This document appears to be an Excel file titled "ASEP Course Support Coverage Matrix Base Year_Amend. 2.xlsx" that provides a detailed weekly breakdown of personnel requirements for the Army Strategic Education Program (ASEP) Course Support contract.
The key details are:
- This contract provides non-personal operations support and staff/presenter support for ASEP courses at the U.S. Army War College (USAWC). The ASEP serves as an educational center focused on strategic decision-making and the use of land power.
- The personnel requirements are broken out by labor category, including Writing Coaches, Curriculum Development, Adjunct Professors, Operations Support, Facilitators, and Education Administrators. The total personnel required per week ranges from 5-12 individuals.
- The contract appears to cover a 1-year base period from FY 2025 into FY 2026, with multiple task order lots including ASEP-A, SLDS, ASEP-S, NLC, CJFLCC, GO/CSM Spouse, Military Family Spouse, and Research & Assessments.
- The solicitation number is W91QF024Q7009 and the contracting agency is the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Copy of ASEP Course Support Coverage Matrix Base Year_16 Oct 2024.xlsx | XLSX spreadsheet | |
| ASEP Course Support_CLIN Structure_Amend 4.xlsx | XLSX spreadsheet | |
| Questions Answered_Amend 2.docx | DOCX document | |
| ASEP Course Support_CLIN Structure_Amend 3.xlsx | XLSX spreadsheet | |
| ASEP Course Support Coverage Matrix Base Year_Amend 3.xlsx | XLSX spreadsheet | |
| 212-1 and 212-2_ASEP Course Support_Amend 2.docx | DOCX document | |
| PWS ASEP Course Support Amend 2.docx | DOCX document | |
| Questions Answered_Amend 2.docx | DOCX document | |
| ASEP Course Support Coverage Matrix Base Year_Amended.xlsx | XLSX spreadsheet | |
| ASEP Course Support_CLIN Structure_Amended.xlsx | XLSX spreadsheet | |
| ASEP Course Support Coverage Matrix Base Year_Final.xlsx | XLSX spreadsheet | |
| 212-1 and 212-2_ASEP Course Support_FINAL.docx | DOCX document | |
| Combined Synopsis Solicitation_ASEP Course Support 24-30.pdf | ||
| ASEP Course Support_CLIN Structure_25 Sept 2024_FINAL.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FY 2019-FY2020 | |||||||||||||||||||||||||||||||||||||||||||||||||
| Week # | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | |
| August | September | October | November | December | January | February | March | April | May | June | |||||||||||||||||||||||||||||||||||||||
| Writing Coach LOT 1A | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | ||||||||||||||||||||||||||||
| Writing Coach LOT 2A | 4 | 4 | 4 | 4 | |||||||||||||||||||||||||||||||||||||||||||||
| Writing Coach LOT 5A | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||||
