About this file

This document provides an amendment to a solicitation for the construction of the Human Engineering Lab at the Soldier Systems Center in Natick, Massachusetts.

The amendment makes changes to the bidding schedule, specifications, and drawings. It revises the bidding schedule to replace the original with an enclosed updated version dated May 7, 2020. It also modifies narrative text in several specifications sections and titles one section. Further, it revises and reissues one specification section and several contract drawings.

The amendment answers questions from potential offerors, providing clarification on items like insulation requirements, central monitoring systems, data outlets, and kitchen equipment. It directs offerors to enclosed revised documents and notes changes to specifications and drawings in response to the questions. The solicitation is to be held by the Army Corps of Engineers for up to 90 days for evaluation of base bid and optional items for the construction work.

View the file

Other files

Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to response to RFI's and to provide revised Bid Schedule, revised Draw ings, and revised Specs. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-May-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ20B0001

X 9B. DATED (SEE ITEM 11)

04-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-May-2020

CODE

US ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA ROAD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ20B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

AMENDMENT 0009

Spec Ref Drawing Ref

Question Response

Bid Schedule 1. Optional Bid #4 calls for a price to furnish and install kitchen equipment. There are no itemized mfr/model equipment specs that show accessories and full item descriptions.

Should we go only by the mfrs/models listed in the schedule? Please advise.

As part of the enclosed amendment, ATTACHMENT 1 - KITCHEN EQUIPMENT has been added to the end of Section 11 42 00. This attachment provides salient features of the kitchen equipment.

Sections 083323 and 083323.10

2. Should the motors for these doors be NEMA Type 7 Class 1 Group C and D explosion proof? If yes, does this apply to both interior and exterior Overhead Coiling Doors?

Explosion-proof enclosures for the motors at the overhead coiling and bi-fold doors are not required for this project. As part of the enclosed amendment, see revisions to Section 08 33 23 and Section 08 33 23.10 eliminating the requirement for explosion proof enclosures.

07 22 00 A-002 3. Roof Insulation Thickness: The Roof Assembly Notes on Sheet A-002 of the drawings state, “Roof assembly insulation thickness is minimum required (R-value = 48 min @ roof drains) per assembly type.

Positive roof drainage (1/2”/FT.) to be made up with additional tapered insulation prior to membrane placement.”

The two tables to the right of the Roof Assemblies details on Sheet A-002 of the drawings indicate that 8” XPS with an R-value of 48.4 was utilized by the Government in the calculation of the total R-value for both ERA-1 and ERA-2. It is our understanding that “XPS” refers to extruded polystyrene insulation.

There is also a note on the Roof Plan - Part AB / B4 of Sheet A-114AB of the drawings that states, “Min. R-48 at drains.” Subpart 2.1.1a Insulation Types of Specification Section 07 22 00 requires polyisocyanurate board to be utilized as the roof insulation material.

Subpart 2.1.1a Insulation Types of Specification Section 07 22 00 requires polyisocyanurate board to be utilized as the roof insulation material.

Subpart 2.1.4 Insulation Thickness of Specification Section 07 22 00 states, “Provide a minimum base insulation thickness of 8 inch at Roof drainage locations. Develop thermal resistance values (R-values) indicated for average thickness of tapered system. Base calculations on the R-value for aged insulation.”

If the minimum thickness of polyisocyanurate insulation required at the roof drains is eight inches (8”), then the R-value of the insulation will only be approximately 47.2; not the R-value of 48.4 for XPS as indicated on the drawings.

Please confirm our interpretation that the Contractor will only be required to provide a minimum polyisocyanurate insulation thickness of eight inches (approximate R-value of 47.2) at the roof drains; and not be required to provide a minimum polyisocyanurate insulation R-value of 48

The requirement is to provide a minimum insulation thickness of 8 inches at roof drains and a 1/2"/foot slope. Additionally, the required roof insulation type is polyisocyanurate. As part of the enclosed amendment, Sheet A- 002, Sheet A-114AB, and Sheet A-114C have been revised to indicate the above requirements.

(thickness greater than eight inches) at the roof drains.

