B08 JPMRC 26-01_PWS_AC and Power Gen SVC_19SEP25.pdf
PDF 432 KB Posted
- Solicitation number
- W91QVP25Q5002
About this file
This Performance Work Statement (PWS) details rental air conditioning and power generator services for the Joint Pacific Multinational Readiness Center (JPMRC) 26-01 exercise. The contract is for the 25th Infantry Division at Schofield Barracks, Hawaii, with a performance period from 15 October 2025 to 21 November 2025. The contractor must provide 75 air conditioning units capable of cooling 18' x 25' tents to a constant 75 degrees Fahrenheit, along with necessary power generators, for 24/7 operations. The units will be placed across multiple locations, including 57 tents on concrete slabs and 18 tents on grass, with the contractor responsible for delivery, setup, maintenance, and removal of all equipment.
Key requirements include ensuring proper load balancing, power distribution, grounding of generators, and placement of generators on spill mats to capture potential accidental spills. The contractor must coordinate with the Contracting Officer Representative (COR) three business days prior to delivery to confirm equipment placement, and must be capable of reading military grid coordinates. All services and equipment must be fully operational by 15 October 2025, with the contractor responsible for replacing or repairing any damaged equipment within one calendar day of notification. Invoicing will be conducted through Wide Area Work Flow (WAWF), and the contractor must report all labor hours through the System for Award Management (SAM) Service Contract Report.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 4.docx | DOCX document | |
| B08 Amendment 00003.pdf | ||
| B08 Amendment 00002.pdf | ||
| RFI V2 _ W91QVP-25-Q-5002 .docx | DOCX document | |
| tents spec.pdf | ||
| B.08 Amendment 00001 JPMRC 25 - AC & Generators.pdf | ||
| RFI_ W91QVP-25-Q-5002.docx | DOCX document | |
| B.08 RFQ Updated JPMRC 26-01 AC & Generators v3.pdf | ||
| B08 Pricing Sheet 25-Q-5002.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
(Includes associated Performance Requirements Summary (PRS)
JPMRC 26-01 Rental Air Conditioning and Power Generator Services Period of Performance: 15 OCT 2025- 21 NOV 2025
Part 1 General Information
1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide air conditioning units and power generators on Training Site Area X-Ray, Schofield Barracks, Hawaii. The Government shall not exercise any supervision or control over the contract service providers performing these services. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.2 Background: 25th Infantry Division participates in Exercise - Joint Pacific Multinational Readiness Center (JPMRC) 26-01 and requires these services to sustain the force as they achieve training objectives.
1.3 Scope: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents.
1.3.1 Reserved.
1.3.2 The Contractor shall provide air conditioning systems and power generators in support of JPMRC 26-01. Services shall include: haul, delivery, set-up, and pick-up of air conditioning systems and power generators at the conclusion of the exercise.
1.3.3 Due to the volatility of US Army Military Exercises and Operations, contractors must remain flexible to changes in the periods of performance, quantities, and potential for the addition of services within the general scope of the contract.
1.4 Objectives: The objective is to ensure the continuous, safe, and reliable operation of air conditioning systems, providing a cool and comfortable environment for Soldiers during the JPMRC 26-01 exercise in a hot field environment. This objective supports the well-being and operational readiness of Soldiers by offering a designated location for cooling and recovery amidst challenging conditions.
1.5 General Information:
1.5.1 Quality Control Plan (QCP): The contractor’s existing quality assurance system shall be utilized in accordance with
FAR 12.208.
1.5.1.1 Reserved.
1.5.1.2 The Contractor shall inform the Contracting Officer Representative (COR), or if COR is unavailable, the Contract Specialist and Contracting Officer of issues or potential issues that might affect the performance within two (2) hours of identifying those issues. Verbal reports shall be followed up by written reports within 1 day of discovery of the issue.
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.
1.5.3.1 U.S. Holidays: Work shall be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
1.5.3.2 Reserved.
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.
1.5.4.1 Government Facility Office Hours: Reserved.
1.5.4.2 Government Facility Operating Hours: Reserved.
1.5.4.3 Contractor Support Hours: The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential. See Part 5 of the PWS for specifics; coordinate with the COR for scheduling during contract performance.
1.5.4.3.1 Contractor Work Plan: Reserved.
1.5.5 Reserved.
1.5.6 Place of Performance: The work to be performed under this contract occurs, in Area X-Ray 4QEJ9549478280.
1.6 Security Requirements: The following information is provided on security related matters.
1.6.1 Security Program: Reserved.
1.6.2 Personnel Security Clearance Requirements: Reserved.
1.6.3 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The contractor shall comply with requirements of electronic or web-based systems for vehicle and personnel passes in order to gain access to military installations.
