Price Breakout Schedule.pdf

PDF 215 KB Posted

Attached to
JT Myers Lock and Dam Maintenance Building Roof Replacement
Solicitation number
W912QR25QA092
Issued by

About this file

This document is a Price Breakout Schedule for a construction and renovation project. The base line items include replacing the maintenance building roof with a built-up roof system and removing existing metal frame windows, replacing them with two double-insulated vinyl windows. The option line items provide additional flexibility, allowing for up to 7 additional window replacements and up to 25 instances of wood deck replacement within 60 days of the Notice to Proceed (NTP). The schedule is structured to allow the purchasing entity to scale the project as needed, with each line item priced per job or linear foot, though specific dollar amounts are not filled in on this template.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE BREAKOUT SCHEDULE

LINE

ITEM

DESCRIPTION UNIT COST QTY.

ESTIMATED

COST

Replace Maintenance Building Roof with Built-Up Roof

System

$ JOB $

Remove Existing Metal Frame Windows and Replace with

Double Insulated Vinyl Windows in Two (2) Windows

$ JOB $

BASE LINE ITEM TOTAL: $

OPTION

ITEM

DESCRIPTION UNIT COST QTY.

ESTIMATED

COST

Remove Existing Metal Frame Windows and Replace with

Double Insulated Vinyl Window

$ JOB $

Replacement of Defected Wood on Roof Deck for Every 10

Linear Feet

$ LF $

OPTION LINE ITEM TOTAL: $

BASE + OPTION TOTAL: $

Note. Option 03 may be exercised Up to 7 times within sixty (60) days of NTP.

Note. Option 04 may be exercised Up to 25 times within sixty (60) days of NTP.

File details come from the government source that posted it. Updated .