Quality Assurance Surveillance Plan Consolidated Manpower for Information Technology Services Army Contracting Command (ACC) Aberdeen Proving Ground (APG) US Army Communication Electronics Command (CECOM) Command, Control, Communication, Computer, Intelligence, Surveillance & Reconnaissance (C4ISR) Team APG C4ISR The Quality Assurance Surveillance Plan (QASP) provides a basis for the Government Lead/Task Area Contracting Officer’s Representatives (CORs) to monitor the total quality of the contractor’s performance. The QASP provides the Lead/Task Area/CORs a proactive and methodical process for avoiding unacceptable or deficient performance. Our intent is to ensure that C4ISR/CECOM receives the quality of services called for in the Performance Work Statement (PWS). The QASP is designed to define the types of work to be performed, describe the evaluation methods that will be employed by the Government in assessing our performance, define the roles and responsibilities of participating Government officials, describe the process of developing performance documentation, and establish performance standards.
The contractor’s approach to project quality control is a process designed to ensure that deliverables meet established standards and that defects and errors are captured and addressed before submission. We will develop comprehensive Standard Operating Procedures (SOPs) for all required tasks that define the purpose and context for each deliverable, the steps required for completion, and the metrics to be used to assess successful completion. Adherence to SOPs is verified by the management and staff who perform the work and is validated through a process of internal peer review.
C4ISR/CECOM’s quality assurance processes are guided by the objective of continuous business improvement and a focus on project execution effectiveness. Toward this end, a portion of all contract deliverables will be formally audited to confirm fidelity to the quality control process. Our audit helps ensure that deliverables are submitted and accepted. The contractor will perform independent audits of project processes and work products using methods designed to ensure compliance with industry best practices, including ISO 9001:2008, the Software Engineering Institute Capability Maturity Model Integration (CMMI) processes, and other policies and procedures. The contractor shall provide evidence of current certification in ISO 9001:2008 and ISO 20000, as well as appraised at CMMI Maturity Level 3 (Development) or CMMI Maturity Level 3 (Services).
The QASP, provided in Table 1, is tailored to measure the performance of contract services or deliverables to assess whether these services or deliverables meet Acceptable Quality Levels (AQLs) for performance, schedule, quality, accuracy, timeliness, and other measures.
The QASP is designed to be a straightforward tool to measure performance in executing the contract. The below-listed indicators are to be monitored and assessed by the Government. Performance reports that compile the metrics will be provided by the contractor to C4ISR/CECOM on a monthly basis. These performance reports will cover all tasks within the C4ISR/CECOM Consolidated Manpower for Information Technology Services (CONMAN) contract. We consider performance measurements to be a continuing process, likely necessitating that they be tailored in the future to align with the evolving needs of C4ISR/CECOM. We will assess measurements with contractor on a quarterly basis.
The C4ISR/CECOM Lead/Task Area CORs will be responsible for reviewing the performance reports provided by the contractor. As a result, the C4ISR/CECOM Lead/Task Area CORs will be able to monitor, assess, record, and report on the technical performance of the contractor on a day-to-day basis. The C4ISR/CECOM Lead/Task Area CORs will also be responsible for meeting with the contractor to provide feedback, and review and approve any corrective action provided by the contractor.
The C4ISR/CECOM Lead/Task Area CORs will have primary responsibility for completing Quality Assurance Surveillance Forms to document their inspection and evaluation of the contractor’s work performance. A sample form is shown as Figure 1. The Government Contracting Officer (KO) or designee has overall responsibility for evaluating the contractor’s performance in areas of contract compliance, contract administration, and cost and property control. The KO will review the COR’s/Task Area COR’s evaluation of The contractor’s performance and invoices, and the KO take any corrective action as may be deemed necessary.
Performance Requirements Summary Matrix By monitoring the contractor in the areas identified below, the KO/COR/Task Area COR will determine whether the performance levels set forth in the contract have been attained. The following performance standards and AQLs will be used to measure contract performance.
