T-01 TITLE SHEET
T-02 LEGEND
C-01 EXISTING CONDITIONS – ALL UTILITIES
C-02 PHASE 01A EXISTING ACTIVE/LIVE UTILITIES
C-03 PHASE 01B EXISTING ACTIVE/LIVE UTILITIES
C-04 PHASE 02 EXISTING ACTIVE/LIVE UTILITIES
C-05 TEMPORARY ELECTRICAL LAYOUT - CONSTRUCTION PHASE 01A
C-06 TEMPORARY ELECTRICAL LAYOUT - CONSTRUCTION PHASE 01B
C-07 ELECTRICAL RESTORATION
C-08 GENERAL UTILITY RESTORATION
C-09 SITE PREPARATION AND EROSION CONTROL PHASE 01A
C-10 SITE PREPARATION AND EROSION CONTROL PHASE 01B
C-11 SITE PREPARATION AND EROSION CONTROL PHASE 02
C-12 EXCAVATION PLAN PHASE 01A
C-13 EXCAVATION PLAN PHASE 01B
C-14 EXCAVATION PLAN PHASE 02
C-15 CROSS SECTIONS
C-16 RESTORATION PLAN
C-16A NEW STORAGE BUILDING
C-17 DETAILS
Rev.F 11/08/2022 Rev.D 06/01/2022 Rev.E 11/08/2022 Rev.F 11/08/2022 Rev.F 11/08/2022 Rev.D 11/08/2022 Rev.F 11/08/2022 Rev.E 11/08/2022 Rev.F 11/08/2022 Rev.F 11/08/2022 Rev.F 11/08/2022 Rev.F 11/08/2022 Rev.F 11/08/2022 Rev.E 11/08/2022 Rev.F 11/08/2022 Rev.D 11/08/2022 Rev.E 06/01/2022 Rev.G 11/08/2022 Rev 0 11/08/2022 Rev.E 11/08/2022
CURRENT
DATE
PREPARED BY:
DRAWING
NUMBER
100% DESIGN
DMC STUDY AREA REMEDIATION
Date 11/08/22
CHELMSFORD, MA 01824
tel 978.905.2450 fax 978.905.2101 www.aecom.com
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
T-01
SHEET SHEET TITLE SHEET TITLE SHEET TITLESHEET SHEET
AECOM
DRAWING NUMBER:
SHEET NUMBER:
LEGEND T-02
D
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
www.aecom.com
SHEET NUMBER:
EXISTING CONDITIONS - ALL UTILITIES C-01
E
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
www.aecom.com
APPROXIMATE LOCATION
OF NEW GAS LINE
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
SHEET NUMBER:
PHASE 01A
EXISTING ACTIVE/LIVE UTILITIES C-02
F
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
www.aecom.com
LIMITS OF PHASE 01A
EXCAVATION
TRANSFORMER A
TRANSFORMER B
APPROXIMATE LOCATION
OF NEW GAS LINE
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
EVERSOURCE GAS LINE
ENTERS BUILDING AT THIS
LOCATION
SHEET NUMBER:
PHASE 01B
EXISTING ACTIVE/LIVE UTILITIES C-03
F
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
www.aecom.com
LIMITS OF PHASE 01B
EXCAVATION
TRANSFORMER A
TRANSFORMER B
APPROXIMATE LOCATION
OF NEW GAS LINE
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
SHEET NUMBER:
PHASE 02
EXISTING ACTIVE/LIVE UTILITIES C-04
D
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
www.aecom.com
LIMITS OF PHASE 02
EXCAVATION
TRANSFORMER B
APPROXIMATE LOCATION
OF NEW GAS LINE
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
SHEET NUMBER:
TEMPORARY ELECTRICAL LAYOUT
CONSTRUCTION PHASE 01A C-05
F
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
www.aecom.com
LIMITS OF PHASE 01A EXCAVATION
TRANSFORMER A
DISCONNECT AND REMOVE ALL
ACTIVE AND HISTORIC
ELECTRICAL CONDUIT FROM
WITHIN EXCAVATION LIMITS
TEMPORARY
POWER CABLES
APPROXIMATE LOCATION
OF TEMPORARY GENERATOR
TRANSFORMER B
DISCONNECT AND REMOVE ALL
ACTIVE AND HISTORIC
ELECTRICAL CONDUIT FROM
WITHIN EXCAVATION LIMITS
APPROXIMATE LOCATION
OF NEW GAS LINE
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
SHEET NUMBER:
TEMPORARY ELECTRICAL LAYOUT
CONSTRUCTION PHASE 01B C-06
E
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
www.aecom.com
TEMPORARY
POWER CABLES
REMOVE ALL ACTIVE AND
INACTIVE ELECTRICAL CONDUIT
FROM WITHIN EXCAVATION LIMITS
REMOVE ALL ACTIVE AND
INACTIVE ELECTRICAL CONDUIT
FROM WITHIN EXCAVATION LIMITS
APPROXIMATE LOCATION
OF TEMPORARY GENERATOR
APPROXIMATE LOCATION
OF NEW GAS LINE
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
SHEET NUMBER:
ELECTRICAL RESTORATION C-07
F
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
www.aecom.com
LIMITS OF PHASE 01A EXCAVATION
NEW CONDUIT
NEW CONDUIT
NEW CONDUIT
NEW PULL POINT
TRANSFORMER A
NEW CONDUIT
TRANSFORMER B
LIMITS OF PHASE 01B EXCAVATION
LIMITS OF PHASE 2 EXCAVATION
APPROXIMATE LOCATION
OF NEW GAS LINE
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
SHEET NUMBER:
GENERAL UTILITY RESTORATION C-08
F
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
