Text version
F5W61608 USPFO Warehouse Ohio Army National Guard Rev. 0 Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
HIGH SPEED ROLLING DOOR 083730 - 1
SECTION 083730 - HIGH SPEED ROLLING DOOR
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Product Data: Submit manufacturers' product data, roughing-in diagrams and installation instructions for each type and size of high-speed rolling door. Provide operating instructions, maintenance information and complete information describing the operating system including rough-in instructions.
B. Shop Drawings: Submit shop drawings for special components and installations that are not fully dimensioned or detailed on the manufacturer's data sheets, including equipment interconnection diagrams.
C. Wind Loading: High speed rolling door to withstand a wind load condition of 20.6 lbs/sq.ft. (70 mph) at standard pressure and temperature.
D. Furnish each high-speed rolling door as a complete unit produced by one manufacturer, including hardware, accessories, mounting and installation components. Furnish high-speed rolling doors by one manufacturer for the entire project.
PART 2 - PRODUCTS
2.1 ACCEPTABLE MANUFACTURERS:
A. High speed roll-up doors shall be Rytec Fast-Seal Model as specified below or an approved equal.
2.2 HIGH-SPEED ROLLING DOOR:
A. Door Curtain: 3-ply multi-filament Rilon material.
1. Color: As selected by the Architect from manufacturer’s standard colors.
B. Side Frame: Fully bolt-together, reinforced side frames with front and rear wind bar guides and full height vinyl weather strip seals against fabric material. Dual thru-beam photo eye factory-installed in standard models. (Provide interior and exterior wind bars at exterior door only.)
C. Bottom Bar: Extruded aluminum bottom bar capable of releasing in either direction without damage to bar, reversing edge or side covers. Electrical auto-reversing edge
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
HIGH SPEED ROLLING DOOR 083730 - 2
standard. Standard dual cut-off switches automatically shut off motor when bottom bar is impacted. No exposed junction box on bottom bar. Bottom bar pre-assembled on door at factory.
D. Counterbalance & tensioning: Counterbalance system consists of guided counterweights custom-sized to provide proper balancing of each door. Independent tension system maintains constant panel tension.
E. Drive System: .5 HP, 3 ph, 60 Hz, single-speed electric motor with brake is standard.
Motor and all electrical components factory-wired to a single junction box in the roll head assembly.
F. Travel Speed: Standard Operation at 40 inches per second in both directions.
G. Electrical Controls: Self-diagnostic, microprocessor-based controller housed in a NEMA 12 electrical enclosure with vision window. Control panel fully assembled, wired and tested at factory. Controller includes non-adjustable cycle counter with LED readout.
H. Warranty: One-year limited warranty on materials and workmanship. Lifetime warranty on counter-weights and tension springs. Five-year limited warranty on 3-ply Rilon panel material.
I. Activators: Each door shall be controlled by a motion sensor and a push button on each side of door.
J. Hood: Provide gauge metal cover for components at door head.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install door and operating equipment complete with necessary hardware, jamb and head mold strips, anchors, inserts, hangers and equipment supports in accordance with final shop drawings, manufacturer's product data and as specified herein.
1. Secure guides to walls, plumb, level and true to line. Anchor guides at spacings indicated on approved shop drawings.
2. Provide additional support as necessary for attachment of guides, brackets and door and operator mechanisms to interfacing surfaces.
B. Connect and adjust electrical components and operating hardware.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
HIGH SPEED ROLLING DOOR 083730 - 3
C. Upon completion of installation, including work by other trades, lubricate, test and adjust doors to operate in accordance with manufacturer's product data. Final adjustments shall be made by manufacturer's authorized representative.
D. Protect finished installations until Date of Substantial Completion. Repair damage to door panel, hardware and operators.
END OF SECTION 083730