This document contains questions and answers related to a solicitation for a Job Order Contract (JOC) to be located at Fort Lee, Virginia. The solicitation seeks a single-award indefinite delivery, indefinite quantity contract with a twelve-month base period and four one-year option periods to provide construction and related services at Fort Lee. Work will include sustainment, maintenance, repair, and minor construction projects ranging from $2,000 to $4.5 million across various facility types. The North American Industry Classification System code is 236220 and the small business size standard is $36.5 million. Questions were due by April 20, 2020 and should have been directed to the identified contracting staff. The solicitation and any resulting contract will be administered by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis.

View the file

Other files

File Type Posted
Additional RFI Questions3 - 6 May 2020.pdf PDF
Additional RFI Questions2 - 5 May 2020.pdf PDF
Additional RFI Questions - 5 May 2020.pdf PDF
Fort Lee JOC Solicitation Amendment 4 Conformed Copy - May 5.pdf PDF
Fort Lee JOC Solicitation Amendment 4 - May 5.pdf PDF
Fort Lee JOC Solicitation Questions and Aanswers - April 29.pdf PDF
Fort Lee JOC Solicitation Conformed Copy - April 29.pdf PDF
Fort Lee JOC Solicitation Amendment 3 - April 29.pdf PDF
Revised Attachment 4 - Price Schedule_April 29.xlsx XLSX spreadsheet
FY 2019 Projects Historical Data_April 29.xlsx XLSX spreadsheet
Fort Lee JOC Solicitation Conformed Copy - April 14.pdf PDF
Fort Lee JOC Solicitation Amendment 2 - April 14.pdf PDF
Fort Lee JOC Teleconference Slides.PPTX PPTX presentation
Fort Lee JOC Solicitiation - Conformed Copy - April 9.pdf PDF
Fort Lee JOC Solicitiation Amendment 1 - April 9 - pdf.pdf PDF
Attachment 2 - Specific Relevant Contract Reference Sheet.docx DOCX document
Attachment 4 - Price Schedule.xlsx XLSX spreadsheet
Fort Lee Job Order Contract Solicitation_ W91QF5-19-R-0008.pdf PDF
Attachment 3 - Past Performance Questionnaire.doc DOC document
Attachment 5 - Fort Lee Access Request Form.pdf PDF
Attachment 1 - Sample Partner Consent Letter.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Lee JOC Pre-Solicitation Question & Answers W91QF5-19-R-0008

Reference (*Answers in Red)

Question

1. SF 1442, Section 10

Answer: Yes, Government will exercise option early if needed.

1) Is the contract limited to $20 million annually, or is that an estimated breakout of the total contract volume of $100 million. If a limit, does the Government intend to exercise options early if the $20 million is achieved prior to the end of the year?

2. Section B

Answer: Yes

2) Will the option to extend services for an additional six months be included in this contract?

3. Section B

Answer:

a. Government and contractor to use RS Means UNIT Price Book.

b. Government and contractor to use EuroJOC, no substitutions

c. EuroJOC will be updated and readily available. Contractor will pay cost for 13 copies to distribute between contractor and government.

3) Each Clin indicates use of the R.S. Means Unit Price Book along with the EuroJOC associated estimating software.

R.S. Means has undergone numerous changes in the past five years. Please confirm that the EuroJOC software is still readily available and has been maintained. Would the Government consider allowing use of a similar estimating system that utilizes the R.S. Means data such as e4clicks rather than EuroJOC?

4. Section C, Paragraph C.1.2

Answer: Ft. Eustis MICC to answer

4) The second paragraph references a historical graph attachment of previous projects. We did not see this included. Will it be provided with the solicitation?

5. Section C, Paragraph C.1.2

Answer: Contractor shall maintain a permanent on site staffed facility at Fort Lee for weekly meeting with the government CORs and for random meetings as required.

5) Please clarify the manned on-site office. What is the minimum required staffing that must be on-site even if no work is underway?

6. Section C, Paragraph C.2.2.7

Answer: Heavy duty rental equipment such as cranes, dozers, scissor lifts shall be priced separately. Small equipment such as drills, hammers, sensors, screwdrivers etc., shall be priced into the coefficient.

