveled way

Edges of paved shoulder

Slope stake limit

"APPR 02" 199+70.29

"MAIN 01" 24+93.60 =

Protect existing culvert pavement

Sawcutting

PI 25+19.42

Δ = 19°42'37" (LT)

R = 1,400.00' T = 243.21' L = 481.61'

P C

.2

P T

.8

4 2

23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50

364 364

366 366

368 368

370 370

372 372

374 374

376 376

378 378

380 380

382 382

384 384

386 386

388 388

390 390

392 392

394 394

396 396

398 398

400 400

402 402

404 404

406 406

.2

+3.10%

WIND RIVER RD

W

IL

L

IE

S R

O

[1] Overlay transition detail

26+08 to 27+08

See Sheet C.5

"MAIN 01" 27+08.00

E=1302447.3932 N=143223.0422 clearing limits.

No Clearing and Grubbing in this area. See Physical Data for asphalt overlay. See Section C for details.

elevation is based on 2" asphalt milling, followed by 3" Profile is provided for information only. Final pavement surface of adjacent County roadway project.

Adjust overlay transition length as needed to tie to finished

LEGEND:

See Sheet C.5 for detail Asphalt Overlay Transition

:0 c to b e r

W

IN

D

R

IV

E R

P

L A

-3 p w

-w o rk

\d \w a a -s k a m a n -1 p ln

.d g n

PROJECT

D.6

O N d ia

"16

CASE

COVER

TOTAL

60 LBS

19 LBS

79 LBS

PLAN VIEW

A

"2

1 2" 3"

WEIGHTS

APPROXIMATE

(Size)

A

RISER RING DIMENSIONS

RISER RING

SECTION

COVER

SECTION

SECTION OF LETTER

CASE

SECTION

INSTALLATION

SECTION A-A

ISOMETRIC

" dia2

"4

" R4

Concrete base

Concrete base

Soil

Grout steel pipe

2" O.D. galvanized m a x

10" R m in

6"

" dia2

8" dia

9" dia

A

A

1" dia

" dia8

" R8

" R8

" R4

" R8

" R4

4" R

" R4

"2

" R4 m in

1"

"4

NOTE:

2.

1.

Install concrete base on a well compacted foundation.

Dimensions may vary according to manufacturer.

:1

A u g u s t

W

S D

O T

P la n S h e t p w w o r k \d

\W

S D

O T

M o n u m e n t

C a s e a n d C o v e r .d g n

DETAIL

MONUMENT CASE AND COVER

PROJECT

D.7

:1 e p te m b e r

A P

P R

O A

C H

T A

B U

L A

T

IO

N O

F Q

U A

N T

IT

p w w o r k \d

\w a a s k a m a n p ln ty p a p p r .d g n

QUANTITES

APPROACH TABULATION OF

PROJECT

E.1 with tack coat between lifts third lift = 1.5" ; top lift = 1.5")

(bottom lift = 3"; second lift = 3"

9-inch compacted depth, placed in four lifts

Asphalt concrete pavement, type 1, Roadway aggregate, method 2, 6-inch compacted depth

LC

LC

Edge of gravel shoulder

Driveway matchline

Edge of paved shoulder, E d g e o f p a v h o u ld e r

Approach length (L1)

