This solicitation is for the construction of the Human Engineering Lab - Soldier Squad Performance Research Institute at the Natick Soldier Systems Center in Natick, MA. Key requirements include construction of a new building containing a combat maneuver lab, biomechanics lab, and various specialty labs. Site work will include fencing, paving, and landscaping. Bidders must visit the site on March 18th and submit any requests for information by March 25th. The award date is to be determined.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide responses to RFI’s, provide updated specifications, draw ings, and extend the Virtual Bid Opening Date. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ20B0001
X 9B. DATED (SEE ITEM 11)
04-Mar-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-May-2020
CODE
US ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA ROAD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ20B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 07-May-2020 01:00 PM to 21-May-2020 01:00 PM.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
AMENDMENT 0008
Spec Ref Drawing Ref Question Response Bid Schedule & 01 22 00
A-405 1. Plastic Laminate Cabinet With Countertop: Copy 210 South elevation A1 and Copy 326 South elevation F3 on Sheet A 405 state that the cabinets and countertop shown are in “B07 (Bid Option 7)”;
however they also state that it is a “GFGI Option”. Which is correct? Please clarify if the cabinets and countertops are furnished and installed by the Contractor under Bid Option 7 or if they are furnished and installed by the Government.
The cabinets shown in Elevations A1 and F3 are included as part of Bid Option 0007. If Bid Option 0007 is not exercised then the cabinets will be GFGI. Elevations A1 and F3 on Sheet A-405 were revised as part of Amendment 0007 to remove the reference to the "GFGI BID OPTION."
Bid Schedule & 01 22 00
A-405 2. Cabinets With Countertop: Colab 208 North elevation A2 on Sheet A-405 states that the cabinets and countertop shown are in “B07 (Bid Option 7)”; however it also states that it is a “GFGI Option”. Which is correct?
a. Please clarify if the cabinets and countertops are furnished and installed by the Contractor under Bid Option 7 or if they are furnished and installed by the Government.
b. Also, what material are the cabinets and countertop made of for this particular elevation?
a. The cabinets shown in Elevation A2 are included as part of Bid Option 0007. If Bid Option 0007 is not exercised then the cabinets will be GFGI.
Elevation A2 on Sheet A-405 was revised as part of Amendment 0007 to remove the reference to the
"GFGI BID OPTION."
b. Elevation A2 on Sheet A-405 included as part of the enclosed amendment has been revised to indicate cabinet and countertop materials.
A-912 3. Foodservice Equipment: On the Specialty Equipment Schedule – Second Floor, Sheet A-912, all of the kitchen equipment (Items K-1 thru K-8 and K- 10 thru K-30 are shown to be “GFGI” government furnished and installed. Please clarify the following:
a. Is the above mentioned kitchen equipment furnished and installed by the Government under the Base Bid and by the Contractor under Bid Option 0004?
b. Is the wall hood and Ansul system (Item K-9) provided under the Base Bid or under Bid Option 0004?
a. Yes, except for Item "COMP-4" (Computers) which is always GFGI. Sheet A-912 is revised as part of the enclosed amendment to indicate which items are covered under Bid Option #0004.
b. Item K-9 (Wall Hood and Ansul) which is indicated as CFCI on Sheet A-912 is to be included in the Base Bid (Bid Item #0001).
FP-115 4. Fire Protection Within Stair C Above Roof Level: The Fire Protection – Roof Level Plan / FP1 on Sheet FP-115 indicates that the new fire suppression system is to be installed within the portion of Stair A located above the roof level and within the Pump Enclosure located above the roof level of Part AB of the new building.
However, Sheet FP-115 does not indicate that the new fire suppression system is to be installed within the portion of Stair C located
Yes, please provide sprinkler coverage for the top of Stairwell C. Sheet FP-113C is revised in the enclosed amendment to show the sprinkler system design at the top of Stairwell C.
above the roof level of Part C of the new building. Please confirm whether or not the new fire suppression system is to be installed within the portion of Stair C located above the roof level of Part C of the new building.