28 10 05 4. Installation’s Central Monitoring System:

Subpart 2.1 System Description of Specification Section 28 10 05 Electronic Security Systems (ESS) states, “ESS must be compatible with the Installation’s central monitoring system and monitored at the Installation central monitoring station. It is the responsibility of the ESS Contractor to document the make and model number of the campus system and to provide a compatible ESS solution.” Please provide the make and model number of the campus system (the Installation’s central monitoring system) that is monitored at the Installation central monitoring station.

Due to the current work from home requirement due to Covid- 19, the Government is unable to determine the make and model of central base-wide security monitoring system on the U.S.

Army's Soldier Systems Center.

Therefore, to remove the uncertainty and risk associated with not knowing this significant information, the Bidding Schedule and Section 01 22 00 have been revised as part of the enclosed amendment to provide an allowance amount for all work related to furnishing and installing the proposed electronic security equipment and systems.

25 05 11.03 5. Section 25 05 11.03 of the specifications is titled “Cybersecurity for Facility-Related Control Systems – Electric Gate Controllers.”

However, Subpart 1.2 Control System Applicability within this section of the specifications states, “This specific Section applies only to the following control systems:

Bacnet Direct Digital Control.”

Please confirm our interpretation that there are not any sections of the specifications that provide requirements relating to cybersecurity for facility related control system associated with the electric gate controllers.

THIS RFI WAS PREVIOUSLY

RESPONDED TO IN

AMENDMENT 0007.

HOWEVER THE PREVIOUS

RESPONSE IS MODIFIED TO

ADD SUBPARAGRAPH b

BELOW TO THIS RESPONSE.

Cybersecurity requirements do apply to the Electric Gate Controllers. Section 11 12 00, Section 23 09 00, and Section 28 10 05 are revised as part of the enclosed amendment to clarify how the electric gate controllers are tied to the building management system, electronic security system, and fire alarm system and therefore require appropriate cybersecurity controls. b. Section 25 05 11.03 does apply to the HVAC System in addition to the electric gate controllers. The title to Section 25 05 11.03 is revised as part of the enclosed amendment.

T-001 6. Is an open triangle 4 to be 4 Category 6 data, this is not depicted on T-001?

THIS RESPONSE WAS

PROVIDED IN AMENDMENT

0008 BUT INCLUDED A

TYPO. THE CORRECTED

RESPONSE IS RE-ISSUED

HERE. Per the Telecommunication drawings T- 001, under the TEL/DATA OUTLETS heading is an open triangle with a numeral symbol (#). The description for this symbol states “NUMERAL

INDICATES NUMBER OF

RJ45 JACKS ON SAME

FACEPLATE. NO NUMBER

INDICATES ONE DATA

JACK”. So, an open triangle with the number 4 indicates to provide 4 data jacks (and 4 data cables).

T-111A 7. Note 3 mentions data jacks for monitoring the light control panel, how many are required and where will these cables be distributed from?

The data jacks in question are shown in the electrical rooms.

They are located adjacent to where the lighting control panels should be located. Additionally, Sheet T-111A, Room 107.1 shows 4 data jacks with a reference to Note 6, but it should refer to Note 5. This reference on Sheet T-111A has been revised as part of the enclosed amendment.

T-111C 8. Note 6 calls 162 it is assumed this is 152 on the mezzanine level please confirm.

Yes, Note 6 on Sheet T-111C should refer to Room 152. This note has been revised in the enclosed amendment.

T-112A 9. Note 3 states supply data jacks for monitoring the light control. Please clarify the location of this panel and how many Category 6 cables are required?

a. Note 3 doesn't apply to Sheet T-112A. The same is true of Note 3 on Sheet T-113A. As part of the enclosed amendment, Sheets T-112A and T-113A have been revised to delete Note 3.

b. The lighting control panel and the data jacks are located in the Main Electrical Room (Room 107.1) shown on Sheet 111A.

c. The quantity of cat 6 wiring is one per the riser shown on Sheet T-002. It shows one data jack.

Per the symbol list and in Detail E9 on Sheet T-001, an open triangle means to provide one CAT 6 high speed data cable.

