Amendment 0003 W912QR26RA016_Plans-0003.pdf
PDF 4 MB Posted
- Solicitation number
- W912QR26RA016
About this file
This document is a comprehensive set of architectural and mechanical design drawings for a five-story barracks facility at Fort Campbell, Kentucky, issued in February 2026 with three amendments through May 2026. The project, designated PN 99248, FY2026, P2 511686, is managed by the US Army Corps of Engineers Louisville District.
The drawings encompass architectural floor plans, elevations, sections, and detailed construction specifications across five floors. The mechanical systems include two modular air-to-water heat pump units (MAWHP-1 and MAWHP-2) with 140-ton cooling and 1360 MBH heating capacity each, utilizing R454B refrigerant at 460V/3-phase/60Hz. The HVAC infrastructure consists of five dedicated outdoor air systems (DOAS-1 through DOAS-5) with variable volume capacity ranging from 2,200 to 3,325 CFM, supplemented by numerous fan coil units (FCUs) with 450 CFM nominal capacity serving individual dwelling units and common areas across all floors. Makeup air units (MAU-1 through MAU-5) provide 2,200 CFM 100% outdoor air service to laundry access areas. The system includes cabinet unit heaters (CUHs) and unit heaters (UHs) for corridor and mechanical space conditioning, with a backup electric hot water boiler (EB-1) providing 299 KW output capacity. Control systems utilize BACnet interface with integral thermostats offering occupancy override and scheduling capabilities. All equipment schedules, piping diagrams, ductwork plans, lighting layouts, electrical distribution, and telecommunications infrastructure are detailed across multiple drawing sets with comprehensive equipment specifications and performance parameters.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Pl ot
D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C
ER
TI
FI
ED
F
IN
AL
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
FE
BR
U
AR
Y
FT
. C
AM
PB
EL
L, K
Y.
U
EP
H
B
AR
R
AC
KS
PN
FY
P2
Fi le
P at h:
5/
/2
1:
:4
PM
C
:\U se rs \H
2E D
D
KA
S\ D oc um en ts
\5
6_
R ev it2
5_
SI
TE
_U
EP
H
_h 2e dd ka s.
rv t
GI002
SH
EE
T
IN
D
EX
K.
SA
N
TO
S
K.
SA
N
TO
S
M .B
AR
R
Y
M .B
AR
R
Y
INDEX OF DRAWINGS -VOL. 1
SHEET NUMBER Sheet Name
GENERAL
GI000 COVER SHEET VOLUME 1
GI002 SHEET INDEX
GI003 SHEET INDEX
GI004 SITE AREA, LOCATION, AND VICINITY MAP
GI005 CONTRACTOR HAUL ROUTE
GI006 LIFE SAFETY / FIRE PROTECTION CODE REVIEW (FOR REFERENCE ONLY)
GI007 CODE COMPLIANCE SITE PLAN
GI008 FIRST FLOOR - LIFE SAFETY PLAN
GI009 SECOND FLOOR - LIFE SAFETY PLAN
GI010 THIRD FLOOR - LIFE SAFETY PLAN
GI011 FOURTH FLOOR - LIFE SAFETY PLAN
GI012 FIFTH FLOOR - LIFE SAFETY PLAN
GI013 OCCUPANT LOAD SCHEDULE - FIRST FLOOR
GI014 OCCUPANT LOAD SCHEDULE - SECOND FLOOR
GI015 OCCUPANT LOAD SCHEDULE - THIRD FLOOR
GI016 OCCUPANT LOAD SCHEDULE - FOURTH FLOOR
GI017 OCCUPANT LOAD SCHEDULE - FIFTH FLOOR
GEOTECHNICAL
B-001 SOIL AND ROCK CLASSIFICATION
B-101 BORING AND TEST PIT LOCATION PLAN
B-102 GEOPHYSICAL RESULTS 1
B-103 GEOPHYSICAL RESULTS 2
BB201 BORING LOGS AND TEST PITS
BB202 BORING LOGS AND TEST PITS
BB203 BORING LOGS AND TEST PITS
BB204 BORING LOGS AND TEST PITS
BB205 BORING LOGS AND TEST PITS
BB206 BORING LOGS AND TEST PITS
BB207 BORING LOGS AND TEST PITS
BS301 SOIL PROFILE 1
BS302 SOIL PROFILE 2
SURVEY MAPPING
VA101 AERIAL PHOTOGRAPH WITH SITE OVERLAY
VF101 OVERALL EXISTING CONDITIONS
VF102 EXISTING CONDITIONS
VF103 EXISTING CONDITIONS
VF104 EXISTING CONDITIONS
VF105 EXISTING CONDITIONS
VF106 EXISTING CONDITIONS
VF107 EXISTING CONDITIONS
VF401 CONTROL POINT DESCRIPTIONS
CIVIL
GC101 OVERALL EROSION CONTROL PLAN
GC102 EROSION CONTROL PLAN
GC103 EROSION CONTROL PLAN
GC104 EROSION CONTROL PLAN
GC105 EROSION CONTROL PLAN
GC501 EROSION CONTROL DETAIL
GC502 EROSION CONTROL DETAIL
GC503 EROSION CONTROL DETAIL
CD101 OVERALL DEMOLITION PLAN
CD102 DEMOLITION PLAN
CD103 DEMOLITION PLAN
CD104 DEMOLITION PLAN
CD105 DEMOLITION PLAN
CD106 DEMOLITION PLAN
CD107 DEMOLITION PLAN
CS101 OVERALL CIVIL SITE PLAN
CS102 CIVIL SITE PLAN
CS103 CIVIL SITE PLAN
CS104 CIVIL SITE PLAN
CS105 CIVIL SITE PLAN
CS401 OVERALL JOINT PLAN
CS402 JOINT PLAN
CS403 JOINT PLAN
CS404 JOINT PLAN
CS405 JOINT PLAN
CS501 CIVIL SITE DETAILS
CS502 CIVIL SITE DETAILS
CS503 CIVIL SITE DETAILS
CS504 CIVIL SITE DETAILS
CG101 OVERALL GRADING AND DRAINAGE PLAN
CG102 GRADING AND DRAINAGE PLAN
CG103 GRADING AND DRAINAGE PLAN
CG104 GRADING AND DRAINAGE PLAN
CG105 GRADING AND DRAINAGE PLAN
CG201 STORM SEWER PROFILES
CG202 STORM SEWER PROFILES
CG203 STORM SEWER PROFILES
CG501 GRADING DETAILS
CG502 GRADING DETAILS
CG503 GRADING DETAILS
CG504 GRADING DETAILS
CG505 GRADING DETAILS
CU101 OVERALL UTILITY PLAN
CU102 UTILITY PLAN
CU103 UTILITY PLAN
INDEX OF DRAWINGS -VOL. 1
SHEET NUMBER Sheet Name
A-151 FIFTH FLOOR PLAN - AREA 5A
A-152 FIFTH FLOOR PLAN - AREA 5B
A-153 FIFTH FLOOR PLAN - AREA 5C
A-160 ROOF PLAN
A-170 FIRST FLOOR REFLECTED CEILING PLAN - COMPREHENSIVE
A-171 FIRST FLOOR REFLECTED CEILING PLAN - AREA 1A
A-172 FIRST FLOOR REFLECTED CEILING PLAN - AREA 1B
A-173 FIRST FLOOR REFLECTED CEILING PLAN - AREA 1C
A-174 SECOND FLOOR REFLECTED CEILING PLAN - COMPREHENSIVE
A-175 SECOND FLOOR REFLECTED CEILING PLAN - AERA 2A
A-176 SECOND FLOOR REFLECTED CEILING PLAN - AERA 2B
A-177 SECOND FLOOR REFLECTED CEILING PLAN - AERA 2C
A-178 THIRD FLOOR REFLECTED CEILING PLAN - COMPREHENSIVE
A-179 THIRD FLOOR REFLECTED CEILING PLAN - AERA 3A
A-180 THIRD FLOOR REFLECTED CEILING PLAN - AERA 3B
A-181 THIRD FLOOR REFLECTED CEILING PLAN - AERA 3C
A-182 FOURTH FLOOR REFLECTED CEILING PLAN - COMPREHENSIVE
A-183 FOURTH FLOOR REFLECTED CEILING PLAN - AERA 4A
A-184 FOURTH FLOOR REFLECTED CEILING PLAN - AERA 4B
A-185 FOURTH FLOOR REFLECTED CEILING PLAN - AERA 4C
A-186 FIFTH FLOOR REFLECTED CEILING PLAN - COMPREHENSIVE
A-187 FIFTH FLOOR REFLECTED CEILING PLAN - AERA 5A
A-188 FIFTH FLOOR REFLECTED CEILING PLAN - AERA 5B
A-189 FIFTH FLOOR REFLECTED CEILING PLAN - AERA 5C
A-190 ENLARGED TYPICAL DWELLING UNITS - REFLECTED CEILING PLANS
A-201 EXTERIOR NORTH AND SOUTH ELEVATIONS
A-202 EXTERIOR WEST ELEVATION
A-203 EXTERIOR EAST ELEVATION
A-204 EXTERIOR ENLARGED NORTH ELEVATION
A-205 EXTERIOR ENLARGED SOUTH ELEVATION
A-301 BUILDING LONGITUDINAL & CROSS SECTIONS
A-311 WALL SECTIONS
A-312 CURTAIN WALL SECTIONS
A-401 ENLARGED COMMON AREA - FIRST FLOOR
A-402 ENLARGED COMMON AREA - FIRST FLOOR
A-403 ENLARGED COMMON AREA 2ND TO 5TH FLOOR
A-404 ENLARGED LAUNDRY ROOMS PLAN AND ELEVATIONS