13 34 19 A-951 5. Metal Building Systems – Collateral Loads: Subpart 1.2.1.6 Collateral Loads of Specification Section 13 34 19 Metal Building Systems states, “Include additional dead loads other than the weight of metal building system for permanent items such as sprinklers, piping and mechanical systems, electrical systems, and ceilings, but not less than as follows:
a. At the CML (Between Grids 6 and 10.1):
40 PSF; Includes 7 PSF allowance for Photo Voltaic Equipment . . .” CML General Notes 6.A and 6.B on Sheet A-951 requires the pre-engineered metal building (“PEMB”) manufacturer to incorporate the additional suspended loading applied to the PEMB building and states that loading requirements include the “. . . suspended client equipment loadings, see;
A. Mat Lifter; (2 Units) 6,000 LBS. EA.
B. Mobile Truss System: 5 LBS. / SQ. FT.
(20 Ft x 40 Ft Truss Array).” While Subpart 1.2.1.6d of Specification Section 13 34 19 lists the 6,000 pound total load for each of the mat lifter units and states, “Note – This is in addition to the uniform collateral loads listed above,” which refers to the 40 PSF collateral load requirement to be included between grids 6 and 10.1, Subpart 1.2.1.6 does not include any specific reference to the 5 PSF load for the mobile truss system indicated on Sheet A-951. [CONTINUED
BELOW]
The mobile truss system loading indicated on Sheet A-951 is required to be incorporated by the PEMB manufacturer into their design and is NOT included within the stated 40 PSF uniform Collateral Load.
Collateral Loads identified in 13 34 19: Subpart
1.2.1.6 are specific to permanent dead loads to be applied to and incorporated into the PEMB manufacturer’s delegated design calculations. As stated in Subpart 1.2.1.6, the 40 PSF load criteria includes a 7 PSF load allowance for Photo Voltaic Equipment. Additional dead loads that have been identified on Sheet A-951 as suspended client equipment loadings, such as Mat Lifters (isolated loads) and the Mobile Truss System (uniform loads,) are in addition to the 40 PSF uniform collateral loads identified in Subpart 1.2.1.6. A symbol to identify support point load locations for the truss assembly has been added to the Symbol Legend on Sheet A-951. The symbol includes the description: “TYPICAL MOUNTING LOCATION
FOR CRK-M MOTOR AND TRUSS ASSEMBLY
(1000 LB POINT LOAD EACH).” This symbol has been added to the plan layout on Sheet A- 951 to show locations for the support points of the truss system and the loading criteria noted in the symbol accounts for the combined point load of the truss assembly including the motor. Also, Note 6B has been revised to state: “MOBILE TRUSS
SYSTEM: REFER TO SUPPORT LOCATIONS
SHOWN ON PLANS AND TYPICAL LOADING
CRITERIA.”
CON'T CON'T [CONTINUED FROM ABOVE] Please confirm our interpretation that the 5 PSF collateral load for the mobile truss system indicated on Sheet A-951 required to be incorporated by the PEMB manufacturer is included within the 40 PSF uniform collateral load listed within Subpart 1.2.1.6a of Specification Section 13 34 19.
6. Specialty Equipment – CRK-3.1, CRK 3.2, CRK-3.3, and CRK-M: The Specialty Equipment Schedule on Sheet A-911 includes the following items:
Sheets A-951 and A-952 have been revised as part of the enclosed amendment to provide the requested information and to remove any discrepancies. These revisions include:
• CRK-3.1, Ceiling Grid, Custom 50X40, quantity of two,
• CRK-3.2, Ceiling Grid, Custom 20X40, quantity of four,
• CRK-3.3, Ceiling Grid, Custom 40X40, quantity of two, and
• CRK-M, Ceiling Grid Motor, 1000KG D8 LVC, quantity of 68.
All four of the above-listed specialty equipment items, which are located within the Combat Maneuver Lab 125 of the new building, are designated as “GFGI” (Government Furnished Government Installed). CML General Note 6.B on Sheet A-951 requires the pre-engineered metal building (“PEMB”) manufacturer to incorporate the additional suspended loading applied to the PEMB building and states that loading requirements include the “. . . suspended client equipment loadings, see;
B. Mobile Truss System: 5 LBS. / SQ. FT.
(20 Ft x 40 Ft Truss Array),”
[CONTINUED BELOW]
(1) A symbol to identify support point load locations for the truss assembly has been added to the Symbol Legend on Sheet A-951. The Symbol includes the description: “TYPICAL
MOUNTING LOCATION FOR CRK-M MOTOR
AND TRUSS ASSEMBLY (1000 LB POINT
LOAD EACH).” This Symbol has been added to the plan layout on Sheet A-951 to show locations for the support points of the truss system and the loading criteria noted in the symbol accounts for the combined point load of the truss assembly including the motor.
(2) Note 6B has been revised to state: “MOBILE
TRUSS SYSTEM: REFER TO SUPPORT
LOCATIONS SHOWN ON PLANS AND
TYPICAL LOADING CRITERIA.”
Additionally, supplemental steel shall be provided by PEMB manufacturer for the support of the truss assembly. Provide supplemental steel perpendicular to the PEMB primary frame supports as indicated on Section E1/Sheet A-952 for ceiling truss assembly.