| TOTAL Writing Coach Lots | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 1 | 1 | 1 | 1 | 4 | 4 | 4 | 4 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | ||||||||||||||||
| FY 2025 | FY 2026 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Lot 1 ASEP-A Lot 2 SLDS Lot 3 ASEP-S Lot 4 NLC Lot 5 CJFLCC Lot 6 GO/CSM Spouse Lot 7 Military Family Spouse Lot 8 Research and Assessments | 1 - 7 Dec 2024 | 8 - 14 Dec 2024 | 15 - 21 Dec 2024 | 22 - 28 Dec 2024 | 29 Dec - 4 Jan 2025 | 5 - 11 Jan 2025 | 12 - 18 Jan 2025 | 19 - 25 Jan 2025 | 26 Jan - 1 Feb 2025 | 2 - 8 Feb 2025 | 9 - 15 Feb 2025 | 16 - 22 Feb 2025 | 23 Feb - 1 Mar 2025 | 2 - 8 Mar 2025 | 9 - 15 Mar 2025 | 16 - 22 Mar 2025 | 23 - 29 Mar 2025 | 30 Mar - 5 Apr 2025 | 6 - 12 Apr 2025 | 13 - 19 Apr 2025 | 20 - 26 Apr 2025 | 27 Apr - 3 May 2025 | 4 - 10 May 2025 | 11 - 17 May 2025 | 18 - 24 May 2025 | 25 - 31 May 2025 | 1 - 7 Jun 2025 | 8 - 14 Jun 2025 | 15 - 21 Jun 2025 | 22 - 28 Jun 2025 | 29 Jun - 5 Jul 2025 | 6 - 12 Jul 2025 | 13 - 19 Jul 2025 | 20 - 26 July 2025 | 27 Jul - 2 Aug 2025 | 3- 9 Aug 2025 | 10 - 16 Aug 2025 | 17 - 23 Aug 2025 | 24 - 30 Aug 2025 | 31 Aug - 6 Sept 2025 | 7 - 13 Sept 2025 | 14 - 20 Sept 2025 | 21 - 27 Sept 2025 | 28 Sept - 4 Oct 2025 | 5 - 11 Oct 2025 | 12 - 18 Oct 2025 | 19 - 25 Oct 2025 | 26 Oct - 1 Nov 2025 | |
| Week # | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | |
| December | Janurary | February | March | April | May | June | July | August | September | October | |||||||||||||||||||||||||||||||||||||||
| Writing Coach Lot 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||||||||||||||||||||||
| Writing Coach Lot 4 - (3 x per year x 2 contractors SAF) | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | |||||||||||||||||||||||||||||||||||||
| Writing Coach Lot 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 0 | 0 | 0 | 0 | 1 | 1 | 1 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 2 | 2 | 2 | 1 | 1 | 1 | 1 | 1 | 0 | 0 | 0 | 2 | 2 | 2 | 2 | |
| FY 2025 | FY 2026 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Lot 1 ASEP-A Lot 2 SLDS Lot 3 ASEP-S Lot 4 NLC Lot 5 CJFLCC Lot 6 GO/CSM Spouse Lot 7 Military Family Spouse Lot 8 Research and Assessments | 1 - 7 Dec 2024 | 8 - 14 Dec 2024 | 15 - 21 Dec 2024 | 22 - 28 Dec 2024 | 29 Dec - 4 Jan 2025 | 5 - 11 Jan 2025 | 12 - 18 Jan 2025 | 19 - 25 Jan 2025 | 26 Jan - 1 Feb 2025 | 2 - 8 Feb 2025 | 9 - 15 Feb 2025 | 16 - 22 Feb 2025 | 23 Feb - 1 Mar 2025 | 2 - 8 Mar 2025 | 9 - 15 Mar 2025 | 16 - 22 Mar 2025 | 23 - 29 Mar 2025 | 30 Mar - 5 Apr 2025 | 6 - 12 Apr 2025 | 13 - 19 Apr 2025 | 20 - 26 Apr 2025 | 27 Apr - 3 May 2025 | 4 - 10 May 2025 | 11 - 17 May 2025 | 18 - 24 May 2025 | 25 - 31 May 2025 | 1 - 7 Jun 2025 | 8 - 14 Jun 2025 | 15 - 21 Jun 2025 | 22 - 28 Jun 2025 | 29 Jun - 5 Jul 2025 | 6 - 12 Jul 2025 | 13 - 19 Jul 2025 | 20 - 26 July 2025 | 27 Jul - 2 Aug 2025 | 3- 9 Aug 2025 | 10 - 16 Aug 2025 | 17 - 23 Aug 2025 | 24 - 30 Aug 2025 | 31 Aug - 6 Sept 2025 | 7 - 13 Sept 2025 | 14 - 20 Sept 2025 | 21 - 27 Sept 2025 | 28 Sept - 4 Oct 2025 | 5 - 11 Oct 2025 | 12 - 18 Oct 2025 | 19 - 25 Oct 2025 | 26 Oct - 1 Nov 2025 | |