A-405 ENLARGED FITNESS ROOM
A-411 ENLARGED TYPICAL DWELLING UNITS PLANS
A-412 ENLARGED KITCHEN / LIVING / BATHROOM PLANS AND ELEVATIONS AND SCHEDULE
A-413 ENLARGED ABA TOILET AND JANITOR AND DAYROOM ELEVATIONS AND SCHEDULE
A-414 ENLARGED CQ DESK PLANS AND ELEVATIONS AND CASEWORK SECTIONS
A-415 KITCHEN / DAYROOM / BATHROOM CASEWORK SECTIONS
A-420 ENLARGED STAIR PLANS
A-421 ENLARGED STAIR SECTIONS
A-422 ENLARGED STAIR PLANS
A-423 ENLARGED STAIR SECTIONS
A-424 ENLARGED STAIR PLANS
A-425 ENLARGED STAIR SECTIONS
A-426 STAIR DETAILS
A-431 ENLARGED ELEVATOR PLANS
A-432 ELEVATOR SECTIONS
A-433 ELEVATOR DETAILS
A-441 ENLARGED CANOPY PLANS AND SECTION AND DETAILS
A-442 ENLARGED MAIL KIOSK PLAN AND ELEVATIONS
A-443 ENLARGED ROOF PLANS - MAIL KIOSK AND BIKE STAND - SHADE STRUCTURES AND DETAILS
A-444 ENLARGED BUILDING SIGNAGE PLAN AND ELEVATIONS AND SECTIONS AND DETAILS
A-445 ENLARGED BIKE STAND SHADE STRUCTURE AND DETAILS
A-451 ENLARGED MECHANICAL YARD PLANS AND DETAILS
A-452 ENLARGED DUMPTER PLANS AND SECTION AND DETAILS
A-501 WALL SECTION DETAILS
A-511 ROOF DETAILS
A-512 ROOF ISOMETRIC DETAILS
A-513 ROOF ISOMETRIC DETAILS
A-514 ROOF HATCH SECTIONS AND PLAN
A-521 EXTERIOR PLAN DETAILS
A-522 INTERIOR PLAN & CEILING DETAILS
A-541 MISC DETAILS
A-601 PARTITION TYPES, SCHEDULE, AND DETAILS
A-602 FIRE-RATED PARTITION DETAILS (DWELLING UNIT)
A-603 FIRE-RATED PARTITION DETAILS (DWELLING UNIT)
A-604 FIRE-RATED PARTITION DETAILS
A-611 DOORS AND FRAMES SCHEDULE AND DETAILS - FIRST FLOOR 1 of 3 A-612 DOORS AND FRAMES SCHEDULE AND DETAILS - FIRST FLOOR 2 of 3 A-613 DOORS AND FRAMES SCHEDULE AND DETAILS - FIRST FLOOR 3 of 3 A-621 DOORS AND FRAMES SCHEDULE AND DETAILS - SECOND FLOOR 1 of 3 A-622 DOORS AND FRAMES SCHEDULE AND DETAILS - SECOND FLOOR 2 of 3 A-623 DOORS AND FRAMES SCHEDULE AND DETAILS - SECOND FLOOR 3 of 3 A-631 DOORS AND FRAMES SCHEDULE AND DETAILS - THIRD FLOOR 1 of 3 A-632 DOORS AND FRAMES SCHEDULE AND DETAILS - THIRD FLOOR 2 of 3 A-633 DOORS AND FRAMES SCHEDULE AND DETAILS - THIRD FLOOR 3 of 3 A-641 DOORS AND FRAMES SCHEDULE AND DETAILS - FOURTH FLOOR 1 of 3 A-642 DOORS AND FRAMES SCHEDULE AND DETAILS - FOURTH FLOOR 2 of 3 A-643 DOORS AND FRAMES SCHEDULE AND DETAILS - FOURTH FLOOR 3 of 3 A-651 DOORS AND FRAMES SCHEDULE AND DETAILS - FIFTH FLOOR 1 of 3 A-652 DOORS AND FRAMES SCHEDULE AND DETAILS - FIFTH FLOOR 2 of 3 A-653 DOORS AND FRAMES SCHEDULE AND DETAILS - FIFTH FLOOR 3 of 3
A-661 DOOR DETAILS - ALUMINUM STOREFRONT (S/F)
A-662 DOOR DETAILS - HOLLOW METAL (HM)
A-663 DOOR DETAILS - HOLLOW METAL (HM) & ALUMINUM CURTAIN GLASS WALL
A-671 WINDOW AND FRAMES SCHEDULES AND TYPES AND DETAILS
A-672 WINDOW AND FRAMES SCHEDULES AND TYPES AND DETAILS
A-681 ALUMINUM CURTAIN GLASS WALL TYPES & ELEVATIONS
A-682 ALUMINUM CURTAIN GLASS WALL DETAILS
A-683 ALUMINUM CURTAIN GLASS WALL DETAILS
A-691 LOUVER AND FRAMES SCHEDULES AND TYPES AND DETAILS
A-801 AIR BARRIER PLANS, SECTIONS, AND NOTES
Grand total: 264
INDEX OF DRAWINGS -VOL. 1
SHEET NUMBER Sheet Name
CU104 UTILITY PLAN
CU105 UTILITY PLAN
CU106 UTILITY PLAN
CU107 UTILITY PLAN
CU201 SANITARY SEWER PROFILES
CU202 WATER LINE PROFILE
CU501 UTILITY DETAILS
CU502 UTILITY DETAILS
SITE ELECTRICAL
ES101 ELECTRICAL SITE PLAN
ES102 AREA LIGHTING SITE PLAN
SITE TELECOMMUNICATION
TS101 TELECOMMUNICATIONS SITE PLAN
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES, DESIGN LOADS & ABBREVIATIONS
S-002 GENERAL STRUCTURAL NOTES
S-003 LIVE AND SNOW LOAD DIAGRAMS
S-004 WIND LOAD DIAGRAMS
S-005 HORIZONTAL BUILDING TIE DIAGRAMS
S-110 FOUNDATION PLAN - COMPREHENSIVE
S-111 FOUNDATION PLAN - AREA 1A
S-112 FOUNDATION PLAN - AREA 1B
S-113 FOUNDATION PLAN - AREA 1C
S-120 SECOND FLOOR FRAMING PLAN - COMPREHENSIVE
S-121 SECOND FLOOR FRAMING PLAN - AREA 2A
S-122 SECOND FLOOR FRAMING PLAN - AREA 2B
S-123 SECOND FLOOR FRAMING PLAN - AREA 2C
S-130 THIRD FLOOR FRAMING PLAN - COMPREHENSIVE
S-131 THIRD FLOOR FRAMING PLAN - AREA 3A
S-132 THIRD FLOOR FRAMING PLAN - AREA 3B
S-133 THIRD FLOOR FRAMING PLAN - AREA 3C
S-140 FOURTH FLOOR FRAMING PLAN - COMPREHENSIVE
S-141 FOURTH FLOOR FRAMING PLAN - AREA 4A
S-142 FOURTH FLOOR FRAMING PLAN - AREA 4B
S-143 FOURTH FLOOR FRAMING PLAN - AREA 4C
S-150 FIFTH FLOOR FRAMING PLAN - COMPREHENSIVE
S-151 FIFTH FLOOR FRAMING PLAN - AREA 5A
S-152 FIFTH FLOOR FRAMING PLAN - AREA 5B
S-153 FIFTH FLOOR FRAMING PLAN - AREA 5C
S-160 LOWER FRAMING PLAN - COMPREHENSIVE
S-161 LOWER ROOF FRAMING PLAN - AREA A
S-162 LOWER ROOF FRAMING PLAN - AREA B
S-163 LOWER ROOF FRAMING PLAN - AREA C
S-170 UPPER ROOF FRAMING PLAN - COMPREHENSIVE
S-171 UPPER ROOF FRAMING PLAN - AREA A
S-172 UPPER ROOF FRAMING PLAN - AREA B
S-173 UPPER ROOF FRAMING PLAN - AREA C
S-311 BRACED FRAME ELEVATIONS
S-312 BRACED FRAME ELEVATIONS
S-313 BRACED FRAME ELEVATIONS
S-314 BRACED FRAME ELEVATIONS
S-401 ENLARGED FOUNDATION PLANS
S-501 TYPICAL FOUNDATION DETAILS
S-502 TYPICAL FOUNDATION DETAILS
S-503 TYPICAL FOUNDATION DETAILS
S-504 TYPICAL FOUNDATION DETAIL
S-511 FOUNDATION SECTIONS AND DETAILS
S-521 TYPICAL FRAMING DETAILS
S-522 TYPICAL FRAMING DETAILS
S-523 TYPICAL FRAMING DETAILS
S-524 TYPICAL FRAMING DETAILS
S-531 FRAMING SECTIONS AND DETAILS
S-532 FRAMING SECTIONS AND DETAILS
S-533 FRAMING SECTIONS AND DETAILS
S-601 COLUMN SCHEDULE
S-901 3D REPRESENTATION
ARCHITECTURAL
A-001 GENERAL NOTES, ABBREVIATIONS
A-002 ABA ACCESSIBILITY GUIDELINES ( FOR REFERENCE ONLY )
A-003 SEALANT, MASONRY JOINTS & MISC. STANDARD DETAILS
A-110 FIRST FLOOR PLAN - COMPREHENSIVE
A-111 FIRST FLOOR PLAN - AREA 1A
A-112 FIRST FLOOR PLAN - AREA 1B
A-113 FIRST FLOOR PLAN - AREA 1C
A-120 SECOND FLOOR PLAN - COMPREHENSIVE
A-121 SECOND FLOOR PLAN - AREA 2A
A-122 SECOND FLOOR PLAN - AREA 2B
A-123 SECOND FLOOR PLAN - AREA 2C
A-130 THIRD FLOOR PLAN - COMPREHENSIVE
A-131 THIRD FLOOR PLAN - AREA 3A
A-132 THIRD FLOOR PLAN - AREA 3B
A-133 THIRD FLOOR PLAN - AREA 3C
A-140 FOURTH FLOOR PLAN - COMPREHENSIVE
A-141 FOURTH FLOOR PLAN - AREA 4A
A-142 FOURTH FLOOR PLAN - AREA 4B
A-143 FOURTH FLOOR PLAN - AREA 4C
A-150 FIFTH FLOOR PLAN - COMPREHENSIVE
AM
EN
D
M
EN
T
AP
R
IL
AM
EN
D
M
EN
T
AP
R
IL
W
2Q R
R
A0
_P la ns -0
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Pl ot
D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C
ER
TI
FI
ED
F
IN
AL
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
FE
BR
U
AR
Y
FT
. C
AM
PB
EL
L, K
Y.
U
EP
H
B
AR
R
AC
KS
PN
FY
P2
Fi le
P at h:
5/
/2
1:
:4
PM
C
:\U se rs \H
2E D
D
KA
S\ D oc um en ts
\5
6_
R ev it2
5_
SI
TE
_U
EP
H
_h 2e dd ka s.
rv t
GI003
SH
EE
T
IN
D
EX
K.
SA
N
TO
S
K.