CON'T CON'T [CONTINUED FROM ABOVE] While we understand that the PEMB manufacturer is required to account for the collateral load of the GFGI mobile truss system within the design of the PEMB, the drawings and specifications do not specifically require the PEMB manufacturer to design and/or provide any supplementary steel for the GFGI mobile truss system to be supported from / attached to. Additionally, while the PEMB – Typical Building Frame / E1 on Sheet A-952 includes a note that states, “Coordinate Location of Structural Steel to Support Ceiling Truss with Truss Manufacturer,” generally shows the location of the GFGI “Suspended Ceiling Truss,” and includes six secondary structure support symbols located along the entire length of the building (also shown on Sheet A-951), the drawings and specifications do not contain any specific requirements for the PEMB manufacturer to design and/or provide this supplementary steel (secondary structure) for the GFGI mobile truss system. Since the Government is the only party currently privy to the detailed requirements for the sizes, locations, and quantities of supplementary steel (secondary structure) for the GFGI mobile truss system, please confirm our interpretation that any supplementary steel (secondary structure) required for support and installation (attachment) of the GFGI mobile truss system, will be designed, provided, and installed by the Government.
A-951 7. Roof Mounted HVAC Units Service / Maintenance Platforms: CML General Notes 4 and 7 on Sheet A-951 make reference to “Service Platforms” and “Maintenance Platforms” as it relates to the HVAC equipment located on the roof level of the pre-engineered metal building (“PEMB”). However, the drawings and specifications do not require service / maintenance platforms for the HVAC equipment located on the roof level of the PEMB. Please confirm our interpretation that service / maintenance platforms are not required to be provided for the HVAC equipment located on the roof level of the PEMB.
Service/maintence platforms are not required. Note No. 4 on Drawings A-951 & A-952 has been revised as part of the enclosed amendment to state:
“PROVIDE AND INCORPORATE REQUIRED
STEEL FRAMING SUPPORTING ROOF
MOUNTED HVAC UNITS. SPACING AND
SIZING OF FRAMING TO BE DETERMINED
BY THE PEMB MANUFACTURER BASED ON
THE APPROVED HVAC UNITS. LOCATE
STEEL FRAMING BELOW ROOF PURLIN
FRAMING.”
T-001 8. Is an open triangle 4 to be 4 Category 6 data, this is not depicted on T-001?
Per the Telecommunication drawings T-001, under the TEL/DATA OUTLETS heading is an open triangle with a numeral symbol (#). The description for this symbol states “NUMERAL INDICATES
NUMBER OF RJ45 JACKS ON SAME
FACEPLATE. NO NUMBER INDICATES ONE
DATA JACK.” So, an open triangle with the number 6 indicates to provide 4 data jacks (and 4 data cables).
T-001 9. Is an open triangle 6 to be 6 Category 6 data, this is not depicted on T-001?
Per the Telecommunication drawings T-001, under the TEL/DATA OUTLETS heading is an open triangle with a numeral symbol (#). The description for this symbol states “NUMERAL INDICATES
NUMBER OF RJ45 JACKS ON SAME
FACEPLATE. NO NUMBER INDICATES ONE
DATA JACK.” So, an open triangle with the number 6 indicates to provide 6 data jacks (and 6 data cables).
T-002 10. Note 19 calls out different color cables for the different systems, (a) should jack colors match the cable color required? (b) Will these cables all terminate onto dedicated patch panel fields, separate for voice, data, WAP, AV, and POE or all within the same patch panel field? (c) What should be considered a PoE outlet on the drawings since WAP’s have a dedicated color?
a. No, we were requiring the different colors in order to distinguish between the different systems that the cable may feed, like WAP’s, CCTV, card access and etc. Another reason for the different color requirement is for PoE cables, in which, the National Electrical Code (NEC) would require derating if the PoE cables are to be bundled together.
b. Sheet T-002, Telecommunications Riser, Note 20 states “ANY TELECOMMUNICATION WIRING
ASSOCIATED WITH THE BUILDING
AUTOMATION, LIGHTING RELAY PANELS,
AND ELECTRONIC SECURITY SHALL BE
PATCHED ON A SEPARATE PATCH PANEL.
SEPARATE OF THE REST OF THE
DATA CABLING. THESE ARE TO BE WIRED
TO A SEPARATE NETWORK SWITCH.”
c. The WAP outlet is shown on Detail A7 on Sheet T-001.
T-002 11. Note 13: what is required here termination of an existing 25 pair relocated by the customer, it is assumed building protector and modules should be provided by the tel/data contractor, will the be extended from the BEP within 50’ of entry to a 110 block? Is all this within EF 105? Is this 25 pair CAT 3 or CAT 5e?
