RFI_ W91QVP-25-Q-5002.docx

DOCX document 16 KB Posted

Attached to
Amendment #00003 JPMRC 26-01 Air Conditioning and Power Generator service
Solicitation number
W91QVP25Q5002
Issued by

About this file

This Request for Information (RFI) for Solicitation W91QVP-25-Q-5002 seeks details about an Air Conditioning and Generator System project for the 413th CSB, RCO-HI team. The RFI covers three primary areas of inquiry: tent layout, power and generator requirements, and site walk coordination. Specifically, the vendor is confirming tent configurations (75 tents, approximately 4-5 per row), generator operational parameters (24/7 running), and refueling responsibilities. The government confirmed that generators will continuously operate, with the contractor responsible for refueling, and the Contracting Officer's Representative (COR) will be available for a site walk on Thursday at 1:00 PM. The opportunity is categorized under NAICS code 238220 for Plumbing, Heating, and Air-Conditioning Contractors, and is being managed by the Department of the Army Materiel Command Army Contracting Command.

View the file

Other files

File Type Posted
RFI 4.docx DOCX document
B08 Amendment 00003.pdf PDF
B08 Amendment 00002.pdf PDF
RFI V2 _ W91QVP-25-Q-5002 .docx DOCX document
tents spec.pdf PDF
B.08 Amendment 00001 JPMRC 25 - AC & Generators.pdf PDF
B08 JPMRC 26-01_PWS_AC and Power Gen SVC_19SEP25.pdf PDF
B.08 RFQ Updated JPMRC 26-01 AC & Generators v3.pdf PDF
B08 Pricing Sheet 25-Q-5002.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91QVP-25-Q-5002

Air Conditioning and Generator System

RFI #1 submitted 22 SEP 2025

1. Tent Layout: Are all 75 tents confirmed to be in area X-3C? The image we reviewed referenced 90 tents in total. Could you please confirm the actual number and how they will be distributed (e.g., number per row)?

· We will have 75 tents on site; we have about 4-5 per row

1. Power and Generator Details: In past projects, generators were required to run 24/7. Will that be the case here as well? Also, could you clarify who will be responsible for refueling?

· Yes, the generators will be running 24/7, we will be responsible for refueling.

1. Site Walk: We’d appreciate the opportunity to do a site walk. Please let us know your availability so we can coordinate the time that works.

· COR will be available on Thursday at 1300