SA
N
TO
S
M .B
AR
R
Y
M .B
AR
R
Y
INDEX OF DRAWINGS - VOL. 2
SHEET NUMBER Sheet Name
INTERIOR
I-110 1ST FLOOR FINISH AND SPECIAL ITEMS PLAN - COMPREHENSIVE
I-111 1ST FLOOR FINISH AND SPECIAL ITEMS PLAN - AREA 1A
I-112 1ST FLOOR FINISH AND SPECIAL ITEMS PLAN - AREA 1B
I-113 1ST FLOOR FINISH AND SPECIAL ITEMS PLAN - AREA 1C
I-120 2ND, 3RD, 4TH, & 5TH FLOOR FINISH AND SPECIAL ITEMS PLAN -
COMPREHENSIVE
I-121 2ND, 3RD, 4TH & 5TH FLOOR FINISH AND SPECIAL ITEMS PLAN - AREA 2A
I-122 2ND, 3RD, 4TH & 5TH FLOOR FINISH AND SPECIAL ITEMS PLAN - AREA 2B
I-123 2ND, 3RD, 4TH & 5TH FLOOR FINISH AND SPECIAL ITEMS PLAN - AREA 2C
I-401 ENLARGED BATHROOM AND KITCHEN PLAN - 1ST, 2ND, 3RD, 4TH, AND 5TH
FLOORS
I-402 ENLARGED CQ DESK PLANS AND ELEVATIONS - 1ST FLOOR
I-403 ENLARGED FLOOR TILING PLANS - 1ST FLOOR
I-404 ENLARGED FLOOR TILING PLANS - 1ST, 2ND, 3RD, 4TH, AND 5TH FLOORS
I-405 ENLARGED FLOOR TILING PLANS - 2ND, 3RD, 4TH, AND 5TH FLOORS
I-501 FLOOR AND WALL TRANSITION DETAILS
I-601 INTERIOR COLOR SCHEDULE
I-602 ROOM FINISH SCHEDULE
I-603 ROOM FINISH SCHEDULE
I-604 ROOM FINISH SCHEDULE
I-605 ROOM FINISH SCHEDULE
I-606 ROOM FINISH SCHEDULE
I-607 ROOM FINISH SCHEDULE
I-608 ROOM FINISH SCHEDULE
IF001 FURNITURE LEGEND
IF110 1ST FLOOR FURNITURE PLAN - COMPREHENSIVE
IF111 1ST FLOOR FURNITURE PLAN - AREA 1A
IF112 1ST FLOOR FURNITURE PLAN - AREA 1B
IF113 1ST FLOOR FURNITURE PLAN - AREA 1C
IF120 2ND, 3RD, 4TH & 5TH FLOOR FURNITURE PLAN - COMPREHENSIVE
IF121 2ND, 3RD, 4TH & 5TH FLOOR FURNITURE PLAN - AREA 2A
IF122 2ND, 3RD, 4TH & 5TH FLOOR FURNITURE PLAN - AREA 2B
IF123 2ND, 3RD, 4TH & 5TH FLOOR FURNITURE PLAN - AREA 2C
IG110 1ST FLOOR SIGNAGE PLAN - COMPREHENSIVE
IG111 1ST FLOOR SIGNAGE PLAN - AREA 1A
IG112 1ST FLOOR SIGNAGE PLAN - AREA 1B
IG113 1ST FLOOR SIGNAGE PLAN - AREA 1C
IG120 2ND FLOOR SIGNAGE PLAN - COMPREHENSIVE
IG121 2ND FLOOR SIGNAGE PLAN - AREA 2A
IG122 2ND FLOOR SIGNAGE PLAN - AREA 2B
IG123 2ND FLOOR SIGNAGE PLAN - AREA 2C
IG130 3RD FLOOR SIGNAGE PLAN - COMPREHENSIVE
IG131 3RD FLOOR SIGNAGE PLAN - AREA 3A
IG132 3RD FLOOR SIGNAGE PLAN - AREA 3B
IG133 3RD FLOOR SIGNAGE PLAN - AREA 3C
IG140 4TH FLOOR SIGNAGE PLAN - COMPREHENSIVE
IG141 4TH FLOOR SIGNAGE PLAN - AREA 4A
IG142 4TH FLOOR SIGNAGE PLAN - AREA 4B
IG143 4TH FLOOR SIGNAGE PLAN - AREA 4C
IG150 5TH FLOOR SIGNAGE PLAN - COMPREHENSIVE
IG151 5TH FLOOR SIGNAGE PLAN - AREA 5A
IG152 5TH FLOOR SIGNAGE PLAN - AREA 5B
IG153 5TH FLOOR SIGNAGE PLAN - AREA 5C
IG501 SIGNAGE DETAILS
IG502 SIGNAGE DETAILS
IG601 SIGNAGE SCHEDULE
FIRE PROTECTION
FP001 GENERAL NOTES, ABBREVIATIONS, AND LEGEND
FP110 FIRST FLOOR PLAN - COMPREHENSIVE
FP111 FIRST FLOOR PLAN - AREA 1A
FP112 FIRST FLOOR PLAN - AREA 1B
FP113 FIRST FLOOR PLAN - AREA 1C
FP120 SECOND FLOOR PLAN - COMPREHENSIVE
FP121 SECOND FLOOR PLAN - AREA 2A
FP122 SECOND FLOOR PLAN - AREA 2B
FP123 SECOND FLOOR PLAN - AREA 2C
FP130 THIRD FLOOR PLAN - COMPREHENSIVE
FP131 THIRD FLOOR PLAN - AREA 3A
FP132 THIRD FLOOR PLAN - AREA 3B
FP133 THIRD FLOOR PLAN - AREA 3C
FP140 FOURTH FLOOR PLAN - COMPREHENSIVE
FP141 FOURTH FLOOR PLAN - AREA 4A
FP142 FOURTH FLOOR PLAN - AREA 4B
FP143 FOURTH FLOOR PLAN - AREA 4C
FP150 FIFTH FLOOR PLAN - COMPREHENSIVE
FP151 FIFTH FLOOR PLAN - AREA 5A
FP152 FIFTH FLOOR PLAN - AREA 5B
FP153 FIFTH FLOOR PLAN - AREA 5C
FP401 FIRE PROTECTION ENLARGED PUMP ROOM PLANS
FP402 FIRE PROTECTION STANDPIPE SECTIONS
FP403 FIRE PROTECTION CORRIDOR REMOTE SECTIONS
FP501 DETAILS
FP502 DETAILS
FP601 FIRE PROTECTION SCHEDULES
FP901 FIRE SUPPRESSION RISER DIAGRAM
FIRE ALARM
FA-001 FIRE ALARM AND MASS NOTIFICATION LEGEND
FA-101 FIRST FLOOR FAMNS PLAN - BUILDING EXTERIOR
FA-102 FIRST FLOOR FAMNS PLAN ENLARGED AREA "A"
FA-103 FIRST FLOOR FAMNS PLAN ENLARGED AREA "B"
FA-104 FIRST FLOOR FAMNS PLAN ENLARGED AREA "C"
FA-105 SECOND THRU FIFTH FLOOR FAMNS PLAN ENLARGED AREA "A"
FA-106 SECOND THRU FIFTH FLOOR FAMNS PLAN ENLARGED AREA "B"
FA-107 SECOND THRU FIFTH FLOOR FAMNS PLAN ENLARGED AREA "C"
FA-501 FIRE ALARM/MASS NOTIFICATION SYSTEMS SEQUENCE OF OPERATION MATRIX
FA-701 FIRE ALARM/MASS NOTIFICATION RISER DIAGRAM
INDEX OF DRAWINGS - VOL. 2
SHEET NUMBER Sheet Name
PLUMBING
P-001 GENERAL NOTES, ABBREVIATIONS, AND LEGEND
P-110 FIRST FLOOR SANITARY PIPING PLAN - COMPREHENSIVE
P-111 FIRST FLOOR SANITARY PIPING PLAN - AREA 1A
P-112 FIRST FLOOR SANITARY PIPING PLAN - AREA 1B
P-113 FIRST FLOOR SANITARY PIPING PLAN - AREA 1C
P-114 FIRST FLOOR DOMESTIC PIPING PLAN - COMPREHENSIVE
P-115 FIRST FLOOR DOMESTIC PIPING PLAN - AREA 1A
P-116 FIRST FLOOR DOMESTIC PIPING PLAN - AREA 1B
P-117 FIRST FLOOR DOMESTIC PIPING PLAN - AREA 1C
P-118 FIRST FLOOR RADON PLAN
P-120 SECOND FLOOR SANITARY PIPING PLAN - COMPREHENSIVE
P-121 SECOND FLOOR SANITARY PIPING PLAN - AREA 2A
P-122 SECOND FLOOR SANITARY PIPING PLAN - AREA 2B
P-123 SECOND FLOOR SANITARY PIPING PLAN - AREA 2C
P-124 SECOND FLOOR DOMESTIC PIPING PLAN - COMPREHENSIVE
P-125 SECOND FLOOR DOMESTIC PIPING PLAN - AREA 2A
P-126 SECOND FLOOR DOMESTIC PIPING PLAN - AREA 2B
P-127 SECOND FLOOR DOMESTIC PIPING PLAN - AREA 2C
P-130 THIRD FLOOR SANITARY PIPING PLAN - COMPREHENSIVE
P-131 THIRD FLOOR SANITARY PIPING PLAN - AREA 3A
P-132 THIRD FLOOR SANITARY PIPING PLAN - AREA 3B
P-133 THIRD FLOOR SANITARY PIPING PLAN - AREA 3C
P-134 THIRD FLOOR DOMESTIC PIPING PLAN - COMPREHENSIVE
P-135 THIRD FLOOR DOMESTIC PIPING PLAN - AREA 3A
P-136 THIRD FLOOR DOMESTIC PIPING PLAN - AREA 3B
P-137 THIRD FLOOR DOMESTIC PIPING PLAN - AREA 3C
P-140 FOURTH FLOOR SANITARY PIPING PLAN - COMPREHENSIVE
P-141 FOURTH FLOOR SANITARY PIPING PLAN - AREA 4A
P-142 FOURTH FLOOR SANITARY PIPING PLAN - AREA 4B
P-143 FOURTH FLOOR SANITARY PIPING PLAN - AREA 4C
P-144 FOURTH FLOOR DOMESTIC PIPING PLAN - COMPREHENSIVE
P-145 FOURTH FLOOR DOMESTIC PIPING PLAN - AREA 4A
P-146 FOURTH FLOOR DOMESTIC PIPING PLAN - AREA 4B
P-147 FOURTH FLOOR DOMESTIC PIPING PLAN - AREA 4C
P-150 FIFTH FLOOR SANITARY PIPING PLAN - COMPREHENSIVE
P-151 FIFTH FLOOR SANITARY PIPING PLAN - AREA 5A
P-152 FIFTH FLOOR SANITARY PIPING PLAN - AREA 5B
P-153 FIFTH FLOOR SANITARY PIPING PLAN - AREA 5C
P-154 FIFTH FLOOR DOMESTIC PIPING PLAN - COMPREHENSIVE
P-155 FIFTH FLOOR DOMESTIC PIPING PLAN - AREA 5A
P-156 FIFTH FLOOR DOMESTIC PIPING PLAN - AREA 5B
P-157 FIFTH FLOOR DOMESTIC PIPING PLAN - AREA 5C
P-401 ENLARGED MECHANICAL ROOM PLANS
P-402 ENLARGED MECHANICAL ROOM PLANS
P-403 ENLARGED MECHANICAL ROOM PLANS
P-404 ENLARGED DOMESTIC PIPING PLANS
P-405 ENLARGED SANITARY PIPING PLANS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-503 PLUMBING DETAILS
P-504 PLUMBING DETAILS
P-601 EQUIPMENT SCHEDULES
P-602 EQUIPMENT SCHEDULES
P-701 DOMESTIC HOT WATER SYSTEM CONTROLS
P-702 DOMESTIC HOT WATER SYSTEM CONTROLS
P-703 BOOSTER PUMP CONTROLS
P-901 FIRST FLOOR SANITARY PIPING RISER DIAGRAM
P-902 SECOND FLOOR SANITARY PIPING RISER DIAGRAM
P-903 THIRD FLOOR SANITARY PIPING RISER DIAGRAM
P-904 FOURTH FLOOR SANITARY PIPING RISER DIAGRAM