T-200 10. Detail E5, is the 24” rack to be a 4 post open frame or an enclosed cabinet with the 19” rack in this room.

There are two racks required in the telecommunications entrance facility. One type is a 24” for equipment and the other type is a 19” for patch panels. The 24” rack is to be a 4 post and shall be enclosed type. Additionally, as part of the enclosed amendment Subpart 2.4.2c in Section 27 10 10 is revised to require 24" cabinets.

T-002 11. Note 16 please confirm fiber type, construction, strand count, and termination type for the fiber being relocated.

As part of the enclosed amendment, Note 16 on Sheet T- 002 has been revised to indicate the information requested.

T-002 12. Note 12 mentions area of refuge phones, which drawings are these phone locations on?

The refuge phones referred to in Note 12 on Sheet T-002 are in the following locations:

1. Drawing T-111C.1, located in the CML Observation area (Rm 150). It’s the letter A with a box around it.

2. Drawing T-112A, located in the elevator lobby (Rm 200). It’s the letter A with a box around it.

3. Drawing T-113A, located in the elevator lobby (Rm 300). It’s the letter A with a box around it.

Details E6 and E8 on Sheet T- 201 indicate that the box with the letter A within is "AREA OF

REFUGE PHONE (TYPICAL)."

Also, Note 3 of each of these details states to locate the RAS annunciator next to the fire alarm control panel.

13. Are fiber optic transceivers to be included for the fiber optic outlet locations? Are fiber optic patch cords required, if so what lengths and how many.

a. At this time, we see no need for fiber optic transceivers.

b. Since the required lengths of patch cables is not known at this time, for bidding purposes assume 15 foot long patch cables for each and every fiber connection shown on the telecommunication drawings.

This is to include the fiber patch panel and the workstation outlets. Coordinate the exact lengths in the field to make the installation neat and clean.

NA A-912 14. Kitchen Equipment Item K-10 Electric Tilt Kettle: The manufacturer of the basis of design for the electric tilt kettle has advised that the indicated model number has been discontinued. Since there is no technical specification for this item, is there an alternate model number and/or manufacturer that would be acceptable?

The corrected model number is provided in Attachment 1 to Section 11 42 00 entitled

KITCHEN EQUIPMENT

SPECIFICATIONS enclosed as part of this amendment

NA A-912 15. Specialty Equipment Mark “STEAM” - Steam Table: The Specialty Equipment Schedule - Second Floor on Sheet A-912, for Room 227 Serving Lab, there is an item Mark “STEAM”, which appears to be two (2) steam tables with no manufacturer or model number given. There is no technical specification provided and we cannot locate “STEAM” on the drawings. It appears that it is Government Furnished Government Installed under the Base Bid. Please clarify if anything is

The Steam Tables are not required. As part of the enclosed amendment, Sheet A-902B is revised to delete the steam tables shown and Sheet A-912 is revised to delete the steam tables from the Specialty Equipment Schedule.

required to be provided by the Contractor for this item, where is it located, and is it part of any Bid Option?

Please provide locations and or distances to the distribution equipment in Building #2

There is no requirement to have Outside Plant (OSP) wiring from Building 2 to enter the new S2PRINT building. Any wiring within Building 2 shall be done by the DPW. The Contractor is only required to extend empty conduits into Building 2 (see Note 4 on Sheet T-002).

M-701, M-702

16. Glycol Feed Systems to accommodate the Hot Water System and Chilled Water System are indicated on Drawing M-701 and M-702.

The Project Specifications neither provide Type, Model, Etc., nor is the system to be found in the Equipment Schedules. Please provide system specification information for this system.

The hot and chilled water systems (each) are provided with a valved connection for the manual glycol feed. There are no automatic glycol feed systems provided.

17. Are copper patch cords to be included? If so what lengths and quantities are required?

Yes, the Contractor is to include patch cords. Patch cords are required in the Entrance Facility and all the telecommunication closets. For bidding purposes, assume the following:

Entrance Facility: 250 - 15' copper patch cords Mezzanine Telecom Closet: 70 - 15' copper patch cords 2nd Floor Telecom Closet: 234 - 15' copper patch cords 3rd Floor Telecom Closet: 280 - 15' copper patch cords Actual lengths of all patch cords to be determined in the field.

