19b0001_Solicitation_Amendment_0001_24Apr19.pdf
PDF 207 KB Posted
- Attached to
- Construct AK USPFO Building
- Solicitation number
- W91ZRU19B0001
About this file
W91ZRU19B0001 Solicitation Amendment 0001 24 April 2019
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
020143
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0001: Incorporates the follow ing changes:
A. Details of the Pre-Bid / Site Visit has been amended. Section 00100 and FAR Clause 52.236-27 has been revised to incorporate the new information.
B. Registration to attend Bid Opening must be submitted by 03 May 2019, 5:00 P.M. AST. Section 00100, paragraph 5.2. has been revised.
C. Wage Determination AK190001 dated 03/29/2019 AK1 has been replaced by AK190001 dated 04/19/2019 AK1.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 21
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Apr-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91ZRU-19-B-0001
X 9B. DATED (SEE ITEM 11)
09-Apr-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Apr-2019
CODE
W91ZRU USPFO FOR ALASKA
KO FOR AKNG
PO BOX B, CAMP DENALI
FT RICHARDSON AK 99505-2610
W91ZRU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91ZRU-19-B-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
SECTION 00100
SECTION 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. Description of the Project: Construct Alaska National Guard (AKNG) United States Property and Fiscal Office (USP&FO) Building to support all administrative, warehouse and central issue facility (CIF) functions provided by the USP&FO. The facility will support all administrative, warehouse and CIF functions provided by the USP&FO. The building will contain administration offices, the warehouse and CIF with functional space allowances for: tool and supply/parts rooms along with loading dock; battery room; small arms vault; bulky equipment storage; administrative/office areas: classrooms; locker/toilet/shower rooms; break room; information technology (IT) support spaces; and required mechanical/electrical areas in a building area of approximately 40,000 SF. It may also include, but not be necessarily limited to, associated supporting facilities such as enclosed unheated storage; controlled waste handling storage; flammable material storage; refuse collection facility; military vehicle (MV) and privately owned vehicle (POV) parking; access roads and curbing; service access aprons; sidewalks;
loading ramp; security lighting and fencing; site and building anti-terrorism/force protection (AT/FP) measures;
utilities to include standby emergency generator; water drainage and management measures; sediment and erosion control measures to be implemented during construction; and landscaping. Buildings will be of permanent construction with heating, ventilation, and air conditioning (HVAC), mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve the project. This project will be required to obtain the United States Green Building Council (USGBC) Leadership in Energy and Environmental Design (LEED) Silver Certifiable level of construction.
2. Instructions to Bidders:
2.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) Solicitation: W91ZRU-19-B-
0001 entitled: Construct AK USP&FO Building, Project Number 020143, at Joint Base Elmendorf- Richardson (JBER), Alaska 99505.
2.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.
2.3. This solicitation is set-aside 100% for small businesses.
3. NOTICE OF PRE-BID CONFERENCE AND SITE VISIT:
3.1. As described in FAR Clause 52.236-27, a pre-bid site visit and conference will be held at the Alaska
National Guard (AKNG) Armory, Building 49000 Army Guard Road, Room B208, Camp Denali, Joint Base Elmendorf-Richardson (JBER), Alaska 99505. Interested Contractors are highly encouraged to attend the pre-bid conference with potential subcontractors. The site visit will be held following the conference. Attendees are cautioned to dress appropriately for weather and site conditions. Work boots and safety vests are required.
The site is undeveloped with considerable vegetation, timber, and uneven ground. Wildlife is present on or near the construction site and may be encountered during the site visit. ALL PARTIES MUST REGISTER EVEN IF THEY ALREADY HAVE BASE ACCESS, NO LATER THAN 29 APRIL 2019, 5:00 p.m. Alaska Standard Time to: virginia.m.trezise-harman.civ@mail.mil and michael.p.conner.civ@mail.mil.
3.2. Please reference FAR Clause 52.236-27 for details on how to gain access to JBER-Richardson.
3.3. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
3.4. A record of the conference shall be made and furnished to all prospective bidders via posting at http://www.fbo.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
4. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:
4.1. Submit all questions in the format shown below by email to the contracting office at the addresses shown below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office.