6) Equipment rental is listed as being included in the coefficient. Equipment use is highly variable among projects and could result in high costs for many large equipment items. Would the Government consider limiting the costs included in the coefficient to small tools/equipment, rather than all equipment rental?

7. Section C, Paragraph C.2.2.7

Answer: No, all local, city, state and government permit requirements shall be enforced and complied with.

7) As permit requirements and cost vary from job to job, would the Government consider removing permit costs from the coefficient?

8. Section C, Paragraph C.2.2.7

Answer: No, land disturbance permits and Storm Water Pollution Plans requiring professional engineering

8) Please confirm that land disturbance permits and Storm Water Pollution Plans requiring professional engineering services are excluded from the coefficient.

services will not be included in the coefficient.

9. Section C, Paragraph C.2.2.10

Answer: Yes

9) Is the reference to Suffern, NY intended to mean Richmond or Petersburg, VA?

10. Section C, Paragraph C.2.2.10

a. Index cost implied will refer to the Richmond, Petersburg area.

b. Material cost will be applied to material cost and labor costs to labor costs unless noted otherwise.

c. Index cost will be applied to equipment cost as well for each line item.

10) This paragraph states, “Material costs shall include the cost index allocated for Suffern, N.Y. (Location factor).”

However, it does not address the application of the cost index to the labor or equipment costs.

a) Please confirm that the material cost index will be applied to the material cost, and the installation (or labor) cost index will be applied to the labor cost for each line item.

b) Please clarify what index will be applied to equipment costs for each line item.

11. Section C, Paragraph C.4.3

Answer: Yes they are used interchangeably.

11) Please confirm that terms Senior Site Manager and Program Manager are used interchangeably to represent the same person.

12. Section C, Paragraph C.4.3;

Paragraph C.5.1.1

A. A Project manager shall have responsibility over the multiple projects assigned to him to scope, price and develop project proposals and report to the government COR on progress and status and requesting decisions to questions. The Superintendent shall responsible for overseeing projects at thee work site and under construction and reporting back to the project manager

B. The Superintendent is expected to manage more than one worksite. The number of project the superintendent manages shall be up to the contractor management on site.

12) Section C indicates a dedicated Project Manager shall be on every worksite when work is being performed in one paragraph, but states a Site Superintendent shall be assigned to each project in another section.

a) Please confirm that a Superintendent rather than a Project Manager shall be at the worksite when work is in progress, as assigned.

b) Because this is a JOC, would the Government consider allowing Superintendents to manage multiple worksites, depending on size, scope, complexity, and proximity of projects, and with approval? IF so, how many projects will one Superintendent be allowed to typically manage at tone time?

13. Section C, Paragraph C.4.4.3 and Section H, Paragraph H.13.4.1

Answer: Senior Site manager is expected to have a min of 10 years’ experience.

13) The requirements for Senior Site Manager in Section C.4.4.3 do not match (for example, requirements for 10 / 15 years of experience). Please clarify the requirements for Senior Site Manager

14. Section C, Paragraph C.4.4.3

Answer: Yes, the contractor shall be responsible for providing PE stamp as required per project.

14) Would the Government consider allowing a different member of the team (other than the Senior Site Manager) to fulfil the P.E. requirement?

15. Section C, Paragraph C.5.2.6

Answer: The EuroJOC Software maker, whom the contractor shall contract with, is expected to make quarterly updates of EuroJOC which the contractor shall pass on to the government and contractor.

15) The contractor is to provide quarterly updates to the EuroJOC software. Does this mean that the most recent quarterly updates are to be used for pricing estimates?

16. Section C, Paragraph C.5.3.1;

Paragraph C.2.2.3.2

16) Please confirm that work assigned outside of the normal hours, even if totaling less than 40 hours, will use the non-standard hours coefficient (e.g. a job performed overnight to minimize disruption of the facility’s mission)

17. Section C, Paragraph C.5.3.2;

Attachment 4, Pricing Sheet

Answer: Coefficients shall remain the same across the entire term of the contract. Thus base and option years shall have same coefficient.

17) Section C states that one coefficient shall be used for the entire term of the contract. However, contractors are able to bid separate coefficients for each contract year. Please confirm that coefficients should be the same across the base and all option years.

18. Section C, Paragraph C.5.3.4

Answer: See question 6.

18) Items to be included in the coefficient include Mobilization and Demobilization of Contractor small equipment. Please define small equipment in this context.