Contractor personnel performing work under this contract shall not have been convicted of any felony and shall pass a criminal background check prior to access the installation.
The Government reserves the right to deny access to or ban any Contractor employee from the installation.
The Contractor shall safeguard all Government equipment, information, facilities, and property provided for Contractor use.
Access and General Protection/Security Policy and Procedures: Contractor and all associated sub-contractor’s employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contract or Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.3.1 Installation Pass Log: Reserved.
1.6.3.2 Individual Termination or Expiration of Employment: Reserved.
1.6.3.3 Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes, if applicable, and return them to the issuing office within 3 days.
1.6.3.4 Common Access Cards (CAC) and CAC Log: Reserved.
1.6.4 Background Checks: Reserved.
1.6.4.1 U.S. Citizen: Reserved.
1.6.4.2 Local Nationals and Third Country Nationals: Reserved.
1.6.5 Physical Security: The Contractor shall safeguard their own equipment without the assistance of the US Government.
1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.
1.7 Key Control: Reserved.
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. These meetings shall be at no additional cost to the Government.
1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government.
Meeting attendees may at times include Contractor managerial, supervisory, or other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies and coordinate site entry of Contractor personnel.
1.10 Key Personnel: N/A
1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government employees. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.12.1 Reserved.
1.12.2 Reserved.
1.13 Contractor Travel: All travel is at the expense of the contractor.
1.14 Other Direct Costs (ODCs): Reserved.
1.15 Data Rights: Reserved.
1.17 Non-Disclosure Requirements: Reserved.
1.17 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.18 Non-Disclosure Statements: Reserved.
1.19 Organizational Conflict of Interest (OCI): Reserved.
1.20 Phase In /Phase Out Period: Reserved.
1.21 Safety: The following provides information pertaining to Safety and Accident Prevention:
Contractor activities shall be conducted in a safe manner that minimizes accidents as well as any impacts on Army operations and members of the public. Contractor shall comply with applicable Federal, State, and local codes and standards, including safety and occupational health requirements, as well as any additional specific requirement contained in this PWS.
1.21.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein.
1.21.2 Emergency Services: The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor will, in turn, notify the KO and the Requiring Activity (RA) Point of Contact (POC) within 30 minutes of the incident.
The Contractor may, at their option, use the Installation’s Emergency Services, available by dialing 9-1-1. Emergency medical treatment and other emergency services for Contractor personnel are the responsibility of the Contractor, including any fees or charges imposed.
1.22 Environmental Compliance: The contract shall adhere to all environmental laws, to include, but not limited to, the proper disposal of hazardous materials.
http://www.dimoc.mil/resources/limitations/
1.22.1 Environmental Compliance Plan and Program: Reserved.
1.23 Required Training: AT Level I Training. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete AT Level I awareness training within 7 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each contractor and subcontractor employee to the COR or to the contracting officer. AT Level I awareness training is available at the following website: http://jko.jten.mil.
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms
2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.
Contracting Officer – means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f).
Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”
Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Contractor-acquired Property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.
Day – means, unless otherwise specified, a calendar day.
Defective Service – means a service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable – means anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Government-furnished Property – As reflected in FAR 52.245-1, Government-furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract
Government Property - means all property owned or leased by the Government. Government property includes both Government-furnished and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
http://jko.jten.mil/
Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.
High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.
Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.
Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document, and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS.
The QASP, with very few if any exceptions, is an internal to Government document.
Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however, they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.
Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
Work Day - The number of hours per day the Contractor provides services in accordance with the contract.
Work Week - Monday through Sunday. This contractor is expected to work weekends.
2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.
ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CFE Conventional Forces Europe CFR Code of Federal Regulations
CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DoD Department of Defense FAR Federal Acquisition Regulation FRG Federal Republic of Germany GFP Government Furnished Property HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Awareness IAC Installation Access Control IACO Installation Access Control Office ID Identification IGCE Independent Government Cost Estimate IT Information Technology JTR Joint Travel Regulation JPAS Joint Personnel Adjudication System KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security PA Property Administrator PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office SIGE Safety and Health Protection Plan TE Technical Exhibit USAG United States Army Garrison USAREUR United States Army Europe UOM Unit of Measure
PART 3
GOVERNMENT PROPERTY (GP) AND SERVICES
3. Government Property and Services The contractor is solely responsible to provide the necessary services, facilities, utilities, equipment, and so forth in order to meet the requirements in this contract.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Property and Services
4.1 General: The Contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents.
4.2 Secret Facility Clearance: Reference paragraph 4.1.
4.3 Materials: Reference paragraph 4.1. Contractor shall furnish special equipment required to conduct refueling operations. Army personnel will conduct refueling of contracted equipment.
