Amendment W912WJ21R0003-0005.pdf
PDF 581 KB Posted
- Solicitation number
- W912WJ21R0003
About this file
This document contains an amendment to a solicitation and responses to requests for information. The U.S. Army Corps of Engineers, New England District is seeking proposals to replace two original oil-filled power transformers and manually operated disconnect switches at the Fox Point Hurricane Barrier in Providence, Rhode Island. The period of performance is 540 calendar days with an estimated budget between $1 million to $5 million. Bidders are responsible for all escalation costs and cannot sample equipment on site. Test results from 2010 show Transformer 43A contains 195 PPM PCB and Transformer 41B contains 69 PPM PCB. All responsible sources may directly submit proposals which will be considered by the New England District. Questions can be emailed to the specified Contract Specialist.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ21R0003-0004.pdf | ||
| Revised 48 20 00.pdf | ||
| Revised 48 19 23.pdf | ||
| Amendment W912WJ21R0003-0003.pdf | ||
| Amendment W912WJ21R0003-0002.pdf | ||
| Appendix D.pdf | ||
| Amendment W912WJ21R0003-0001.pdf | ||
| Appendix H SBPD.pdf | ||
| Fox Point 1141 1143 FDRS Schematic Wiring Diagram H-19998- 0.pdf | ||
| Supplemental Price Breakdown to the Bidding Schedule.xlsx | XLSX spreadsheet | |
| W912WJ21R0003.pdf | ||
| Plans.pdf | ||
| Specs.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above referenced solicitation is hereby amended to provide responses to Requests for Information, as indicated on the attached pages.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Feb-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ21R0003
X 9B. DATED (SEE ITEM 11)
04-Jan-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Feb-2021
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ21R0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REQUESTS FOR INFORMATION
1. Since there is such a long timeframe between bid and notice to proceed, we are asking if the Corps wants bidders to include the cost for locking in pricing with an 11/1 NTP, or if they want this priced in today’s dollars and USACE will allow for an increase in contract price for escalation at NTP? In other words, does the Corps want to take on escalation risk or do they want the bidders to? Specifically for the transformers.
RESPONSE: The Government will not assume any escalation risk. Contractors should propose according to the information provided in the RFP.
2. Is there a way I can send someone to pull a sample out and is there a drain plug to just open up and grab the sample on these units? I have to find out what the parts per million are on the PCBs in order to give him an accurate number for your bid.
RESPONSE: Unfortunately we cannot accommodate sampling from the site at this time. However, testing was completed March 29, 2010 with the following results:
Transformer 43A, or the “A” side transformer, contains 195 PPM PCB Transformer 41B, or the “B” side transformer, contains 69 PPM PCB.
(End of Summary of Changes)