Subject Line: RFI for SOLICITATION W91ZRU-19-B-0001 Email: virginia.m.trezise-harman.civ@mail.mil and sandra.m.kenzie.civ@mail.mil
PRE-BID INQUIRY FORMAT
Date of Bid Inquiry: _______________
From: ______________________________ Company Name: ________________________________
Address:_____________________________________________________________________________
Phone Number: _____________________________ Fax Number:______________________________
Email address: ________________________________________________________________________
Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)
4.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.
4.3. All questions and requests for information (RFI) must be received NOT LATER THAN 07 May 2019 at 02:00 P.M Alaska Standard Time. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS
EARLY IN THIS PROCESS.
4.4. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on FBO at http://www.fbo.gov
4.5. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.
4.6. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (FedBizOpps.gov or fbo.gov) system. Plans and specifications are locked on FBO and require Contractors to request export controlled access through DLA. See complete instructions on FBO.
FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system.
4.6.1. Amendments, if/when issued will be posted to https://www.fbo.gov/ for electronic downloading.
This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.
5. BID REPOSITORY AND BID OPENING:
5.1. A bid repository is provided for hand carried bids and is located at the Alaska National Guard (AKNG), USPFO Purchasing and Contracting, Building 49140 Army Guard & Ruff Road, Room 101B, Camp Denali, Joint Base Elmendorf-Richardson (JBER), Alaska 99505. Hand carried bids must be deposited in the repository prior to the time established for opening of bids. Bidders are cautioned that they will be required to sign-in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. See instructions for obtaining access to the base in FAR 52.236-27. Follow the same instruction for obtaining entry to hand carry bid. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.
5.2. The bid opening will occur at the time and date specified in Block 13 of the SF1442 at Alaska National
Guard (AKNG), USPFO Conference Room, Building 49140 Army Guard & Ruff Road, Room 121, Camp Denali, Joint Base Elmendorf-Richardson (JBER), Alaska 99505. All interested offerors are encouraged to attend the bid opening. Due to space constraints, attendance is limited to one (1) representative for each offeror. REGISTRATION FOR BID OPENING MUST BE SUBMITTED NO LATER THAN 03 MAY 2019, 5:00 p.m. Alaska Standard Time to: virginia.m.trezise-harman.civ@mail.mil and michael.p.conner.civ@mail.mil.
6. WAGE DETERMINATION:
Construction Wage Rates are applicable to this project are General Decision Number: AK1 as shown in Section 00800.
7. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS:
This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.
8. CLAUSES AND PROVISIONS:
Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
9. DISPOSITION OF UNSUCCESSFUL BIDS:
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids including the bid bond.
10. OFFERORS QUALIFICATIONS:
To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.
11. BRAND NAME ITEMS INCLUDE:
Best Lock Cores: The use of a single lock core enables the systematic management of the lock system on all facilities belonging to the Alaska National Guard (AKNG). Providing a single lock core for all installation buildings allows for single keying a tracking mechanism, an emergency response master key to work properly in emergency situations for both security forces and fire department and reduced maintenance and training costs for the AKARNG over the life-cycle of the building.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. Attendees are cautioned to dress appropriately for weather and site conditions. Work boots and safety vests are required. The site is undeveloped with considerable vegetation, timber, and uneven ground. Wildlife is present on or near the construction site and may be encountered during the site visit.
(b) An organized site visit has been scheduled for-
Thursday, 02 May 2019 at 10:00 a.m. (Alaska Standard Time)
(c) Participants will meet at Alaska National Guard (AKNG) Armory, Building 49000, Army Guard Road, Room B208, Joint Base Elmendorf-Richardson (JBER), Alaska 99505.
All interested contractors are highly encouraged to attend with their potential subcontractors. Contractors interested in attending must provide the following information NO LATER THAN 17 APRIL 2019 at 12:00 p.m. noon Alaska Standard Time to ensure access to the military base. Your information will be available at the JBER-Fort Richardson gate for verification to enter installation. Registered visitor(s) are required to present a Driver License at the gate. ALL PARTIES MUST REGISTER EVEN IF THEY ALREADY HAVE BASE ACCESS, NO LATER THAN 29 APRIL 2019, 5:00 p.m. Alaska Standard Time to: virginia.m.trezise-harman.civ@mail.mil and michael.p.conner.civ@mail.mil.
