Amendment 0009_Bid Schedule Revised.PDF
PDF 48 KB Posted
- Solicitation number
- W912WJ20B0001
About this file
This document contains a bidding schedule and related federal contract opportunity solicitation for construction services. The bidding schedule outlines base bid line items totaling $250,000 for construction of a new Human Engineering Lab, allowance for electronic security systems, and CMRA reporting. It also lists 10 optional line item bids that may be exercised within 90 days of notice to proceed, such as furnishing emergency generator equipment, millwork, and vehicle gates. The total contract value will be determined by the combined base bid and optional line item amounts. The related solicitation is from the Department of the Army Corps of Engineers Engineering District New England for construction of the Human Engineering Lab - Soldier Squad Performance Research Institute at the Natick Soldier Systems Center in Natick, MA. Interested contractors must attend an organized site visit on March 18, 2020 and submit any requests for information by March 25, 2020 to allow adequate response time.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BIDDING SCHEDULE (dated 5/7/2020)
Refer to Section 01 22 00 MEASUREMENT AND PAYMENT.
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount
Base Bid Items
0001 Construct New Human Engineering Lab 1 Job Job $__________
0012 Allowance for Electronic Security Systems 1 Job Job $250,000.00
0013 CMRA 1 Job Job $__________
Time for fulfilling the CMR requirement if included or if not included in your overhead for initial CMR database set up and for annual CMR reporting.
The Contractor will report ALL contractor manpower (including all subcontractor manpower) required for performance of this contract to include all task orders and modifications IAW the Office of the Assistant Secretary of the Army (Manpower and Reserve Affairs). Refer to clause 52.204-9002 for additional information.
TOTAL ESTIMATED AMOUNT, BASE BID ITEMS $______________
Optional Bid Items
0002 Furnish and Install Emergency Generator Equipment, Pad and Infrastructure 1 Job Job $__________
0003 Furnish and Install Temporary Government Field Office 1 Job Job $__________
0004 Furnish and Install Kitchen Equipment, Tables and Shelving 1 Job Job $__________
0005 Furnish and Install Laundry Equipment 1 Job Job $__________
0006 Furnish and Install RBG Lighting and Controls in Kitchen and Sensory Room 1 Job Job $__________
0007 Furnish and Install Millwork, Casework and Shelving 1 Job Job $__________
0008 Furnish and Install Automatic Vehicle Gates in lieu of Manual Vehicle Gates 1 Job Job $__________
0009 Provide Electric Door Hardware in lieu of Mechanical Locksets at Select Doors 1 Job Job $__________
0010 Furnish and Install Lockers in Second Floor Mens and Womens Shower Rooms 1 Job Job $__________
0011 Furnish and Install Vertical Metal Ornamental Fins on Metal Building 1 Job Job $__________
TOTAL AMOUNT, OPTIONAL BID ITEMS $_____________
TOTAL ESTIMATED AMOUNT, BASE AND OPTIONAL BID ITEMS $_____________
Note 1: Bidders must bid all items. The submitted Bid must be held for up to 90 days. The work will be awarded as a whole to one bidder. Offers will be evaluated and the low bidder determined by the Total Estimated Amount for Line Items 0001 through 0013, including the Base Bid Items and all of the Optional Items.
Note 2: Line Items 0001, 0012, and 0013 above comprise the Base Bid and combined together are the minimum work that will be awarded.
Note 3: Line Item Numbers 0002 through 0011 above are Optional Line Items that may, at the option of the Government, be exercised at any time up to 90 days after Notice to Proceed for the Base Bid. If one or more Optional Items is/are awarded after Notice to Proceed is issued, 30 additional calendar days will be added to the project duration in total.
Note 4: All work shall be completed within the time period specified in Section 00800 SPECIAL CONTRACT REQUIREMENTS, FAR Clause 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984), except as noted in Note 3 above.
File details come from the government source that posted it. Updated .