About this file

This solicitation seeks construction services for a new human engineering laboratory building at the Natick Soldier Systems Center in Natick, Massachusetts. Key requirements include site work, foundations, precast concrete panels, metal wall and roofing systems, interior finishes, and mechanical, electrical and security systems. Bids are due by 1:00 PM on May 7, 2020. A mandatory pre-bid site visit will be held on March 18, 2020. All questions are due by March 25, 2020 to allow adequate time for responses. The selected contractor must follow all security protocols for the military base and be able to obtain necessary access approvals.

View the file

Other files

Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide responses to RFI's, provide revised sheets, extend the bid opening date and to make changes to specifications. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 24

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Apr-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ20B0001

X 9B. DATED (SEE ITEM 11)

04-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Apr-2020

CODE

US ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA ROAD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ20B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 30-Apr-2020 01:00 PM to 07-May-2020 01:00 PM.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

RFI'S AMENDMENT 0007

Spec Ref Drawing Ref Question Response 07 42 63 A-710 1. Insulated Fabricated Wall Panel Steel Sheet Gauge:

The Exterior Finish Schedule on Sheet A-710 of the drawings indicates that the basis of design for insulated metal panel, MP-1, is the 7.2 Insul-Rib profile manufactured by Metl-Span and the basis of design for MP-2, is the striated profile manufactured by Metl- Span.

Subpart 2.1.1 Steel Sheet within Subpart 2.1 Panel Materials of Specification Section 07 42 63 Insulated Fabricated Wall Panels states that the steel sheet for the insulated fabricated wall panels is required to be fy = 20 gauge.

Subpart 2.4.1 Steel Sheet within Subpart 2.4 Panel Materials of Specification Section 13 34 19 Metal Building Systems states that the steel sheet for the panel materials is required to be fy = 18 gauge.

However, according to the product data sheet from Metl Span, the CF 7.2 Insul-Rib Insulated Metal Wall Panel has exterior face options of 26, 24, or 22 gauge and interior face options of 26, 24, or 22 gauge.

Additionally, according to the product data sheet from Metl Span, the CF Striated Insulated Metal Wall Panel has exterior face options of 24 or 22 gauge and interior face options of 26, 24, or 22 gauge.

Please clarify which gauge(s) for both the exterior and interior faces of the basis of design insulated metal panels the Contractor is to include in its bid.

See revised Sections 07 42 63 and 13 34 19 as part of enclosed amendment for revised panel gauges.

13 34 19 2. Thermal Performance of Metal Roof Panel Assemblies at the Pre-Engineered Metal Building (Part C): Subpart 1.2.4.1 Metal Roof Panel Assemblies within Subpart 1.2.4 Thermal Performance of Specification Section 13 34 19 Metal Building Systems states, “U-factor: 0.02” and “R-value: 51.” However, the drawings indicate the ERA-2 Roof Assembly to be

The Contractor is not required to install a panelized metal roof system. Install ERA-2 roof assembly as indicated on Sheet A-002. The thermal performance criteria for ERA-2 is R=48 (min.) at roof drains. See enclosed amendment for revisions to Section 13 34 19.

installed on the roof of the pre-engineered metal building (Part C); not metal roof panel assemblies.

Please confirm our interpretation that the Contractor is not required to install metal roof panel assemblies with a U-Factor of 0.02 and

13 34 19 3. Air Infiltration of Metal Roof Panels at the Pre- Engineered Metal Building (Part C): Subpart 1.2.5 Air Infiltration for Metal Roof Panels of Specification Section 13 34 19 Metal Building Systems includes specific requirements for allowable air leakage through the roof assembly; however, the drawings do not require installation of any metal roof panel assemblies on the pre-engineered metal building (Part C).

Please confirm our interpretation that Subpart 1.2.5 of Specification Section 13 34 19 is not applicable.

Agree. Section 13 34 19, Sub-paragraph 1.2.5 Air Infiltration for Metal Roof Panels is not applicable as the roof system (ERA-2) is a composite field assembled roof system.

The Building Part C does require meeting an overall air barrier system leakage requirement.

See Section 07 27 10.00 10 Building Air Barrier System, Paragraph 1.6 for air barrier envelope reqiurements for Building Part C. See enclosed amendment deleting Pargraph 1.2.5 of Section 13 34 19.

13 34 19 4. Eave Height of the Pre-Engineered Metal Building (Part C): Subpart 1.3e Definitions of Specification Section 13 34 19 Metal Building Systems defines “Eave Height” as “Vertical dimension from finished floor to eave (the line along the sidewall formed by intersection of the planes of the roof and wall)” and Subpart 1.4.4 Eave Height states “Eave height must be 33 Ft., as indicated by nominal height on Drawings.”

However, the eave height of the pre-engineered metal building (Part C) indicated within the drawings is much greater than 33 feet. Please confirm the height that the eave height must be.

Refer to Section E1 / A-952 PEMB- Building Framing Drawings. The clear span eave height is established by the roof low point of the top chord of the rigid frame at Gird line 10.1; LP 200’- 8”. The Building Area ‘C’ finish floor is 165’-6” (01-FIRST FLR). The overall eave height from finish floor is 35’ – 2”, not inclusive of structural bearing. Minimum clearances shown on A-952 are to be maintained. See enclosed amendment for revision to Section 13 34 19, Para. 1.4.4.

25 05 11.03 5. Section 25 05 11.03 of the specifications is titled “Cybersecurity for Facility- Related Control Systems – Electric Gate Controllers.” However, Subpart 1.2 Control System Applicability within this section of the specifications states, “This specific Section applies only to the following control systems: Bacnet Direct Digital Control.” Please confirm our interpretation that there are not any sections of the specifications that provide requirements relating to cybersecurity for facility related control system associated with the electric gate controllers.