V a ria b le

R 2R

W

Approach tie-in

A p p r o a c h l e n g th

L

ASPHALT CONCRETE PAVEMENT SURFACINGTYPICAL ASPHALT CONCRETE PAVEMENT

APPROACH ROAD PLAN

:1 e p te m b e r

A P

P R

O A

C H

R O

A D

C O

N N

E C

T

IO

N D

E T

A

IL

p w w o r k \d

\w a a s k a m a n p ln ty p a p p r .d g n

DETAILS

APPROACH ROAD CONNECTION

PROJECT

E.2

O

U T

L E

T

I

N L E

T

M

O N

U M

E N

T L I D

U N

A B

L E T

O O

P E

N P

O S

S I B

L E P

T

P C P

O I N

T S

N

S28°45'49"E

99+70 99+80 99+90 100+00 100+10

345 345

350 350

355 355

360 360

365 365

370 370

375 375

380 380

385 385

100+20 100+30 100+40

.0

.2

-11.56%

O

U T L E T

N

BEGIN CONSTRUCTION

BEGIN CONSTRUCTION

END CONSTRUCTION

END CONSTRUCTION

"APPR 01" 99+71.75

"APPR 02" 199+70.29

Existing ground

Existing ground

Profile grade

Profile grade pavement

Edge of pavement

Edge of pavement

Edge of

Slope stake limit pavement

Edge of to be constructed

01" LineAPPR" to be constructed

02" LineAPPR"

"MAIN 01""MAIN 01"

Protect existing gate clearing limits

Construction and clearing limits

Construction and

Slope stake limit

S10°14'30"E

199+70 199+80 199+90 200+00 200+10

365 365

370 370

375 375

380 380

385 385

390 390

395 395

400 400

405 405

200+20 200+30 200+40

.4

.8

-7.82%

"APPR 01" 100+00.00

"APPR 01" 100+19.26

"APPR 02" 200+00.00

"APPR 02" 200+18.07

"MAIN 01" 21+44.45

"MAIN 01" 24+93.60

W I N

D R I V

E R R

D

W

IN

D R

IV

E R R

D

R

R

.5

R

R

E= 1301965.2957

N= 142936.3427

E= 1301974.5620

N= 142919.4620

E= 1302275.8807

N= 143072.8870

E= 1302279.0934

N= 143055.1058

:3 e p te m b e r

A L

I

A p p r o a c h

D r iv e w a y

S h e t] p w w o r k \d

\w a a s k a m a n p ln a p p r .d g n

PROJECT

E.3

10.4 x 16 20310 -1000

60707 -0700

Station E S T

IM

A T E D

M A X

IM

U M

C O

V E R

S T R U

C T U

R A L

E X C

A V A T

IO

N

PL

U

G

E X

IS

T

IN

G P

IP

E

LI

N

IN

G

-I

N C

H P

IP

E C

U

LV

E R T

S K E W

A N

G

LE

A llo w ab le P ip e

M at er ia l (S ee k ey b el o w

B E V E

LS

V :n

H

B E V E

LS

V :n

H

REMARKS

FEET CUYD EACH LNFT Lt Rt 16+78 7 7 1 20+67 30 168 Do not begin culvert lining work until approved by the CO.

PROJECT TOTAL 7 1 168

Allowable Pipe Material A Aluminum AS Aluminized steel C Concrete DI Ductile Iron GS Galvanized steel P Plastic (blank) Any appropriate material x/__ Any appropriate material except __

PAY ITEM NUMBER

-A u g -2

:3

A

M c:

\p w -w o rk

\d w a a -s ka m a n -1

D ra in a g e

T a b u la ti o n .x ls x]

S h ee t

TABULATION OF DRAINAGE QUANTITIES

PROJECT

F.1WA FLAP SKAMAN 92135(1)

SHEET

NUMBERNote: The quantities shown hereon are approximate and are subject to field adjustments.

:5 e p te m b e r

T A

B U

L A

T

IO

N O

F Q

U A

N T

IT

IE

p w w o r k \d

\w a a s k a m a n p ln e c .d g n

TABULATION OF QUANTITIES

PROJECT

G.1

Steel or wood post

Silt fence reinforcement

Geotextile

Backfilled and compacted soil

End Posts Detail

End posts, see

Section B

Geotextile fabric, fabric, Section A

Geotextile

Fasten fabric to posts around each post one full turn.

Fold geotextile fabric

End Posts Detail

End posts, see

(undisturbed)

Existing ground

Limits of clearing

Staple or tie

Geotextile fabric

Steel or wood post

Tie top of posts together driven tightly together.

Steel or wood posts Staple or tie

NO SCALE

NOTE:

running around the ends.

Curve ends of silt fence upgrade to prevent water from as possible.