Yes, the Contractor is to provide the building protector and modules. The Contractor is to extend from the 66 blocks to the 110 blocks. Assume to install up to 50 feet of the 25 pair cable from the 66 block to the 110 block. The cable shall be type Cat 3 as specified in Section 27 10 00, Subpart 2.3.1.1 of the Specifications.
T111C and T111C.1
12. Have the outlets detailed on the AV drawings been accounted for on the T111C and T111C.1 drawings or are these in addition to outlets depicted on the T drawings?
Yes, all the A/V data outlets shown in the A/V drawings have been accounted for within the telecommunication sheets T-111C and T111C.1.
10 14 00.20 13. There appear to be two sign different materials. One a Photopolymer ADA and the other an MP Plastic. The drawings show acrylic. Which should we price?
Signage materials shall conform to the requirements of Subpart 2.2 of Section 10 14 00.20 (Type MP plastic). Section 10 14 00.20 has been revised as part of the enclosed amendment to delete any reference to surface applied photopolymer. Also, the references to “Acrylic” on Sheets A-940A and A-940B have been deleted and revised to reference “SIGN PANEL, COLOR SC1.”
10 14 00.20 14. There is no sign type S8 Building Directory in the drawings yet the specifications 2.4.1 is looking for an electronic directory system.
The Directory is to be non-electronic as shown in Detail A2 on Sheet A-940B. Specification Section 10 14 00.20 has been revised as part of the enclosed amendment to delete any reference to an electronic building directory.
15. Please clarify Bid option 008. Is the intention of the base bid that there be no motorized or remote operation for the gates?
The base bid is to provide manual lift arm gates, as shown on Sheet C- 121 and in Detail A5 on Sheet C-506, with no motorized or remote operation. The Bid Option is to provide automatic gates as shown on Sheet C-122 in lieu of the manual lift arm gates.
03 45 00 & 03 45 13
16. Specifications 03 45 00, page 14, item
2.2.9 Tie wire and Specifications 03 45 13, page 17, item 2.2.9 Tie wire calls out for a monel steel or stainless steel tie. Will a substitution of a poly coated 19-gauge tie wire be acceptable?
No, bid as stated.
03 45 00 Specification 03 45 00, page 19, item 3.2 Examination. Please confirm that properly preparing, verifications of all supporting structure are completed and ready for precast concrete wall panels will be the responsibility of the General Contractors. General Contractor will need to coordinate this with all necessary trades, with a minimum of a 2 week notice from General Contractors prior of delivery of the precast concrete wall panels.
The Government requires that the specified work be performed. It is the responsibility of the Prime Contractor and their subcontractors to coordinate concerning the performance of this effort or any other work.
Coreslab Structures (Conn.) will not be carrying this line in our scope of work.
03 45 00 & 03 45 13
17. Specification 03 45 00, page 20, item
3.3.5.1 Joint Sealing, item 3.5 Joints
and Gaskets and Specification 03 45 13, page 21, item 2.5 Joint materials. Please confirm that this line item will be accounted for in a different bid package other than the precast concrete scope of work. Coreslab Structures (Conn.) will not be carrying this line in our scope of work.
The Government requires that the specified work be performed. It is the responsibility of the Prime Contractor and their subcontractors to coordinate concerning the performance of this effort or any other work.
03 45 13 18. Specification 03 45 13, page 1, Part 1, General. States “structurally composite insulated precast concrete wall system” Please clarify if the exterior 3” wythe is to have a composite connection through the 5” insulation to the interior 8” wythe?
Refer to Specification Section 03 45 13, Subpart
1.5.5 Thermal Calculations which requires
calculations demonstrating thermal performance for composite panels and thermal transmission performance of all components including connectors. Refer to Specification Section 03 45 13, Subpart 2.4.2 Connectors for Concrete Sandwich Wall Panels which provides requirements for fiber composite connectors and describes these connectors as "concrete wythe to wythe connectors" in sub-paragraph 2.4.2b.
08 11 00 19. Specification 08 11 00, page 8, item
2.1.2.2 Blast Load Table. Please confirm
that the blast load shown are correctly accounted for (PSI)? When reviewing this blast load requirements PSI loads seams to be very significant blast requirement. Are they supposed to be PSF?
The units for the blast loads provided in specification 08 11 00 in Table 1 are correctly identified as psi for pressure and psi-msec for impulse.