Cybersecurity requirements do apply to the Electric Gate Controllers. Section 11 12 00, Section 23 09 00, and Section 28 10 05 are revised as part of the enclosed amendment to clarify how the electric gate controllers are tied to the building management system, electronic security system, and fire alarm system and therefore require appropriate cybersecurity controls.

26 08 00 6. Apparatus Inspection and Testing for Underground Electrical Distribution: Subpart 1.3 Related Requirements of Section 33 71 02 Underground Electrical Distribution of the specifications states, “Section 26 08 00 Apparatus Inspection and Testing applies to this section . . .” However, Section 33 71 02 is not included as one of the specification sections listed within Subpart 3.1 Acceptance Tests and Inspections of Section 26 08 00 required to be performed by a first tier qualified testing organization / subcontractor.

Section 26 08 00 Apparatus Inspection and Testing is applicable to the testing and inspection requirements set forth within Section 33 71 02 Underground Electrical Distribution.

Paragraph 3.1 of Section 26 08 00 Apparatus Inspection and Testing is revised as part of the enclosed amendment. Additionally, revisions to Section 26 28 21.00 40, Section 26 32 14, and Section 26 51 00 to add testing

Please clarify whether or not Section 26 08 00 Apparatus Inspection and Testing is applicable to the testing and inspection requirements set forth within Section 33 71 02 Underground Electrical Distribution.

requirements are included in the enclosed amendment.

A-504 & A-533 7. Details A6/A-504 & E/A-533 indicate 1’-5” thick insulated panels. All other details indicate 1’-4” thick insulated panels. If 1’-5” thick panels are required, please provide a detailed explanation of the floors and gridlines that they occur at.

The 1’-5” dimension shown at the left panel in Detail A6/Sheet A- 504 is incorrect. The dimension of panel type “EWA-1” is 1’-4” as shown correctly to the right side of this same detail. The 1’-5” dimension shown at the panels in Detail E1/Sheet A-533 is incorrect, the correct dimension is 1’-4” as shown for the panel type “EWA-1” on Sheet A-002 for Exterior Wall Assembly “EWA-1”. See revised Sheets A-504 and A-533 in enclosed amendment.

8. Details indicate using splice sleeves at 12” oc for panel to panel and panel to foundation. Can we use welded connections in lieu of splice sleeves?

No, bid as shown.

A-511 9. Please verify that continuous non shrinking grout is only at the panel to foundation (A9/A-511).

Non-shrink grout shall be provided at panel to foundation connection. Further locations may be required for continual bearing as required by precast panel manufacturer.

A-710 10. Please provide description of Coreslab precast reference samples CS 1619 & CS 1613. We need the cement color and pigment color.

See revised Sheet A-710 included in enclosed amendment for colors requested.

Important Note: Though some drawings mention brand names, bidders may use any brand consistent with the requirements established in the Specifications.

A-609 11. Please verify that the 8” thick non-insulated panels PC-X (PC-4) are nonpigmented standard gray cement.

If not gray, please provide cement and pigment colors.

PC-X type panels are structural wythe back-up only panels, and should match other structural Wythe back-up portion of adjacent insulated panels. Standard grey cement is acceptable.

S-402 12. Detail C6A/S-402 indicates only 1” space between the steel structure and the back of precast panels. This space is inadequate due to tolerances of steel and precast. 2” space minimum is required. Please verify this space will be revised.

Agree that a 2" space is required. The change from a 1” to 2” spacing shall be accomplished by moving the perimeter column grids in by 1" so that the gap is increased to 2". See revised Structural and Architectural sheets included in enclosed amendment reflecting this change. Note that Sheet A-951, which is also affected by this request for information (RFI) is not included in the enclosed amendment as it is being further revised in response to other RFIs but will be reissued as part of a future amendment

08 34 01 13. Could you please elaborate on section 08 34 01 “Forced Entry Resistant Components”. Where is this referred to in the drawings? Does it apply to other specification sections?

As noted in Paragraph 2.3 of Section 08 34 01, this is for the Overhead Door Catchment System and is called out and shown on Sheets A-413 and A-513 for OH Doors EX-04 and EX-06 as referenced on Sheet A-111B.

08 34 01 14. Could you please elaborate on section 08 34 01 “Forced Entry Resistant Components”. Where is this referred to in the drawings? Does it apply to other specification sections?

As noted in Paragraph 2.3 of Section 08 34 01, this is for the Overhead Door Catchment System and is called out and shown on Sheets A-413 and A-513 for OH Doors EX-04 and EX-06 as referenced on Sheet A-111B.

15. Can a site visit for sub-contractors be scheduled? A scheduled pre-bid site visit was held on 18 March 2020 at 10:00 am as was stated on page 14 of the Solicitation.

16. Where can the project trailers be located? As stated in Paragraph 3.5.3 of Section 01 50 00 Temporary Construction Facilities, "Provide and maintain administrative field office facilities within the construction area at the designated site." This shall be taken to mean within the fenced project limit of work.

17. Please clarify footing widths along column line 1. Foundation wall footing widths are provided in Detail A1/Sheet S- 301.

18. Please clarify footing width at column line L between 7 and 5.

Foundation wall footing widths are provided in Detail A6/Sheet S- 302.

19. Please clarify footing width at column line L between 8 and 7.

Foundation wall footing width is provided in Detail A1/Sheet S-301.