Install silt fence to follow the ground contours as closely attached to, and does not slide down, supporting posts.

procedures. All types must ensure silt fence remains manufacturer's recommendations for installation as long as specified dimensions are satisfied. Follow

Alternate preassembled silt fence options will be allowed

4.

3.

2.

1.

POST AND GEOTEXTILE INSTALLATION DETAIL

SILT FENCE INSTALLATION AT TOE OF FILL

END DETAIL

POSTS AT JOINTS

END POSTS DETAIL

PLAN

ELEVATION

PLAN

PLAN

PLANELEVATION

Flow

T o e o f s lo p e

See Note 3

Fi ll sl op e

See Note 3

Varies

Flow Fi ll slo pe

Flow f o r s p a c in g

S e e N o te

Varies

T o e o f s lo p e m in m in m in

4" min.

6" min. trench 6-foot maximum spacing without silt fence reinforcement.

10-foot maximum spacing with silt fence reinforcement.

SILT FENCE

157-1W

FP-24, FP-14

10/2016

WFL STANDARD

:5

S e p te m b e r

S td W p w w o r k \d

\w a a s k a m a n W

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

G.4 are similar for flat-bottom ditches

Check dam installation details

V-ditch design shown.

uphill side of fiber roll trench material on

Place excavated See Note 5

Flow line the ends. See Note 6 to prevent flow around

Curve ends upstream

Gravel bag

Filter rock

Filter rock

Trench 2" min.

Trench 2" min.

Fiber roll 9" Ø min.

NO SCALE

NOTE:

conditions.

Adjust check dam spacing based on site-specific around the ends of the fiber roll.

Provide sufficient length to prevent water from flowing

Drive stakes into undisturbed soil of trench bottom.

stakes. Drive stakes at each end of the fiber roll and at

Install check dams in ditches perpendicular to the flowline.

installation.

Repair all rills or gullies and properly compact prior to requirements of the check dam device.

gravel bags as approved, to meet the functional

Construct check dams from fiber rolls, filter rock, or

7.

6.

5.

4.

3.

2.

1.

FIBER ROLL CHECK DAM

GRAVEL BAG CHECK DAM

FILTER ROCK CHECK DAM

CROSS SECTION

(See Note 7)

CHECK DAM SPACING*

FIBER ROLL

CROSS SECTION

V-DITCH

CROSS SECTION

FLAT-BOTTOM DTICH

STAKING DETAIL

FIBER ROLL

PLAN

CROSS SECTION

(See Note 7)

CHECK DAM SPACING

FILTER ROCK

(See Note 7)

CHECK DAM SPACING**

GRAVEL BAG

than 6%.

dams on ditch grades steeper

** Do not use gravel bag check on ditch grades steeper than 5%.

Do not use fiber roll check dams

* Spacing calculated based on

Flow

F lo w

Se e N ote m in m in m in .6 m in

-inch wood8

-inch x 18

Stake fiber rolls in place with 1

Expose stakes 2-inches minimum above top of fiber roll.

2-foot maximum spacing.

9" Ø minimum fiber roll.

GRADE

DITCH

SPACING (max.)

CHECK DAM

5%

4%

3%

2%

GRADE

DITCH

SPACING (max.)

CHECK DAM

6%

5%

4%

3%

2%

GRADE

DITCH

SPACING (max.)

CHECK DAM

6%

5%

4%

3%

2%

(FT)

(FT)

(FT)

MODERATE GRADES

CHECK DAM

157-15W

7/2016

:2

A u g u s t

S td W p w w o r k \d

\w a a s k a m a n W

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

G.5

Ponded water

Rolled erosion control productRolled erosion control product

Rolled erosion control product

Filter rock

Filter rockFilter rock

NO SCALE

NOTE:

conditions.

Adjust check dam spacing based on site-specific

Install check dams in ditches perpendicular to the flowline.

installation.

Repair all rills or gullies and properly compact prior to

3.

2.

1.