S-402 20. Drawing S402 / Detail C6A. Please confirm that the L6x4x3/8” (LVV) angle, W6x20 hanger, L4x4x3/8” brace angle and L6x6x3/8” clip angle with gussets plate is to be furnish and installed by steel sub contractor.
The Government requires that the work shown be performed. It is the responsibility of the Prime Contractor and their subcontractors to coordinate concerning the performance of this effort or any other work.
S-402, A-512, A- 513, A-521, & A-609
21. Drawing S402 / Detail C6A, Drawing A-512 / Detail A5, Drawing A-513 / Detail C4, Drawing A-521 / Detail E4, Drawing A-609 / Detail C1. Please confirm that the bent plate is to be furnish and installed by steel subcontractor.
The Government requires that the work shown be performed. It is the responsibility of the Prime Contractor and their subcontractors to coordinate concerning the performance of this effort or any other work.
S-403 & A-514
22. Drawing S403 / Detail F4 and Drawing A-514 / A7. Please confirm that the steel sub-contractor will furnish the embedded steel plate to the precast concrete sub-contractor.
The Government requires that the work shown be performed. It is the responsibility of the Prime Contractor and their subcontractors to coordinate concerning the performance of this effort or any other work.
A-508, A-509, & A-513
23. Drawing A-508 / Detail A1, C1, D8, Drawing A-509 / Detail A4, A6, C6, Drawing A-512 / A5, D5, Drawing A-513 / Detail C6. Please confirm that the window sub-contractor will furnish the embedded steel plate to the precast concrete sub-contractor.
The Government requires that the work shown be performed. It is the responsibility of the Prime Contractor and their subcontractors to coordinate concerning the performance of this effort or any other work.
A-533 24. Drawing A-533 / E8 GFRC column enclosure. Please confirm that this line item
The Government requires that the work shown be performed. It is the responsibility of the Prime will be accounted for in a different bid package other than the precast concrete scope of work. Coreslab Structures (Conn.)
will not be carrying this line in our scope of work.
Contractor and their subcontractors to coordinate concerning the performance of this effort or any other work.
A-609 25. Drawing A-609 / C1. Please advise if a welded connection engineered by the precast concrete sub-contractor in lieu of the splice sleeve connector as shown will be acceptable. If not, please provide bar sizes and splice sleeve connector size.
Bidders shall bid the design as shown. Specifically concerning the design of the connections for the preast insulated concrete panels, Subpart 1.5.2 of Section 03 45 13 states that "Connection of units to other members, or to other units must be of the type and configuration indicated. The design and sizing of connections for all design loads will be completed by the Contractor."
C-505 26. Please confirm material type for E5- Metal Guardrail Fence on sheet C-505, i.e. Stainless Steel or Carbon Steel.
The metal guardrail fence is stainless steel as called out on the Detail E5 on Sheet C-505.
A-151A 27. Kindly clarify what ceiling type CS3.1 is, neither the reflected ceiling plan, finish schedule nor room finish schedule identify the same.
Refer to Drawing A-004 – CEILING TYPES, which shows ceiling types and cross sections for ceiling assemblies. The ceiling type/finish ‘CS3.1’ has been added to Sheet A-700 along with the paint and color information as part of the enclosed amendment.
A-151A 28. Reflected Ceiling plan drawing A151A has a ceiling designation of EXS-1, Neither the finish schedule nor the ceiling schedule on the same page have an abbreviation for EXS-1. Kindly clarify.
The following revisions have been made as part of the enclosed amendment to eliminate the references to ceiling designation EXS-1:
1. Sheet A-151A has been revised to correct the ceiling designation from “EXS-1” to “DFS-1” for the two exterior soffits.
2. Sheet A-002 – EXTERIOR ROOF & WALL ASSEMBLIES, has been revised to correct the soffit type assembly designation from “EXS-1” to “DFS-1”. Also, refer to Drawing A-710
– SCHEDULE - EXTERIOR FINISH, for Finish Type “DFS-1” (Direct Applied Finish System) which provides color and texture information for this finish.
A151B, A151C.1
29. Reflected Ceiling Plans A151 B, A151 C.1, Combat Maneuver Lab 125, Biomechanics lab 121 Show AFS ceilings, there is no ceiling cross section for the detail in this area. Is the general contractor to assume the detail would be the same as the AFS in A152B? Note: AFS in A152B is represented as AGC- 2 and AGC-1, this is a 2” AFS finish on 2 layers of 5/8” GWB+3-5/8” mtl std framing w/3.5” Acoustic blanket insulation suspended from 1.5” cold rolled channels.
Refer to Drawing A-004 – CEILING TYPES, which shows ceiling types and cross sections for ceiling assemblies.