P-905 FIFTH FLOOR SANITARY PIPING RISER DIAGRAM
P-906 FIRST FLOOR DOMESTIC PIPING RISER DIAGRAM
P-907 SECOND FLOOR DOMESTIC PIPING RISER DIAGRAM
P-908 THIRD FLOOR DOMESTIC PIPING RISER DIAGRAM
P-909 FOURTH FLOOR DOMESTIC PIPING RISER DIAGRAM
P-910 FIFTH FLOOR DOMESTIC PIPING RISER DIAGRAM
MECHANICAL
M-001 GENERAL NOTES, ABBREVIATIONS, AND LEGEND
M-110 FIRST FLOOR HVAC DUCTWORK PLAN - COMPREHENSIVE
M-111 FIRST FLOOR HVAC DUCTWORK PLAN - AREA 1A
M-112 FIRST FLOOR HVAC DUCTWORK PLAN - AREA 1B
M-113 FIRST FLOOR HVAC DUCTWORK PLAN - AREA 1C
M-114 FIRST FLOOR HVAC PIPING PLAN - COMPREHENSIVE
M-115 FIRST FLOOR HVAC PIPING PLAN - AREA 1A
M-116 FIRST FLOOR HVAC PIPING PLAN - AREA 1B
M-117 FIRST FLOOR HVAC PIPING PLAN - AREA 1C
M-120 SECOND FLOOR HVAC DUCTWORK PLAN - COMPREHENSIVE
M-121 SECOND FLOOR HVAC DUCTWORK PLAN - AREA 2A
M-122 SECOND FLOOR HVAC DUCTWORK PLAN - AREA 2B
M-123 SECOND FLOOR HVAC DUCTWORK PLAN - AREA 2C
M-124 SECOND FLOOR HVAC PIPING PLAN - COMPREHENSIVE
M-125 SECOND FLOOR HVAC PIPING PLAN - AREA 2A
M-126 SECOND FLOOR HVAC PIPING PLAN - AREA 2B
M-127 SECOND FLOOR HVAC PIPING PLAN - AREA 2C
M-130 THIRD FLOOR HVAC DUCTWORK PLAN - COMPREHENSIVE
M-131 THIRD FLOOR HVAC DUCTWORK PLAN - AREA 3A
M-132 THIRD FLOOR HVAC DUCTWORK PLAN - AREA 3B
M-133 THIRD FLOOR HVAC DUCTWORK PLAN - AREA 3C
M-134 THIRD FLOOR HVAC PIPING PLAN - COMPREHENSIVE
M-135 THIRD FLOOR HVAC PIPING PLAN - AREA 3A
M-136 THIRD FLOOR HVAC PIPING PLAN - AREA 3B
M-137 THIRD FLOOR HVAC PIPING PLAN - AREA 3C
M-140 FOURTH FLOOR HVAC DUCTWORK PLAN - COMPREHENSIVE
M-141 FOURTH FLOOR HVAC DUCTWORK PLAN - AREA 4A
M-142 FOURTH FLOOR HVAC DUCTWORK PLAN - AREA 4B
M-143 FOURTH FLOOR HVAC DUCTWORK PLAN - AREA 4C
M-144 FOURTH FLOOR HVAC PIPING PLAN - COMPREHENSIVE
M-145 FOURTH FLOOR HVAC PIPING PLAN - AREA 4A
M-146 FOURTH FLOOR HVAC PIPING PLAN - AREA 4B
M-147 FOURTH FLOOR HVAC PIPING PLAN - AREA 4C
M-150 FIFTH FLOOR HVAC DUCTWORK PLAN - COMPREHENSIVE
M-151 FIFTH FLOOR HVAC DUCTWORK PLAN - AREA 5A
M-152 FIFTH FLOOR HVAC DUCTWORK PLAN - AREA 5B
M-153 FIFTH FLOOR HVAC DUCTWORK PLAN - AREA 5C
M-154 FIFTH FLOOR HVAC PIPING PLAN - COMPREHENSIVE
M-155 FIFTH FLOOR HVAC PIPING PLAN - AREA 5A
M-156 FIFTH FLOOR HVAC PIPING PLAN - AREA 5B
INDEX OF DRAWINGS - VOL. 2
SHEET NUMBER Sheet Name
M-157 FIFTH FLOOR HVAC PIPING PLAN - AREA 5C
M-301 MECHANICAL SECTIONS
M-401 FIRST FLOOR MECHANICAL ROOM
M-402 SECOND AND THIRD FLOOR MECHANICAL ROOMS
M-403 ENLARGED HVAC PLAN
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-505 MECHANICAL DETAILS
M-601 MECHANICAL EQUIPMENT SCHEDULES
M-602 MECHANICAL EQUIPMENT SCHEDULES
M-603 MECHANICAL EQUIPMENT SCHEDULES
M-604 MECHANICAL EQUIPMENT SCHEDULES
M-605 MECHANICAL EQUIPMENT SCHEDULE
M-700 HVAC CONTROLS LEGEND
M-701 POINTS SCHEDULE INSTRUCTIONS
M-702 CONTROL SYSTEM NETWORK
M-703 MAWHP-1 & 2 CONTROL SCHEMATIC
M-704 MAWHP SEQUENCE OF OPERATION & LADDER DIAGRAM
M-705 MAWHP CONTROL POINTS SCHEDULE
M-706 MAWHP PRIMARY & SECONDARY PUMP CONTROL POINTS SCHEDULE
M-707 DOAS-1 THRU DOAS-5 CONTROL SCHEMATIC
M-708 DOAS LADDER DIAGRAM
M-709 DOAS SEQUENCE OF OPERATION
M-710 DOAS CONTROL POINTS SCHEDULE
M-711 MAKE-UP AIR UNIT CONTROL SCHEMATIC
M-712 MAKE-UP AIR UNIT LOGIC DIAGRAMS & POINT SCHEDULE
M-713 FCU SCHEMATIC AND SEQUENCE OF OPERATION
M-714 FCU POINTS SCHEDULE
M-715 CABINET/UNIT HEATER CONTROLS
M-716 ENERGY CONTROLS MONITORING
M-717 ENERGY CONTROLS MONITORING
M-718 THERMOSTAT SCHEDULE
M-719 THERMOSTAT SCHEDULE
ELECTRICAL
E-001 LEGEND AND ABBREVIATIONS
E-101 FIRST FLOOR LIGHTING PLAN
E-102 FIRST FLOOR LIGHTING PLAN ENLARGED AREA "A"
E-103 FIRST FLOOR LIGHTING PLAN ENLARGED AREA "B"
E-104 FIRST FLOOR LIGHTING PLAN ENLARGED AREA "C"
E-105 SECOND FLOOR LIGHTING PLAN
E-106 SECOND FLOOR LIGHTING PLAN ENLARGED AREA "A"
E-107 SECOND FLOOR LIGHTING PLAN ENLARGED AREA "B"
E-108 SECOND FLOOR LIGHTING PLAN ENLARGED AREA "C"
E-109 THIRD FLOOR LIGHTING PLAN
E-110 THIRD FLOOR LIGHTING PLAN ENLARGED AREA "A"
E-111 THIRD FLOOR LIGHTING PLAN ENLARGED AREA "B"
E-112 THIRD FLOOR LIGHTING PLAN ENLARGED AREA "C"
E-113 FOURTH FLOOR LIGHTING PLAN
E-114 FOURTH FLOOR LIGHTING PLAN ENLARGED AREA "A"
E-115 FOURTH FLOOR LIGHTING PLAN ENLARGED AREA "B"
E-116 FOURTH FLOOR LIGHTING PLAN ENLARGED AREA "C"
E-117 FIFTH FLOOR LIGHTING PLAN
E-118 FIFTH FLOOR LIGHTING PLAN ENLARGED AREA "A"
E-119 FIFTH FLOOR LIGHTING PLAN ENLARGED AREA "B"
E-120 FIFTH FLOOR LIGHTING PLAN ENLARGED AREA "C"
E-121 FIRST FLOOR POWER PLAN - COMPREHENSIVE
E-122 FIRST FLOOR POWER PLAN ENLARGED AREA "A"
E-123 FIRST FLOOR POWER PLAN ENLARGED AREA "B"
E-124 FIRST FLOOR POWER PLAN ENLARGED AREA "C"
E-125 SECOND FLOOR POWER PLAN - COMPREHENSIVE
E-126 SECOND FLOOR POWER PLAN ENLARGED AREA "A"
E-127 SECOND FLOOR POWER PLAN ENLARGED AREA "B"
E-128 SECOND FLOOR POWER PLAN ENLARGED AREA "C"
E-129 THIRD FLOOR POWER PLAN - COMPREHENSIVE
E-130 THIRD FLOOR POWER PLAN ENLARGED AREA "A"
E-131 THIRD FLOOR POWER PLAN ENLARGED AREA "B"
E-132 THIRD FLOOR POWER PLAN ENLARGED AREA "C"
E-133 FOURTH FLOOR POWER PLAN - COMPREHENSIVE
E-134 FOURTH FLOOR POWER PLAN ENLARGED AREA "A"
E-135 FOURTH FLOOR POWER PLAN ENLARGED AREA "B"
E-136 FOURTH FLOOR POWER PLAN ENLARGED AREA "C"
E-137 FIFTH FLOOR POWER PLAN - COMPREHENSIVE
E-138 FIFTH FLOOR POWER PLAN ENLARGED AREA "A"
E-139 FIFTH FLOOR POWER PLAN ENLARGED AREA "B"
E-140 FIFTH FLOOR POWER PLAN ENLARGED AREA "C"
E-150 MECHANICAL FIRST FLOOR POWER PLAN - COMPREHENSIVE
E-151 MECHANICAL FIRST FLOOR POWER PLAN ENLARGED AREA "A"
E-152 MECHANICAL FIRST FLOOR POWER PLAN ENLARGED AREA "B"
E-153 MECHANICAL FIRST FLOOR POWER PLAN ENLARGED AREA "C"
E-154 MECHANICAL SECOND FLOOR POWER PLAN - COMPREHENSIVE
E-155 MECHANICAL SECOND FLOOR POWER PLAN ENLARGED AREA "A"
E-156 MECHANICAL SECOND FLOOR POWER PLAN ENLARGED AREA "B"
E-157 MECHANICAL SECOND FLOOR POWER PLAN ENLARGED AREA "C"
E-158 MECHANICAL THIRD FLOOR POWER PLAN - COMPREHENSIVE
E-159 MECHANICAL THIRD FLOOR POWER PLAN ENLARGED AREA "A"
E-160 MECHANICAL THIRD FLOOR POWER PLAN ENLARGED AREA "B"
E-161 MECHANICAL THIRD FLOOR POWER PLAN ENLARGED AREA "C"
E-162 MECHANICAL FOURTH FLOOR POWER PLAN - COMPREHENSIVE
E-163 MECHANICAL FOURTH FLOOR POWER PLAN ENLARGED AREA "A"
E-164 MECHANICAL FOURTH FLOOR POWER PLAN ENLARGED AREA "B"
E-165 MECHANICAL FOURTH FLOOR POWER PLAN ENLARGED AREA "C"
E-166 MECHANICAL FIFTH FLOOR POWER PLAN - COMPREHENSIVE
E-167 MECHANICAL FIFTH FLOOR POWER PLAN ENLARGED AREA "A"
E-168 MECHANICAL FIFTH FLOOR POWER PLAN ENLARGED AREA "B"
E-169 MECHANICAL FIFTH FLOOR POWER PLAN ENLARGED AREA "C"
E-170 LIGHTNING PROTECTION PLAN VIEW
E-401 ENLARGED PLAN VIEWS - TYPICAL SUITE AND LAUNDRY SPACES
E-402 ENLARGED PLAN VIEWS - 1ST AND 2ND FLOOR ELECTRICAL ROOM
E-403 ENLARGED PLAN VIEWS - 3RD TO 5TH FLOOR ELECTRICAL ROOMS
E-404 ENLARGED PLAN VIEWS - 1ST FLOOR MECHANICAL AND PUMP ROOMS
E-405 ENLARGED PLAN VIEWS - 2ND FLOOR MECHANICAL ROOM AND 5TH FLOOR
ELEVATOR CONTROL ROOM
