This document is a Price Breakout Schedule (Amendment 0002) for a construction project involving building maintenance and renovation. The base line items include replacing the maintenance building roof with an EPDM Single-Ply System and removing existing metal frame windows, replacing them with two double-insulated vinyl windows. The optional line items allow for additional window replacements (up to 7 times) and replacement of defective roof deck wood (up to 25 times within 60 days of Notice to Proceed). The pricing structure is set up with unit costs and quantities for each line item, though specific dollar amounts are not filled in on this document. The amendment provides flexibility for the contractor to address additional repair needs within a specified timeframe after the project begins.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
***Amendment 0002***
PRICE BREAKOUT SCHEDULE
LINE
ITEM
DESCRIPTION UNIT COST QTY.
ESTIMATED
COST
Replace Maintenance Building Roof with Built-Up Roof
System EPDM Single-Ply System
$ JOB $
Remove Existing Metal Frame Windows and Replace with
Double Insulated Vinyl Windows in Two (2) Windows
$ JOB $
BASE LINE ITEM TOTAL: $
OPTION
ITEM
DESCRIPTION UNIT COST QTY.
ESTIMATED
COST
Remove Existing Metal Frame Windows and Replace with
Double Insulated Vinyl Window
$ JOB $
Replacement of Defected Wood on Roof Deck for Every 10
Linear Feet
$ LF $
OPTION LINE ITEM TOTAL: $
BASE + OPTION TOTAL: $
Note. Option 03 may be exercised Up to 7 times within sixty (60) days of NTP.