20. Where is Grade Beam 1 detailed? Specifically at Column Line H between 9 and 10.

Note 4 of Plan S-111B states: “GB”

INDICATES GRADE BEAM,

SEE DETAIL C8/Sheet S-301.

21. Please clarify footing widths at column line H between 3 and 4.

Foundation wall footing widths are provided in Detail A1/Sheet S- 301.

22. Please clarify footing widths at column line L between 3 and 4.

Foundation wall footing width is provided in Detail A1/Sheet S-301.

23. In many places the scaled width dimensions of footings or walls don't match the detailed width.

As stated in Clause 252.236-7001

CONTRACT DRAWINGS AND

SPECIFICATIONS which is incorporated by full text in Section 00800 - Special Contract Requirements of the Solicitation, "The Contractor shall follow figures marked on drawings in preference to scale measurements." However, if the offeror can provide specific locations where it is believed dimensions do not match the drawing scale, the Government will investigate.

24. What are the depths of the two recessed slabs @ Column lines H & L between 2 & 3?

The “Foundation Notes” on the Structural Drawing S-111A, specifically note #7 states to “SEE

ARCHITECTURAL DWGS.

FOR DIMENSIONS AND TOP OF

CONCRETE ELEVATIONS

NOT SHOWN”. The depth of the pits are called out on Sheet A-101 SLAB PLAN – FIRST FLOOR and include section references also.

25. Where is detail C6A/S-402? Detail C6A on Sheet S-402 is referenced on Sheet S-112A.

A-021 - A-024 26. Fire proofing legend is shown on A021 – A024, Is fire proofing needed on steel not shown as SFRM on A021 – A024?

The scope for the fire-proofing of structural members is accurately shown on Drawings A-021 – A-024 in accordance with the Legend provided.

27. Will there be any intumescent coatings on beams?

If yes please indicate extent.

The scope of the intumescent coating of structural members is shown on Drawings A-021 – A-024 in accordance with the Legend provided.

28. Stair C1.5 finishes are undefined. See revised Sheets A-611, A-701, and A-701C included as part of enclosed amendment providing the requested finishes for Stair C.

09 29 00 29. GWB Specification mentions abuse board, please indicate extent of locations or remove from specification.

Refer to the Interior Partition Types, Drawing A-003, Partition General Note #5 states “HIGH-

IMPACT GYPSUM BOARD TO BE

USED IN ALL LAB AREAS”. This material is specified in paragraph

2.1.5.3 Abuse Resistant Gypsum Board

– Impact Damage Duty Abuse Resistant, of Section 09 29 00 GYPSUM WALLBOARD . Partition General Note #12 on Sheet A-003 states:

“ABUSE-RESISTANT GYPSUM

BOARD TO BE USED AS THE

EXPOSED LAYER IN ALL

CORRIDORS, STAIRS, LOBBY,

AND RECEPTION AREAS.”

This material is specified in paragraph

2.1.5 Abuse Resistant Gypsum Board –

Surface Damage Duty of Section 09 29 00.

09 29 00 30. GWB specification calls for level 5 UNO, is this desired at all exposed GWB locations?

No, see revisions to Section 09 29 00 as part of the enclosed amendment. Level 5 finish is not required for this project

14 21 23 31. Elevator specification calls for 5,500 lb rated load for elevator #1. This is not a standard, should specification be changed to 3,500 lb?

No, minimum 5,500 lb rated elevator is a project requirement.

32. Section 08 11 00 outlines the “Blast Requirement” criteria and the glass is clearly defined on A-607. This is fine. With regard to thermal performance the center of the glass U Value is called out to be .25 and the metal panel requirements are .29. Typically to get to those values triple glazing and extra heavy thermal breaks would be required to get close however we are unaware of any manufacturers that can achieve both the blast ratings as well as the specified thermal characteristics. If unable to meet both criteria, is the blast rating more critical than the thermal requirements?

Seethe revisions to Section 08 81 00 GLAZING as part of the enclosed amendment. The revisions to the glazing in Section 08 81 00 are consistent with the Basis of Design indicated on Sheet A-710 and the configuration of the the laminated insulating glazing shown on Sheet A- 607.

08 71 00 A-605, A-606 33. Questions regarding doors, frames and hardware:

a. From the door schedule, comment “D” lists doors to be mineral core. None of the doors with this note are to be fire rated. Please verify if doors can be structural composite lumber per spec similar to other non-rated doors.

b. Door schedule comments D, E, and H mention sound seal gaskets and door bottom. Is it the intent that these doors require STC rating? No STC ratings are listed for these openings in the door schedule for these openings.

c. Electric locks are specified as Schlage L9000 series mortise locks. All other locks aren’t specified other than an ANSI number. Are there any specifics for the non-Schlage L9000 locks?

d. Schlage L9000 locks cannot be Marine Grade 1 per spec. If Marine Grade 1 is a requirement, please verify make and model of locks to meet Marine grade 1 non-ferrous and where Marine grade locks are to be used.

e. Some of the wood doors are calling for STC 60 ratings. We are not aware of a wood door manufacturer being able to make a STC 60 rated door. Can these be hollow metal?

a) No, this is a project requirement to provide better acoustic performance for the door. Provide doors in accordance requirements indicated on the drawings.

b) STC ratings are only called out for the Sound Control Door Assemblies as specified under Section 08 34 73. Other doors that have features attributed to acoustic treatments as noted by comments D, E, and H are intended for those doors as acoustic improvements over standard doors but with no STC requirement.

c)Subpart 2.3.6.2 of Section 08 71 00 states that electrified mortise locks shall be in accordance with ANSI/BHMA A156.25. All other hardware items shall be provided in accordance with ANSI/BHMA standards as stipulated in their respective specification paragraphs.