| Week # | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | |
| December | Janurary | February | March | April | May | June | July | August | September | October | |||||||||||||||||||||||||||||||||||||||
| Curriculum Development LOT 1 | LOT 1B | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
| Curriculum Development LOT 2 | LOT 2B | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
| Curriculum Development LOT 4 | LOT 4A | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
| TOTAL Curriculum Development | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 |
| FY 2025 | FY 2026 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Lot 1 ASEP-A Lot 2 SLDS Lot 3 ASEP-S Lot 4 NLC Lot 5 CJFLCC Lot 6 GO/CSM Spouse Lot 7 Military Family Spouse Lot 8 Research and Assessments | 1 - 7 Dec 2024 | 8 - 14 Dec 2024 | 15 - 21 Dec 2024 | 22 - 28 Dec 2024 | 29 Dec - 4 Jan 2025 | 5 - 11 Jan 2025 | 12 - 18 Jan 2025 | 19 - 25 Jan 2025 | 26 Jan - 1 Feb 2025 | 2 - 8 Feb 2025 | 9 - 15 Feb 2025 | 16 - 22 Feb 2025 | 23 Feb - 1 Mar 2025 | 2 - 8 Mar 2025 | 9 - 15 Mar 2025 | 16 - 22 Mar 2025 | 23 - 29 Mar 2025 | 30 Mar - 5 Apr 2025 | 6 - 12 Apr 2025 | 13 - 19 Apr 2025 | 20 - 26 Apr 2025 | 27 Apr - 3 May 2025 | 4 - 10 May 2025 | 11 - 17 May 2025 | 18 - 24 May 2025 | 25 - 31 May 2025 | 1 - 7 Jun 2025 | 8 - 14 Jun 2025 | 15 - 21 Jun 2025 | 22 - 28 Jun 2025 | 29 Jun - 5 Jul 2025 | 6 - 12 Jul 2025 | 13 - 19 Jul 2025 | 20 - 26 July 2025 | 27 Jul - 2 Aug 2025 | 3- 9 Aug 2025 | 10 - 16 Aug 2025 | 17 - 23 Aug 2025 | 24 - 30 Aug 2025 | 31 Aug - 6 Sept 2025 | 7 - 13 Sept 2025 | 14 - 20 Sept 2025 | 21 - 27 Sept 2025 | 28 Sept - 4 Oct 2025 | 5 - 11 Oct 2025 | 12 - 18 Oct 2025 | 19 - 25 Oct 2025 | 26 Oct - 1 Nov 2025 | |
| Week # | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | |
| December | Janurary | February | March | April | May | June | July | August | September | October | |||||||||||||||||||||||||||||||||||||||
| Adjunct Professor LOT 1 | LOT IC | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||||||||||||||||||||||||||||||
| Adjunct Professor LOT 3 | 1 | 1 | 1 | ||||||||||||||||||||||||||||||||||||||||||||||
| Adjunct Professor LOT 8 - (40 hours per month SAF) | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||
| TOTAL Adjunct Professor | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 1 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 0 | |