www.aecom.com
LIMITS OF PHASE 01A
EXCAVATION
LIMITS OF PHASE 01B
EXCAVATION
SEE NOTE 4
LIMITS OF PHASE 02
EXCAVATION
APPROXIMATE LOCATION
OF NEW GAS LINE
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
SHEET NUMBER:
SITE PREPARATION AND
EROSION CONTROL - PHASE 01A C-09
F
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
WWW.AECOM.COM
C-17
CONSTRUCTION
ENTRANCE
C-17
SILT FENCE W/ HAY BALES
P
R
REMOVE AND REPLACE
IN KIND
PROTECT IN PLACE
TEMPORARY WATER
TREATMENT AREALIMITS OF PHASE 01A
EXCAVATION
TEMPORARILY
REMOVE FENCING
GATE
APPROXIMATE LOCATION
OF NEW GAS LINE
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
SHEET NUMBER:
SITE PREPARATION AND
EROSION CONTROL - PHASE 01B C-10
F
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
WWW.AECOM.COM
P
R
REMOVE AND REPLACE
IN KIND
PROTECT IN PLACE
TEMPORARY WATER
TREATMENT AREA
LIMITS OF PHASE 01B
EXCAVATION
P
R
REMOVE AND REPLACE
IN KIND
PROTECT IN PLACE
GATE
See Note 1
WATER TREATMENT
DISCHARGE POINT
See Note 2
APPROXIMATE LOCATION
OF NEW GAS LINE
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
SHEET NUMBER:
SITE PREPARATION AND
EROSION CONTROL - PHASE 02 C-11
F
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
www.aecom.com
C-17
TEMPORARY
CONSTRUCTION FENCE
P
R REMOVE AND REPLACE IN KIND
PROTECT IN PLACE
LIMITS OF PHASE 02 EXCAVATION
BYPASS DURING
EXCAVATION
TEMPORARY WATER
TREATMENT AREA
GATE
WATER TREATMENT
DISCHARGE POINT
APPROXIMATE LOCATION
OF NEW GAS LINE
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
SHEET NUMBER:
EXCAVATION PLAN
PHASE 01A C-12
E
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
www.aecom.com
TEMPORARY SHORING
TEMPORARY SHORING TO REMAIN
FOR PHASE 01B EXCAVATION
TEMPORARY SHORING AND
FOUNDATION UNDERPINNING
TEMPORARY SHORING AND
FOUNDATION UNDERPINNING
LIMITS FOR EXCAVATION
TO BEDROCK
TEMPORARY SHORING
EXCAVATE TO EL. 191
THEN DOWN TO BEDROCK SURFACE
APPROXIMATE LOCATION
OF NEW GAS LINE
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
SHEET NUMBER:
EXCAVATION PLAN
PHASE 01B C-13
F
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
www.aecom.com
TEMPORARY SHORING
TEMPORARY SHORING
TEMPORARY SHORING TO REMAIN
FOR PHASE 02 EXCAVATION
TEMPORARY SHORING AND
FOUNDATION UNDERPINNING
LIMITS OF EXCAVATION
TO BEDROCK
LIMITS OF EXCAVATION
TO BEDROCK
EST.
BEDROCK
EL. 185±
EST.
BEDROCK
EL. 192±
APPROXIMATE LOCATION
OF NEW GAS LINE
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
SHEET NUMBER:
EXCAVATION PLAN
PHASE 02 C-14
D
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
www.aecom.com
LIMITS OF EXCAVATION
TEMPORARY SHORING
LIMITS FOR EXCAVATION TO BEDROCK EST.
BEDROCK
EL. 192±
APPROXIMATE LOCATION
OF NEW GAS LINE
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
SHEET NUMBER:
CROSS SECTIONS C-15
E
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
SHEET NUMBER:
RESTORATION PLAN C-16
G
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
www.aecom.com
AREA "A"
See Note 1
AREA "B"
See Note 1
AREA "D"
See Note 1
AREA "C"
See Note 1
See Note 4
See Note 4
See Note 3
See Note 4
C-17
RESTORE
PAVEMENT
C-17
RESTORE
PAVEMENT
C-17
RESTORE
PAVEMENT
See Note 2
APPROXIMATE LOCATION
OF NEW GAS LINE
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
APPROXIMATE LOCATION
OF NEW GAS CONNECTION
SEE C-16A
FOR DETAILS
SHEET NUMBER:
NEW STORAGE BUILDING C-16A
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60614871.6
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
PAVEMENT RESTORATION DETAIL
PAVEMENT MILLING AND OVERLAY DETAIL
AECOM
DRAWING NUMBER:
SHEET NUMBER:
DETAILS C-17
E
DMC STUDY AREA REMEDIATION
DURHAM MEADOWS SUPERFUND SITE60132597.11.02
U.S. EPA REGION 1
DURHAM MEADOWS SUPERFUND SITE
DURHAM, CONNECTICUT
250 APOLLO DRIVE
CHELMSFORD, MA 01824
www.aecom.com
C-09, C-10, C-11
TEMPORARY CONSTRUCTION FENCE WITH VISUAL BARRIER
C-11
STORM DRAIN INLET PROTECTION
C-09, C-10, C-11
CONSTRUCTION ENTRANCE
C-09, C-10, C-11
SILT FENCE WITH HAY BALES
C-16, C-09
PAVEMENT DETAILS 6
C-16
ASPHALT CURBING