Important Note: Though some drawings mention brand names, bidders may use any brand consistent with the requirements established in the Specifications.

d) See revisions to Section 08 71 00 as part of enclosed amendment. Marine Grade I Locksets are not required for this project.

e) These STC rated doors are Sound Control Door Assemblies as noted by Comment B and are specified under Section 08 34 73. These are steel doors cladded with wood veneer as described in the specifications.

08 71 00 A-605, A-606 34. It appears that the hardware sets appended with a letter indicate the hardware set to be replaced with Bid Option 0009, however this isn't always the case. There

The hardware set number does not designate whether the hardware is are instances where the appended hardware set doesn't line up with a Bid Option 0009 hardware set and other time where there is no letter. For example Doors 123C and 151 A.

included in Bid Option 0009 or not. In the DOOR SCHEDULE, the column titled HARDWARE notes the hardware set to be provided if Bid Option 0009 is not awarded (column titled “SET NUMBER”) and the hardware set to be provided if Bid Option 0009 is awarded (column title ”BO-0009 SET

NUMBER”).

A-520 35. Roof tie off (davit bases) are shown on A520, but locations are not shown on plans. Are these required?

If so please provide locations, count & structural details.

The tie-offs are not required for this project. As part of the enclosed amendment, Detail B3 on Sheet A-520 is crossed out and annotated as “Not Used” . However, safety railings as shown in Detail B1 on Sheet A-520 are required and Drawing A-114AB is revised as part of the enclosed amendment to show locations and extent of railings required.

Specification Section 05 52 00 METAL RAILINGS is revised to add information on the safety railings.

36. Please provide information on HVAC equipment hoist.

HVAC equipment hoist is not required for this project. Sheet A- 114AB is revised as part of the enclosed amendment to delete the notation referencing the HVAC equipment hoist.

A-261 37. Are the dotted casework outlines also needing to be included in the quote? Page A-261 is an example page with the dotted outlined casework I am referring to.

Dashed items designated with a Bid Option mark “B-XX” are to be included in the Bid Option line item "XX" identified and are not part of the Base Bid. Dashed items without a "B-XX" designation are shown for coordination and reference only and are GFGI (Government Furnished Government Installed). See enclosed amendment for revisions to Sheet A- 405 clarifying casework.

38. Does the Div 28 Security Contractor install the Field Cabling for Card Readers labeled as "Future" BO-0009 Option?

Field or Homerun wiring is not required for card access doors labeled as Future unless Bid Option 0009 is awarded. Refer to Measurement and Payment Specification Section 01 22 00, Paragraph 1.3.i. for description of Bid Option 0009.

39. Under Dwg. EV 601, General Access Control Notes; It details - "Video Intercom Equipment to be furnished and installed by Div 28 contractor". Is there a riser diagram available for this equipment?

There are no Video Intercoms and no Key Pads in this project. GNERAL ACCESS CONTROL NOTE 2 on Sheet EV601 has been modified as part of the enclosed amendment to eliminate the references to Video Intercom and Key Pads

28 10 05 40. In Div 28 paragraph 2.2.1 it states 25% should be included. Is that based on including the Future count?

No, the 25% spare capacity is in addition to bid options. This requirement is for 25% spare capacity on the scope that is awarded. The base electronic security system should have 25% spare capacity if only the base scope is awarded. If Bid Option #009 is awarded, 25% space capacity should be provided on top of the base plus bid option scope.

M-502 41. Detail A1, A4, 7 A7 on drawing M-502 call for internal duct liner from the main supply duct to the last take off not less than 10 feet. Where the duct from the VAV or FPB is round, is the intention for the round duct to be internally lined resulting in a double wall duct? Is the internal duct liner required for all VAV’s & FPB’s or just where specifically indicated on the drawings?

The internal duct liner should be provided after each FPB/VAV terminal according to Details A1, A4, and A7 on Sheet M-502 to the last take off and at least 10’-0” long if the last take off is closer, and also as shown on the drawings, including supply, transfer and return ducts. If there is a single duct after the FPB/VAV terminal, then the duct liner should be provided not shorter than 10’-0” long and as shown on the drawings. The lining is not required in the Inventory, Laundry, Locker, Shower and Restrooms. All duct liner locations are specifically indicated on the drawings. The round duct lining is the same as rectangular duct lining – no double wall required.

AMENDMENT 0007 OF SOLICITATION

1.1 CHANGES TO SPECIFICATIONS

1.1.1 Narrative Changes to the Specifications

(1) Section 05 52 00; The following subparts are added to this section:

“2.4 Non-Penetrating Guardrail System

Provide non-penetrating safety guardrails as indicated and detailed on the Contract Drawings. The non-penetrating guardrail System shall have top and mid rail in accordance with OSHA Standards - 29 CFR 1910.29 (b)(1)(2), and be capable of resisting a lateral Structural Load of 200 lb, minimum, in any direction to all components in accordance with OSHA Regulation 29 CFR 1926.501(b0(15) and 1926.502 (b)(2) through (b)(7). The factory produced, warrantied system to include the following:

a. Horizontal top rail height: 42 inches, minimum above roof wearing surface.

b. Rail components (top, mid-rail, and stanchions): 1-5/8 inch O.D.

pipe; finish shall be hot dipped galvanized (G-90), free of sharp edges and snag points.

c. Mounting Bases: Class 30 gray iron material cast with four receiver posts. Finish for bases shall be hot dipped galvanized. Provide rubber pads on bottom of bases.

d. Receiver Posts: Shall have a positive locking system into slots that allow rails to be mounted in any direction. Friction locking systems are not allowed. Receiver posts shall have drain holes.

e. Hardware: 1010 carbon steel securing pins, zinc plated.

