230811 pre-functional checklists mechanical.pdf

PDF 22 KB Posted

Attached to
CONSTRUCT USPFO WAREHOUSE
Solicitation number
W91364-09-B-0003
Issued by

About this file

230811 pre-functional checklists mechanical.pdf

View the file

Other files

File Type Posted
Bid Abstract 09-B-0003.pdf PDF
SF30Amendment2 09-B-0003.pdf PDF
ADDENDUM NO 03 USPFO Narrative.pdf PDF
ADDENDUM NO 02 USPFO Narrative SENT.pdf PDF
SF30Amendment3 09-B-0003.pdf PDF
09-B-0003 Amendment 3.pdf PDF
ADDENDUM NO 03 CSMS PH II Narrative.pdf PDF
ADDENDUM NO 02 CSMS PH II Narrative SENT.pdf PDF
USPFO WH Addendum.pdf PDF
Bid Questions USPFO WAREHOUSE JACOBS RESPONSES JFK.doc DOC document
e2c23100.PDF PDF
OHARNG-USPFO-G-130W .pdf PDF
OHARNG-USPFO-A-820W .pdf PDF
083730 high speed rolling door.pdf PDF
220523 general duty valves for plumbing piping.pdf PDF
092900 gypsum board.pdf PDF
102113 toilet compartments.pdf PDF
OHARNG-USPFO-A-723W .pdf PDF
270500 common work results for communications.pdf PDF
081113 hollow metal doors and frames.pdf PDF
052100 steel joist framing.pdf PDF
017329 cutting and patching.pdf PDF
220516 expansion fittings and loops for plumbing piping.pdf PDF
104413 fire extinguishing cabinets.pdf PDF
102800 toilet bath and laundry accessories.pdf PDF
077100 roof specialties.pdf PDF
061000 rough carpentry.pdf PDF
USPFO_FA501W.pdf PDF
USPFO_M501W.pdf PDF
USPFO_S252W.pdf PDF
E802.pdf PDF
E104.pdf PDF
055000 metal fabrications.pdf PDF
USPFO_M301W.pdf PDF
OHARNG-USPFO-A-806W .pdf PDF
OHARNG-USPFO-A-213bW .pdf PDF
C603.pdf PDF
263600 transfer switches.pdf PDF
017839 project record documents.pdf PDF
093000 tiling.pdf PDF
E401.pdf PDF
013200 construction progress documentation.pdf PDF
260533 raceway and boxes for electrical systems.pdf PDF
OHARNG-USPFO-A-320W .pdf PDF
311000 clearing grubbing.pdf PDF
262413 switchboards.pdf PDF
221319 sanitary waste piping specialties.pdf PDF
USPFO_FA301W.pdf PDF
260500 common work results for electrical.pdf PDF
USPFO_S002W.pdf PDF
Show 40 more

Latest 50 of 373 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F5W61608 USPFO Warehouse Ohio Army National Guard Rev. 0 Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

PRE-FUNCTIONAL CHECKLISTS MECHANICAL 230811 - 1

SECTION 230811 – PRE-FUNCTIONAL CHECKLISTS MECHANICAL

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section contains representative Pre-functional Checklists in a form format (PC).

1. The PC procedures displayed in a form format here are intended to provide the CxA with an example of a format and an indication of the rigor of the required prefunctional checklists and documentation for various equipment types.

Though they were not developed specifically for this project, they are generally applicable.

2. The checklists contain items for Divisions 21, 22, 23, and 26 contractors to perform. On each checklist, a column is provided that should be filled out by the Contractor assigning responsibility for that line item to a trade.

3. Those executing the checklists are only responsible to perform items that apply to the specific application at hand. These checklists do not take the place of the manufacturer’s recommended checkout and start-up procedures or report.

Some checklist procedures may be redundant of some checkout procedures that will be documented on typical factory field checkout sheets. Double documenting is required in those cases.