30. What are the weights of the gym mats that are Government Furnished Government Installed?
Refer to Note 6A on Sheet A-951 which provides the weight criteria for the mat lifters which is inclusive of the mat material.
A-303 31. What is the weight or the Overhead Truss System identified on Section E1, Drawing A-303 shown as Government Furnished Government Installed?
Support points and weights for the Overhead Truss System have been provided in the revised Drawing A-951 that is included in the enclosed amendment.
A-520 32. Does Detail C8/Sheet A-520 apply to the roof edge at the parapets?
No, Detail C8/A-520 is intended for locations where there is no parapet. The title of Detail C8 on Sheet A-520 has been revised as part of the enclosed amendment from 'TYPICAL METAL DECK AT ROOF EDGE' to 'TYP. METAL ROOF
DECK EDGE TREATMENT AT ROOF EDGES
WITHOUT PARAPET'.
A-203, A-314, A-511
33. Is granite base required to the right of door EX-10 all the way to Column G on Elevation A1/A203? The elevations do not show it typical like shown to the left of Door EX-10 . There is a sidewalk in this area, however Section A9/A314 taken through the wall does show a granite base in the enlarged detail shown on D4/A511.
Please clarify.
The granite base is not required and therefore not shown in Elevation A1 on Sheet A-203 between Door EX-10 and column line G . Detail F1 on Sheet A-511 has been added to Drawing A- 511 as part of the enclosed amendment showing the base of wall condition along this concrete walkway and a callout for this detail has been added to Section A9 on Sheet A-314 with the notation “@
CONCRETE WALKWAY.”
34. Reference 00600: Does this section need to be submitted if we are registered in SAM?
No, if the entirety of the representations and certifications are completed in SAM, you do not need to submit section 00600 separately.
35. Please confirm that they only forms to be submitted are: SF1442, Bid Schedule and Bid Bond.
The contractor shall submit, at a minimum, the signed solicitation with their priced bid, all amendments issued with signature acknowledging receipt, Bid Schedule, Bid Bond, and representations and certifications if they are not properly completed in SAM.
36. Do you need all 68 pages of the solicitation, offer and Award submitted? Or can we just submit SF1442, and page 3, 4 +5 of the solicitation?
No, you do not have to submit the entire solicitation but all amendments must be acknowledged.
09 65 00 A-700 37. LVT-1 and LVT-3 are specified as 18”x36” tile. This material only comes in 18”x18” standard size, 18”x24” and 4.5”x36” and 6”x36” custom size. Which size is to be included?
Drawing A-700 FINISH SCHEDULE and Section 09 65 00, Subpart 2.2 have been revised as part of the enclosed amendment to revise the tile size to the standard 18” x 18” size for LVT-1 and LVT-3.
A-700 38. RF-3 is indicated on the finish legend drawing A-700. However, it is not shown as used anywhere in the drawings.
Where is this material to be included?
RF-3 is to be provided at the stair landings. Sheets A-611, A-701A, A- 701B, A-701C, A-701C.1, A- 702A, A-702B, A-703A, and A-703B have been revised as part of the enclosed amendment to include RF-3 where required.
A-611, A-701A, A-262
39. The Finish Schedule on drawing A-611 and Finish Floor plan A-701A indicate wall tile WT-2 in the following rooms 100, 101, 102 and 103. However, elevations F1, F9 and D9 on drawing S-262 indicate WT-1.
Which is correct?
The correct wall tile finish for Rooms 100, 101, 102, and 103 is WT- 2. Sheet A-262 has been corrected to indicate WT-2 as part of the enclosed amendment.
40. Neither the plans or specs specify if flooring types SC-1 (sealed concrete) and HTC-1 (hand troweled concrete) are to receive rubber baseboard. Please clarify.
Refer to Drawing A-611 ROOM FINISH SCHEDULE which shows that rooms where flooring types SC-1 and HTC-1 are to receive RB-1 rubber base.
A-700 41. A-700 Finish Schedule calls for ESD-1 flooring (electrostatic tile) but none is shown on the finish plans. Please clarify.
Refer to Drawing A-611 SCHEDULE – ROOM FINISH, which lists this flooring for several rooms and also refer again to Sheets A- 701C.1 and A- 703B which indicate rooms with ESD-1 flooring.
42. Which type of rubber flooring (RF-1, RF-2, RF-3, or RF-4) is to be installed at the stair landings?
RF-3 is to be installed at the stair landings. Sheets A-611, A-701A, A- 701B, A-701C, A-701C.1, A- 702A, A-702B, A-703A, and A-703B have been revised as part of the enclosed amendment to include RF-3 where required.