2.4.1 Installation and Protection of Installed Construction

Install guardrails in accordance with manufacturer’s instructions. Do not begin installation until roofing systems are completed, released for installation by the Contractor and have been properly prepared to receive scheduled placement. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration. Replace damaged products including products/components displaying surface abrasion (G-90 finish).”

(2) Section 07 42 63, Subpart 2.1.1; This subpart is replaced in its entirety with the following:

“2.1.1 Steel Sheet

Roll-form steel wall and liner panels to the specified profiles, widths and depths as indicated. Refer to Contract Drawing A-002 -

EXTERIOR ROOF AND WALL ASSEMBLIES; EWA-4, EWA-5 & 5A & EWA-7,

specifically. Material must be plumb and true, and within the tolerances listed:

a. Steel Sheet conforming to ASTM A653/A653M and AISI SG03-3. Exterior

Face: AZ-50 aluminum-zinc coated steel - 22 GA (embossed). Interior Face: G-90 galvanized - 24 GA (embossed).

b. Individual panels to have continuous length to cover the entire length of any unbroken wall area with no joints or seams and formed without warping, waviness, or ripples that are not part of the panel profile and free of damage to the finish coating system.

c. Provide panels with thermal expansion and contraction consistent with the type of system specified.

1. Profile and coverage to be a minimum height and width from manufacturer's standard for the indicated wall area.

2. Flat, Embossed surface texture.”

(3) Section 07 42 63, Subpart 2.1.2; In the first sentence, “modified polyisocyanurate” is deleted.

(4) Section 07 42 63, Subpart 2.1.3; Subparagraph d is revised to read as follows:

“d. Interior Finish Coating: G-90 galvanized.”

(5) Section 07 42 63, Subpart 2.1; The following subpart is added:

“2.1.4 Panel Profile and Thermal Performance

Provide manufactured insulated panels to dimensions and profiles indicated on Contract Drawing A-002. Provide minimum R-Values indicated. All panels to include an offset double tongue-and-groove with extended metal shelf for positive face fastening.”

(6) Section 08 71 00, Subpart 2.3.2; Subparagraphs a and b are deleted in their entirety.

(7) Section 08 71 00, Subparts 2.3.6.6, 2.3.6.6.1, 2.3.6.6.2, 2.3.6.6.3;

These subparts are deleted in their entirety.

(8) Section 08 71 00, Subpart 3.6; For Hardware Set HW-11, “Pair Hinges” is revised to “4 Pair Hinges”.

(9) Section 08 81 00, Subpart 2.2; The second sentence of this subpart is revised to read as follows:

“Non-residential glazed systems (including frames and glass) must be certified by the National Fenestration Rating Council with a whole-window Solar Heat Gain Coefficient (SHGC) maximum of 0.36 determined according to NFRC 200 procedures and a U-factor maximum of 0.29 Btu/hr-ft2-F in accordance with NFRC 100.”

(10) Section 08 81 00, Subpart 2.2.1; This subpart is revised to read as

“Submit design analysis with calculations showing that the design of each different size and type of aluminum window unit and its anchorage to the structure meets the minimum antiterrorism standards required.

Coordinate design analysis with requirements of Section 08 11 00 – BUILDING ENVELOPE-AT/FP REQUIREMENTS, herewith and UFC Section 4-010- 0; Minimum Antiterrorism Standards for Buildings. Calculations verifying the structural performance of each window proposed for use, under the given loads, must be prepared and signed by a registered Professional Engineer. The window components and anchorage devices to the structure, as determined by the design analysis, must be reflected in the shop drawings. Refer to, and coordinate glazed assemblies with Exterior Glazing Schedule.

The inner lite must be ASTM C1048, Grade B heat strengthened, Style I (uncoated), Type I, Class 1 (transparent), Quality q3, 3/16 - 5/16 inch thick (see Glazing Type). The exterior lite must be ASTM C1048, Grade B heat strengthened, Type I, Class 1 (clear), Quality q3, 1/4 inch thick.”

(11) Section 08 81 00, Subpart 2.2.2; The second sentence in this subpart (“Glass performance must be U value maximum of 0.24 Btu/hr-ft2-F, Solar Heat Gain Coefficient (SHGC) maximum of 0.28.”) is deleted.

(12) Section 09 29 00, Subpart 3.4; In the sixth sentence, “Level 5” is revised to “Level 4”.

(13) Section 09 29 00, Subpart 3.4.1; This subpart is deleted in its entirety.

(14) Section 11 12 00, Subpart 1.1.1; Subparagraphs a and b are revised to read as follows:

“a. Section Includes

1. Automatic barrier gates with remote operator and card reader.

2. Vehicle and obstruction detectors.

b. Related Sections

1. Section 28 10 05 ELECTRONIC SECURITY SYSTEM for integrating parking control equipment with building security system.

2. Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

3. Section 25 05 11.03 CYBERSECURITY FOR FACILITY RELATED CONTROL

SYSTEMS – HVAC, UTILITY MONITORING, AND ELECTRIC GATE

CONTROLLERS”

(15) Section 11 12 00, Subpart 1.3; Subparagraph a is revised to read as

“a. Parking Control System: Three gates controlling vehicular along the one-way Access Driveway with parking spaces between the S2PRINT Parking Lot to Rich Ave.

