AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is necessary to respond to RFIs. All other aspects remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Nov-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ22R0014
X 9B. DATED (SEE ITEM 11)
21-Sep-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Nov-2022
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ22R0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 00008
Requests for Information
1. In the requirements for Factor 4 Cost Submission Requirements, Subcontracts, under Major Subcontracts:
Transportation and Disposal are typically considered commercial items. Is it acceptable to provide the information outlined in item (c) for the transportation and disposal supporting cost information? Previous experience indicates that detailed supporting information for transportation and disposal is not available prior to bid time.
Yes, this would be acceptable.
2. Reference Measurement and Payment CLIN 0005 Demolition – First and last bullets are contradictory.
First bullet states inclusion of demo/removal of ug/ag utilities, etc., but last bullet says removal of ug utilities are considered incidental and not compensated. Please clarify.
Demolition and removal of underground structures including but not limited to utilities will be compensated.
3. Reference Amendment #5, Question and Answer #44, “The Government will not review any data not submitted in Excel”, may additional documentation be provided in PDF in order to support the data summary total which will be provided in Excel?
PDF backup data to support the cost information in the Excel sheets, such as quotes, labor agreements, rental rates, etc., may be submitted and will be reviewed.
4. Reference Item Number 7, “Temporary Electrical Service”, this item includes many scopes of electric and is difficult to price by the “Day”, we respectfully request this item be changed to be paid lump sum.
Unit of measure for this item will remain “Day”.
5. Reference Section 01 22 00 (Measurement & Payment), Bid Item 0002 includes “provide and maintain temporary fencing” and install and maintain temporary facilities and controls”, however, Bid Item 0003 also includes “maintain temporary facilities” to include “temporary fencing”. Please confirm which Bid Items these should fall under.
Initial installation of temporary items should be included in Bid Item 0002, “Mobilization and Site Preparation” while continued monthly costs for temporary facilities should be included in Bid Item 003, “Temporary Facilities”.
6. Reference Section 01 22 00 (Measurement & Payment) and Spec Section 02120, please confirm which Bid Item the pre- and post-characterization sampling activities be put under. Bid Items 0011, 0012, and 0013 are paid per ton and sampling activities are of a different measurement unit.
Pre- and post-characterization sampling activities fall under Bid Item 0006, “Excavating, Stockpiling and Loading”.
W912WJ22R0014
7. Temporary Electric Service and Line Replacement states “The electrical contractor shall be responsible for acquiring the Utility bills to determine the loads the temporary generator system will be required to handle.” Please provide utility bills for the DMC facility.
Refer to Specifications Section 02000-2 for load that temporary generator must handle. Utility bills are currently unavailable but will be provided to the successful offeror.
(End of Summary of Changes)