19. Section C, Paragraph C.5.3.4

Answer: Line item numbers come out of the RS Means Unit Price Book.

19) Please clarify the requirement for labor percentages on top of line items to be included in the coefficient. Can the Government please provide the line item numbers it is referring to?

20. Section C, Paragraph Section C.5.4

Answer: 10 to 15 percent

20) What percentage of Task Orders does the government anticipate will be Design Build Task Orders?

21. Section C, Paragraph C.5.4.1

Answer: Unless very minor services the contractor shall price professional services separately using the RS Means line items.

21) How will the contractor be reimbursed for providing professional design services, RS Means Line Item or Non-pre Priced Line Item?

22. Section C, Paragraph C.5.11.3

Answer: Please see revised solicitation

22) Please clarify the formulas (e.g. what does A, B, C, D, E, and F stand for) for time of completion.

23. Section C, Paragraph C.5.15

Answer: At least two throughout life of contract.

23) How often does the Government anticipate partnering sessions will be held?

24. Section G, Paragraph G.4.1.1(4)

24) Does the posted time for submittal of the contractor’s proposal include the time for any design, if required?

Answer: Yes although considerable more time is given for the submission of submittals requiring designs,

25. Section H, Paragraph H.13.4.1

Answer: Requirement shall be left up to contractor however the Senior Site manager shall have no less than 10 years’ experience and the one with the most experience and the one who has handled the most dollar amount shall be considered the most qualified.

25) This section indicates a requirement for the Senior Site Manager have experience managing no less than fifty projects per fiscal year simultaneously totaling a minimum of $50 million. Would the Government consider changing this requirement to projects totaling a minimum of $20 million to align with the posted anticipated volume of this contract?

26. Section H, Paragraph H.13.4.1

Answer: No

26) Would the Government consider removing the requirement for the specific engineering disciplines as part of the bachelor’s degree? This position is required to be a P.E., proving a proficiency in appropriate engineering requirements.

27. Section H, Paragraph H.13.4.2 contractor however the Senior Site manager shall have no less than 10 years’ experience and the one with the most experience shall be considered the most qualified.

27) This section indicates a requirement for the Senior Project Manager have experience managing no less than forty projects per fiscal year simultaneously totaling a minimum of $25 million. Would the Government consider changing this requirement to projects totaling a minimum of $20 million to align with the posted anticipated volume of this contract?

28. Section H, Paragraph H.13.4.2

Answer: Senior Project Manager shall fall right under the SSM and be responsible for overseeing a “pool” of potential project managers. Assignment as to who reports to who shall be the requirement of the contractor.

28) Please clarify the intent of the Senior Project Manager. Is this person overseeing a “pool” of potential project managers, or must every project manager assigned to this contract meet the qualifications for “Senior Project Manager”

29. Section H, Paragraph H.13.4.3 contractor however the Senior Construction Superintendent with the most experience shall be considered the most qualified.

29) This section indicates a requirement for the Senior Construction Superintendent have experience managing no less than fifty projects per fiscal year simultaneously totaling a minimum of $50 million. Would the Government consider changing this requirement to more realistically align with the requirement with the posted anticipated volume of $20 million of this contract?

30. Section H, Paragraph H.13.4.3

Answer: The Senior Construction Superintendent is the General Superintendent, overseeing a pool of Field Superintendents who are assigned to the individual projects.

30) Please clarify the intent of the Senior Construction Superintendent. We interpret this role to function as a General Superintendent, overseeing a pool of Field Superintendents who are assigned to the individual projects. Is this correct, or must every project manager assigned to this contract meet the qualifications for “Senior Construction Superintendent”?

31. Section H, Paragraphs H.13.4.2 and H.13.4.3

31) Please confirm that only the Senior Project Manager and Senior Construction Superintendent must be identified, with resumes submitted, at this time, and that the remaining Project Managers and Site Superintendents may be identified upon award.

32. Section H, Paragraph H.13.4.4

Answer: The Safety Officer shall report directly to senior management of the company and also act as the QC officer.

The safety officer shall be responsible for weekly updates and report any safety violations to company management and government COR. Yes it needs to be submitted at this time.

32) Is there a requirement for a SSHO or Safety Officer (Safety Officer is referenced in Section C.4.10)? If so, are there any requirements for the position? Please confirm this position does not need to be submitted at this time.