E-406 ENLARGED PLAN VIEWS - 3RD FLOOR MECHANICAL ROOM
E-407 ENLARGED PLAN VIEWS - 4TH FLOOR MECHANICAL ROOM
INDEX OF DRAWINGS - VOL. 2
SHEET NUMBER Sheet Name
E-408 ENLARGED PLAN VIEWS - 5TH FLOOR MECHANICAL ROOM
E-409 SECTIONAL VIEWS - STAIRWELL POWER AND LIGHTS - ALL FLOORS
E-410 SECTIONAL VIEWS - ELEVATOR SUMP PIT AND TOH MECHANICAL
E-411 SECTIONAL VIEWS - ELECTRICAL ROOM ARRANGEMENTS WITH FEEDER
CONDUITS
E-501 INTERIOR LED LIGHTING SCHEDULE
E-502 LIGHTING AND SWITCHED OUTLET CONTROL DETAILS
E-503 LIGHTNING PROTECTION DETAILS
E-601 RISER DIAGRAM - 208/120V POWER SYSTEM
E-602 RISER DIAGRAM - 480/277V POWER SYSTEM
E-603 RISER DIAGRAM - MECHANICAL POWER SYSTEM
E-604 ONE-LINE DIAGRAMS
E-605 THREE PHASE FEEDER SCHEDULE AND MAIN GROUND BUS DETAIL
E-606 SINGLE PHASE SUITE FEEDER SCHEDULES
E-607 MECHANICAL AND HVAC ELECTRICAL LOAD SCHEDULE
E-608 PANEL SCHEDULES - TYPICAL SUITE LOAD CENTER AND 1ST/2ND FLOOR
COMMON AREAS
E-609 PANEL SCHEDULES - 3RD-5TH FLOOR COMMON AREAS
E-610 PANEL SCHEDULES - 1ST - 2ND FLOOR TELECOM ROOM PANELS
E-611 PANEL SCHEDULES - 3RD - 5TH FLOOR TELECOM ROOM PANELS
E-612 PANEL SCHEDULES - 1ST FLOOR 208/120V SUITE FEEDER AND LAUNDRY
PANELS
E-613 PANEL SCHEDULES - 2ND FLOOR 208/120V SUITE FEEDER AND LAUNDRY
PANELS
E-614 PANEL SCHEDULES - 3RD FLOOR 208/120V SUITE FEEDER AND LAUNDRY
PANELS
E-615 PANEL SCHEDULES - 4TH FLOOR 208/120V SUITE FEEDER AND LAUNDRY
PANELS
E-616 PANEL SCHEDULES - 5TH FLOOR 208/120V SUITE FEEDER AND LAUNDRY
PANELS
E-617 PANEL SCHEDULES - 1ST - 3RD FLOOR MECHANICAL AND DOMESTIC WATER
E-618 PANEL SCHEDULES - 4TH - 5TH FLOOR MECHANICAL AND DOMESTIC WATER
E-619 SCHEDULES - 480V AND 208V SERVICE ENTRANCE / SWITCHGEAR
TELECOMMUNICATIONS
T-001 GENERAL TELECOMMUNICATIONS NOTES
T-101 FIRST FLOOR TELECOMMUNICATIONS PLAN - COMPREHENSIVE
T-102 FIRST FLOOR TELECOMMUNICATIONS PLAN ENLARGED AREA "A"
T-103 FIRST FLOOR TELECOMMUNICATIONS PLAN ENLARGED AREA "B"
T-104 FIRST FLOOR TELECOMMUNICATIONS PLAN ENLARGED AREA "C"
T-105 SECOND FLOOR TELECOMMUNICATIONS PLAN - COMPREHENSIVE
T-106 SECOND FLOOR TELECOMMUNICATIONS PLAN ENLARGED AREA "A"
T-107 SECOND FLOOR TELECOMMUNICATIONS PLAN ENLARGED AREA "B"
T-108 SECOND FLOOR TELECOMMUNICATIONS PLAN ENLARGED AREA "C"
T-109 THIRD FLOOR TELECOMMUNICATIONS PLAN - COMPREHENSIVE
T-110 THIRD FLOOR TELECOMMUNICATIONS PLAN ENLARGED AREA "A"
T-111 THIRD FLOOR TELECOMMUNICATIONS PLAN ENLARGED AREA "B"
T-112 THIRD FLOOR TELECOMMUNICATIONS PLAN ENLARGED AREA "C"
T-113 FOURTH FLOOR TELECOMMUNICATIONS PLAN - COMPREHENSIVE
T-114 FOURTH FLOOR TELECOMMUNICATIONS PLAN ENLARGED AREA "A"
T-115 FOURTH FLOOR TELECOMMUNICATIONS PLAN ENLARGED AREA "B"
T-116 FOURTH FLOOR TELECOMMUNICATIONS PLAN ENLARGED AREA "C"
T-117 FIFTH FLOOR TELECOMMUNICATIONS PLAN - COMPREHENSIVE
T-118 FIFTH FLOOR TELECOMMUNICATIONS PLAN ENLARGED AREA "A"
T-119 FIFTH FLOOR TELECOMMUNICATIONS PLAN ENLARGED AREA "B"
T-120 FIFTH FLOOR TELECOMMUNICATIONS PLAN ENLARGED AREA "C"
T-401 ENLARGED TELECOM ROOM PLANS
T-402 FIRST AND SECOND FLOOR TELECOMMUNICATIONS SECTION VIEWS
T-403 THIRD AND FOURTH FLOOR TELECOMMUNICATIONS SECTION VIEWS
T-404 FIFTH FLOOR TELECOMMUNICATIONS SECTION VIEWS
T-501 TELECOM OSP ENTRANCE AND GROUNDING DETAILS
T-502 TELECOM GROUNDING AND MARKING DETAILS
T-503 TELECOM VOICE AND DATA OUTLET DETAILS
T-504 DOOR ALARM RISER AND DETAILS
Grand total: 357
INDEX OF DRAWINGS - VOL 2
SHEET NUMBER Sheet Name
GENERAL
GI001 COVER SHEET VOLUME 2
GI002 SHEET INDEX
GI003 SHEET INDEX
AM
EN
D
M
EN
T
AP
R
IL
AM
EN
D
M
EN
T
M
AY
W
2Q R
R
A0
_P la ns -0
FND
WALL
2"
4"
2'
0"
(2) #4 x 4'-0"
IN TOP 1/3 OF SLAB
1/2" EXP JOINT
W/ SEALANT UNO
3/4"øx10" SMOOTH DOWEL
BAR @ 12" OC
LUBRICATE ONE END OR
SET FIRST PLACEMENT END
IN APPROVED PLASTIC
INSERT
APPLY CURING COMPOUND
TO SLAB EDGE IMMEDIATELY
AFTER FORM IS REMOVED.
1/8"xT/4" CONTINUOUS SAW CUT
(1" MIN) OR STRIP INSERT W/ JT.
FILLER & ELASTOMERIC
SEALANT.
NOTES:
1. SAW CUT JOINTS WITH EARLY ENTRY SAW AS SOON AS THE SLAB CAN SUPPORT THE WEIGHT OF THE SAW
CUTTING EQUIPMENT AND CUTTING DOES NOT DAMAGE THE SLAB.
2. SLAB CONTROL JOINTS, CJ, CONSIST OF CONSTRUCTION JOINTS AND SAWN OR INSERT CRACK CONTROL JOINTS.
3. INSTALL JOINTS INDICATED ON PLANS UNO. SUBMIT PROPOSED ALTERNATE LOCATIONS OR ADDITIONAL JOINTS
NOT SHOWN TO THE CONTRACTING OFFICER FOR APPROVAL. PROPOSED ALTERNATE LOCATIONS MAY BE REJECTED. MAX JOINT SPACING MUST BE 24 x SLAB THICKNESS. MAX POUR LENGTH MUST BE 100'-0" BETWEEN CONSTRUCTION JOINTS. RATIO OF LENGTH TO WIDTH MUST NOT EXCEED 1.5. TOTAL AREA OF POUR MUST NOT
EXCEED 10,000 SF BETWEEN CONSTRUCTION JOINTS.
4. DISCONTINUE REINFORCEMENT AT CONSTRUCTION JOINTS.
1ST
PLACEMENT
2ND PLACEMENT
S E
E P
L A
N T
INDUCED CRACK
M
IN
T /4
3/16" MAX
1/8" MIN
1/8" x T/4" CONTINUOUS SAW CUT
(1" MIN) OR STRIP INSERT W/ JT
FILLER & ELASTOMERIC SEALANT
PROVIDE 15 MIL VAPOR
BARRIER DIRECTLY
BELOW SLAB TYP
SLAB ON GRADE
SEE PLAN FOR THICKNESS
AND REINF
6" GRANULAR BASE / CAPILLARY
WATER BARRIER TYP
SEE EARTHWORK SPECIFICATIONS
WWR OR REINF
BAR PER PLAN
TYP
2" CLR
CONSTRUCTION JOINT SAWN CONTROL JOINT SLAB ON GRADE
M A
X
/2 x
T
B O
T /R
E
IN
F M
IN
/3 x
T
TERMINATE HALF REINF
1" CLEAR EACH SIDE OF JOINT
ADJACENT CONC WALL, PIER,
COL ISOLATION POCKET,
ISOLATED MECH PAD UNO
1/2" EXP JOINT
W/ SEALANT
CJ
C J
(2) #4 x 4'-0"
CENTER IN SLAB
2' - 0" TYP
D
T
ADDITIONAL #4 CONT
+ #4 x 3'-0" DIAGONAL
CORNER BARS
OPTIONAL DOWELED
CONSTRUCTION JOINT
SYMMETRICAL
ABOUT DRAIN
FLOOR DRAIN - SEE
ARCH & MECH DWGS
UPSET DRAIN IF REQ
FOR FLOOR FINISH
MIN UNO
2' - 0" RADIUS x 1/2" DEEP
SLOPE OR PER PATTERN
SHOWN ON PLAN SHEETS
T
1' - 0"
C
LR
1"
C
LR
1"
2'
0"
FOUNDATION WALL
C L R
FLEXIBLE CLOSED
CELL FOAM PLANK
FULL DEPTH OF SLAB
(2) #4 TOP & BOT
1" CLR FROM TOP
2" CLR FROM BOT
TYP
DOUBLE DOOR
INTERIOR
SLAB
PAVEMENT
FOUNDATION WALL
C L R
FLEXIBLE CLOSED
CELL FOAM PLANK
FULL DEPTH OF SLAB
#4 TOP & BOT
1 1/2" CLR FROM TOP
2 1/2" CLR FROM BOT
PERSONNEL DOOR
INTERIOR
SLAB
PAVEMENT
CLR
1"
C
LR
1"
#4 TOP & BOT
1" CLR FROM TOP
2" CLR FROM BOT
2'
0"
TOP BARSWIDTHMARK DEPTH BOTTOM
BARS
STIRRUPS (EA SIDE / PIER CAP)
SIZE SPACING
STIRRUPS
AS SPECIFIED
MID BARS
TOP BARS
GB1 18" 24" (3) #8 LONG #4 4@12, R@18
NOTES:
1. LOCATE CONSTRUCTION JOINTS ON GRADE BEAMS AT THE BEAM MIDSPAN. CONTACT SURFACES SHALL BE ROUGHENED CONSISTENT WITH THE AMPLITUDES AND
REQUIREMENTS OF ACI 318.
2. QUANTITY AT STIRRUP SPACING REFERS TO NUMBER OF SPACES. NOT NUMBER OF TIES. R = REMAINING LENGTH OF SPAN.
3. CONTRACTOR SHALL PROVIDE AND INSTALL MECHANICAL COUPLERS IN LIEU OF LAP SPLICES FOR LONGITUDINAL REINFORCING WHERE REQUIRED TO PLACE BARS IN
CONGESTED ZONES. LOCATIONS OF SPLICE OR MECHANICAL COUPLER SHALL BE AS SHOWN ON THE SCHEDULE. MECHANICAL COUPLER SHALL DEVELOP FULL TENSION AND COMPRESSION CAPACITY OF REBAR TO 1.25 TIMES THE YIELD STRENGTH. SUBMIT PRODUCT CUT SHEET OF MECHANICAL COUPLERS FOR REVIEW TO THE CONTRACTING
OFFICER WITH REINFORCEMENT SHOP DRAWINGS.
