083730 high speed rolling door.pdf

PDF 10 KB Posted

Attached to
CONSTRUCT USPFO WAREHOUSE
Solicitation number
W91364-09-B-0003
Issued by

About this file

083730 high speed rolling door.pdf

View the file

Other files

File Type Posted
Bid Abstract 09-B-0003.pdf PDF
SF30Amendment2 09-B-0003.pdf PDF
ADDENDUM NO 03 USPFO Narrative.pdf PDF
ADDENDUM NO 02 USPFO Narrative SENT.pdf PDF
SF30Amendment3 09-B-0003.pdf PDF
09-B-0003 Amendment 3.pdf PDF
ADDENDUM NO 03 CSMS PH II Narrative.pdf PDF
ADDENDUM NO 02 CSMS PH II Narrative SENT.pdf PDF
USPFO WH Addendum.pdf PDF
Bid Questions USPFO WAREHOUSE JACOBS RESPONSES JFK.doc DOC document
e2c23100.PDF PDF
OHARNG-USPFO-G-130W .pdf PDF
OHARNG-USPFO-A-820W .pdf PDF
220523 general duty valves for plumbing piping.pdf PDF
092900 gypsum board.pdf PDF
102113 toilet compartments.pdf PDF
OHARNG-USPFO-A-723W .pdf PDF
270500 common work results for communications.pdf PDF
081113 hollow metal doors and frames.pdf PDF
052100 steel joist framing.pdf PDF
017329 cutting and patching.pdf PDF
220516 expansion fittings and loops for plumbing piping.pdf PDF
104413 fire extinguishing cabinets.pdf PDF
102800 toilet bath and laundry accessories.pdf PDF
077100 roof specialties.pdf PDF
061000 rough carpentry.pdf PDF
USPFO_FA501W.pdf PDF
USPFO_M501W.pdf PDF
USPFO_S252W.pdf PDF
E802.pdf PDF
E104.pdf PDF
055000 metal fabrications.pdf PDF
USPFO_M301W.pdf PDF
OHARNG-USPFO-A-806W .pdf PDF
OHARNG-USPFO-A-213bW .pdf PDF
C603.pdf PDF
263600 transfer switches.pdf PDF
017839 project record documents.pdf PDF
230811 pre-functional checklists mechanical.pdf PDF
093000 tiling.pdf PDF
E401.pdf PDF
013200 construction progress documentation.pdf PDF
260533 raceway and boxes for electrical systems.pdf PDF
OHARNG-USPFO-A-320W .pdf PDF
311000 clearing grubbing.pdf PDF
262413 switchboards.pdf PDF
221319 sanitary waste piping specialties.pdf PDF
USPFO_FA301W.pdf PDF
260500 common work results for electrical.pdf PDF
USPFO_S002W.pdf PDF
Show 40 more

Latest 50 of 373 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F5W61608 USPFO Warehouse Ohio Army National Guard Rev. 0 Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

HIGH SPEED ROLLING DOOR 083730 - 1

SECTION 083730 - HIGH SPEED ROLLING DOOR

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Product Data: Submit manufacturers' product data, roughing-in diagrams and installation instructions for each type and size of high-speed rolling door. Provide operating instructions, maintenance information and complete information describing the operating system including rough-in instructions.

B. Shop Drawings: Submit shop drawings for special components and installations that are not fully dimensioned or detailed on the manufacturer's data sheets, including equipment interconnection diagrams.

C. Wind Loading: High speed rolling door to withstand a wind load condition of 20.6 lbs/sq.ft. (70 mph) at standard pressure and temperature.

D. Furnish each high-speed rolling door as a complete unit produced by one manufacturer, including hardware, accessories, mounting and installation components. Furnish high-speed rolling doors by one manufacturer for the entire project.

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS:

A. High speed roll-up doors shall be Rytec Fast-Seal Model as specified below or an approved equal.

2.2 HIGH-SPEED ROLLING DOOR:

A. Door Curtain: 3-ply multi-filament Rilon material.

1. Color: As selected by the Architect from manufacturer’s standard colors.

B. Side Frame: Fully bolt-together, reinforced side frames with front and rear wind bar guides and full height vinyl weather strip seals against fabric material. Dual thru-beam photo eye factory-installed in standard models. (Provide interior and exterior wind bars at exterior door only.)

C. Bottom Bar: Extruded aluminum bottom bar capable of releasing in either direction without damage to bar, reversing edge or side covers. Electrical auto-reversing edge

Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

HIGH SPEED ROLLING DOOR 083730 - 2

standard. Standard dual cut-off switches automatically shut off motor when bottom bar is impacted. No exposed junction box on bottom bar. Bottom bar pre-assembled on door at factory.

D. Counterbalance & tensioning: Counterbalance system consists of guided counterweights custom-sized to provide proper balancing of each door. Independent tension system maintains constant panel tension.

E. Drive System: .5 HP, 3 ph, 60 Hz, single-speed electric motor with brake is standard.

Motor and all electrical components factory-wired to a single junction box in the roll head assembly.

F. Travel Speed: Standard Operation at 40 inches per second in both directions.

G. Electrical Controls: Self-diagnostic, microprocessor-based controller housed in a NEMA 12 electrical enclosure with vision window. Control panel fully assembled, wired and tested at factory. Controller includes non-adjustable cycle counter with LED readout.

H. Warranty: One-year limited warranty on materials and workmanship. Lifetime warranty on counter-weights and tension springs. Five-year limited warranty on 3-ply Rilon panel material.

I. Activators: Each door shall be controlled by a motion sensor and a push button on each side of door.

J. Hood: Provide gauge metal cover for components at door head.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install door and operating equipment complete with necessary hardware, jamb and head mold strips, anchors, inserts, hangers and equipment supports in accordance with final shop drawings, manufacturer's product data and as specified herein.

1. Secure guides to walls, plumb, level and true to line. Anchor guides at spacings indicated on approved shop drawings.

2. Provide additional support as necessary for attachment of guides, brackets and door and operator mechanisms to interfacing surfaces.

B. Connect and adjust electrical components and operating hardware.

Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

HIGH SPEED ROLLING DOOR 083730 - 3

C. Upon completion of installation, including work by other trades, lubricate, test and adjust doors to operate in accordance with manufacturer's product data. Final adjustments shall be made by manufacturer's authorized representative.

D. Protect finished installations until Date of Substantial Completion. Repair damage to door panel, hardware and operators.

END OF SECTION 083730

File details come from the government source that posted it. Updated .