33. Section H, Paragraph H.13.4.4

Answer: Yes, Construction Superintendents shall also have experience in the execution of asbestos and lead paint base abatements.

33) This paragraph describes the qualifications required for the CQC/Safety Inspectors. However, this paragraph also states that Construction Superintendents shall also have experience in the execution of asbestos and lead paint base abatements. Please confirm this is as intended and is not meant to reference only CQC/Safety Inspectors.

34. Section H, Paragraph H.13

Answer: No, the contractor must be ready to hit the ground running at day one and be fully staffed as required.

Multiple projects may be ready to move into the Award Phase and contractor must be able to handle potential work load.

34) The staffing requirements are very restrictive for a small business firm, especially noting that there are very few contracts of similar size, scope, and complexity for Federal facilities and that letters of commitment are required for each individual, meaning they must be on staff or identified prior to proposal submission. Would the Government please consider opening up the requirements for relevant experience to allow more firms to participate in this opportunity?

35. Section I, Clause 52.216-19

Answer: FAR Clause 52.216-19 has been revised.

35) Please confirm the reference to the contractor not being obligated to honor any single or combination of items in excess of $2 million, since the stated project size in Section C.1.2 may go as high as $4.5 million.

36. Section I, Clause 5152.237-

Answer: There will be no change to the Coefficient throughout the life of the contractor.

36) Please confirm that the Adjustments to Contractor’s Coefficient for Option Years clause on pages 72-74 will not apply to this contract since an updated unit price book will be used each year.

37. Section L, no specific paragraph

Answer: No additional requirements

37) Please confirm that there are not additional requirements for offerors proposing as a joint venture or otherwise clarify what is required (e.g. a copy of the JV agreement.)

38. Section L, Paragraph 3.b.1, Volume I – General

Answer: Please see revised Section L.

38) The instructions say to include Section B as part of Volume I. However, no pricing is to be submitted in any volume except Volume IV (per paragraph 3.a.3). Please clarify the requirement for Section B submittal as part of Volume I.

39. Section L, Paragraph 3.a.7

Answer: Yes, 11x17 foldouts are permissible and each side of the 11x17 will be considered a page.

39) This paragraph says 11x17 foldouts are permissible up to 10 pages. Please confirm that a single side of an 11x17 sheet of paper defines a page for the purpose of these foldouts. (and not the definition of a page as one side of a standard 8 ½ x 11” paper as indicated earlier in the paragraph.)

40. Section L, Paragraph 3.b.1 Tab A

40) This paragraph indicates that Offerors are cautioned that the SF 1 442 must contain an original signature. How are offerors to provide an original signature for a proposal

Answer: The offeror can provide an Electronic signature as an original signature. Or the offeror can scan a hand written signature and submit that as well on the SF 1442. Ft. Eustis MICC to provide further clarity.

electronically submitted? Are we to submit a paper copy of the SF 1442 in addition to the electronic version?

41. SF 1442 / Section L

Answer: The performance bond should be submitted with every Delivery Order under the umbrella contract and should the cost of the Delivery Order. Ft. Eustis MICC should provide further clarity.

41) The SF 1442 indicates an offer guarantee is required.

Please confirm and indicate how much the bond shall be written for and where within the proposal it shall be submitted.

42. Section L, Paragraph 3.b.3, Volume III

Answer: Stand-alone projects and/or individual task orders that fall under an IDIQ will be considered relevant.

42) Are offerors to submit IDIQ contracts as a whole entity or individual projects as evidence of relevant past performance? Individual projects

43. Section L, Paragraph 3.b.3, Answer: Government requires a min of at least four relevant contracts no to exceed more than five years prior.

43) Is there a minimum or maximum number of specific relevant contracts that may be submitted?

44. Section L, Paragraph 3.b.3, Answer: No

44) Because the size / complexity of this contract is rare within the Federal arena, would the Government consider allowing offerors to represent similar past performance within the past eight (8) years rather than restricting it to the past five (5) years?

45. Section L, Paragraph 3.b.3, Answer: Past performance contracts should be submitted by either firm within the joint venture as long as it can demonstrates that they can handle the Ft Lee work load.