4.4 Vehicles and Equipment: Reference paragraph 4.1.
PART 5
SPECIFIC TASKS
5.1 Basic Services: Contractor shall provide air conditioning systems that are freestanding (not window unit or similar) capable of cooling 75 tents measuring 18’ x 25’ keeping a constant temperature of 75 degrees Fahrenheit for 24 hours.
Contractor is permitted to use one air conditioning unit to cool multiple tents if it can cool the tents at 75 degrees Fahrenheit.
Contractor shall provide all necessary equipment for safe operation and installation of air conditioning units to include but not limited to power generators, cables, air ducts, PVC pipes for the JPMRC 26-01 rotation. Services shall include haul, delivery, install, trouble-shoot, set-up, and pick-up, of air conditioning systems and power generators to Area X-Ray on Schofield Barrack, Hawaii.
5.2 Tasks: Tasks consist of the following:
(a) STD: Delivery - Contractor shall deliver air conditioning systems and power generators to Area X-Ray. All services and equipment must be fully operational no later than 15 OCT 25. Air conditioning systems and power generators will be topped off with all required fluids such as fuel, lubricants, freon, oil, etc. The contractor shall coordinate with the Contractor Officer Representative (COR) three (3) business days prior to the delivery dates to confirm the locations where the air conditioning systems and power generators are to be placed. The contractor should be able to read military grid coordinates.
X-3C: Need AC for (75) tents. (57) tents are placed on concrete slabs and (18) tents placed directly on the grass.
Location Dates Grid Tents AC/Generators
Area X-Ray 15 OCT-21 NOV 2025 4QEJ9549478280 75 18’x25’
As needed to support layout
(b) STD: Air Conditioning Systems - Contractor shall provide air conditioning systems that are freestanding (not window unit or similar) capable of cooling 75 tents measuring 18’ x 25’ keeping a constant temperature of 75 degrees Fahrenheit for 24/7 operations.
Note: Example of freestanding air-conditioning units and 18’x25’ tent similar in design to what will be used by service members during the JPMRC 26-01 rotation.
Base X 305
(c) STD: Power Generators - Contractors shall provide power generators needed to power air conditioning units.
Contractor will ensure power generators are grounded using proper grounding equipment. Contractors will place generators on a spill mat or platform to capture accidental spills during services. Contractor will be responsible for any environmental damage that occurs as a result of the operation of either their power generation or air-conditioning equipment.
(d) STD: Servicing/Safety - The contractor shall replace or repair damaged Air Conditioning units or power generators as requested within one (1) calendar day of notification.
(e) STD: Removal – The contractor and COR will conduct a joint inspection of air conditioning systems and power generators prior to their removal. Contractor shall pick up the air conditioning units and power generators within two (2) business days after the service order or contract expires.
(f) STD: The Government Representative reserves the right to cancel or modify locations before the scheduled delivery date and time without any additional charges.
(g) Invoicing: All Contractor invoices shall be submitted via Wide Area Work Flow (WAWF). The contractor shall be required to establish account(s), access method(s), log-in(s), and get necessary training in order to submit invoices through WAWF. Invoices not submitted via WAWF shall not be accepted or paid.
5.3 Service Contract Reporting
5.3.1 System for Award Management (SAM) Service Contract Report (SCR): The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the U.S. Army via a secure data collection site. The Contractor is required to completely fill in all required data fields through the following web address: www.sam.gov. Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk by clicking “View Assistance for SAM.gov” which is located at the top of the SAM.gov website.
From there, you can the select “Contact Our Service Desk” which will allow you to contact SAM.gov directly. If contract period of performance ends prior to September 30, the Contractor has 30 calendar days from end date of the contract to complete the SAM SCR requirement.
Steps for Submitting a Service Contract Report (SCR)
1. Go to www.sam.gov and log in.
2. Select Entity Registrations and then select Service Contract Reporting.
3. SAM displays your entities which have service contracts and meet the reporting criteria. Select View by entity to see the service contracts for each entity.
4. Next, select Add for the service contract against which you want to create a Service Contract Report. Each service contract which meets the FAR Subpart 4.1703 reporting thresholds is displayed.
5. You will be taken to the Complete Service Contract Report page. SAM displays the contract details and allows you to report. You are required to enter the following information:
• Total Amount Invoiced: Total dollar amount invoiced for services performed during the previous Government fiscal year under the contract (this amount should include the prime and any subcontract amount).