ROLLED EROSION CONTROL PRODUCT

FILTER ROCK CHECK DAM WITH

PROFILE VIEW

V-DITCH

CROSS SECTION

FLAT-BOTTOM DITCH

CROSS SECTION

(See Note 3)

CHECK DAM SPACING

FILTER ROCK

Check Dam spacing (S)

Ditch Gr ade (G)

:2 ty p m in m in

"6

(G)

GRADE

DITCH

SPACING (S)

MAX. CHECK DAM

≥10%

8% and 9%

7%

(FT)

EROSION CONTROL PRODUCT

CHECK DAM WITH ROLLED

157-16W

7/2016

:0

M a rc h

S td W p w

-w o rk \d

\w a a

-s k a m a n

-1

W

-1

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

G.6 length requirements culverts table for

See Fiber rolls at around culvert outlet

Install fiber rolls end section with flared

Culvert outlet uphill side of fiber roll

Place excavated material on

Fill slope on uphill side of fiber roll

Place excavated material Wood stakes

Fiber roll

Slope

Fill or cut slope uphill side of fiber roll

Place excavated material on

Fiber roll roll 2" min.

Trench fiber

Stagger joints (typ.)

along contours

Install fiber rolls flared end section

Culvert inlet with table for length requirements

See Fiber rolls at culverts around culvert inlet

Install fiber rolls

See note 6 control runoff culvert as needed to

Install fiber rolls below

Fiber roll

A A

151V:2H and steeper

30Between 1V:3H and 1V:2H

45Between 1V:4H and 1V:3H

601V:4H or flatter spacing (ft)

Fiber Roll Maximum �9" Slope Gradient

FIBER ROLL SPACING TABLE*

site-specific conditions.

*Approximate spacing shown. Adjust spacing as needed due to specific conditions.

Adjust length as needed due to site-across the top of the culvert inlet only.

*Approximate length shown for rolls

3054" or larger

2030" to 48"

1024" or smaller

Fiber Roll length (ft)�9" Culvert Size

FIBER ROLL AT CULVERTS*

NO SCALE

AT CULVERT OUTLET

FIBER ROLL

AT CULVERT INLET

FIBER ROLL

FIBER ROLL JOINT DETAIL

FIBER ROLL LAPPING DETAIL

FIBER ROLL SLOPE LAYOUT

INSTALLATION DETAIL

FIBER ROLL AS PERIMETER CONTROL STAKE DETAIL

SECTION A-A

Flow m in .Trench 2" min.

L im it C le a ri n g ta k e

S lo

Flow irection of ru n off

Pay lim its

Pay lim its ove rlap12" mi n.

m in

Flow

Trench 2" min.

Flow

Flow

See fiber roll spacing table Flow

Se e n ote

Se e n ote culvert is crossing the disturbance.

on both the road and around the culvert and all water entering the

6. Place fiber rolls all the way around the inlet when the disturbance is water is forced to flow through fiber roll rather than under it.

Tamp soil backfill against upstream side of fiber roll to ensure storm Place fiber rolls in continuous contact with trench bottom and sides.

5. For fiber rolls on bare soil, construct trenches parallel to the contour.

stakes 2 inches above top of fiber roll.

4. Drive stakes into undisturbed soil at least 12 inches deep. Expose max. at culverts. Stake fiber rolls 6 inches from each end.

stakes. Space stakes 4-foot o.c. max. on slopes and 2-foot o.c.

3. Stake fiber rolls in place with 1-inch x 1-inch or 1-inch Ø wood level.

fiber roll, do not allow the fiber roll to vary more than 5% from

2. Install fiber rolls along slope contours. For any 20-foot section of

1. Repair all rills and gullies and properly compact before installation.

NOTE:

:3

A u g u s t

D e t

C

-5 p w

-w o rk \d

\w a a

-s k a m a n

-1

C

-5

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USEFIBER ROLL

C157-55

DRAFT: 06/2024

CFLHD DETAIL

PROJECT

G.7 with plastic liner or riprap

Temporary diversion channel

NO SCALE

temporary barrier

Use sandbags to construct A

A

Flow

PLASTIC LINED DIVERSION CHANNEL

SECTION B-B

SECTION A-A

W

B

W

B

SandbagsPlastic liner

SSSS

D D SS

SS

Flow

Plastic liner when scheduled)

Silt fence (typ.

and secure with sandbags (typ.)