45) In the case of a joint venture, please confirm that past performance contracts may be submitted for one of the joint venture partners and must not be only for the joint venture proposing on the contract.

46. Section L, Paragraph 3.b.3,

46) If Company A was previously in a joint venture with Company B and Company A performed in JV A/B in the same role as they hold in the proposing joint venture between Company A and Company C, may the experience of JV A/B be submitted for Company A as part of JV A/C on this contract?

47. Section L, Paragraph 3.b.3,

47) Will Attachment 2 be within the page limitation for Volume III?

48. Section L, Paragraph 3.b.3,

48) Will the Government confirm that Attachment 3, PPQ is not considered within the page limitation for Volume III due to the fact they go directly to the KO and offerors will not know exactly how many pages have been submitted.

Answer: Yes the PPQ will be considered even if it goes to the KO. Ft. Eustis to provide more clarity.

49. Section L, Paragraph 3.b.4.d

(Volume IV)

Answer: No, Offeror must provide NNP Coefficient for the overall contract.

49) This paragraph defines the bare NPP cost as the cost of the work without prime or subcontractor overhead.

Subcontractor overheads can vary significantly by trade and are typically considered part of the bare cost to which the NPP coefficient is applied. Would the Government consider allowing the NPP coefficient to be a markup to a complete subcontractor quote including the sub’s overhead and profit?

50. Section M, Paragraph M.3.3.4.1; Attachment 4, Pricing Sheet

Answer: Attachment 4 has been revised.

50) Section M contains a different calculation of the Total Evaluated Price than is provided in Attachment 4. Please clarify.

51. Attachment 4, Pricing Sheet and Section C, Paragraph C.2.2.3.1

Answer: 0700-1600 shall be the normal work hours

51) The standard hours listed on the pricing sheet are 0630- 1700, and in Section C normal working hours are defined as 0700-1600. Please clarify the hours that are considered standard / normal working hours.

52. Attachment 4, Pricing Sheet

Answer: Ft. Lee Has contactor to handle Emergency Responses. Does not apply to this contract. Please see revised Attachment 4.

52) Note 6 references Emergency Response. Please clarify if/how that applies to this contract and specifically the pricing schedule.

53. Attachment 4, Pricing Sheet

Answer: Government CORs will not require training. Contractor to train their own staff.

53) The base year description for RSMeans + Estimating Tool indicates contractors are to provide a price for RSMeans book, software, and training. Is the training for the estimating software or RSMeans generally? Please clarify what type of training will be required (in-person or online) and how many people will be trained.

54. Attachment 4, Pricing Sheet;

Answer: Attachment 4 has been revised.

54) The calculation for the Total Evaluated Price appears to be incorrect. Please clarify.

55. Attachment 4, Pricing Sheet

Answer: Only EuroJOC Software will acceptable for this contract

55) Note 7 indicates that many different estimating software programs are acceptable. Please confirm this is the case.

56. Attachment 5

Answer: Yes you can substitute JV partner with subcontractor/teaming partner.

56) Please clarify how joint venture partners are to complete this form. May we substitute JV partner in for (Subcontractor/teaming partner?)

57. Draft Solicitation, Page 13 of 94, Section C.4.4.3(a) Senior Site Manager.

Answer: Senior Site manager and Program manager are the same.

57) Section C.4.4.3(a) heading is Senior Site Manager (Licensed PE). However the text below regarding Senior Site Manager’s qualifications uses the term Program Manager. For the proposal narrative we provide, are the titles Senior Site Manager and Program Manager considered the same role and can the titles be interchanged?

58. Draft Solicitation, Page 45 of 94, Section H.13.4.1. Senior Site Manager (PE).

Answer: No, the Senior Site Manger must have a professional registration. If it is an Architect then they must have a Registered Architects License. These requirements are not negotiable.

58) Per the above referenced section, the Senior Site Manager must have the following qualifications:

• Licensed PE

• Minimum 10 years experience

• Experience managing no less than fifty (50) projects per fiscal year simultaneously totaling a minimum of $50 million.

• 15 years experience developing detailed cost estimates and proposals.

• Minimum 15 years experience as construction supervisor , superintendent and CQC/Safety Inspector.