1. One gate controlling vehicular access from the S2PRINT parking lot to the access driveway.

a) Entering Access Driveway at Gate: Operable by cabinet-mounted card access system.

b) Opens upon building fire alarm.

c) Exiting Access Driveway at Gate: Prohibited.

d) Gate can be opened remotely from building management system

(BMS).

e) Gate can be opened from a remote operator.

2. One gate controlling vehicular access from the access driveway to Rich Ave.

a) Exiting Access Driveway at Gate: Opens automatically upon vehicle exit.

b) Opens upon building fire alarm.

c) Entering Access Driveway at Gate: Prohibited.

d) Gate can be opened remotely from BMS.

e) Gate can be opened from a remote operator.

3. One gate controlling vehicular access to the Building 2 loading dock north of the S2PRINT Building.

a) Entering Access Driveway at Gate: Operable by cabinet-mounted card access system.

b) Opens upon building fire alarm.

c) Exiting Access Driveway at Gate: Prohibited.

d) Gate can be opened remotely from BMS.

e) Gate can be opened from a remote operator.”

(16) Section 11 12 00, Subpart 1.6.c; This subpart is revised to read as

“b. Wiring Diagrams: For power, signal, and control wiring. Indicate interconnections with BMS, access control, and fire alarm systems.”

(17) Section 11 12 00, Subpart 2.2.4a; This subpart is revised to read as

“a. Integration: Integrate operation of gate as follows:

1. Connect to BMS for remote gate opening.

2. Connect to building fire alarm system. Gates shall open upon fire alarm activation.

3. Connect to access control system.

4. Connect to remote operator.”

(18) Section 11 12 00, Subpart 2.4a; This subpart is revised to read as

“a. Provide controller capable of interconnection with security system is specified in Section 28 10 05 ELECTRONIC SECURITY SYSTEM.”

(19) Section 11 12 00, Subpart 3.3.d; Subparagraph 1 under this subpart is deleted in its entirety.

(20) Section 13 34 19, Subpart 1.2.4.1; This subpart is deleted in its

(21) Section 13 34 49, Subpart 1.2.4.2; Subparagraphs a and b are deleted and replace with the following:

“Refer to Specification Section 07 42 63 - INSULATED FABRICATED WALL PANELS. Provide wall panels equal to dimension, detail, performance, and finish as specified.”

(22) Section 13 34 19, Subpart 1.2.5; This subpart is deleted in its

(23) Section 13 34 19, Subpart 1.4; The following is added to the end of the first paragraph:

“Refer to Contract Drawing A-002; EXTERIOR ROOF & WALL ASSEMBLIES and Exterior Roof System ERA-2. Provide a 3" metal Roof Deck System consistent with required load combinations. Coordinate roof deck structural performance and installation sequencing with Section 07 22 00 - ROOF DECK INSULATION and Section 07 54 19 - POLYVINYL-CHLORIDE

ROOFING.”

(24) Section 13 34 19, Subpart 1.4.3; This subpart is revised to read as

“The Contractor shall provide and incorporate into their delegated design, additional supplemental steel as required (considered

Secondary Framing) to support all identified MEP equipment, fixtures, and their respective distribution systems.”

(25) Section 13 34 19, Subpart 1.4.4; In this subpart the dimension “33 Ft.” is revised to “35 feet-2 inches”.

(26) Section 13 34 19, Subpart 1.4.7; In the first sentence the word “panel” is deleted.

(27) Section 13 34 19, Subpart 1.4.8; This subpart is revised to read as

“Provide manufacturer’s factory-assembled, insulated metal wall panels to layout, profiles and details as indicated on Contract Drawings and consistent with requirements of Section 07 42 63 – INSULATED

FABRICATED WALL PANELS.”

(28) Section 13 34 19, Subpart 2.4.1; Revise the first sentence to read as

“Roll-form steel panels to Manufacturer performance profile, to fy = 24 gauge and depth as minimums.”

(29) Section 13 34 19, Subpart 2.4.2; Revise this subpart to read as

“Provide factory-formed aluminum wall panel assembly fabricated to the requirements of Section 07 42 63 INSULATED FABRICATED WALL PANELS.

Include accessories required for weather-tight installation.”

(30) Section 23 09 00, Subpart 1.2; The following sections are added to the list of sections in this subpart:

“e. Section 11 12 00 PARKING CONTROL EQUIPMENT

f. Section 28 10 05 ELECTRONIC SECURITY SYSTEMS”

(31) Section 25 05 11.03; The title of this section is revised to:

“SECTION 25 05 11.03

CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS – HVAC, UTILITY

MONITORING, AND ELECTRIC GATE CONTROLLERS”

(32) Section 26 08 00, Subpart 3.1; The list of sections in this subpart is revised to read as follows:

“a. 26 20 00 Interior Distribution System

b. 26 24 13 Switchboards

c. 26 28 21.00 40 Automatic Transfer Switch

d. 26 32 14 Gas Engine Generator Set

e. 26 51 00 Interior Lighting subpart 2.6.3

f. 26 60 13.00 40 Low Voltage Motors

g. 33 71 02 Underground Electrical Distribution”

(33) Section 26 20 00, Subpart 3.5.2, This subpart is revised to read as

“Test wiring rated 600 volt and less to verify that no short circuits or accidental grounds exist. Perform insulation resistance tests on wiring No. 6 AWG and larger diameter using instrument which applies voltage of 1,000 volts DC for 600 volt rated wiring and 500 volts DC for 300 volt rated wiring per NETA ATS to provide direct reading of resistance. All existing wiring to be reused shall also be tested.”

