Amendment 0003_215 Main St. - Access Requirements Oct 4 2022.pdf

PDF 382 KB Posted

Attached to
Environmental Remediation Services at the Durham Manufacturing Company Site in Durham, Connecticut
Solicitation number
W912WJ22R0014
Issued by

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AECOM

DRAWING NUMBER:

SHEET NUMBER:

215 MAIN STREET

ACCESS REQUIREMENTS 1

DMC STUDY AREA REMEDIATION

DURHAM MEADOWS SUPERFUND SITE60614871

U.S. EPA REGION 1

DURHAM MEADOWS SUPERFUND SITE

DURHAM, CONNECTICUT

250 APOLLO DRIVE

CHELMSFORD, MA 01824

www.aecom.com

LIMITS OF PHASE 01A

EXCAVATION

LIMITS OF PHASE 01B

EXCAVATION

LIMITS OF PHASE 02

EXCAVATION

APPROXIMATE LOCATION

OF STORAGE CONTAINER

ACCESS AREA

BOUNDARY

MATURE ARBORVITAE (24)

SPACED 10' APART

File details come from the government source that posted it. Updated .