| FY 2025 | FY 2026 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Lot 1 ASEP-A Lot 2 SLDS Lot 3 ASEP-S Lot 4 NLC Lot 5 CJFLCC Lot 6 GO/CSM Spouse Lot 7 Military Family Spouse Lot 8 Research and Assessments | 1 - 7 Dec 2024 | 8 - 14 Dec 2024 | 15 - 21 Dec 2024 | 22 - 28 Dec 2024 | 29 Dec - 4 Jan 2025 | 5 - 11 Jan 2025 | 12 - 18 Jan 2025 | 19 - 25 Jan 2025 | 26 Jan - 1 Feb 2025 | 2 - 8 Feb 2025 | 9 - 15 Feb 2025 | 16 - 22 Feb 2025 | 23 Feb - 1 Mar 2025 | 2 - 8 Mar 2025 | 9 - 15 Mar 2025 | 16 - 22 Mar 2025 | 23 - 29 Mar 2025 | 30 Mar - 5 Apr 2025 | 6 - 12 Apr 2025 | 13 - 19 Apr 2025 | 20 - 26 Apr 2025 | 27 Apr - 3 May 2025 | 4 - 10 May 2025 | 11 - 17 May 2025 | 18 - 24 May 2025 | 25 - 31 May 2025 | 1 - 7 Jun 2025 | 8 - 14 Jun 2025 | 15 - 21 Jun 2025 | 22 - 28 Jun 2025 | 29 Jun - 5 Jul 2025 | 6 - 12 Jul 2025 | 13 - 19 Jul 2025 | 20 - 26 July 2025 | 27 Jul - 2 Aug 2025 | 3- 9 Aug 2025 | 10 - 16 Aug 2025 | 17 - 23 Aug 2025 | 24 - 30 Aug 2025 | 31 Aug - 6 Sept 2025 | 7 - 13 Sept 2025 | 14 - 20 Sept 2025 | 21 - 27 Sept 2025 | 28 Sept - 4 Oct 2025 | 5 - 11 Oct 2025 | 12 - 18 Oct 2025 | 19 - 25 Oct 2025 | 26 Oct - 1 Nov 2025 | |
| Week # | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | |
| December | Janurary | February | March | April | May | June | July | August | September | October | |||||||||||||||||||||||||||||||||||||||
| Ops Support LOT 1 - (4 weeks 3x per year SAF) | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||
| Ops Support LOT 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||
| Ops Support LOT 3 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||||||
| Ops Support LOT 4 | LOT 4B | 1 | 1 | 1 | 0.4 | 1 | 1 | 1 | 0.4 | 1 | 1 | ||||||||||||||||||||||||||||||||||||||
| Ops Support LOT 6 - (3 weeks x 3 per year SAF) | |||||||||||||||||||||||||||||||||||||||||||||||||
| Ops Support LOT 7 - | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||||
| TOTAL OPS Support | 2 | 2 | 2 | 2 | 2 | 2 | 3 | 2 | 2 | 3 | 3 | 1 | 1 | 1 | 2 | 1 | 1 | 1 | 0.4 | 1 | 0 | 1 | 1 | 0 | 2 | 1 | 1 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | 1 | 2 | 1 | 0.4 | 0 | 3 | 2 | 1 | 1 | 0 | 0 | 1 | 2 | 2 | |
| FY 2025 | FY 2026 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Lot 1 ASEP-A Lot 2 SLDS Lot 3 ASEP-S Lot 4 NLC Lot 5 CJFLCC Lot 6 GO/CSM Spouse Lot 7 Military Family Spouse Lot 8 Research and Assessments | 1 - 7 Dec 2024 | 8 - 14 Dec 2024 | 15 - 21 Dec 2024 | 22 - 28 Dec 2024 | 29 Dec - 4 Jan 2025 | 5 - 11 Jan 2025 | 12 - 18 Jan 2025 | 19 - 25 Jan 2025 | 26 Jan - 1 Feb 2025 | 2 - 8 Feb 2025 | 9 - 15 Feb 2025 | 16 - 22 Feb 2025 | 23 Feb - 1 Mar 2025 | 2 - 8 Mar 2025 | 9 - 15 Mar 2025 | 16 - 22 Mar 2025 | 23 - 29 Mar 2025 | 30 Mar - 5 Apr 2025 | 6 - 12 Apr 2025 | 13 - 19 Apr 2025 | 20 - 26 Apr 2025 | 27 Apr - 3 May 2025 | 4 - 10 May 2025 | 11 - 17 May 