• Must have Bachelor’s degree in Engineering in either Mechanical, Electrical, Civil or Structural Engineering

• Or Bachelor’s degree in Construction Management

• Or Bachelor’s degree in Architecture or equivalent

We request that you remove the Professional Engineer (PE) requirement for this role. If proposed key personnel holds a bachelor’s degree in construction management or Architecture, they will not be eligible for a PE registration. More importantly, it doesn’t appear that the contract requirements require engineering services. So the PE unfairly limits personnel and in some cases small businesses that may not have a PE in their firm managing their construction contracts.

Restate “the Senior Site Manager must have is preferred to have the following qualifications:”

And we request the qualifications be brought down to twenty

(20) projects per fiscal year simultaneously totaling a minimum of $20 million. Per the RFP, there is a $20M maximum per year for the proposed contract. The requirement to demonstrate a minimum of $50 million per year far exceeds the proposed contract’s requirements. The current requirement excludes many experienced JOC contractors and can only be filled by a senior executive/VP level person who oversees multiple programs. Also, per research, the maximum the incumbent received per fiscal year for this contract was $22.7M with an average per year of $9.3 million. Again, the required minimum of $50 million per year far exceeds the contract’s historical requirements. And even at $20M that will limit many small businesses that have the corporate capability to ensure the contract can be managed effectively by an experienced team, even if the single manager has not managed $20M in one year.

59. Draft Solicitation, Page 46 of

94, Section H.13.4.2. Senior Project Manager.

Answer: Please See Revised Section H.

59) Per the above referenced section, the Senior Project Manager must have the following qualifications:

- Experience managing no less than forty (40) projects per fiscal year simultaneously totaling a minimum of $25 million.

- 5 years experience gathering, coordinating, directing and negotiating with multiple disciplined subcontractors

- 10 years experience developing detailed cost estimates and proposals.

- 8 years experience as construction supervisor , superintendent and CQC/Safety Inspector.

- Shall have Bachelor’s degree in Engineering in either Mechanical, Electrical, Civil or Structural Engineering

- Or Bachelor’s degree in Construction Management

- Or Bachelor’s degree in Architecture or equivalent

Restate “the Senior Project Manager must have is preferred to have the following qualifications:”

We request the qualifications be brought down to twenty

(20) per fiscal year simultaneously totaling a minimum of $20 million. Per the RFP, there is a $20M maximum per year for the proposed contract. The requirement to demonstrate a minimum of $25 million per year exceeds the proposed contract’s requirements and excludes several excellent Project Managers with careers in JOC contracting. Also, per research, the maximum the incumbent received per fiscal year for this contract was $22.7M with an average per year of $9.3 million. Again, the required minimum of $20 million per year far exceeds the contract’s average historical requirements.

60. Draft Solicitation, Page 46 of 94, Section H.13.4.3. Senior Construction Superintendent.

Answer: Please See Revised Section H.

60) Per the above referenced section, the Senior Construction Superintendent must have the following qualifications:

- Experience overseeing construction of no less than twenty (20) projects per fiscal year simultaneously totaling a minimum of $20 million.

- 10 years experience coordinating, directing and managing multiple disciplined subcontractors

- Minimum 15 years of experience as construction supervisor, construction superintendent, construction manager and contractor quality control (CQC)/Safety Inspector

- Shall have Bachelor’s degree of engineering in either Mechanical, electrical, civil or structural engineering

- Or Bachelor’s degree in Construction Management

- Or trade certification

- Or on the job training

Restate “the Senior Construction Superintendent must have is preferred to have the following qualifications:”

We request the qualifications be brought down to twenty (20) per fiscal year simultaneously totaling a minimum of $20 million. Per the RFP, there is a $20M maximum per year for the proposed contract. The requirement to demonstrate a minimum of $20 million per year excludes several excellent Superintendents who have made their careers in JOC contracting. Also, per research, the maximum the incumbent received per fiscal year for this contract was $22.7M with an average per year of $9.3 million. Again, the required minimum of $20 million per year far exceeds the contract’s average historical requirements.

61. Draft Solicitation, Page 47 of 94, Section H.13.4.5. Office Managers.

Answer: Purchasing Agent or Expeditor shall be designated by the contractor.

61) Per the above referenced section, the Office Manager shall also have the capability of acting as a Purchasing Agent or Expeditor.

Please restate to say that the contractor shall designate an individual to also function as a Purchasing Agent and Expediter.