6.

5.

4.

3.

2.

1.

Flow

Provide geotextile filter conforming to Subsection 714.01(c).

using one of the methods listed in Subsection 204.11(a).

temporary culvert. Compact temporary culvert backfill channel through the roadway embankment with

When specified replace the portion of the diversion liner. Bury the upstream edge of the liner a minimum of

Do not construct with longitudinal joints if using a plastic

Construct channel at a minimum grade of 0.5 percent.

width of the temporary diversion channel.

Use plastic liner or riprap along the entire length and diameter, riprap class, channel dimensions and quantities.

See Erosion Control Section for temporary culvert

NOTE:

Permanent culvert

Roadway centerline

BB

See Note 5 when scheduled)

Silt fence (typ.

backflow into natural channel

Use sandbags to prevent

Permanent natural channel

Earthwork limits

DIVERSION CHANNEL

PLAN

TEMPORARY CULVERT

SECTION B-B

Ø embankment

Roadway embankment

Roadway

Temporary culvert backfill

Subgrade

Bedding

Natural ground

RIPRAP LINED DIVERSION CHANNEL

SECTION A-A SECTION B-B

W

B B

W

T T when scheduled)

Silt fence (typ.

Sandbags

Riprap lining Riprap lining

SS SSD D

SS SS

FlowFlow

Geotextile filterGeotextile filter

6" deep and secure with riprap or sandbags.

Bury plastic liner 6" deep

2' 2'2'2'

DIVERSION CHANNELS

TEMPORARY STREAM

628-1

FP-24

1/2024

FLH STANDARD

:3

A u g u s t

S td p w w o r k \d

\w a a s k a m a n S td .d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

G.8

NO SCALE

Compacted native soil

Erosion control blanket

Erosion control blanket

Compacted native soil

Erosion control blanket

12" spacing

12" spacing

6" x 6" Trench

6" x 6" Trench

NOTE:

Overlap in the direction of the prevailing wind.

recommendations.

Install fasteners according to the manufacturer's

2.

1.

Se e

Not e

Pr ev ai lin g wi nd

AT TOP OF SLOPE

ANCHOR TRENCH

DETAIL A

AT TOE OF SLOPE

ANCHOR TRENCH

DETAIL B

SHINGLE SPLICE

DETAIL C

PERSPECTIVE VIEW

Fasteners @

Fastener

Fastener

Flow

Fastener (typ)

Fasteners @

Toe of slope of slope. See Detail A

Anchor trench at top

Slope stake

Blanket edge

Shingle splice. See Detail C edge overlap of slope. See Detail B

Anchor trench at toe

Blanket ends

S ee N ote 1

Fasten er sp acin g

6"

6"

3'

' m

ax. c to c

4" min.

overlap

6" m in.

12" max. c to c

12" max. c to c

12" max. c to c

PRODUCT ON SLOPES

ROLLED EROSION CONTROL

629-1W

8/2024

:5

S e p te m b e r

S td W p w w o r k \d

\w a a s k a m a n W

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

G.9

Fasteners

Fastener

Fastener

6" max c to c

NOTE:

PERSPECTIVE VIEW

INITIAL ANCHOR

DETAIL A

See Note 2

CHECK SLOT

DETAIL B

SHINGLE SPLICE

DETAIL C

ANCHOR TRENCH

DETAIL D

native soil

Compacted control blanket

Erosion control blanket

Erosion native soil

Compacted control blanket

Erosion

Anchor Trench. See Detail D control blanket

Erosion native soil

Compacted for a V-ditch.

Trapezoidal ditch shown. Similar details

Roll ends may be spliced in a check slot.

manufacturer's recommendations.

Provide check slots according to the manufacturer's recommendations.

Install fasteners according to the

4.