REQUIRED INFORMATION:
1) Attendee - Last Name, First Name, MI
2) Driver License Information (Number, Issuing State)
3) Date of Birth
4) Name of Company
TO
Virginia M. Trezise-Harman 907-428-6188 virginia.m.trezise-harman.civ@mail.mil and
Michael P. Conner 907-428-6182 michael.p.conner.civ@mail.mil
(End of provision)
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE DETERMINATION
General Decision Number: AK190001 04/19/2019 AK1
Superseded General Decision Number: AK20180001
State: Alaska
Construction Types: Building and Heavy
Counties: Alaska Statewide.
BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/04/2019 1 01/11/2019 2 01/18/2019 3 02/22/2019 4 03/01/2019 5 03/29/2019 6 03/29/2019 7 04/12/2019
8 04/19/2019
ASBE0097-001 01/01/2018
Rates Fringes
Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 38.68 21.57
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 37.38 19.55
BOIL0502-002 10/01/2017
Rates Fringes
BOILERMAKER......................$ 46.17 29.70
BRAK0001-002 07/01/2018
Rates Fringes
Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 40.81 19.77 Tile & Terrazzo Finisher.........$ 34.79 19.62
CARP1501-001 09/01/2016
Rates Fringes
MILLWRIGHT.......................$ 36.74 22.99
CARP2520-003 09/01/2018
Rates Fringes
Diver Stand-by....................$ 42.65 25.66 Tender......................$ 41.65 25.66 Working.....................$ 82.45 25.66 Piledriver Piledriver; Skiff Operator and Rigger..................$ 38.34 25.66 Sheet Stabber...............$ 38.34 25.66 Welder......................$ 43.90 25.66
DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:
50-100 feet $1.00 per foot 101 feet and deeper $2.00 per foot
ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:
5-50 FEET $1.00 PER FOOT/DAY
51-100 FEET $2.00 PER FOOT/DAY
101 FEET AND ABOVE $3.00 PER FOOT/DAY
SATURATION DIVING:
The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP4059-001 09/01/2018
Rates Fringes
CARPENTER
Including Lather and Drywall Hanging.............$ 38.34 25.66
ELEC1547-004 04/01/2018
Rates Fringes
CABLE SPLICER....................$ 39.82 3%+$26.44
ELECTRICIAN......................$ 39.49 3%+$26.69
ELEC1547-005 04/01/2019
Line Construction
Rates Fringes
CABLE SPLICER....................$ 56.05 3%+31.78
Linemen (Including Equipment Operators, Technician)...........$ 54.30 3%+31.78 Powderman........................$ 52.30 3%+31.78
TREE TRIMMER.....................$ 36.21 3%+25.19
ELEV0019-002 01/01/2019
Rates Fringes
ELEVATOR MECHANIC................$ 57.23 33.705+a+b
FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:
New Year's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving, and Christmas Day
ENGI0302-002 01/01/2019
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.53 23.65
GROUP 1A....................$ 42.29 23.65
GROUP 2.....................$ 39.76 23.65
GROUP 3.....................$ 39.04 23.65
GROUP 4.....................$ 32.83 23.65
TUNNEL WORK
GROUP 1....................$ 44.58 23.65
GROUP 1A...................$ 46.52 23.65
GROUP 2....................$ 43.74 23.65
GROUP 3....................$ 42.94 23.65
GROUP 4....................$ 36.11 23.65
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller: Breakdown, Intermediate, and Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;
Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;
Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:
Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through
40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler
GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),
(b) Tower cranes; Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.; Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.
and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;
Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;
GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, (i.e., Elevating Grader and Material Transfer Vehicle); Locomotives: rod and geared engines;
Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.
GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant
Engineer shall be required on cranes over 85 tons or over 100 feet of boom.