62. Section L, General Instructions,

1. Proposal Submittal and Inquiries, Paragraph a

Answer: Please see revised Section L.

62) After visiting the safe.apps.mil website, it appears that a request code will be required from the recipient in order to upload proposal files for submission. Will the request code be issued with the final solicitation?

63. Section L, General Instructions,

3. Proposal Preparation Instructions, Paragraph a.3

Answer: Yes.

63) The instructions state that all electronic documents are to be Microsoft Office 2010 based. Would the Government consider allowing Portable Document Format (PDF) files to allow for Government provided forms, such as the SF 1442, PPQs, etc?

64. Section L, General Instruction,

3. Proposal Preparations Instructions, Paragraph b.1 Volume 1 – General

Answer: Please see Revised Section L.

64) This paragraph lists a completed Section B among the documents required for Volume 1, yet it is not detailed as a requirement under Tabs A-F for Volume I. Please confirm that it is listed in error for Volume I and is only to be submitted with our pricing in Volume IV.

65. Section L, General Instructions,

3. Proposal Preparation Instructions, Paragraph 2.

Volume II – Project Management Ability – TAB A, 2nd Bullet (Page 89 of 94).

Answer: Offeror to provide full QC and Safety Plans even if they exceed limitation of 30 pages.

65) The RFP states, “Offeror shall provide their proposed quality control and safety plans….” Volume II is limited to 30 pages and our QC and Safety plans alone far exceed these limitations. Does the Government want complete proposed plans or only a summary of the key aspects of our proposed QC and Safety plans? If complete plans are desired, will they be exempt from the page limitations for Volume II?

66. Section C, C.4.4 Contractor Staff, C.4.4.3(a) Senior Site Manager (Page 13 of 94)

66) Will fifteen (15) years or more of construction IDIQ program management experience be acceptable for the Senior Site Manager/Program Manager in lieu of being a licensed PE?

Answer: NO, the PE and Architectural Registration requirement is non-negotiable.

67. Section L, General Instructions,

3. Proposal Preparation Instructions, Volume III – Past Performance Proposal – Evaluation Factor 2, Paragraph (4), 3rd bullet, Consent Letters (Page 89 of 94)

Answer: Yes.

67) If offeror is pursuing this contract as a single prime contractor, but citing past performance performed with a previous teaming or joint venture partner, is a consent letter required?

68. Section C, Paragraph C.4.3 Supervision (Page 13 of 94) and Paragraph C.5.1.1 (Page 17 of 94)

Answer: Project Manager is not required to be on worksite when work is being performed as long as Superintendent is present on every worksite.

68) Paragraph C.4.3 states that a dedicated Project Manager should be provided on every worksite when work is being performed. Is this in addition to having a Superintendent on every worksite, as stated in Paragraph C.5.1.1?

69. PPQ, Attachment 3 – Appendix D Enclosure 2, Paragraph 1

Answer: Please see revised Section L and PPQ.

69) The PPQ states “…Contractors record of past (within the past three years) and current performance.” Section M.3.2.3.1. Recency states, “the effort must have been performed during the five (5) years prior to date for receipt of offers.” Please change the PPQ language to confirm Offerors will be evaluated on past performance performed during the last five years as stated in the RFP.

70. PPQ, Attachment 3 – Appendix D Enclosure 2, Part III. Return Information

Answer: Please see Section L for KO’s email address.

70) PPQ states to return the completed Questionnaire via email to the Contracting Officer identified in the cover letter.

There is no accompanying cover letter provided with the PPQ and draft RFP package. Will the Government be providing a cover letter with the Contracting Officer’s information?

71. Section C, Paragraph C.5.1.1 (page 17 of 94)

Answer: No, Ft. Lee recognizes that offeror will be assigned multiple projects to per different Superintendent

71) Section C states that, “The Contractor shall assign a Site Superintendent for each project in accordance with FAR 52.236-6 Superintendence by the Contractor, or as otherwise required by any order issued under this contract.” Earlier in Section C, Paragraph C.1.2, it states to anticipate upwards of 100 multi-discipline projects being executed simultaneously. Projects will vary in scope and value from $2,000 to approximately $4.5M. Are Offeror’s to assume that a separate Site Superintendent (upwards of

100) is required for each project, regardless of complexity of the task order?