3.

2.

1.

Fastener

Flo w

Fastener

See Detail D

Anchor trench

See Detail C

Shingle splice edges

Blanket

Fastener (typ.)

Flow

Flow ends

Blanket

See Detail B

Check Slot.

See Detail A

Initial Anchor

See Note 1

Fastener spacing

Fastener end overlap

6"

6" ed ge ov er lap6" m in

6"

12" max. c to c

12" max. c to c

36" max c to c

6" max c to c

12" max c to c

6" min.

PRODUCT IN CHANNELS

ROLLED EROSION CONTROL

629-2W

8/2024

:5

S e p te m b e r

S td W p w w o r k \d

\w a a s k a m a n W

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

G.10

A u g u s t

T

A B

U L

A T

IO

N

O F

W A

L L

Q U

A N

T

IT

p w w o r k

\d

\w a a s k a m a n p ln m s e w a ll

.d g n

QUANTITIES

TABULATION OF

PROJECT

H.1

O

U T L E

T

+ 18" OUTLET

18" INLET

Existing ground

Top of wall

Bottom of wall at wall face

Final grade

N

BEGIN MSE WALL END MSE WALL

Slope stake limit

Slope stake limit clearing limits

Construction and

Construction limit

Edge of paved shoulder

Edge of paved shoulder Edge of travel way

Edge of travel way

"Main 01" design (MSE wall)

Contractor provided retaining structure

M1

M2

M3

M4

M5

M6

M7

M8

M9 M10

M11

M12

M13

M14

M15

M16 M17

M18

M19

M20 clearing limits

Construction and

PI 201+56.75

Δ = 01°23'19" (RT)

R = 715.23' T = 8.67' L = 17.33'

PI 200+03.84

Δ = 00°25'32" (LT)

R = 1,034.77' T = 3.84' L = 7.68'

P C

.0

N36°58'52"E

P T

.6

199+50 200+00 200+50 201+00 201+50

328 328

330 330

332 332

334 334

336 336

338 338

340 340

342 342

344 344

34.77' RT

15+40.00 (Main 01), 200+00.00 =

34.77' RT

17+06.00 (Main 01), 201+65.42 =

E= 1301525.0364 N= 142559.4043

E= 1301624.7319 N= 142691.3989

WIND RIVER RD

NOTE:

1. See Sheet H.4 for wall profile data.

:1

S e p te m b e r

M

S E

W a ll

M S

E W a ll

S h e p w

-w o rk \d

\w a a

-s k a m a n

-1 p ln m s e w a ll .d g n

PROJECT

H.2

CP

22104

PC

TP

TP

N

BEGIN SOLDIER PILE WALL END SOLDIER PILE WALL

paved shoulder

Edge of

Edge of travel way

Edge of travel way paved shoulder

Edge of

Slope stake limit

Slope stake limit

Construction limit structure design (soldier pile wall)

Contractor provided retaining

Existing ground

Bottom of concrete fascia wall

Drilled shaft (typ.)

Soldier pile (typ.)

Existing culvert g.s. at 359'

Boring BH23-02 clearing Limits

Construction and clearing Limits

Construction and

S1

S2

S3

S4 S5 S6

S7

S8

S9

S10

S11

S12

S13

S14

S15S16S17S18

S19

S20

N90°00'00"E

PI 301+23.75

Δ = 10°00'28" (RT)

R = 716.48' T = 62.73' L = 125.15'

P O

B

.0

P C

.0

P C

C

.1

302+00 303+00298+00 299+00 300+00 301+00

300 300

310 310

320 320

330 330

340 340

350 350

360 360

370 370

380 380

31.52' RT

300+00.00 = 18+36.25 (Main 01), 33.52' RT

301+86.82 = 20+31.00 (Main 01), WIND RIVER RD fascia wall Top of concrete

NOTE:

Submit wall design per Section 257.