| Performance Indicator |
| Performance Standard |
| AQL |
| Method of Surveillance |
Quality Control Plan (QCP)
| QCP covers all major services and deliverables. Includes a description of inspection records. Inspection results availability for review. |
| 100% monthly |
| Direct Observation and 100% Inspection by KO and/or COR |
| QCP Schedule |
| All QCP items have been scheduled and performed according to QCP. Inspection results availability for review. |
| 100% monthly |
| Direct Observation and 100% Inspection by KO and/or COR |
| Customer Complaint Resolution |
| Response and resolution of customer issues will meet Government-prescribed standards |
| 100% responded to, and resolved, monthly |
| Direct Observation and customer feedback |
| Customer Satisfaction |
| Responses to customer satisfaction surveys must yield satisfactory results in accordance with Government-prescribed standards |
| 95% satisfaction monthly |
| Direct Observation and customer feedback |
| Interactive Customer Evaluations (ICE) |
| Customer ICE submissions rate the overall performance of the contractor as either Excellent or Good. |
| 90% monthly |
| 100% review of ICE submissions by COR |
| Delivery of Quality Products or Services |
| Timely delivery of quality products and services according to Government-prescribed schedules. |
| 100% monthly |
| Direct Observation, 100% Inspection by COR, and customer feedback |
| Deliverables Submission Timeliness |
| Delivery of all items in accordance with Government-prescribed schedules |
| 99% on-time monthly |
| Direct Observation, 100% Inspection by COR, and customer feedback |
| Government Furnished Equipment (GFE) Audits |
| Monthly inventory audits of 10% of GFE. Audit results available for review. |
| 100% accurate monthly |
| Direct Observation and 100% Inspection by COR |
| Monthly Performance Reports (MPR) |
| MPR submitted by the 15th of each month. |
| 99% on time monthly, no more than 3 business days late |
| Direct Observation and 100% Inspection by COR |
| Plan of Actions and Milestones (POA&M) Response |
| All POA&Ms must be completed and closed by the date defined in the approved POA&M |
| 100% on time monthly |
| Direct observation and 100% inspection by COR |
| Information Assurance (IA) / Information Technology (IT) Training And Certifications |
| All contractor staff must maintain IA/IT Training and Certification requirements of PWS and DoD 8570.01M |
| 100% satisfaction monthly |
| Direct Observation and 100% Inspection by COR |
| Personnel Security Clearance |
| All contractor staff will meet required security clearance investigation levels per the PWS (Base & TO) |
| 100% monthly satisfaction |
| Direct Observation and 100% Inspection by COR |
| CMMI Appraisal |
| The prime contractor must remain current with their organization’s CMMI Appraisal Status as noted in the PWS. |
| 100% satisfaction |
| Direct Observation and 100% Inspection by COR |
| ISO Certification |
| The prime contractor must remain current with their organization’s ISO Certification Status as noted in the PWS. |
| 100% satisfaction |
| Direct Observation and 100% Inspection by COR |
| Staffing Levels |
| The contract will be staffed at 95% or greater. |
| 100% satisfaction |
| Direct Observation and 100% Inspection by COR |
| Contract Vacancies |
| The contractor must fill non-key positions within 30 days of vacancy |
| 100% satisfaction |
| Direct Observation and 100% Inspection by COR, Monthly Status Reports |
| Sexual Harassment & Assault Response and Prevention (SHARP) |
| The Government will perform random SHARP monitoring inspections as noted in PWS |
| 100% satisfaction |
| Direct Observation |
| Anti-Terrorism (AT) Level 1 Training Completion |
| All contractor staff must complete AT Level 1 Training within 30 days after Task Order (TO) release |
| 100% completion as required |
| Direct Observation and 100% Inspection by COR |
| iWatch Training Completion |
| All contractor staff must complete iWatch training within 30 days of TO award |
| 100% completion as required |
| Direct Observation |
| Transition-In Timeliness |
| Execute the Transition-In Plan and be fully operational within 30 days of the effective date of contract award |
| 90% on-time (max 3 days late) |
| Direct Observation |
| Transition-Out Plan Timeliness |
| Transition-out plan will be drafted and submitted to the government within 90 days of contract award |
| 100% on time |
| Direct Observation |
| Transition-Out Plan |
| Transition-out plan will be finalized within 120 days after contract award |
| 100% on time |
| Direct Observation |
| Employee Performance |
| Positive and negative employee performance will require immediate action by the contractor staff with resolution provided to the COR |
| 100% satisfaction |
| Direct Observation and customer feedback |
| Contractor Manpower Reporting Application (CMRA) |
| The contractor shall report contractor labor hours required for performance of services provided under this contract for the Army via a secure data collection site. |
| 100% Annual Per Policy |
| Direct Observation |
Table 1: Performance Requirements Summary Matrix.
QUALITY ASSURANCE MONITORING FORM Figure 1 – Quality Assurance Monitoring Form.SERVICE or STANDARD: ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
SURVEY PERIOD: ___________________
| SURVEILLANCE METHOD (Check): | _____ | Random Sampling | |
| | _____ | 100% Inspection |
| | _____ | Periodic Inspection |
| | _____ | Customer Complaint |
LEVEL OF SURVEILLANCE SELECTED (Check):
| _____ | Monthly |
| _____ Quarterly | |
| _____ As needed | |
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %
ANALYSIS OF RESULTS:
OBSERVED SERVICE PROVIDER PERFORMANCE MEASUREMENT RATE = ______%
SERVICE PROVIDER’S PERFORMANCE (Check):
| ____ | Meets Standards |
| ____ | Does Not Meet Standards |
NARRATIVE OF PERFORMANCE DURING SURVEY PERIOD: _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
PREPARED BY: __________________________________ DATE: ____________________