Supplemental Price Breakdown to the Bidding Schedule.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Replacement of Transformers at the Fox Point Hurricane Barrier, Providence, RI
Solicitation number
W912WJ21R0003
Issued by

About this file

This document contains a supplemental price breakdown spreadsheet and related federal contract opportunity notice for the replacement of two power transformers at the Fox Point Hurricane Barrier in Providence, Rhode Island. The U.S. Army Corps of Engineers, New England District is soliciting proposals to replace the original oil-filled power transformers designated as Transformers A and B, as well as the original manually operated disconnect switches at the transformer primary connections. The price breakdown spreadsheet provides unit pricing for individual work items associated with the removal of the existing transformers and installation of the new transformers. The contract opportunity notice specifies this is an unrestricted best value procurement with an estimated value between $1,000,000 and $5,000,000 and a period of performance of 540 calendar days. Proposals must be submitted through the System for Award Management website.

View the file

Other files

File Type Posted
Amendment W912WJ21R0003-0005.pdf PDF
Amendment W912WJ21R0003-0004.pdf PDF
Revised 48 20 00.pdf PDF
Revised 48 19 23.pdf PDF
Amendment W912WJ21R0003-0003.pdf PDF
Amendment W912WJ21R0003-0002.pdf PDF
Appendix D.pdf PDF
Amendment W912WJ21R0003-0001.pdf PDF
Appendix H SBPD.pdf PDF
Fox Point 1141 1143 FDRS Schematic Wiring Diagram H-19998- 0.pdf PDF
W912WJ21R0003.pdf PDF
Plans.pdf PDF
Specs.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Supplemental Price Breakdown to the Bidding Schedule
Replace Transformers A and B
Fox Point Hurricane Barrier - Providence, Rhode Island
UOMPrice
Project Grand Total (Items 0001-0005)LS$0.00
ItemUOMPrice
'0001Existing Transformer A - Siteprep, Shutdown, Disconnection and Removal
0001AShutdown Power Transformer A side and Disconnect exist. 5,v, 3000 amp Bus Duct.LS$0.00
0001BCable and Conduit RemovalLS$0.00
0001CRemove 15 kV, 1,200 A 3pole Disconnect and Space Heater w/branch wiringLS$0.00
0001DRemove steel Busduct EnclosureLS$0.00
0001EDisconnect 15 kV Potheads and Primary Connections from TransformerLS$0.00
0001FRemove and Dispose of Transformer OilLS$0.00
0001GRemove and Dispose of Transformer ALS$0.00
Item 0001 Total$0.00
ItemUOMPrice
'0002New Transformer A - New Installation and Cut-Over
0002AProcure and Deliver New Unit Substation TranformerLS$0.00
0002BSeismic absorbers for transformer baseLS$0.00
0002CNew Transformer Installation on prepared baseLS$0.00
0002DPrep and Fill New Transformer Oil TankLS$0.00
0002EReconnect 15 kV Potheads and New Primary Conductors and All Conduit and WiringLS$0.00
0002FInstall new 15kV, 1,200 Amp Disconnect, space heater, wiringLS$0.00
0002GInstall new Bus Duct EnclosureLS$0.00
0002HCutover Power to Transformer A sideLS$0.00
0002ITest and CommissionLS$0.00
Item 0002 Total$0.00
ItemUOMPrice
'0003Existing Transformer B - Siteprep, Shutdown, Disconnection and Removal
0003AShutdown Power Transformer A side and Disconnect exist. 5,v, 3000 amp Bus Duct.LS$0.00
0003BCable and Conduit RemovalLS$0.00
0003CRemove 15 kV, 1,200 A 3pole Disconnect and Space Heater w/branch wiringLS$0.00
0003DRemove steel Busduct EnclosureLS$0.00
0003EDisconnect 15 kV Potheads and Primary Connections from TransformerLS$0.00
0003FRemove and Dispose of Transformer OilLS$0.00
0003GRemove and Dispose of Transformer ALS$0.00
Item 0003 Total$0.00
ItemUOMPrice
'0004New Transformer B - New Installation and Cut-Over
0004AProcure and Deliver New Unit Substation TranformerLS$0.00
0004BSeismic absorbers for transformer baseLS$0.00
0004CNew Transformer Installation on prepared baseLS$0.00
0004DPrep and Fill New Transformer Oil TankLS$0.00
0004EReconnect 15 kV Potheads and New Primary Conductors and All Conduit and WiringLS$0.00
0004FInstall new 15kV, 1,200 Amp Disconnect, space heater, wiringLS$0.00
0004GInstall new Bus Duct EnclosureLS$0.00
0004HCutover Power to Transformer A sideLS$0.00
0004ITest and CommissionLS$0.00
Item 0004 Total$0.00
ItemUOMPrice
'0005Training, As-Builts,and Project Close-Out SubmittalsLS$0.00
Item 0005 Total$0.00