(34) Section 26 28 21.00 40; The title of this section is revised to read as follows:

“SECTION 26 28 21.00 40

AUTOMATIC TRANSFER SWITCHES (OPTIONAL BID ITEM OOO2)”

(35) Section 26 28 21.00 40, Subpart 1.2; The following reference is added to this subpart:

“INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)

NETA ATS (2017; Errata 2017) Standard for

Acceptance Testing Specifications for Electrical Power Equipment and Systems”

(36) Section 26 28 21.00 40, Subpart 3.1; The first sentence of this subpart is revised to read as follows:

“Install automatic transfer switches as indicated, and in accordance with NFPA 70 and the manufacturer's instructions.”

(37) Section 26 28 21.00 40, The following Subparts are added to this section:

“3.3 PREREQUISITES FOR FUNCTIONAL ACCEPTANCE TESTING

Completion of the following requirements is mandatory prior to scheduling functional acceptance tests for the automatic transfer switch.

3.3.1 Performance of Acceptance Checks and Tests

Complete as specified in paragraph entitled "Acceptance Checks and Tests". The Acceptance Checks and Tests shall be accomplished by the Testing organization as described in Section 26 08 00 APPARATUS

INSPECTION AND TESTING.

3.3.2 Manufacturers O&M Information

The manufacturers O&M information shall have been submitted to and approved by the Contracting Officer.

3.3.3 Test Equipment

All test equipment and instruments shall be on hand prior to scheduling field tests, or subject to Contracting Officer's approval, evidence shall be provided to show that arrangements have been made to have the necessary equipment and instruments on site prior to field testing.

3.4 FIELD QUALITY CONTROL

Give the Contracting Officer 15 days advance notice of dates and times scheduled for tests which require the presence of the Contracting Officer. The Contracting Officer will coordinate with the using activity and schedule a time that will eliminate or minimize interruptions and interference with the activity operations. The contractor shall be responsible for costs associated with conducting tests outside of normal working hours and with incorporating special arrangements and procedures, including temporary power conditions. The contractor shall provide labor, equipment, apparatus, including test load, and consumables required for the specified tests. Calibration of all measuring devices and indicating devices shall be certified. The test load shall be a cataloged product in accordance with Section 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS. Perform the following field tests in accordance with the manufacturer's recommendations and include the following visual and mechanical inspections and electrical tests, performed in accordance with NETA

ATS.

3.4.1 Automatic Transfer Switch Acceptance Checks and Tests

a. Visual and Mechanical Inspection

1. Compare equipment nameplate data with specifications and approved shop drawings.

2. Inspect physical and mechanical condition.

3. Confirm correct application of manufacturer's recommended lubricants.

4. Verify that manual transfer warnings are attached and visible.

5. Verify tightness of all control connections.

6. Verify tightness of accessible bolted connections by calibrated torque-wrench method. Thermographic survey is not required.

7. Perform manual transfer operation.

8. Verify positive mechanical interlocking between normal and alternate sources.

b. Electrical Tests

1. Measure contact-resistance.

2. Perform insulation-resistance on each pole, phase-to-phase and phase-to-ground with switch closed, and across each open pole for one minute. Perform tests in both source positions.

3. Verify settings and operations of control devices.

4. Calibrate and set all relays and timers.

3.4.2 Functional Acceptance Tests

Functional Acceptance Tests shall include simulating power failure and demonstrating the following operations for each automatic transfer switch. Contractor shall show by demonstration in service that the automatic transfer switches are in good operating condition, and function not less than five times.

a. Perform automatic transfer tests:

1. Simulate loss of normal/preferred power.

2. Return to normal/preferred power.

3. Simulate loss of emergency power.

4. Simulate all forms of single-phase conditions.

b. Verify correct operation and timing of the following functions:

1. Normal source voltage-sensing relays.

2. Engine start sequence.

3. Time delay upon transfer.

4. Alternate source voltage-sensing relays.

5. Automatic transfer operation.

6. Interlocks and limit switch function.

7. Time delay and retransfer upon normal power restoration.”

(38) Section 26 28 21.00 40; The title of this section is revised to read as follows:

“SECTION 26 32 14

GAS-ENGINE GENERATOR SET (OPTIONAL BID ITEM OOO2)”

(39) Section 26 32 14, Subpart 1.3; The following reference is added to this subpart:

“INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)

NETA ATS (2017; Errata 2017) Standard for

(40) Section 26 28 21.00 40, Subpart 2.6; This subpart is deleted in its

(41) Section 26 28 21.00 40, Subpart 2.7; This subpart is deleted in its

(42) Section 26 28 21.00 40; The following subpart is added to this section:

“2.10 Walk-in Enclosure Electrical Components

a. 120/208 volt main breaker load center panel with molded case branch circuit breakers feeding battery charger, generator jacket heater, electric space heater, enclosure lighting, motor operated dampers and convenience receptacles.

b. AC lighting consisting of surface mounted fluorescent fixtures with prismatic diffuser and cold weather ballast. Lighting shall be 120 VAC, controlled by a toggle switch located at each entrance door.

c. Duplex Receptacles, 20amp/120volt.

d. Battery charger, battery racks, and batteries shall be factory installed and wired.

e. Electric space heater(s) with thermostat to create a constant air temperature within the enclosure for personnel and equipment.”

(43) Section 26 32 14, Subpart 3.2.1; The number of this subpart is change from “3.2.1” to “3.2.2”.

(44) Section 26 32 14; The following subparts are added to this section:

“3.2.1 Acceptance Checks and Tests

Perform in accordance with the manufacturer's recommendations and the following visual and mechanical inspections and electrical tests performed in accordance with NETA ATS.