07 22 00 43. Subpart 3.5 Inspection of Specification Section 07 22 00 Roof and Deck Insulation states, “A roof insulation technician, responsible directly to the Contractor and experienced in the installation of roof insulation and related work, must perform the inspection functions and be on the site whenever roof insulation operations are in progress.”
Since the roofing subcontractor will be responsible directly to the Prime Contractor, please confirm our interpretation that it will be acceptable for the roof insulation technician to be an employee of the roofing subcontractor who will be on the site whenever roof insulation operations are in progress.
The roof insulation technician shall be directly responsible to the Contractor for quality control of the roof insulation work being done by the roofing subcontractor. The roof insulation technician shall not be either hired by or an employee of the roofing subcontractor.
A-202, A-206, A-520
44. Galvanized OSHA Guardrail: The Ext.
Elevation – North – Part C / A1 on Sheet ID A-202 contains a note and associated arrow (pointing to nothing in particular above the roof level) stating, “Galvanized OSHA Guardrail.” A similar note and arrow are also indicated on the Bid Option 11 – Ext. Elevation – North
– Part C / F6 on Sheet ID A-206 near Column Line “F” (also pointing to nothing in particular above the roof level).
Additionally, a similar note and arrow(s) are also indicated on the North/South Section Thru CML / A1 on Sheet ID A-302 (also pointing to nothing in particular above the roof level). Further, the Safety Railing Detail / B1 on Sheet ID A-520 provides a typical detail for a section of “Safety Railing” and its interface with the PVC membrane roofing system.
However, nowhere on any drawings are there any specific requirements or locations indicated on the Part C roof area of the building to receive these “Galvanized OSHA Guardrail(s)” or “Safety Railing(s).”
In fact, the only roof area shown on the drawings to contain safety railings is the perimeter of the Chiller Dunnage platform
Safety railings as shown in Detail B1 on Sheet A- 520 are required and Drawing A-114AB was revised as part of the Amendment 0007 to show locations and extent of railings required.
Specification Section 05 52 00 METAL RAILINGS were also revised as part of the Amendment 0007 to add information on the safety railings.
on the Part AB roof area of the building, as indicated by the Typical Section at Grillage Guardrail / A1 on Sheet ID S-402.
Please confirm our interpretation that there are no “Galvanized OSHA Guardrail(s)” or “Safety Railings” required to be provided on the Part C roof area of the building, other than those railings that are an integral part of the “Ballasted Roof Access Stairs B.O.D.
PHP Systems” for the Roof Access Bulkhead indicated on the Roof Plan – Part C / A1 on Sheet A-114C.
A-520 45. Roof Anchors: The Roof Tie-Off detail B3 on Sheet ID A-520 shows a typical roof fall protection tie-off anchor relative to the new roofing system. However, the drawings and specifications do not contain any requirements to furnish and install permanent roof fall protection tie-off anchors. Please confirm our interpretation that there are no permanent roof fall protection tie-off anchors required to be furnished and installed for this project.
The tie-offs are not required for this project. As part of the Amendment 0007, Detail B3 on Sheet A-520 was crossed out and annotated as “Not Used” .
However, safety railings as shown in Detail B1 on Sheet A-520 are required and Drawing A-114AB was revised as part of Amendment 0007 to show locations and extent of railings required.
Specification Section 05 52 00 METAL RAILINGS was also revised as part of the Amendment 0007 to add information on the safety railings.
A-114AB 46. Equipment Hoist for HVAC Maintenance 1000LB Capacity: The Roof Plan – Part AB / B4 on Sheet ID A-114AB includes a note and associated arrow near the intersection of Column Lines H and
10.1 that states, “Equipment Hoist for HVAC Maintenance 1000LB Capacity.”
However, the drawings and specifications do not contain any specific requirements for this equipment hoist (i.e., manual, automatic, electric, hydraulic, fixed, mobile, operational characteristics, etc.), nor do the drawings contain any requirements to provide an electrical circuit and connection for this equipment hoist. Please confirm our interpretation that a manual equipment hoist for HVAC maintenance with a 1000LB capacity can be provided to satisfy this requirement.
HVAC equipment hoist is not required for this project. Sheet A- 114AB was revised as part of Amendment 0007 to delete the notation referencing the HVAC equipment hoist.
A-151B, A-901B
47. Gantry Assembly: On Sheet ID A-151- B in Room 121, there is a note “GANTRY ASSEMBLY”; however, there is no reference note or detail outlining the work to be performed. Then, on Sheet ID A- 901B, “OVERHEAD GANTRY(S)” are depicted again without reference. Please confirm our interpretation the overhead gantries and all associated support structures in Room 121 will be Government-furnished and Governmentinstalled.
