Exhibits.pdf

PDF 3 MB Posted

Attached to
JT Myers Lock and Dam Maintenance Building Roof Replacement
Solicitation number
W912QR25QA092
Issued by

About this file

This document contains a Quality Control Plan Sample for a federal contract. The plan outlines comprehensive training and quality assurance procedures for contract work. Key details include:

Prior to beginning work, employees will receive task-specific training, including a review of contract specifications and on-the-job training. All crew members will be cross-trained and use checklists to ensure complete and timely work. A designated Quality Control Inspector (QCI) will perform inspections, with 100% inspection required for unusual or critical items. The allowable reject level is zero, and immediate corrective action is mandatory for any deficiencies. The QCI will complete a daily Quality Control Inspection Report documenting work completed, inspections performed, and any corrective actions, which will be submitted to the Corps of Engineers by 9:00 a.m. the following day. The contractor commits to modifying procedures as needed to meet contract specifications.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A

Exhibit B Sample Forms

Exhibit C Quality Control Plan Sample

Prior to beginning work, each employee will be trained to perform the task he or she has been hired to perform.

This training will consist of a review and thorough explanation of the contract specifications and requirements, followed by ‘on-the-job’ training to ensure that the contract requirements are understood. All members of a crew will be cross-trained, so that they understand all aspects of a particular type of work. Following training, each employee will be provided with a checklist of work that they are required to perform, which will serve to ensure that all aspects of a particular job are completed on time. The employee will mark each item as it is completed (with completion time), and will sign and date each sheet to ensure accountability for completed work.

Prior to start of the contract, the Contractor will designate a Quality Control Inspector (QCI) in writing. The designated QCI will perform inspections of completed work as soon as possible to ensure that the work meets contract specifications. The inspection schedule will depend on the type of work being completed; items of a routine nature will be inspected based on a random or planned sampling schedule. 100% of unusual items, items which are more important, or highly visible items will be inspected.

Allowable reject levels for all items of work will be zero.

Upon discovery of any deficiency, corrective action will be initiated immediately. The QCI will immediately either correct the deficiency personally, direct another employee to correct the deficiency, or direct the employee who marked the item as ‘complete’ to correct the deficiency. The QCI will meet with the employee who was responsible for initial completion of the work and review contract specifications for the work which was inadequately performed.

The QCI will determine what actions caused the inadequate work and take immediate steps to ensure that the work is correctly performed the next time it is scheduled.

A Quality Control Inspection Report will be completed by the QCI for each day’s work. This report will document what work was completed, what facilities were inspected, the time the inspections were performed, and the results of these inspections. This report will also document any deficiencies noted during inspections and corrective actions taken on deficiencies. This report will be provided to the Corps of Engineers the same day the work is scheduled, or the next morning prior to 9:00 a.m. by e-mail, fax, or in person.

If a Contract Discrepancy Report (CDR) is issued by the government, the Contractor will review the CDR with the QCI within one day of receipt of the CDR, and will meet with the Corps of Engineers representative as soon as possible. Prior to meeting with the Corps representative, the Contractor will meet with the QCI and the individual/crew responsible for completing the work to determine the cause of the contract discrepancy and what actions will be required to prevent any reoccurrence. The Contractor will document these actions on the CDR for submittal to the government.

The contractor will modify these procedures as required to ensure that contract specifications are met.