3.2.1.1 Circuit Breakers - Low Voltage Insulated Case/Molded Casea.

a. Visual and mechanical inspection

1. Compare nameplate data with specifications and approved shop drawings.

2. Inspect circuit breaker for correct mounting.

3. Operate circuit breaker to ensure smooth operation.

4. Inspect case for cracks or other defects.

5. Verify tightness of accessible bolted connections and cable connections by calibrated torque-wrench method. Thermographic survey is not required.

6. Inspect mechanism contacts and arc chutes in unsealed units.

b. Electrical Tests

1. Perform contact-resistance tests.

2. Perform insulation-resistance tests.

3. Adjust Breaker(s) for final settings in accordance with engine-generator set manufacturer's requirements.

3.2.1.2 Battery Systems

2. Inspect physical and mechanical condition.

3. Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method. Thermographic survey is not required.

4. Measure electrolyte specific gravity and temperature and visually check fill level.

5. Verify adequacy of battery support racks, mounting, anchorage, and clearances.

b. Electrical tests

1. Set charger float and equalizing voltage levels.

2. Verify all charger functions and alarms.

3. Measure each cell voltage and total battery voltage with charger energized and in float mode of operation.

4. Perform a capacity load test.

3.2.1.3 Engine-Generator Set

2. Inspect physical and mechanical condition.

3. Inspect for correct anchorage and grounding.

b. Electrical and mechanical tests

1. Perform an insulation-resistance test on generator winding with respect to ground. Calculate polarization index.

2. Perform phase rotation test to determine compatibility with load requirements.

3.2.1.4 Grounding System

Inspect ground system for compliance with contract plans and specifications.

b. Electrical tests

Perform ground-impedance measurements utilizing the fall-of-potential method. On systems consisting of interconnected ground rods, perform tests after interconnections are complete. On systems consisting of a single ground rod perform tests before any wire is connected. Take measurements in normally dry weather, not less than 48 hours after rainfall. Use a portable ground testing megger in accordance with manufacturer's instructions to test each ground or group of grounds. The instrument must be equipped with a meter reading directly in ohms or fractions thereof to indicate the ground value of the ground rod or grounding systems under test.”

(45) Section 26 32 14, Subpart 1.3; The following reference is added to this subpart:

“INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)

NETA ATS (2017; Errata 2017) Standard for

(46) Section 26 51 00; The following subparts are added to this section:

“1.5.12 Central Emergency Lighting System

Product shall be UL 924 rated and shall comply with NFPA 70 and

NFPA 10.

1.1.5.12.1 Testing Agency Qualifications

Member company of the International Electric Testing Association or is an NRTL.

1.5.12.2 Electrical Components, Devices, and Accessories

Listed and labeled as defined in NFPA 70, Article 100 by a testing agency acceptable to authorities having jurisdiction and marked for intended use.”

(47) Section 26 51 00; The following subparts are added to this section:

“2.6.3.7 Surge Protection

Compliant and tested per UL 924 standards.

2.6.3.7 Interter Compliance

The inverter shall be tested and listed by Underwriters Laboratory to the UL 924 standard which also includes the Self-testing and Self-Diagnostic portion of the standard. Self-Testing shall be performed monthly for a minimum of 30 seconds and annually for a minimum of 90 minutes to comply and also contain fully programmable, password protected Load-Reduction fault programming capabilities.

2.6.3.8 Source Quality Control

a. Factory test complete inverter system, including battery, before shipment. Include the following:

1. Functional test and demonstration of all functions, controls, indicators, sensors, and protective devices.

2. Full-load test.

3. Transient-load response test.

4. Overload test.

5. Power failure test.

b. Observation of Test: Give 14 days' advance notice of tests and provide access for Owner's representative to observe tests at Owner's option.

c. Report test results. Include the following data:

1. Description of input source and output loads used. Describe actions required to simulate source load variation and various operating conditions and malfunctions.

2. List of indications, parameter values, and system responses considered satisfactory for each test action. Include tabulation of actual observations during test.

3. List of instruments and equipment used in factory tests.”

(48) Section 26 51 00; The following subparts are added to this section:

“3.1.9 Central Emergency Lighting Inverter

a. Examine areas and conditions for compliance with requirements for ventilation, temperature, humidity, and other conditions affecting performance.

1. Verify that manufacturer's written instructions for environmental conditions have been permanently established in spaces where equipment will be installed, before installation begins.

b. Examine roughing-in for electrical connections to verify actual locations of connections before installation.

c. Proceed with installation only after unsatisfactory conditions have been corrected.

3.1.9.1 Installation

Maintain minimum clearances and workspace at equipment according to manufacturer's written instructions and NFPA 70.”

(49) Section 26 51 00; The following subparts are added to this section:

“3.3 Field Quality Control

3.3.1 Central Emergency Lighting System Testing

a. Testing Agency: Engage a qualified testing agency to perform tests and inspections and prepare test reports.

b. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust components, assemblies, and equipment installations, including connections. Report results in writing.

c. Tests and Inspections:

1. Inspect interiors of enclosures for integrity of mechanical and electrical connections, component type and labeling verification, and ratings of installed components.

2. Test manual and automatic operational features and system protective and alarm functions.

3. Test communication of status and alarms to remote monitoring equipment.

4. Perform each visual and mechanical inspection and electrical test stated in NETA ATS. Certify compliance with test parameters.

5. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

d. Remove and replace malfunctioning units and retest as specified above.

3.3.2 Central Emergency Lighting System Startup Service

a. Engage a factory-authorized service representative to perform startup service.

b. Verify that central battery inverter is installed and connected according to the Contract Documents.

c. Verify that electrical wiring installation…