Yes, the Monorail (Overhead Gantry) is Government Furnished and Government Installed.
The following revisions are made as part of the enclosed amendment:
1. Sheet A-151B has been revised to delete the notation "Gantry Assembly."
2. Note 12 in the POWER/TEL/DATA OUTLET AND FURNITURE PLAN GENERAL NOTES on Drawings A901A, A901B, A-902A, A- 902B, A- 903A, and A-903B have been revised to read as follows: "12. FURNITURE, FIXTURES AND
EQUIPMENT SHOWN ARE FOR REFERENCE
ONLY AND NOT IN CONTRACT (N.I.C.)
UNLESS NOTED OTHERWISE ON THE
SPECIALTY EQUIPMENT SCHEDULE
PROVIDED ON DRAWINGS A-911, A- 912,
AND A-913.
3. On Sheet A-901B the word "OVERHEAD GANTRY" has been changed to "MONORAIL" to match the description provided in the SPECIALTY EQUIPMENT SCHEDULE on Drawing A-911.
01 50 00 C-111, C-501 48. Temporary Fencing: On Sheet IDs C- 111 and C-501 a 8 foot high temporary chain linked fence is indicated surrounding the project site, generally following the limits of construction. Paragraphs 2.3.3 and
3.5.4 of Specification Section 01 50 00 indicates a 6 foot high chain linked fence around the project site limits and a separate fencing around a designated storage area within the project site fencing with green slats. We have been unable to locate a local temporary fence company that offers temporary fencing with slats. We suggest that the storage area fencing be eliminated and a 6 foot high chain linked fence with vision fabric on both sides be provided around the perimeter of the project site in the location shown on Sheet ID C- 111.
This will meet the intent of both the drawings and specifications by shielding from view the materials and equipment as well and preventing the public from gaining access to the work area. Is this variance acceptable?
The construction fence requirements in Section 01 50 00 have been revised as part of the enclosed amendment to conform to the fence details shown on Sheet C-501 and screening fabric has been allowed as a alternative to slats.
A-261, A-262 49. W-Shelf: Squad VR Lab 332-West A6 on Sheet ID A-261 and Soldier VR Lab 330-South C8 on Sheet ID A-262 show a “W-Shelf” without explanation. We have been unable to locate a description of that item within the documents. Please confirm our interpretation the W-Shelves will be Governmentfurnished and Government-installed and that there is no blocking or support required to be provided by the Contractor.
W-Shelving shown will be Government-Furnished- Government-Installed (GFGI). However, the Contractor is required to provide support for GFGI shelving. Notations have been added to Interior Elevations A6 on Sheet A-261 and C8 on Sheet A- 262 as part of the enclosed amendment indicating that the W-Shelving is ‘GFGI’. Please refer to Sheet A-250 TYPICAL MOUNTING HEIGHTS which provide blocking/strapping requirements for GFGI Equipment with notation stating: “PROVIDE
CONTINUOUS LIGHT GAUGE STRAPPING AT
DATUMS INDICATED ON ALL PARTITIONS
INSIDE LABS.”
AMENDMENT 0008 OF SOLICITATION
1.1 CHANGES TO SPECIFICATIONS
1.1.1 Revised and Re-issued Specification Sections
The following specification section are revised and reissued (deletions are shown as red and strike-through while additions are shown as green and underlined).
(1) Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS (dated 04/23/2020)
(2) Section 1014 00.20 INTERIOR SIGNAGE (dated 04/23/2020)
1.2 CHANGES TO DRAWINGS
1.2.1 Revised and Reissued Contract Drawings
The following sheets are revised and reissued:
(1) A-002
(2) A-151A
(3) A-151B
(4) A-250
(5) A-251
(6) A-252
(7) A-253
(8) A-254
(9) A-255
(10) A-260
(11) A-261
(12) A-262
(13) A-263
(14) A-314
(15) A-405
(16) A-407
(17) A-511
(18) A-520
(19) A-611
(20) A-700
(21) A-701A
(22) A-701B
(23) A-701C
(24) A-701C.1
(25) A-702A
(26) A-702B
(27) A-703A
(28) A-703B
(29) A-901A
(30) A-901B
(31) A-902A
(32) A-902B
(33) A-903A
(34) A-903B
(35) A-911
(36) A-912
(37) A-913
(38) A-940
(39) A-940A
(40) A-940B
(41) A-941A
(42) A-951
(43) A-952
(44) FP-113C
(45) E-111A
END OF AMENDMENT
(End of Summary of Changes)