waa-skaman92135-1_clearing_limits.pdf

PDF 417 KB Posted

Attached to
WA FLAP SKAMAN 92135(1), Wind River Road Slide Reconstruction
Solicitation number
69056725B000013
Issued by

About this file

This document is a clearing limits report for a Federal Highway Administration (FHWA) Western Federal Lands Highway Division project located in Washington State. The project involves Wind River Road slide reconstruction, specifically designated as WA FLAP SKAMAN 92135(1). The report provides detailed station offset, northing, and easting coordinates for the project's main alignment (MAIN 01), documenting the precise geographical positioning and clearing boundaries for a road reconstruction effort.

The technical documentation includes coordinate data from station 14+00.000 to 27+00.000, with both right (Clearing_Limit_R) and left (Clearing_Limit_L) offset alignments meticulously mapped. Each data point captures the station location, baseline offset, and corresponding northing and easting coordinates. The report was created on Friday, October 3, 2025, at 10:30 AM, with the file originating from a design survey (Design SurvFt) and stored at the file path c:\pw-work\d0510526\waa-skaman92135-1_cor.dgn. All measurements are recorded in feet, providing precise geographical reference points for the road reconstruction project.

View the file

Other files

File Type Posted
Bid Tabulation_Wind River Road Slide Reconstruction.pdf PDF
BidSum_WA FLAP SKAMAN 92135(1).pdf PDF
QandA_01-29-2026.pdf PDF
Amendment A006.pdf PDF
QandA_01-28-2026.pdf PDF
QandA_01-27-2026-3.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
QandA_01-27-2026-2.pdf PDF
Amendment A004.pdf PDF
QandA_01-27-2026.pdf PDF
QandA_01-26-2026.pdf PDF
Amendment A003.pdf PDF
QandA_01-23-2026.pdf PDF
Amendment A002.pdf PDF
Interested Vendors list.pdf PDF
QandA_01-22-2026.pdf PDF
QandA_01-14-2026.pdf PDF
Amendment A001.pdf PDF
QandA_01-12-2026.pdf PDF
waa-skaman92135-1_Project-Name-Change.pdf PDF
GM 16-24 Prelim Geotech Memo WA FLAP SKAMAN 92135-1.pdf PDF
waa-skaman92135-1_WindRiverRoad_SupplementalGeotechReport.pdf PDF
waa-skaman92135-1_construction-limits.pdf PDF
waa-skaman92135-1_XYZ_final.pdf PDF
IFB 69056725B000013.pdf PDF
waa-skaman92135-1_xs.pdf PDF
waa-skaman92135-1_Earthwork.pdf PDF
waa-skaman92135-1_construction-staking-notes.pdf PDF
waa-skaman92135-1_plan_IFB.pdf PDF
waa-skaman92135-1_Physical Data.zip ZIP file
waa-skaman92135-1_proposed-alignment.pdf PDF
waa-skaman92135-1_XYZ_base.pdf PDF
WFLHD Construction Contract Administration.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clearing Limits for MAIN 01 for

FEDERAL HIGHWAY ADINISTRATION

WESTERN FEDERAL LANDS

HIGHWAY DIVISION PROJECT

WA FLAP SKAMAN 92135(1)

WIND RIVER ROAD

SLIDE RECONSTRUCTION

Project:

Description:

Baseline (Active) Alignment:

File Name:

Last Revised:

Input Grid Factor:

Note: All units in this report are in feet unless specified otherwise.

Offset Alignment Baseline Alignment (Clearing_Limit_R) (ALI_MAIN_01) Baseline Alignment Offset Alignment Offset Alignment Point Name Station Offset Northing Easting

14+00.000 37.268 142449.076 1301431.032 14+50.000 38.001 142485.886 1301467.593 15+00.000 38.827 142526.052 1301503.693 15+50.000 44.999 142561.429 1301539.4 16+00.000 44.961 142601.393 1301569.448 16+50.000 45.582 142640.961 1301600.022 17+00.000 46.1 142679.937 1301630.137 17+50.000 37.936 142721.407 1301654.09 18+00.000 42.014 142752.843 1301689.701 18+50.000 83.914 142752.949 1301751.755 19+00.000 94.564 142772.194 1301792.776 19+50.000 97.999 142794.308 1301830.477 20+00.000 102.192 142813.082 1301869.74 20+50.000 110.531 142825.324 1301911.694 21+00.000 41.611 142906.389 1301925.506 21+50.000 48.706 142917.662 1301974.401 22+00.000 41.838 142942.058 1302018.583

ALI_MAIN_01

c:\pw-work\d0510526\waa-skaman92135-1_cor.dgn 10/3/2025 10:28

Station Offset Northing Easting Report

Report Created: Friday, October 3, 2025 Time: 10:30:27 AM

Design SurvFt

22+50.000 42.02 142959.877 1302065.3 23+00.000 42.063 142978.276 1302112.559 23+50.000 42.474 142998.092 1302160.103 24+00.000 40.486 143021.752 1302205.865 24+50.000 38.047 143047.396 1302250.478 25+00.000 49.36 143062.694 1302300.997 25+50.000 44.873 143093.352 1302342.842 26+00.000 42.696 143123.49 1302384.734 26+50.000 41.221 143154.495 1302425.877 26+50.000 40.977 143156.456 1302428.123 27+00.000 38.889 143187.587 1302465.312

Project:

Description:

Baseline (Active) Alignment:

File Name:

Last Revised:

Input Grid Factor:

Note: All units in this report are in feet unless specified otherwise.

Offset Alignment Baseline Alignment (Clearing_Limit_L) (ALI_MAIN_01) Baseline Alignment Offset Alignment Offset Alignment Point Name Station Offset Northing Easting

16+50.000 -21.336 142681.216 1301546.566 17+00.000 -22.744 142722.238 1301575.822 17+50.000 -35.22 142770.102 1301599.496 20+00.000 -39.944 142937.191 1301800.462 20+50.000 -50.959 142971.262 1301842.551 21+00.000 -51.078 142992.611 1301891.489 21+50.000 -26.483 142987.816 1301947.351 22+00.000 -21.371 143001.035 1301995.842 22+50.000 -21.522 143019.164 1302042.44

ALI_MAIN_01

c:\pw-work\d0510526\waa-skaman92135-1_cor.dgn 10/3/2025 10:29

Station Offset Northing Easting Report

Report Created: Friday, October 3, 2025 Time: 10:32:16 AM

Design SurvFt

File details come from the government source that posted it. Updated .