T-002 18. T-002 shows conduits and refers to note 5, however note 5 refers to wall rack and associated cabling in 331.2, please clarify.

This note reference is incorrect.

It should state: Refer to note 4.

As part of the enclosed amendment, Sheet T-002 has been revised to correct this reference.

T-002 19. T-002 riser drawing shows cable from room 109 to what is assumed this is for the microwave antenna at room 109 the note says refer to note 15 it is assumed this is actual referring to note 14 please clarify. How should this Category 6 cable be terminated in room 109 a wall mounted Category 6 patch panel, or 110 block? It is assumed the Category 6 jack will remain in the ceiling on the third floor with a interface cable from this outlet to the proposed Antenna please confirm.

a. Yes, the reference to Note 15 on Sheet T-002 is incorrect and should reference Note 14. As part of the enclosed amendment, Sheet T-002 is revised to correct this reference.

b. The termination of the CAT 6 cable within the Room 109 shall be at a RJ-45 end. It shall terminate in a data jack next to the piece of HVAC equipment.

Then, a patch cord shall connect from the faceplate to the HVAC equipment located in Room 109.

c. As for the question about terminating the other end of the cable, the cable shall be routed thru the roof and into a bell box where the CAT 6 cable will terminate into a CAT 6 faceplate.

This is per Note 8 on Sheet T- 114.

20. Question on the new center, will the data center equipment be moved into the new center or will there be separate solicitations for new Data Center Systems?

No reference to a sheet or specification was included with this RFI. Due to the lack of information, the Government was unable to determine what room (data center) or what equipment is being referred to.

21. The previous RFI was not intended to clarify the type of materials the connector is made from "...but rather what type of connector is desired, a composite connection or a non-composite connection?"

As stated in Subpart 1.4 of Section 03 45 13, the precast insulated concrete panels shall be fully composite units.

AMENDMENT 0009 OF SOLICITATION

1.1 CHANGES TO THE SOLICITATION

(1) In Section 00100 Bidding Schedule/Instructions to Bidders, the BIDDING

SCHEDULE is deleted and replaced with enclosed BIDDING SCHEDULE (dated 7 May 2020)

1.2 CHANGES TO SPECIFICATIONS

1.2.1 Narrative Changes to the Specifications

(1) Section 08 33 23, Subpart 2.2.4.2; this subpart has been revised to read as follows:

“Provide motors which are the high-starting-torque, reversible, constant-duty electrical type with overload protection of sufficient torque and horsepower to move the door in either direction from any position. Ensure they produce a door-travel speed of not less than 8 nor more than 12 inches per second without exceeding the horsepower rating.

Provide motors which conform to NEMA MG 1, open enclosure type IP00

(IC 01).”

(2) Section 08 33 23.10, Subpart 2.3.2.2; this subpart has been revised to read as follows:

“Provide motors which are the high-starting-torque, reversible, constant-duty electrical type with overload protection of sufficient torque and horsepower to move the door in either direction from any position. Ensure they produce a door-travel speed of not less than 8 nor more than 12 inches per second without exceeding the horsepower rating.

Provide motors which conform to NEMA MG 1, weather-protective enclosure type 1 (IC01) designation, temperature rating, service factor, enclosure type, and efficiency to the requirements specified.”

(3) Section 11 42 00, Subpart 2.2; this subpart is revised to read as follows:

“Refer to Attachment 1 – KITCHEN EQUIPMENT at the end of this section and the Specialty Equipment Schedule on Sheet A-912. Submit NSF Certification, and UL Certification for individual food preparation equipment components.”

(4) Section 11 42 00; Add ATTACHMENT 1 – KITCHEN EQUIPMENT (enclosed) to the end of this section.