IRON0751-003 07/01/2018
Rates Fringes
IRONWORKER
BRIDGE, STRUCTURAL,
ORNAMENTAL, REINFORCING
MACHINERY MOVER, RIGGER,
SHEETER, STAGE RIGGER,
BENDER OPERATOR.............$ 37.90 31.48
FENCE, BARRIER INSTALLER....$ 34.40 31.48
GUARDRAIL INSTALLERS........$ 35.14 31.48
GUARDRAIL LAYOUT MAN........$ 35.14 31.48
HELICOPTER, TOWER...........$ 38.90 31.48
LABO0341-005 04/01/2018
Rates Fringes
Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees
GROUP 1.....................$ 30.26 27.01
GROUP 2.....................$ 31.26 27.01
GROUP 3.....................$ 32.16 27.01
GROUP 3A....................$ 35.44 27.01
GROUP 3B....................$ 39.98 24.30
GROUP 4.....................$ 19.83 27.01
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 33.29 27.01
GROUP 2....................$ 34.39 27.01
GROUP 3....................$ 35.38 27.01
GROUP 3A...................$ 38.98 27.01
GROUP 3B...................$ 42.88 24.30
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot
Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
LABO0942-001 04/01/2018
Rates Fringes
Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees
GROUP 1.....................$ 30.26 27.21
GROUP 2.....................$ 31.26 27.21
GROUP 3.....................$ 32.16 27.21
GROUP 3A....................$ 35.44 27.21
GROUP 3B....................$ 38.98 24.50
GROUP 4.....................$ 19.83 27.21
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 33.29 27.21
GROUP 2....................$ 34.39 27.21
GROUP 3....................$ 35.38 27.21
GROUP 3A...................$ 38.98 27.21
GROUP 3B...................$ 42.88 24.50
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod
Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
PAIN1959-001 07/01/2018
NORTH OF THE 63RD PARALLEL
Rates Fringes
PAINTER
BRUSH/ROLLER PAINT OR WALL
COVERER.....................$ 32.09 21.09
TAPING, TEXTURING,
STRUCTURAL PAINTING,
SANDBLASTING, POT TENDER,
FINISH METAL, SPRAY,
BUFFER OPERATOR, RADON
MITIGATION, LEAD BASED
PAINT ABATEMENT, HAZARDOUS
MATERIAL HANDLER............$ 32.61 21.09
PAIN1959-002 07/01/2018
SOUTH OF THE 63RD PARALLEL
Rates Fringes
PAINTER
Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and Commercial Spray............$ 32.09 21.09 Machine Taper/Drywall.......$ 32.61 21.09 Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 32.61 20.09
PAIN1959-003 07/01/2018
NORTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 39.28 23.49
PAIN1959-004 07/01/2018
Rates Fringes
FLOOR LAYER: Carpet.............$ 29.13 14.06
PAIN1959-006 07/01/2018
SOUTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 39.28 23.49
* PLAS0867-001 04/01/2019
Rates Fringes
PLASTERER
North of the 63rd parallel..$ 38.13 21.68 South of the 63rd parallel..$ 37.88 21.68
* PLAS0867-004 04/01/2019
CEMENT MASON/CONCRETE FINISHER
North of the 63rd parallel..$ 38.13 21.68 South of the 63rd parallel..$ 37.88 21.68
PLUM0262-002 07/01/2018
East of the 141st Meridian
Rates Fringes
Plumber; Steamfitter.............$ 38.02 27.12
PLUM0367-002 12/03/2018
South of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 39.00 26.70
PLUM0375-002 07/01/2018
North of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 41.46 26.40
PLUM0669-002 04/01/2017
Rates Fringes
SPRINKLER FITTER.................$ 46.00 23.29
ROOF0189-006 04/01/2019
Rates Fringes
ROOFER...........................$ 44.62 16.03
SHEE0023-003 07/01/2018
South of the 63rd Parallel
Rates Fringes
SHEET METAL WORKER...............$ 42.70 26.40
SHEE0023-004 07/01/2017
North of the 63rd Parallel
SHEET METAL WORKER...............$ 47.74 23.48
TEAM0959-003 03/01/2019
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 39.94 24.12
GROUP 1A....................$ 41.21 24.12
GROUP 2.....................$ 38.68 24.12
GROUP 3.....................$ 37.86 24.12
GROUP 4.....................$ 37.28 24.12
GROUP 5.....................$ 36.52 24.12
GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler
GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)
GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;
Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;
Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards; Partsman;
Stringing Truck
GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Oil Distributor Drivers; Trucks/Jeeps (push or pull); Traffic Control Technician
GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;
Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate); Lumber Carrier; Water Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons; Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle; Hydro-seeders, dual axle;
Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver; Combination Truck-fuel and grease;
Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield); Ready Mix, up to and including 7 yards;
GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;
Gear/Supply Truck; Bus Operator, Up to 30 Passengers;
Rigger/Swamper
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
File details come from the government source that posted it.