4. WHERE GRADE BEAMS INTERSECT, DISCONTINUE TRANSVERSE REINFORCEMENT AND CONTINUE LONGITUDINAL (LONG) THROUGH PERPENDICULAR GRADE BEAM.
5. WHERE GRADE BEAMS FORM A T INTERSECTION, PROVIDE STANDARD HOOKS FOR ALL LONGITUDINAL STEEL.
ELEVATION SECTION
WIDTH
S E
E F
N D
P L A
N
FINISHED FLOOR
ELEV - SEE PLAN
(3) #8 LONG
S E
E F
N D
P L A
N
D E
P T
H
MID BARS
(2) #8 LONG
BOTTOM
BARS
ANCHOR RODS AND PIER
CAP REINF NOT SHOWN
FOR CLARITY TYP
CONC PIER CAP
SEE TYP DET
Ln
6"
0.3Ln
CLASS B SPLICE
CLASS B SPLICE
H O
O K
S T
D
GB2 12" 24" (2) #8 LONG #4 12@8, R@18(2) #8 LONG (2) #8 LONG
ELEV - SEE CIVIL
TOP OF GRADE
2'-6" WIDE x 1'-0" THICK WALL FOOTING.
REINFORCED W/ (3) #4 LONGITUDINAL AND
#3 @12" OC TRANSVERSE. T/FTG = (-2'-0").
#4@18" OC VERT DOWEL
(3) #3 OC HORIZ
EACH FACE
6" CMU BLOCK
PARTIALLY GROUTED
#4 @ 18" OC MASONRY DOWEL
SEE ARCH DWGS FOR
SIGN CONSTRUCTION
1' - 6"
TYP
3" CLR
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
F E
B R
U A
R Y
F T
C
A M
P B
E L L K
Y
U E
P H
B A
R R
A C
K S
P N
F
Y P
F ile
P a th
/7
/2
:0
:3
P M
C
U s e rs
\H E
D E
J C
B \D o c u m e n ts
\5 R e v it S
U
E P
H H
E
D E
J C
B .r v t
S-502
T Y
P
IC
A L F
O U
N D
A T
IO
N
D E
T A
IL
S
J B
U S
H
R H
E T
T
IN
G E
R
J M
A C
M
IL
L A
N
M W
IL
S
O N
SCALE: NTS
A5
TYPICAL REENTRANT CORNER
REINFORCING DETAIL
SCALE 3/4" = 1'-0"
D9
TYPICAL SLAB ON GRADE DETAILS
SCALE: NTS
A13
TYPICAL ISOLATION JOINT DETAIL
SCALE: NTS
A9
TYPICAL DISCONTINUOUS CJ DETAIL
SCALE: NTS
A17
TYPICAL SOG STEP DETAIL
SCALE: NTS
A1
TYPICAL FLOOR DRAIN DETAIL
SCALE: NTS
D1
TYPICAL SLAB AT DOOR OPENING DETAIL
SCALE 1/2" = 1'-0"
J11
GRADE BEAM SCHEDULE
A
M E
N D
M E
N T
A P
R
IL
A
M E
N D
M E
N T
M A
Y
SCALE: NTS
K1
TYPICAL MONUMENT SIGN FOUNDATION DETAIL
W
2Q R
R
A0
_P la ns -0
1.
2.
3.
4.
REFERENCE SHEETS A-001 THROUGH A-003 FOR STANDARD
INFORMATION INCLUDING ABBREVIATIONS, LEGENDS, SYMBOLS AND
DETAILS.
REFERENCE MECHANICAL AND PLUMBING DRAWINGS FOR EXACT
LOCATION AND DIMENSION OF EQUIPMENT AND PIPE WALL AND ROOF
PENETRATIONS.
MANUFACTURERS REFERENCED ARE INTENDED FOR DESIGN INTENT
ONLY, AND ARE NOT INTENDED TO LIMIT SELECTIONS FROM OTHER
MANUFACTURERS. WHEN ALTERNATE SELECTIONS ARE SUBMITTED,
SUBMITTAL SHALL INCLUDE COLOR SAMPLES OF MATERIALS LISTED FOR
COMPARISON
ALUMINUM SUNSHADES ARE TO BE PROVIDED AT ALL EXTERIOR
WINDOW TYPES AND CURTAIN WALL ASSEMBLIES. REFER TO A-691 FOR
ADDITIONAL INFO.
GENERAL NOTES - ELEVATIONS
5. BRICK EXPANSION JOINTS ARE TO BE ALIGNED WITH VERTICAL BRICK
REVEALS WHERE APPLICABLE AND ARE INDICATED ON THE ELEVATIONS
BY THE BEJ ABBREVATION.
6. REFERENCE SHEET A-130, ROOF PLAN FOR ADDITIONAL INFORMATION
ON THE ROOF, INCLUDING ROOF SLOPE.
7. REFER TO A-621 FOR ADDITIONAL INFORMATION ON WINDOW UNIT AND
STOREFRONT SYSTEM GLAZING TYPES
8. REFER TO GLAZING SPECIFICATION 08 81 00 AND EXTERIOR FINISH
SCHEDULE FOR COLOR AND ADDITIONAL PROPERTIES OF THE WINDOW
AND CURTAIN WALL GLAZING AND SPANDREL. GLAZING COLOR AND
SHADE SHOWN ON THE EXTERIOR ELEVATIONS ARE ADJUSTED FOR
GRAPHIC CLARITY AND DO NOT MATCH THE TRUE GLAZING COLOR
SPECIFIED ON THIS PROJECT.
1' - 5 1/2"
5'
6"
12' - 4" 2' - 4"
14' - 8"3/4"
13' - 9 1/4"
4"
6"
8" 4'
0"
5"
5'
6"
F1 A-444
CAST STONE
EMBLEM
CAST STONE
CAST STONE
BASE
UTILITY BRICK 1/3 BOND
COURSING (X14)
3/4"
1' - 4"
3/4"
6" 4"
4'
0" 8"
5'
6"
UTILITY BRICK 1/3 BOND
COURSING (X14)
6"
4"
13' - 9 1/4"
3/4" 14' - 8"
5'
6"
2' - 4" 12' - 4"
8" 4'
0"
5"
F1 A-444
UTILITY BRICK 1/3 BOND
COURSING (X14)
5'
1"
A-444 F15
SIGN FOUNDATION - REFER TO
STRUCTURAL
CAST STONE CAP, TYP.
DRIP EDGE FLASHING
2 REBAR EVENLY SPACED -
REFER TO STRUCTURAL
6" CONCRETE BLOCK
1' - 5 1/2"
1" 4"5"
UTILITY BRICK 1/3 BOND
COURSING (X14)
3 5/8"
1 5/8"
5 5/8"
1 1/2"
3 5/8"
1' - 4"
A-444A7
A-444
A-444
A-444
F7
A15
A1
1' - 5 1/2"
F1 A-444
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Pl ot
D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C
ER
TI
FI
ED
F
IN
AL
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
FE
BR
U
AR
Y
FT
. C
AM
PB
EL
L, K
Y.
U
EP
H
B
AR
R
AC
KS
PN
FY
P2
Fi le
P at h:
M . B
AR
R
Y
5/ 8/
:2
6:
A M
C :\U se rs
\H 2E
D D
KA
S\
D oc um en ts \5
6_ R ev it2
5_
A_ U
EP
H
_h 2e dd ka s.
rv t
A-444
EN
LA
R G
ED
B
U
IL
D
IN
G S
IG
N
AG
E
PL
AN
A N
D
EL
EV
AT
IO
N
S
AN
D S
EC
TI
O N
S
AN
D D
ET
AI
LS
K.
S
AN
TO
S
K.
S
AN
TO
S
M . B
AR
R
Y
0 1' 2' 4' 1/2" = 1'-0"A15 MONUMENT SIGN - RIGHT ELEVATION
1/2" = 1'-0"A7 MONUMENT SIGN - FRONT ELEVATION
1/2" = 1'-0"A1 MONUMENT SIGN - LEFT ELEVATION
1/2" = 1'-0"F7 MONUMENT SIGN - BACK ELEVATION
1/2" = 1'-0"F1 MONUMENT SIGN - SECTION
1 1/2" = 1'-0"F15 MONUMENT SIGN DETAIL @ TOP
1/4" = 1'-0"K1 MONUMENT SIGN PLAN
AM
EN
D
M
EN
T
M
AY
W
2Q R
R
A0
_P la ns -0
D D D D D D DD DDD
W W W W W W W W
T
T
T
T
T
FCU
1-29
HWST
CWST
A
M
-1
A
M
-1
FITNESS
ROOM
JANITOR
VESTIBULE
100A
JAN. /
STOR.
ELEV.
E101
STAIR
S101
TELECOM
LAUNDRY
ACCESS
MECHANICAL
ROOM
ELECTRICAL
ROOM
PUMP
ROOM
ABA
TOILET
LOBBY
CQ
MIDDLE
CORRIDOR
100C
BACK
CORRIDOR
100D
DAY ROOM
VESTIBULE
100E
20"x10" EX
8"ø SA
10"ø SA
10"x10" EX
8"ø OA
10"ø SA
24"x12" OA 16"x12" OA 12"ø OA
4"ø EX TYP
P-5
P-6
P-1
P-2
P-3
P-4P-8
P-7
ES
18"x10" OA
UH
1-2
22"x10" OA
"x
O A
32"x10" OA
MAU-1
12"x28" OA
24"x14" EX
28"x12" EX
UH
1-4
CUH
1-2
UH
1-3
MAWHP-1 MAWHP-2
38"x12" EX
12"x10" OA
12"x10" OA
18"x10" OA
22"x22" OA
40"x12" OA
UH
1-5
UH
1-6
D
670 CFM
D
300 CFM
D
670 CFM D
240 CFM
D
240 CFM
D
150 CFM
D
150 CFM
D
240 CFM
D
240 CFM
D
145 CFM
D
100 CFM
D
145 CFM
F
25 CFM
C
25 CFM
C
25 CFM
C
25 CFM
D
100 CFM
D
125 CFM
F
110 CFM
FCU
1-33
FCU
1-30
FCU
1-34
10"x10" EX
6"ø EX
8"ø EX
6"ø OA
8"ø OA
1L 1-1
L 1-2
8"ø SA 6"ø OA
6"ø OA 12"ø SA
F
280 CFM
F
280 CFM
28"x12" EX
28"x12" OA D
550 CFM
TYP. FOR 4
A11
M-301
A1
M-301
H1
M-301
H11
M-301
E
480 CFM
E
480 CFM
E
290 CFM
45 CFM
F
110 CFM
M-401
A11
FCU
1-32
CUH
1-3
12"ø SA
10"ø SA
8"ø SA
1. THE LOUVER ON THE FIRST FLOOR IS BLANKED OFF TO COMPLY WITH ATFP
REQUIREMENTS. OUTDOOR AIR TO MAU-1 COMES FROM FLOOR ABOVE. SEE
SHEET M-122.