2. Soldier pile spacing shown for illustration.

1. See Sheet H.4 for wall profile data.

E= 1301707.7206 N= 142784.0442

E= 1301862.4188 N= 142886.9403

:0

S e p te m b e r

A

L I_

S P

W

A L L

S P

W a ll

P la n S h e p w

-w o rk \d

\w a a

-s k a m a n

-1 p ln s p w a ll .d g n

PROJECT

H.3

:4 e p te m b e r

P o in t

T a b le p w w o r k \d

\w a a s k a m a n p ln s p w a ll

.d g n

POINT DATA

WALL PROFILE

PROJECT

NUMBER

H.4

87°

Existing ground form (typ.)

Welded wire

WITH WELDED WIRE FORM FACE

MECHANICALLY-STABILIZED EARTH WALL

sheet drain, 50% coverage

Geocomposite

Unclassified borrow H

Select granular backfill

Grid length, "L"

Mainline profile grade

6" (min.)

(min.)

4' Set back

See Detail A

Underdrain system

[2]Varies

Wall excavation, .7

H

H e ig h t v a r ie s

1:3

See Sheet C.3 for details

Pavement structure at mid height of panel at face 12" (min.)

Gabion rock

FACING DETAIL - ROCK FILL

Select granular backfill

Select granular backfill grid, 3 per panel (typ.)

on facing and

Tie transverse bars m

4' Return (min.)

Welded wire form facing

WELDED WIRE FORM

adjoining wire form for support, 4"

Place edge of wire inside of

4 x 4 W5 x W5

Inset end struts 6"

24" C to C or as needed.

Support struts spaced maximum

NOTE:

FOOTNOTE:

Min. gradient = 2.0%

UNDERDRAIN SYSTEM

PERFORATED PIPE

DETAIL A

Underdrain backfill

Leveling course

12"

Flow

24"

Geocomposite drain towards rigid outlet pipe drain beneath leveling course. Minimum gradient 0.5%

6" Ø Perforated pipe underdrain system pipe drain every 100 feet (max.)

6" Ø Rigid outlet

2%

See Facing Detail

8'-0" ± whichever is greater

8' or 70% of H, class 2, non-woven

Geotextile filter, class 2, non-woven

Geotextile filter, 18" m in

(2) 45° Elbows

Friction angle = 34° for backfill material.

Unit weight of backfill material 125 pcf

Design assumptions:

1.

class A steel posts

Guardrail system MGS, type 2, 3" - 6"

4' shoulder

Top of wall (TW) (Layout line)

24" Embankment

Slope (1:3)

[3]Extend 6" (min.) beyond facing grading D.

Leveling course base, leveling pad (BLP)

Bottom of

Bottom of wall (BW)

[1]Rodent guard drain towards underdrain system.

Slope bottom of excavation at a minimum 2 percent grade to [3] accordance with Subsection 208.03.

1:1 Slope shown. Construct slopes at stable inclinations in[2] per manufacturer's recommendation

-inch. Install2

Opening in rodent guard not to exceed [1] geogrid

Reinforcement geogrid

Reinforcement

LC

1.52'

SHEET 1 of 2

EARTH WALL DETAILS

MECHANICALLY-STABILIZED9

:5 c to b e r

M

S E

W a ll

D e ta p w w o r k

\d

\w a a s k a m a n w a ll d e ta il

.d g n

:5 c to b e r

M

S E

W a ll

D e ta p w w o r k

\d

\w a a s k a m a n w a ll d e ta il

.d g n

PROJECT

H.5

Underlying mats

Return mat

Welded wire form

(PLAN VIEWS)

GEOGRID BUTT DETAIL

Adjacent geogrids

TANGENT WALL FACE

backside without overlap

Butt adjacent geogrids at

Wall face

CURVE LEFT WALL FACE

Adjacent geogrids

Backside overlap acceptable

Wall face

CURVE RIGHT WALL FACE

Adjacent geogrids

Backside separation acceptable

Wall face wall face without overlap

Butt adjacent geogrids at wall face without overlap

Butt adjacent geogrids at

Reinforcement length (L) wall face without overlap

Butt adjacent geogrids at

4' (min.)