2025 | 18 - 24 May 2025 | 25 - 31 May 2025 | 1 - 7 Jun 2025 | 8 - 14 Jun 2025 | 15 - 21 Jun 2025 | 22 - 28 Jun 2025 | 29 Jun - 5 Jul 2025 | 6 - 12 Jul 2025 | 13 - 19 Jul 2025 | 20 - 26 July 2025 | 27 Jul - 2 Aug 2025 | 3- 9 Aug 2025 | 10 - 16 Aug 2025 | 17 - 23 Aug 2025 | 24 - 30 Aug 2025 | 31 Aug - 6 Sept 2025 | 7 - 13 Sept 2025 | 14 - 20 Sept 2025 | 21 - 27 Sept 2025 | 28 Sept - 4 Oct 2025 | 5 - 11 Oct 2025 | 12 - 18 Oct 2025 | 19 - 25 Oct 2025 | 26 Oct - 1 Nov 2025 | |
| Week # | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | |
| December | Janurary | February | March | April | May | June | July | August | September | October | |||||||||||||||||||||||||||||||||||||||
| Facilitator Lot 5 | 0.8 | 2 | 2 | 0.8 | 0.8 | 2 | 2 | 0.8 | |||||||||||||||||||||||||||||||||||||||||
| Facilitator | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.8 | 2 | 2 | 0.8 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.8 | 2 | 2 | 0.8 |
| Lot 1 ASEP-A Lot 2 SLDS Lot 3 ASEP-S Lot 4 NLC Lot 5 CJFLCC Lot 6 GO/CSM Spouse Lot 7 Military Family Spouse Lot 8 Research and Assessments | 1 - 7 Dec 2024 | 8 - 14 Dec 2024 | 15 - 21 Dec 2024 | 22 - 28 Dec 2024 | 29 Dec - 4 Jan 2025 | 5 - 11 Jan 2025 | 12 - 18 Jan 2025 | 19 - 25 Jan 2025 | 26 Jan - 1 Feb 2025 | 2 - 8 Feb 2025 | 9 - 15 Feb 2025 | 16 - 22 Feb 2025 | 23 Feb - 1 Mar 2025 | 2 - 8 Mar 2025 | 9 - 15 Mar 2025 | 16 - 22 Mar 2025 | 23 - 29 Mar 2025 | 30 Mar - 5 Apr 2025 | 6 - 12 Apr 2025 | 13 - 19 Apr 2025 | 20 - 26 Apr 2025 | 27 Apr - 3 May 2025 | 4 - 10 May 2025 | 11 - 17 May 2025 | 18 - 24 May 2025 | 25 - 31 May 2025 | 1 - 7 Jun 2025 | 8 - 14 Jun 2025 | 15 - 21 Jun 2025 | 22 - 28 Jun 2025 | 29 Jun - 5 Jul 2025 | 6 - 12 Jul 2025 | 13 - 19 Jul 2025 | 20 - 26 July 2025 | 27 Jul - 2 Aug 2025 | 3- 9 Aug 2025 | 10 - 16 Aug 2025 | 17 - 23 Aug 2025 | 24 - 30 Aug 2025 | 31 Aug - 6 Sept 2025 | 7 - 13 Sept 2025 | 14 - 20 Sept 2025 | 21 - 27 Sept 2025 | 28 Sept - 4 Oct 2025 | 5 - 11 Oct 2025 | 12 - 18 Oct 2025 | 19 - 25 Oct 2025 | 26 Oct - 1 Nov 2025 | 2 - 8 Nov 2025 |
| Week # | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 |
| December | Janurary | February | March | April | May | June | July | August | September | October | November | ||||||||||||||||||||||||||||||||||||||
| Education Administrator LOT 6 - | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
| Education Administartor LOT 7 - (52 weeks per year SAF) | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||||||||||||||||
| Education Administrator | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