• Prime Contractor Hours Expended: Prime contractor direct labor hours expended on the services performed during the previous Government fiscal year. The amount you enter is automatically divided by 2,080 hours to calculate a Full Time Employee (FTE) equivalent, displayed under the Prime Contractor Hours Expended as Prime Contractor FTEs.
6. Report any required Tier 1 subcontractor information by selecting the Add Tier 1 Subcontract Information button.
7. When you are ready to submit the report, select Submit. This saves your report and returns you to the Select Service
Contract page where you can create other SCRs or edit an existing SCR.
Steps for Editing a Submitted Report
1. Follow steps 1-4 above. Any previously submitted SCR will have a View/Edit button instead of an Add button.
2. Select View/Edit. You will be able to view the current SCR, edit available fields, and resubmit the record. You can also delete previously entered information altogether.
http://www.sam.gov/ http://www.sam.gov/
STD: All information provided by the Contractor shall be accurate, complete, and not exceed suspense dates noted in corresponding paragraph above.
AQL: 100% Compliant
PART 6
APPLICABLE PUBLICATIONS
6. Applicable Publications (Current Editions): The following publications, manuals, regulations, etc. are mentioned in this PWS and are listed below.
6.1.1 Department Of Defense Contract Security Classification Specification (DD Form 254)
6.1.2 Department of Defense Security Agreement (DD Form 441)
6.1.3 National Industrial Security Program Operating Manual (DoD 5220.22-M)
6.1.4 Installation Access Control (AE Reg 190-16)
6.1.5 The Army Physical Security Program (AR 190-13)
6.1.6 Contractor Identification (AE Reg 27-715)
6.1.7 U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)
6.1.8 Information Assurance Workforce Improvement Program (DoD 8570-M)
6.1.9 Information Assurance Training Certification and Workforce Management Directive (DoDD 8570.01)
6.1.10 Information Assurance (AR 25-2)
6.1.11 Electromagnetic Compatibility Directive (2004/108/EC)
6.1.12 Policies and Procedures for Property Accountability (AR 735-5)
TECHNICAL EXHIBIT A
Performance Requirements Summary (PRS)
PERFORMANCE
OBJECTIVE
STANDARD PERFORMANCE
THRESHOLD
ACCEPTABLE
QUALITY LEVELS
(AQLs)
METHOD OF
SURVEILLANCE
Air-Conditioning and Power Generation Standards Contractor shall comply with all listed Air Conditioning Systems and Power Generator standards.
The contractor will ensure that proper load balancing and power distribution is occurring. Contractor will use the proper ducting.
AQL 5% error Periodic Inspection Customer Feedback
Services Maintenance and Safety Standards Contractor shall comply with all listed servicing, maintenance, and Security standards.
Contractor will ensure power generators are grounded using proper grounding equipment. Contractors will place generators on a spill mat to capture accidental spills during services.
Contractors will ensure AIRCONS and generators are properly secured.
AQL 0% error 100% Inspection Periodic Inspection Customer Feedback
Delivery Standards Contractor shall comply with all listed delivery standards.
All services and equipment set up and fully operational NLT 15 OCT. Air conditioning systems and power generators will be topped off with all required fluids such as fuel, lubricants, freon, oil, etc. The contractor shall coordinate with the Contractor Officer Representative (COR) three (3) business days prior to the delivery dates to confirm the locations where the air conditioning systems and power generators are to be placed. The contractor should be able to read military grid coordinates.
AQL 0% error 100% Inspection Periodic Inspection Customer Feedback
Legality Standards Contractor shall comply with all establish standards, laws, and regulations.
The Contractor shall conduct work in accordance with established PWS and all applicable U.S., state, and local laws, regulations, standards, provisions, and directives to include applicable publications in Part 5.
AQL 0% error Random Sample
TECHNICAL EXHIBIT B DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies
Medium/F ormat
Submit To
Name and contact information of the Contract Manager and designated alternate
Within 3 days of award
1 copy Email KO and
COR
Names and Photocopies of Identification for all Contractor Employees requiring access to the place/location of performance
Within 3 days of award
1 copy MS Word or PDF
KO and
COR
Pre-Exercise Equipment Inspection Sheet (Joint walk-through with contractor and COR)
3 days after delivery
1 copy PDF KO and
COR
Post- Exercise Equipment Inspection Sheet (Joint walk-through with contractor and COR)
3 days after completion of services
1 copy PDF KO and
COR
Period of Performance: 15 OCT 2025- 21 NOV 2025
File details come from the government source that posted it. Updated .