(5) Section 25 05 11.03. The title of this section is revised to read as follows:

SECTION 25 05 11.03

CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS – ELECTRIC GATE

CONTROLLERS AND HVAC SYSTEM

(6) Section 27 10 10, Subpart 2.4.2, Subparagraph c; the 6th line of this subparagraph is revised to change “19 inches” to “24 inches”.

1.2.2 Revised and Re-issued Specification Sections

The following specification section are revised and reissued (deletions are shown as red and strike-through while additions are shown as green and underlined):

(1) Section 01 22 00 MEASUREMENT AND PAYMENT (dated 04/27/2020)

(2) Section 23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL (dated

5/7/2020)

1.3 CHANGES TO DRAWINGS

1.3.1 Revised and Reissued Contract Drawings

The following sheets are revised and reissued:

(1) A-002

(2) A-114AB

(3) A-114C

(4) A-902B

(5) A-912

(6) M-601

(7) E-111B

(8) E-111C.1

(9) E-114

(10) EP604

(11) EP605

(12) EP609

(13) EP610

(14) T-001

(15) T-002

(16) T-111A

(17) T-111C

(18) T-112A

(19) T-113A

END OF AMENDMENT

The following have been modified:

BID SCHEDULE

BIDDING SCHEDULE (dated 5/7/2020)

Refer to Section 01 22 00 MEASUREMENT AND PAYMENT.

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount

Base Bid Items

0001 Construct New Human Engineering Lab 1 Job Job $__________

0012 Allowance for Electronic Security Systems 1 Job Job $250,000.00

0013 CMRA 1 Job Job $__________

Time for fulfilling the CMR requirement if included or if not included in your overhead for initial CMR database set up and for annual CMR reporting.

The Contractor will report ALL contractor manpower (including all subcontractor manpower) required for performance of this contract to include all task orders and modifications IAW the Office of the Assistant Secretary of the Army (Manpower and Reserve Affairs). Refer to clause 52.204-9002 for additional information.

TOTAL ESTIMATED AMOUNT, BASE BID ITEMS $______________

Optional Bid Items

0002 Furnish and Install Emergency Generator Equipment, Pad and Infrastructure 1 Job Job $__________

0003 Furnish and Install Temporary Government Field Office 1 Job Job $__________

0004 Furnish and Install Kitchen Equipment, Tables and Shelving 1 Job Job $__________

0005 Furnish and Install Laundry Equipment 1 Job Job $__________

0006 Furnish and Install RBG Lighting and Controls in Kitchen and Sensory Room 1 Job Job $__________

0007 Furnish and Install Millwork, Casework and Shelving 1 Job Job $__________

0008 Furnish and Install Automatic Vehicle Gates in lieu of

Manual Vehicle Gates 1 Job Job $__________

0009 Provide Electric Door Hardware in lieu of Mechanical Locksets at Select Doors 1 Job Job $__________

0010 Furnish and Install Lockers in Second Floor Mens and Womens Shower Rooms 1 Job Job $__________

0011 Furnish and Install Vertical Metal Ornamental Fins on Metal Building 1 Job Job $__________

TOTAL AMOUNT, OPTIONAL BID ITEMS $_____________

TOTAL ESTIMATED AMOUNT, BASE AND OPTIONAL BID ITEMS $_____________

Note 1: Bidders must bid all items. The submitted Bid must be held for up to 90 days. The work will be awarded as a whole to one bidder. Offers will be evaluated and the low bidder determined by the Total Estimated Amount for Line Items 0001 through 0013, including the Base Bid Items and all of the Optional Items.

Note 2: Line Items 0001, 0012, and 0013 above comprise the Base Bid and combined together are the minimum work that will be awarded.

Note 3: Line Item Numbers 0002 through 0011 above are Optional Line Items that may, at the option of the Government, be exercised at any time up to 90 days after Notice to Proceed for the Base Bid. If one or more Optional Items is/are awarded after Notice to Proceed is issued, 30 additional calendar days will be added to the project duration in total.

Note 4: All work shall be completed within the time period specified in Section 00800 SPECIAL CONTRACT REQUIREMENTS, FAR Clause 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984), except as noted in Note 3 above.

(End of Summary of Changes)