Price Breakout Schedule.pdf
PDF 215 KB Posted
- Solicitation number
- W912QR25QA092
About this file
This document is a Price Breakout Schedule for a construction and renovation project. The base line items include replacing the maintenance building roof with a built-up roof system and removing existing metal frame windows, replacing them with two double-insulated vinyl windows. The option line items provide additional flexibility, allowing for up to 7 additional window replacements and up to 25 instances of wood deck replacement within 60 days of the Notice to Proceed (NTP). The schedule is structured to allow the purchasing entity to scale the project as needed, with each line item priced per job or linear foot, though specific dollar amounts are not filled in on this template.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE BREAKOUT SCHEDULE
LINE
ITEM
DESCRIPTION UNIT COST QTY.
ESTIMATED
COST
Replace Maintenance Building Roof with Built-Up Roof
System
$ JOB $
Remove Existing Metal Frame Windows and Replace with
Double Insulated Vinyl Windows in Two (2) Windows
$ JOB $
BASE LINE ITEM TOTAL: $
OPTION
ITEM
DESCRIPTION UNIT COST QTY.
ESTIMATED
COST
Remove Existing Metal Frame Windows and Replace with
Double Insulated Vinyl Window
$ JOB $
Replacement of Defected Wood on Roof Deck for Every 10
Linear Feet
$ LF $
OPTION LINE ITEM TOTAL: $
BASE + OPTION TOTAL: $
Note. Option 03 may be exercised Up to 7 times within sixty (60) days of NTP.
Note. Option 04 may be exercised Up to 25 times within sixty (60) days of NTP.