4. Refer to Section 019113 for additional requirements regarding prefunctional checklists, startup and initial checkout. Items that do not apply should be noted along with the reasons on the form. If this form is not used for documenting, one of similar rigor and clarity shall be used. Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off. “Contr.”

column or abbreviations in brackets to the right of an item refer to the contractor responsible to verify completion of this item. A/E = architect/engineer, All = all contractors, CxA = commissioning agent, CC = controls contractor, EC = electrical contractor, MC = mechanical contractor, SC = sheet metal contractor, TAB = test and balance contractor.

1.2 PRE-FUNCTIONAL CHECKLISTS

Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

PRE-FUNCTIONAL CHECKLISTS MECHANICAL 230811 - 2

Prefunctional Checklist

Project ____________________________________

PC-____ EXHAUST FANS ID#’s_________________

1. Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by par-ties having direct knowledge of the event, as marked below, respective to each responsible contractor. This prefunctional checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reli-able functional tests being performed. ___ List attached.

Mechanical Contractor Date Controls Contractor Date

Electrical Contractor Date Sheet Metal Contractor Date

TAB Contractor Date Construction Manager Date

Prefunctional checklist items are to be completed as part of startup & initial checkout, prepara-tory to functional testing.

• This checklist does not take the place of the manufacturer’s recommended checkout and startup procedures or report.

• Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others).

• If this form is not used for documenting, one of similar rigor shall be used.

• Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.

• “Contr.” column or abbreviations in brackets to the right of an item refer to the contractor responsible to verify completion of this item. A/E = architect/engineer, All = all contractors, CxA = commissioning agent, CC = controls contractor, EC = electrical contractor, CM = construction manager, MC = mechanical contractor, SC = sheet metal contractor, TAB = test and balance contractor, Approvals. This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted below.

Commissioning Agent Date Owner’s Representative Date

Notes:

Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

PRE-FUNCTIONAL CHECKLISTS MECHANICAL 230811 - 3

2. Requested documentation submitted Check if Okay. Enter comment or note number if deficient.

Check Equip Tag-> Contr.

Manufacturer’s cut sheets Performance data (fan curves, coil data, etc.)

Installation and startup manual and plan Sequences and control strategies O&M manuals

• Documentation complete as per contract documents for given trade ...................... ___ YES ___ NO

3. Model verification [Contr = ________] 1 = as specified, 2 = as submitted, 3 = as installed. Check if Okay. Enter note number if deficient.

Equip Tag--

Manuf. 2

Model 2

Serial # 3

CFM 2

Sound Pwr1 Level @ 63, 250; 1K Hz3

• The equipment installed matches the specifications for given trade........................ ___ YES ___ NO

4. Installation Checks Check if Okay. Enter comment or note number if deficient.

Check Equip Tag-> Contr.

Cabinet and General Installation Permanent labels affixed Casing condition good: no dents, leaks, door gaskets in-stalled Mountings checked and shipping bolts removed Vibration isolators installed Equipment guards installed Pulleys aligned Belt tension correct Plenums clear of debris Fans rotate freely

Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

PRE-FUNCTIONAL CHECKLISTS MECHANICAL 230811 - 4

Check if Okay. Enter comment or note number if deficient.

Check Equip Tag-> Contr.

Fire and balance dampers installed Backdraft dampers installed, per drawings, and operate freely Duct system complete Electrical Electrical connections complete Disconnect switch installed Overload heaters in place Control connections complete

Operational Checks Fan rotation correct Electrical interlocks verified Any fan status indicators functioning No unusual vibration or and noise Record full load running amps for each fan.

_____rated FL amps x ______srvc factor = _______ (Max amps). Running less than max?

Check voltage: Rate = ______ Actual = _______ Within 5%?

The disconnect switch properly operates After 24 hours of operation, recheck belt tension and align-ment

• The checklist items of Part 4 are all successfully completed for given trade............___ YES ___ NO

Notes:

END OF SECTION 230811