2. 28”x12” OUTDOOR AIR INTAKE UP THRU FLOOR TO THE LOUVER L 2-1 ON
SECOND FLOOR. INSTALL FIRE DAMPER AT THE SLAB AND PROVIDE ACCESS
DOOR INTHE DUCT.
3. VENTILATION DUCT FROM DOAS UNIT RUNNING IN A FIRE RATED SOFFIT. REFER
TO THE ARCHITECTURAL PLANS FOR THE FIRE RATING DETAILS.
4. EMERGENCY SHUT DOWN SWITCH.
5. RUN LOBBY FAN COIL UNIT FCU 1-29 CONDENSATE DRAIN PIPE TO THE JANITORS
CLOSET-105.
6. EXTEND FCU-32 CONDENSATE DRAIN PIPE TO THE FLOOR DRAIN IN THE
MECHANICAL ROOM-111.
7. EXTEND FCU 1-30 CONDENSATE DRAIN PIPE TO THE JANITORS CLOSET-110.
8. PROVIDE OPEN SIDE DRAIN UNDER SINK AT DAY ROOM TO COLLECT
CONDENSATE DRAIN FROM FCU 1-33 AND FCU 1-34.
9. ALL AIR INTAKE AND EXHAUST LOUVER PLENUMS MUST BE DOUBLE WALL
CONSTRUCTION PER SPECIFICATION 23 30 00, 2.10.14
SHEET KEYNOTES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
F E
B R
U A
R Y
KEY PLAN
F T
C
A M
P B
E L L K
Y
U E
P H
B A
R R
A C
K S
P N
F
Y P
F ile
P a th
AREA 1B
PLAN NORTH
/7
/2
:3
:5
A
M C
U s e rs
\H E
D D
M S
\D o c u m e n ts
\5 R e v it M
U
E P
H H
E
D D
M S
.r v t
M-112
F
IR
S T
F L O
O R
H V
A C
D U
C T
W O
R K
P L A
N
A R
E A
B
M S
H A
F
IU
D D
IN
B H
A R
T M
A N
M B
A R
R Y
C G
R E
E N
W E
L L
1/8" = 1'-0"A1
FIRST FLOOR HVAC DUCTWORK PLAN -
AREA 1B
A
M E
N D
M E
N T
A p ri l
A
M E
N D
M E
N T
M a y
W
2Q R
R
A0
_P la ns -0
T T T T
T
T
ELEV
E201
TELECOM
JAN. /
STOR.
STAIR
S201
MECHANICAL
ROOM
STORAGE
STORAGE
ELECTRICAL
ROOM
LAUNDRY
ACCESS
LOBBY
BACK
CORRIDOR
200D
MIDDLE
CORRIDOR
200C
LAUNDRY
ES
FCU
2-33
UH
2-2
UH
2-3
MAU-2
28"x12" OA
CUH
2-2
UH
2-4
UH
2-5
UH
2-7
UH
2-6
18"x10" EX
20"x10" EX
F
110 CFM
C
25 CFM
D
100 CFM
28"x10" EX 30"x10" EX
8"ø EX
10"x10" EX
6"ø EX
A
125 CFM
18"x10" OA
8"ø OA
24"x12" OA 16"x12" OA
12"ø OA
22"x10" OA
20"x10" EX
FCU
2-15
FCU
2-16
FCU
2-17
FCU
2-18
D
145 CFM
D
145 CFM
12"x10" OA
18"x10" OA
20"x24" OA
28"x12" OA
D
550 CFM
TYP. FOR 4
L 2-1
DOAS-1 DOAS-2
40"x18" EX
24"x20" OA
L 2-2
L 2-3
L 2-4
A11
M-301
A1
M-301
H1
M-301
H11
M-301
E
290 CFM
M-402
F5
MECH.
LIVING
250A
KITCHEN
250B
BATHROOM
250C
BEDROOM
250D
CLOSET
250E
BEDROOM
250F
CLOSET
250G
MECH.
LIVING
254A
LIVING
258A
KITCHEN
254B
BATHROOM
254C
BEDROOM
254D
CLOSET
254E
BEDROOM
254F
CLOSET
254G
LIVING
258A
BATHROOM
258C
BEDROOM
258D
CLOSET
258E
BEDROOM
258F
CLOSET
258G
MECH.
LIVING
262A
KITCHEN
262B
BATHROOM
262C
BEDROOM
262D
CLOSET
262E
BEDROOM
262F
CLOSET
262G
6"ø OA
TYP.
1. 28"x12" OUTDOOR AIR DUCT DOWN THROUGH FLOOR OPENING TO MAU-1 ON
FIRST FLOOR. PROVIDE FIRE DAMPER.
2. 6'x6' REMOVABLE TYPE LOUVERS TO FACILITATE THE REMOVAL OF THE
LARGEST PIECE OF THE INSTALLED EQUIPMENT THROUGH THE OPENING TO
THE OUTSIDE OF THE BUILDING.
3. ALL OUTDOOR AIR INTAKE AND THE EXHAUST AIR DUCTWORK TO DOAS UNITS
SHALL BE ASSEMBLY/DISASSEMBLY TYPE TO FACILITATE THE REMOVAL OF THE
EQUIPMENT THROUGH THE LOUVER OPENING.
4. CONTRACTOR FURNISHED AND INSTALLED, UL LISTED, DUCTLESS TYPE
KITCHEN HOOD (TYP.).
5. ALL AIR INTAKE AND EXHAUST LOUVER PLENUMS MUST BE DOUBLE WALL
CONSTRUCTION PER SPECIFICATION 23 30 00, 2.10.14
SHEET KEYNOTES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
F E
B R
U A
R Y
KEY PLAN
F T
C
A M
P B
E L L K
Y
U E
P H
B A
R R
A C
K S
P N
F
Y P
F ile
P a th
AREA 2B
PLAN NORTH
/7
/2
:3
:5
A
M C
U s e rs
\H E
D D
M S
\D o c u m e n ts
\5 R e v it M
U
E P
H H
E
D D
M S
.r v t
M-122
S E
C O
N D
F L O
O R
H V
A C
D U
C T
W O
R K
P L A
N
A R
E A
B
M S
H A
F
IU
D D
IN
B H
A R
T M
A N
M B
A R
R Y
C G
R E
E N
W E
L L
1/8" = 1'-0"A1
SECOND FLOOR HVAC DUCTWORK PLAN -
AREA 2B
A
M E
N D
M E
N T
A p ri l
A
M E
N D
M E
N T
M a y
1 1
W
2Q R
R
A0
_P la ns -0
T T T T
T
T
18"x10" OA
A
125 CFM
18"x10" OA
24"x20" OA
24"x20" EX
6"ø OA
8"ø OA
UH
3-2
UH
3-3
UH
3-4
UH
3-5
UH
3-7
UH
3-6
FCU
3-15
FCU
3-16
FCU
3-17
FCU
3-18
D
100 CFM
D
145 CFM
D
145 CFM
22"x10" OA
"x
O A
6"ø EX
10"x10" EX
8"ø EX
20"x10" EX
18"x10" EX
28"x10" EX
FCU
3-33
C
25 CFM
C
25 CFM
ET-1
ET-2
CUH
3-2
DOAS-3
L 3-3
L 3-4
L 3-1
L 3-2
GFP-1
GFP-2
36"x12" EX
A1
M-301
H11
M-301
C
110 CFM
D
550 CFM
TYP. FOR 4
B
290 CFM
M-402
F13
ELEV
E301
TELECOM
JAN. /
STOR.
STAIR
S301
MECHANICAL
ROOM
STORAGE
STORAGE
ELECTRICAL
ROOM
LAUNDRY
ACCESS
LOBBY
BACK
CORRIDOR
300D
MIDDLE
CORRIDOR
300C
LAUNDRY
MECH.
LIVING
350A
KITCHEN
350B
BATHROOM
350C
BEDROOM
350D
CLOSET
350E
BEDROOM
350F
CLOSET
350G
MECH.
LIVING
354A
LIVING
358A
KITCHEN
354B
BATHROOM
354C
BEDROOM
354D
CLOSET
354E
BEDROOM
354F
CLOSET
354G
LIVING
358A
BATHROOM
358C
BEDROOM
358D
CLOSET
358E
BEDROOM
358F
CLOSET
358G
MECH.
LIVING
362A
KITCHEN
362B
BATHROOM
362C
BEDROOM
362D
CLOSET
362E
BEDROOM
362F
CLOSET
362G
MECH.
5 5
1. 28"x12" OUTDOOR AIR DUCT DOWN THROUGH FLOOR OPENING TO MAU-1 ON
FIRST FLOOR. PROVIDE FIRE DAMPER.
2. 6'x6' REMOVABLE TYPE LOUVERS TO FACILITATE THE REMOVAL OF THE
LARGEST PIECE OF THE INSTALLED EQUIPMENT THROUGH THE OPENING TO
THE OUTSIDE OF THE BUILDING.
3. ALL OUTDOOR AIR INTAKE AND THE EXHAUST AIR DUCTWORK TO DOAS UNITS
SHALL BE ASSEMBLY/DISASSEMBLY TYPE TO FACILITATE THE REMOVAL OF THE
EQUIPMENT THROUGH THE LOUVER OPENING.
4. CONTRACTOR FURNISHED AND INSTALLED, UL LISTED, DUCTLESS TYPE
KITCHEN HOOD (TYP.).
5. ALL AIR INTAKE AND EXHAUST LOUVER PLENUMS MUST BE DOUBLE WALL
CONSTRUCTION PER SPECIFICATION 23 30 00, 2.10.14
SHEET KEYNOTES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
F E
B R
U A
R Y
KEY PLAN
F T
C
A M
P B
E L L K
Y
U E
P H
B A
R R
A C
K S
P N
F
Y P
F ile
P a th
AREA 3B
PLAN NORTH
/7
/2
:3
:1
A
M C
U s e rs
\H E
D D
M S
\D o c u m e n ts
\5 R e v it M
U
E P
H H
E
D D
M S
.r v t
M-132
T H
IR
D
F L O
O R
H V
A C
D U
C T
W O
R K
P L A
N
A R
E A
B
M S
H A
F
IU
D D
IN
B H
A R
T M
A N
M B
A R
R Y
C G
R E
E N
W E
L L
1/8" = 1'-0"A1
THIRD FLOOR HVAC PLAN - AREA 3B
A
M E
N D
M E
N T
A p ri l
A
M E
N D
M E
N T
M a y
1 1
W
2Q R
R
A0
_P la ns -0
T T T T
T
T
M-402
F13
18"x10" OA
A
125 CFM
18"x10" OA
24"x20" OA
24"x20" EX
6"ø OA
8"ø OA
UH
4-2
UH
4-3 UH
4-4
UH
4-5
UH
4-7
UH
4-6
FCU
4-15
FCU
4-16
FCU
4-17
FCU
4-18
D
100 CFM
D
145 CFM
D
145 CFM
22"x10" OA
12"x10" OA
6"ø EX
10"x10" EX
8"ø EX
20"x10" EX
18"x10" EX
28"x10" EX
FCU
4-33
C
25 CFM
F
25 CFM
CUH
4-2
DOAS-4
L 4-3
L 4-4L
4-1 L
4-2
36"x12" EX
F
110 CFM
D
550 CFM
E
290 CFM
ELEV
E401
TELECOM
JAN. /
STOR.
STAIR
S401
MECHANICAL
ROOM
STORAGE
STORAGE
ELECTRICAL
ROOM
LAUNDRY
ACCESS
LOBBY
BACK
CORRIDOR
400D
MIDDLE
CORRIDOR
400C
LAUNDRY
MECH.
