B08 Amendment 00002.pdf
PDF 272 KB Posted
- Solicitation number
- W91QVP25Q5002
About this file
This document is an Amendment (#0002) to a solicitation for AC and Power Generation Service for the Joint Pacific Multinational Readiness Center (JPMRC) 26-01 exercise. The solicitation (W91QVP-25-Q-5002) covers a performance period from 15 OCT 2025 to 21 NOV 2025, specifically for Area X-Ray, which requires AC power for 75 18'x25' tents placed on concrete slabs. The grid location is 4QEJ9549478280, and generators will be positioned as shown in the attached site layout map. An additional Request for Information (RFI #3) clarifies that generator maintenance can be performed between 8-11am with prior coordination with the Contracting Officer's Representative (COR). The site layout indicates a designated dirt road for fuel truck access and details the generator placement near the tent areas, with specific zones marked including a motor pool, field mess, and logistics areas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 4.docx | DOCX document | |
| B08 Amendment 00003.pdf | ||
| RFI V2 _ W91QVP-25-Q-5002 .docx | DOCX document | |
| tents spec.pdf | ||
| B.08 Amendment 00001 JPMRC 25 - AC & Generators.pdf | ||
| RFI_ W91QVP-25-Q-5002.docx | DOCX document | |
| B08 Pricing Sheet 25-Q-5002.xls | XLS spreadsheet | |
| B08 JPMRC 26-01_PWS_AC and Power Gen SVC_19SEP25.pdf | ||
| B.08 RFQ Updated JPMRC 26-01 AC & Generators v3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91QVP-25-Q-5002 Issue Date 25SEP 2025 Amendment #0002
JPMRC 26-01 AC and Power Generation Service Period of Performance: 15 OCT 2025- 21 NOV 2025
Changes highlighed in yellow:
- Generators placement layout
- RFI #3
X-3C: Need AC for (75) tents. All tents are placed on concrete slabs
Location Dates Grid Tents AC/Generators
Area X-Ray 15 OCT-21 NOV 2025 4QEJ9549478280 75 18’x25’ As shown in the image
RFI #3 submitted on 25Sep2025
Can we perform maintenance on the generator throughout the duration of the exercise?
- Yes, as long as its done in the early morning hours, preferably between 8-11am and with prior arrangements made with the COR
G en er at or s sh al l b e pl ac ed h er e
FRONT SIDE
REAR SIDE
75 tents
D irt
R oa d, th is is w he re th e fu el tr uc k w ill d riv e to re fu el th e ge ne ra to rs