| FY 2025 | FY 2026 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Lot 1 ASEP-A Lot 2 SLDS Lot 3 ASEP-S Lot 4 NLC Lot 5 CJFLCC Lot 6 GO/CSM Spouse Lot 7 Military Family Spouse Lot 8 Research and Assessments | 1 - 7 Dec 2024 | 8 - 14 Dec 2024 | 15 - 21 Dec 2024 | 22 - 28 Dec 2024 | 29 Dec - 4 Jan 2025 | 5 - 11 Jan 2025 | 12 - 18 Jan 2025 | 19 - 25 Jan 2025 | 26 Jan - 1 Feb 2025 | 2 - 8 Feb 2025 | 9 - 15 Feb 2025 | 16 - 22 Feb 2025 | 23 Feb - 1 Mar 2025 | 2 - 8 Mar 2025 | 9 - 15 Mar 2025 | 16 - 22 Mar 2025 | 23 - 29 Mar 2025 | 30 Mar - 5 Apr 2025 | 6 - 12 Apr 2025 | 13 - 19 Apr 2025 | 20 - 26 Apr 2025 | 27 Apr - 3 May 2025 | 4 - 10 May 2025 | 11 - 17 May 2025 | 18 - 24 May 2025 | 25 - 31 May 2025 | 1 - 7 Jun 2025 | 8 - 14 Jun 2025 | 15 - 21 Jun 2025 | 22 - 28 Jun 2025 | 29 Jun - 5 Jul 2025 | 6 - 12 Jul 2025 | 13 - 19 Jul 2025 | 20 - 26 July 2025 | 27 Jul - 2 Aug 2025 | 3- 9 Aug 2025 | 10 - 16 Aug 2025 | 17 - 23 Aug 2025 | 24 - 30 Aug 2025 | 31 Aug - 6 Sept 2025 | 7 - 13 Sept 2025 | 14 - 20 Sept 2025 | 21 - 27 Sept 2025 | 28 Sept - 4 Oct 2025 | 5 - 11 Oct 2025 | 12 - 18 Oct 2025 | 19 - 25 Oct 2025 | 26 Oct - 1 Nov 2025 | 2 - 8 Nov 2025 |
| Week # | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 |
| December | Janurary | February | March | April | May | June | July | August | September | October | November | ||||||||||||||||||||||||||||||||||||||
| Writing Coach | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 0 | 0 | 0 | 0 | 1 | 1 | 1 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 2 | 2 | 2 | 1 | 1 | 1 | 1 | 1 | 0 | 0 | 0 | 2 | 2 | 2 | 2 | 0 |
| Curriculum Development | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 |
| Adjunct Professor | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 1 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 0 | 0 |
| OPS Support | 2 | 2 | 2 | 2 | 2 | 2 | 3 | 2 | 2 | 3 | 3 | 1 | 1 | 1 | 2 | 1 | 1 | 1 | 0.4 | 1 | 0 | 1 | 1 | 0 | 2 | 1 | 1 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | 1 | 2 | 1 | 0.4 | 0 | 3 | 2 | 1 | 1 | 0 | 0 | 1 | 2 | 2 | 2 |
| Facilitator | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.8 | 2 | 2 | 0.8 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.8 | 2 | 2 | 0.8 | 0 |
| Education Administrator | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 |
| TOTAL REQUIRED | 8 | 7 | 7 | 7 | 7 | 7 | 8 | 7 | 8 | 9 | 10 | 7 | 8 | 8 | 10 | 8 | 8.8 | 8 | 7.4 | 6.8 | 5 | 7 | 8 | 6 | 8 | 8 | 6 | 7 | 6 | 5 | 5 | 5 | 7 | 7 | 8 | 9 | 7 | 6.4 | 6 | 9 | 9 | 6 | 7 | 5 | 8.8 | 10 | 11 | 9.8 | 7 |
| Number of weeks requiring support: | 52 | # Weeks requiring 12 persons: | 2 | Average number of personnel required in a supported week: |
| Avg weekly manning rqmt per 52 wks: | 5.4 | # Weeks requiring 11 persons: | 2 | |
| # Weeks requiring 10 persons: | 8 | |||
| # Weeks requiring 9 persons: | 6 | |||
| # Weeks requiring 8 persons: | 11 | |||
| # Weeks requiring 7 persons: | 10 | |||
| # Weeks requiring 6 persons: | 11 | |||
| # Weeks requiring 5 person: | 2 |