recommended method.

with hog rings, wire ties, spiral binders, or the manufacturers

Connect adjacent welded wire reinforcement facing elements[1]

[1]Connect reinforcement

AND RETURN MAT DETAILS

MSE WALL FACING , CORNER

Reinforcement geogrid length (L)

Machine

(roll direction)

Machine

(roll direction)

Reinforcement length (L) Reinforcement length (L) wall face perpendicular to front with strongest axis

Reinforcement geogrid, Wall face

SHEET 2 of 2

:0

J u n e

M

E C

H A

N

IC

A L

L Y

-S T

A B

IL

IZ

R

T H

W A

L L

D E

T A p w w o r k \d

\w a a s k a m a n w a ll d e ta il

.d g n

EARTH WALL DETAILS

MECHANICALLY-STABILIZED

PROJECT

H.6 with Section 617 and Section 724.

Galvanize anchor metal components in accordance of the rail.

nuts and washers. Place the washer on the face side

Use eight 5/8" x 1 1/2" (in) machine bolts with hex dimensions shown.

plates welded to match the strength and

Fabricate the anchor plate from 1/4" (in) thick

100 ft.-lbs.

outside nut against the inside nut to a minimum of washers at both ends of the cable. Torque the

Fasten the Anchor Cable using two 1" (in) nuts and

See Sheet I.2 for additional details.

element and post details.

Refer to Standard Plans 617-32 for typical rail

NOTES:

6.

5.

4.

3.

2.

1.

:2

J u n e

G

W

-B E

A M

G U

A R

D R

A

IL

C A

B L

E R

E L

E A

S

IN

G T

E R

M

IN

A L

T Y

P E

G

-C R

T

C o p y p w w o r k \d

\w a a s k a m a n S td c .7

.d g n

SHEET 1 of 2

(ANCHOR SYTEM) DETAILS

TERMINAL SYSTEM

PROJECT

I.1

:2

A u g u s t

G

W

-B E

A M

G U

A R

D R

A

IL

C R

T A

N C

H O

R A

G E

A S

S E

M B

L Y

D E

T A p w w o r k \d

\w a a s k a m a n S td c .7

.d g n

SHEET 2 of 2

(ANCHOR SYSTEM) DETAILS

TERMINAL SYSTEM

PROJECT

I.2

2.

1.

Steel post

Wood blockout Wood blockout

Wood blockout

Steel post Steel post

Steel post

V ditch (typ.)

Steel post Wood blockout bolt and nut guardrail steeper

1V:4H or

Rub rail (typ.)

See Standard 617-31 (wood posts) and 617-32 (steel

Typical post spacing is 6'-3" unless otherwise noted.

" span2

12 ga. W-beam, 9'-4

" x 5" Bolt8

" dia. hole in post4

Field drill "2

12 ga. W-beam, 9'-4

NOTE:

PLAN

ALONG RAIL

ELEVATION

SECTION A-A SECTION B-B

DETAIL A

SECTION C-C

SECTION D-D

BLOCKOUT DETAIL

STEEL POST ANDDETAIL B

ELEVATION

D

C

BA

B C

D

A

See Detail A

Field bend

See Detail B

Ditch bottom

Edge of shoulder

S e e T a b le

Mid-span splice (typ.)

Top of cut

See Note 1

Washer

Pipe sleeve spacer

Shoulder Shoulder VariesShoulder

VariesShoulder w h e n r u b r a il i s r e q u ir

Terminal system, Type MGS-BAT

Pay Limits

Guardrail system MGS

Pay limits

Length of Need posts) for other details.

M in im u m p o s t le n g th

" x 2"8

6'-3

"21

3'-1

"21

3'-1

8" W6 x 8.5

W6 x 9 or c o v e r m in

POST DISTANCE

FROM EDGE OF SHOULDER

POST OFFSETS

22 13 or st ee pe r1V:

3H or st ee pe r1V:

3H or steeper

1V:4H

4681012141618202224 or steeper

1V:4H or steeper

1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .