Questions_with_answers_for_OH_HRF_SCVS_as_of_April13_2015.docx
DOCX document 13 KB Posted
- Solicitation number
- W91364-15T-0011
About this file
Response to questions April 13 2015
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_with_answers_for_OH_HRF_SCVS_for_April_22_2015.docx | DOCX document | |
| Camp_Sherman.zip | ZIP file | |
| Camp_Ravenna.zip | ZIP file | |
| Camp_Ravenna_and_Camp_Sherman_SCVS_locations.docx | DOCX document | |
| Questions_with_answers_for_OH_SFEs_April_10_2015.docx | DOCX document | |
| Annex_A-enhancement.pdf | ||
| Annex_B-enhancement.pdf | ||
| SCVS__Enhancement_SoW.pdf | ||
| 2015_SFE__Statement_of_Work_SCVS_reset_support.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Is the Government planning to hold a site visit on a particular day?
Yes - site visit is planned for Tuesday April 21 for both sites.
Would the Government consider extending the due date of submissions to accommodate a site visit (with due date being extended until 16 April and a major re-scope of requirements to include enhancement) there is a need to actually see the site to determine what enhancement costs will be.
Yes - now extended until April 27th at 10:00 AM
Will both sites each need the following for each event?
2 separate events- SFE 2 locations Camp Sherman with 1 S&E team participating EXEVAL 1 location Camp Ravenna with 2 S&E teams participating. The lumber and equipment package should be in sufficient qty to accommodate the number of teams participating at each location. The SME support requires enough personnel for 2 separate locations
Item each site/event Total (Potentially)
Reset crew 4 crews
3- SME's 12 SME's
1- S&E Safety 4 Safety's
Lumber package 4 Lumber packages
Concrete Breach panels (24) 4 Sets of panels (total 96)
Equipment (portable) 4 packages
Heavy equipment 4 packages
Reference Annex A & B. Is contractor responsible to supply any or all materials contained in description?
Annex A and B do not apply to the SFE EXEVAL SCVS support. They apply only to the enhancement of both SCVS which is not connected to the exercises. And yes if the contractor bids on the separate solicitation of the Enhancement the contractor is responsible for all equipment.
Can government provide photos of sites?
Photos will be uploaded on Weds April 22nd after the site visit.