LIVING
450A
KITCHEN
450B
BATHROOM
450C
BEDROOM
450D
CLOSET
450E
BEDROOM
450F
CLOSET
450G
MECH.
LIVING
454A
LIVING
458A
KITCHEN
454B
BATHROOM
454C
BEDROOM
454D
CLOSET
454E
BEDROOM
454F
CLOSET
454G
LIVING
458A
BATHROOM
458C
BEDROOM
458D
CLOSET
458E
BEDROOM
458F
CLOSET
458G
MECH.
LIVING
462A
KITCHEN
462B
BATHROOM
462C
BEDROOM
462D
CLOSET
462E
BEDROOM
462F
CLOSET
462G
MECH.
TYP. FOR 4
TYP.
1. 28"x12" OUTDOOR AIR DUCT DOWN THROUGH FLOOR OPENING TO MAU-1 ON
FIRST FLOOR. PROVIDE FIRE DAMPER.
2. 6'x6' REMOVABLE TYPE LOUVERS TO FACILITATE THE REMOVAL OF THE
LARGEST PIECE OF THE INSTALLED EQUIPMENT THROUGH THE OPENING TO
THE OUTSIDE OF THE BUILDING.
3. ALL OUTDOOR AIR INTAKE AND THE EXHAUST AIR DUCTWORK TO DOAS UNITS
SHALL BE ASSEMBLY/DISASSEMBLY TYPE TO FACILITATE THE REMOVAL OF THE
EQUIPMENT THROUGH THE LOUVER OPENING.
4. CONTRACTOR FURNISHED AND INSTALLED, UL LISTED, DUCTLESS TYPE
KITCHEN HOOD (TYP.).
5. ALL AIR INTAKE AND EXHAUST LOUVER PLENUMS MUST BE DOUBLE WALL
CONSTRUCTION PER SPECIFICATION 23 30 00, 2.10.14
SHEET KEYNOTES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
F E
B R
U A
R Y
KEY PLAN
F T
C
A M
P B
E L L K
Y
U E
P H
B A
R R
A C
K S
P N
F
Y P
F ile
P a th
AREA 4B
PLAN NORTH
/7
/2
:3
:1
A
M C
U s e rs
\H E
D D
M S
\D o c u m e n ts
\5 R e v it M
U
E P
H H
E
D D
M S
.r v t
M-142
F O
U R
T H
F L O
O R
H V
A C
D U
C T
W O
R K
P L A
N
A R
E A
B
M S
H A
F
IU
D D
IN
B H
A R
T M
A N
M B
A R
R Y
C G
R E
E N
W E
L L
1/8" = 1'-0"A1
FOURTH FLOOR HVAC PLAN - AREA 4B
A
M E
N D
M E
N T
A p ri l
A
M E
N D
M E
N T
M a y
W
2Q R
R
A0
_P la ns -0
T T T T
T
T
T
M-402
F13
FD
FD
A
125 CFM
18"x10" OA
24"x20" OA
24"x20" EX
6"ø OA
8"ø OA
UH
5-2
UH
5-3 UH
5-4
UH
5-7
UH
5-6
FCU
5-15
FCU
5-16
FCU
5-17
FCU
5-18
D
100 CFM
D
145 CFM
D
145 CFM
22"x10" OA
"x
O A
10"x10" EX
8"ø EX
20"x10" EX
18"x10" EX
28"x10" EX
FCU
5-33
F
25 CFM
CUH
5-2
DOAS-5
L 5-3
L 5-4L
5-1 L
5-2
36"x12" EX
F
110 CFM
D
550 CFM
E
290 CFM
ELEV
E501
TELECOM
ELEV.
CONTROL
ROOM
STAIR
S501
MECHANICAL
ROOM
STORAGE
STORAGE
ELECTRICAL
ROOM
LAUNDRY
ACCESS
LOBBY
BACK
CORRIDOR
500D
MIDDLE
CORRIDOR
500C
LAUNDRY
MECH.
LIVING
550A
KITCHEN
550B
BATHROOM
550C
BEDROOM
550D
CLOSET
550E
BEDROOM
550F
CLOSET
550G
MECH.
LIVING
554A
LIVING
558A
KITCHEN
554B
BATHROOM
554C
BEDROOM
554D
CLOSET
554E
BEDROOM
554F
CLOSET
554G
KITCHEN
558B
BATHROOM
558C
BEDROOM
558D
CLOSET
558E
BEDROOM
558F
CLOSET
558G
MECH.
LIVING
562A
KITCHEN
562B
BATHROOM
562C
BEDROOM
562D
CLOSET
562E
BEDROOM
562F
CLOSET
562G
MECH.
TYP. FOR 4
TYP.
5 5 5
1. 28"x12" OUTDOOR AIR DUCT DOWN THROUGH FLOOR OPENING TO MAU-1 ON
FIRST FLOOR. PROVIDE FIRE DAMPER.
2. 6'x6' REMOVABLE TYPE LOUVERS TO FACILITATE THE REMOVAL OF THE
LARGEST PIECE OF THE INSTALLED EQUIPMENT THROUGH THE OPENING TO
THE OUTSIDE OF THE BUILDING.
3. ALL OUTDOOR AIR INTAKE AND THE EXHAUST AIR DUCTWORK TO DOAS UNITS
SHALL BE ASSEMBLY/DISASSEMBLY TYPE TO FACILITATE THE REMOVAL OF THE
EQUIPMENT THROUGH THE LOUVER OPENING.
4. CONTRACTOR FURNISHED AND INSTALLED, UL LISTED, DUCTLESS TYPE
KITCHEN HOOD (TYP.).
5. ALL AIR INTAKE AND EXHAUST LOUVER PLENUMS MUST BE DOUBLE WALL
CONSTRUCTION PER SPECIFICATION 23 30 00, 2.10.14
SHEET KEYNOTES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
F E
B R
U A
R Y
KEY PLAN
F T
C
A M
P B
E L L K
Y
U E
P H
B A
R R
A C
K S
P N
F
Y P
F ile
P a th
AREA 5B
PLAN NORTH
/7
/2
:3
:2
A
M C
U s e rs
\H E
D D
M S
\D o c u m e n ts
\5 R e v it M
U
E P
H H
E
D D
M S
.r v t
M-152
F
IF
T H
F L O
O R
H V
A C
D U
C T
W O
R K
P L A
N
A R
E A
B
M S
H A
F
IU
D D
IN
B H
A R
T M
A N
M B
A R
R Y
C G
R E
E N
W E
L L
1/8" = 1'-0"A1
FIFTH FLOOR HVAC PLAN - AREA 5B
A
M E
N D
M E
N T
A p ri l
A
M E
N D
M E
N T
M a y
W
2Q R
R
A0
_P la ns -0
BEDROOMBEDROOM
CLOSETCLOSET
KITCHEN
LIVING
BATHROOM
MECH.
FCU
BEDROOM BEDROOM
CLOSET CLOSET
KITCHEN
LIVING
BATHROOM
MECH.
"ø
E X
"ø
E X
"ø
E X
"ø
E X
"x
S A
"x
S A
"x
R A
"x
R A
8"ø SA
8"ø SA
8"ø RA
8"ø RA 8"ø RA
8"ø RA
8"ø SA 8"ø SA 8"ø SA 8"ø SAA
150 CFM
A
150 CFM
A
150 CFM
A
150 CFM
A
150 CFM
A
150 CFM
C
25 CFM
C
50 CFM
C
50 CFM
C
25 CFM
A
45 CFM
A
45 CFM
A
45 CFM
A
45 CFM
B
150 CFM
FCU
B
150 CFM
B
150 CFM
B
150 CFM
B
150 CFM
B
150 CFM
8"ø RA 8"ø RA
12"x10" OA
10"x10" OA
"x
O A
14"x10" EX 16"x10" EX 18"x10" EX
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
F E
B R
U A
R Y
F T
C
A M
P B
E L L K
Y
U E
P H
B A
R R
A C
K S
P N
F
Y P
F ile
P a th
/7
/2
:3
:2
A
M C
U s e rs
\H E
D D
M S
\D o c u m e n ts
\5 R e v it M
U
E P
H H
E
D D
M S
.r v t
M-403
E N
L A
R G
E D
H V
A C
P L A
N
M S
H A
F
IU
D D
IN
B H
A R
T M
A N
M B
A R
R Y
C G
R E
E N
W E
L L
1/4" = 1'-0"G11
ENLARGED HVAC PLAN
A
M E
N D
M E
N T
M a y
W
2Q R
R
A0
_P la ns -0
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
F E
B R
U A
R Y
F T
C
A M
P B
E L L K
Y
U E
P H
B A
R R
A C
K S
P N
F
Y P
F ile
P a th
/7
/2
:3
:2
A
M C
U s e rs
\H E
D D
M S
\D o c u m e n ts
\5 R e v it M
U
E P
H H
E
D D
M S
.r v t
M-601
M E
C H
A N
IC
A
L E
Q U
IP
M
E N
T S
C H
E D
U L E
S
M S
H A
F
IU
D D
IN
B H
A R
T M
A N
M B
A R
R Y
C G
R E
E N
W E
L L
MODULAR AIR-TO-WATER HEAT PUMP SCHEDULE
MARK LOCATION TYPE
COOLING HEATING
REFRIGERANT
TYPE FLUID
ELECTRICAL
REMARKS
CAPACITY
(TONS)
FLOW RATE
(GPM) EWT (F) LWT (F)
CAPACITY
(MBH)
FLOW RATE
(GPM) EWT (F) LWT (F) V/HZ/PH MCA MOCP
MAWHP-1 MECHANICAL YARD SCROLL 140 255 56 42 1360 150 110 130 R454B 30% PG 460/3/60 341 400 SEE BELOW
MAWHP-2 MECHANICAL YARD SCROLL 140 255 56 42 1360 150 110 130 R454B 30% PG 460/3/60 341 400 SEE BELOW
FAN COIL UNIT SCHEDULE 1ST FLOOR
MARK LOCATION AREA SERVED DESIGN CFM ESP (IN H2O)
COOLING HEATING MOTOR
REMARKS
MAX COIL WPD
(FT) MAX FLOW RATE (GPM) EWT (°F) LWT (°F) EAT DB (°F) EAT WB (°F) LAT DB (°F)
MAX COIL WPD
(FT)
MAX FLOW RATE
(GPM) EWT (°F) LWT (°F) EAT DB (°F) LAT DB (°F) V/HZ/PH MCA MOCP
FCU 1-1 MECH. CLOSET 119 UNIT-121 450 0.85 3 2 44 56 78 65 55 1 2 125 110 65 90 208/60/1 9.7 15
FCU 1-2 MECH. CLOSET 118 UNIT-120 450 0.85 3 2 44 56 78 65 55 1 2 125 110 65 90 208/60/1 9.7 15
FCU 1-3 MECH. CLOSET 123 UNIT-125 450 0.85 3 2 44 56 78 65 55 1 2 125 110 65 90 208/60/1 9.7 15
FCU 1-4 MECH. CLOSET 122 UNIT-124 450 0.85 3 2 44 56 78 65 55 1 2 125 110 65 90 208/60/1 9.7 15
FCU 1-5 MECH. CLOSET 127 UNIT-129 450 0.85 3 2 44 56 78 65 55 1 2 125 110 65 90 208/60/1 9.7 15
FCU 1-6 MECH. CLOSET 126 UNIT-128 450 0.85 3 2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .