W912QR25BA016_Specs_Vol3-0000.pdf
PDF 3 MB Posted
- Attached to
- March Air Reserve Base, CA B600 Flight Simulator Federal contract opportunity
- Solicitation number
- W912QR25BA016
About this file
This document is a comprehensive Volume 3 specification volume for a Design-Bid-Build project for the Addition/Alteration of Building 600 for Flight Simulators at March Air Reserve Base, California. The specification details technical requirements for mechanical systems, with a focus on HVAC system cleaning, electrical heat tracing, seismic bracing, testing, adjusting, balancing, and thermal insulation for mechanical systems. The document provides extensive technical guidance for contractors, including detailed requirements for materials, installation methods, quality control, and performance standards across various mechanical system components.
The specification covers multiple technical divisions including mechanical, electrical, and insulation systems, with specific attention to installation procedures, material specifications, and quality assurance requirements. Key technical areas include HVAC system cleaning (Section 23 01 30.41), electrical heat tracing (Section 23 05 15), seismic bracing and supports (Section 23 05 48.19), testing and balancing procedures (Section 23 05 93), and thermal insulation for mechanical systems (Section 23 07 00). The document provides precise instructions for contractors on material selection, installation techniques, testing protocols, and compliance with industry standards and energy efficiency requirements, specifically referencing standards from ASHRAE, ASTM, and other technical organizations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Results - W912QR25BA016.pdf | ||
| W912QR25BA016_Plans-0005.pdf | ||
| 2nd Site Visit Sign In Sheet B600.pdf | ||
| W912QR25BA016_Specs-0004.pdf | ||
| W912QR25BA016_Plans-0004.pdf | ||
| W912QR25BA016_Specs-0003.pdf | ||
| W912QR25BA016_Specs-0002.pdf | ||
| W912QR25BA016_Plans-0002.pdf | ||
| W912QR25BA016-0001.pdf | ||
| Sign in B600 8 July Site walk.pdf | ||
| W912QR25BA016_SID-0000.pdf | ||
| W912QR25BA016_FFE-0000.pdf | ||
| W912QR25BA016_Plans-0000.pdf | ||
| W912QR25BA016_Specs_Vol1-0000.pdf | ||
| W912QR25BA016_Specs_Vol2-0000.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Addition/Alteration of Bldg 600 for Flight Simulators March Air Reserve Base,Ca
P2: 504650
Design-Bid-Build
Specifications Vol. 3 of 3(23-33) Certified Final Design
26 June 2025
W912QR25BA016
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR25BA016_Specs_Vol3-0000
P2# 504650 Addition/Alteration of B600 for Flight Simulator March Air Reserve Base
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00
00 80 00.00 06 04/21, CHG 1: 06/23
PRICE BREAKOUT SCHEDULE
SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 32 01.00 06 10/23 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/16, CHG 2: 08/19 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING
01 50 00 11/20, CHG 1: 08/21 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS AND
PERMITS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION AND DECONSTRUCTION
02 81 00 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
HAZARDOUS MATERIALS SURVEY
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 6: 11/23 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 00 08/23 METAL STAIRS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
PROJECT TABLE OF CONTENTS
Certified Final Status
Vol. II
Vol. I
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS
07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 54 19 02/13, CHG 3: 02/21 POLYVINYL-CHLORIDE ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
07 95 00 SEISMIC/EXPANSION CONTROL
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS
08 51 13 05/19 ALUMINUM WINDOWS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
DIVISION 09 - FINISHES
09 06 00 08/22 SCHEDULES FOR FINISHES
09 24 23 08/17, CHG 2: 11/18 CEMENT STUCCO
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 69 13 11/15, CHG 1: 08/18 RIGID GRID ACCESS FLOORING
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 08/20 INTERIOR SIGNAGE
10 26 00 08/20 WALL AND DOOR PROTECTION
10 44 16 11/19 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 24 13 08/20 ROLLER WINDOW SHADES
12 50 00.13 10 08/17, CHG 1: 11/18 FURNITURE AND FURNITURE INSTALLATION
12 59 00 08/17, CHG 1: 08/18 SYSTEMS FURNITURE
DIVISION 14 - CONVEYING EQUIPMENT
14 42 00 03/24 WHEELCHAIR LIFTS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 13 18 08/20 PREACTION SPRINKLER SYSTEMS, FIRE
PROJECT TABLE OF CONTENTS
Certified Final Status
PROTECTION
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 01 30.41 05/22 HVAC SYSTEM CLEANING
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 05/22, CHG 2: 08/24 ELECTRICAL HEAT TRACING
23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING, SUPPORTS, AND
ANCHORAGE FOR MECHANICAL SYSTEMS
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00 05/23 COMMISSIONING OF MECHANICAL AND
PLUMBING SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 21 23 08/17 HYDRONIC PUMPS
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09, CHG 6: 11/22 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 23 11/20 COMPUTER ROOM AIR HANDLING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - HVAC AND AMI
25 05 11.02 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - FIRE PROTECTION
DIVISION 26 - ELECTRICAL
26 05 26.00 40 08/19 GROUNDING AND BONDING FOR ELECTRICAL
SYSTEMS
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 05 73 08/23 POWER SYSTEM STUDIES
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 41 00 08/23 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
PROJECT TABLE OF CONTENTS
Certified Final Status
Vol. III
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00.00 06 07/18 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 23 05/22 GRADED CRUSHED AGGREGATE BASE COURSE
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 92 19 08/17, CHG 1: 08/21 SEEDING
DIVISION 33 - UTILITIES
33 30 00 05/18 SANITARY SEWERAGE
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS
Certified Final Status
SECTION 23 01 30.41
HVAC SYSTEM CLEANING
05/22
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 62.1 (2016) Ventilation for Acceptable Indoor Air Quality
INSTITUTE OF INSPECTION, CLEANING, AND RESTORATION CERTIFICATION
(IICRC)
ANSI/IICRC S520 (2015) Standard and Reference Guide for Professional Mold Remediation
NATIONAL AIR DUCT CLEANERS ASSOCIATION (NADCA)
NADCA (2005) Introduction to HVAC System Cleaning Services
NADCA ACR (2013) Standard for Assessment, Cleaning, and Restoration of HVAC Systems
NADCA ASCS (2013) Air Systems Cleaning Specialist to the NADCA Standard ACR
NADCA HVAC Inspection Manual (2021) Procedures for Assessing the Cleanliness of Commercial HVAC Systems
NORTH AMERICAN INSULATION MANUFACTURERS ASSOCIATION (NAIMA)
NAIMA AH112 (1993) Cleaning Fibrous Glass or Lined Sheet Metal Ducts
NAIMA AH122 (2006) Cleaning Fibrous Insulated Duct Systems - Recommended Practices
NAIMA AH127 (1999) Facts About the Impact of Duct Cleaning on Internal Duct Insulation
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1966 (2020) HVAC Duct Construction Standards Metal and Flexible, 4th Edition
SECTION 23 01 30.41 Page 1
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2024) Safety and Occupational Health (SOH) requirements
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 402-C-01-001 (2001) IAQ Building Education and Assessment Tool (I-BEAM)
EPA 402-F-91-102 (1991) Building Air Quality: A Guide for Building Owners and Facility Managers
UNDERWRITERS LABORATORIES (UL)
UL 181 (2013; Reprint Dec 2021) UL Standard for Safety Factory-Made Air Ducts and Air Connectors
UL 181A (2013; Reprint Dec 2021) Standard for Safety Closure Systems for Use with Rigid Air Ducts
UL 181B (2013; Reprint Dec 2021) UL Standard for Safety Closure Systems for Use with Flexible Air Ducts and Air Connectors
1.2 DEFINITIONS
1.2.1 NADCA Standards
Perform the services specified here in accordance with the current published standards of the National Air Duct Cleaners Association ( NADCA, NADCA ASCS, NADCA ACR and NADCA HVAC Inspection Manual ).
a. All terms in this specification are defined as stated in the NADCA Standards.
b. Follow NADCA Standards without modification or deviation.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Record of Existing Conditions; G, AE
NADCA Firm; G, AE
NADCA Team Assistants; G, AE
NADCA Air System Cleaning Specialist (ASCS); G, AE
SECTION 23 01 30.41 Page 2
NADCA Supervisor Qualifications; G, AE
Records of Experience in the Field of HVAC System Cleaning; G, AE
NADCA Work Execution Schedule; G, AE
SD-03 Product Data
Safety Data Sheets (SDS); G, AE
SD-06 Test Reports
Testing Procedures Summary; G, AE
Post-Project Report; G, AE
1.4 QUALITY CONTROL
1.4.1 NADCA Firm
Submit information certifying that the NADCA firm is a first tier subcontractor who is not affiliated with any other company participating in work on this contract, including furnishing equipment. Further, submit the following, for the firm, to Contracting Officer for approval:
a. Independent NADCA firm:
NADCA Firm: NADCA registration number and expiration date of current certification;
NADCA Supervisor Qualifications: Name and copy of NADCA supervisor certificate and expiration date of current certification.
NADCA Air System Cleaning Specialist (ASCS): Name and documented evidence that the team field leader has satisfactorily performed full-time supervision of HVAC cleaning work in the field for not less than three years immediately preceding this contract's bid opening date.
NADCA Team Assistants: Names and documented evidence that each field technician has satisfactorily assisted a NADCA team field leader in performance of HVAC cleaning work in the field for not less than one year immediately preceding this contract's bid opening date.
Current Certificates: Ensure registrations and certifications are current, and valid for the duration of this contract. Renew Certifications which expire prior to completion of the HVAC cleaning work, in a timely manner so that there is no lapse in registration or certification. NADCA agency or NADCA team personnel without a current registration or current certification are not to perform HVAC cleaning work on this contract.
b. TAB Team Members: NADCA team approved to accomplish work on this contract are full-time employees of the NADCA firm. No other personnel is allowed to do HVAC cleaning work on this contract.
c. Replacement of NADCA Team Members: Replacement of members may occur if each new member complies with the applicable personnel qualifications and each is approved by the Contracting Officer.
SECTION 23 01 30.41 Page 3
1.4.2 Experience
Submit records of experience in the field of HVAC system cleaning. Bids will only be considered from firms which are regularly engaged in HVAC system maintenance with an emphasis on HVAC system cleaning and decontamination.
1.4.3 Equipment, Materials and Labor
Possess and furnish all necessary equipment, materials and labor to adequately perform the specified services and comply with the applicable provisions of NADCA General Specifications for the Cleaning of Commercial HVAC Systems and ASHRAE 62.1 .
a. Assure that all employees have received safety equipment training, medical surveillance programs, individual health protection measures, and manufacturer's product and Safety Data Sheets (SDS) as required for the work by the U.S. Occupational Safety and Health Administration, and as described by this specification. For work performed in countries outside of the U.S.A., comply with applicable national safety codes and standards.
b. Maintain a copy of all current SDS documentation and safety certifications at the site at all times, as well as comply with all other site documentation requirements of applicable OSHA programs and this specification.
c. Submit all Safety Data Sheets (SDS) for all chemical products proposed used in the cleaning process, including all VOC ratings.
1.4.4 Licensing
Provide proof of maintaining the proper license(s), if any, as required to do work in the state of California. Comply with all Federal, State and local rules, regulations, and licensing requirements.
1.4.5 Health and Safety
1.4.5.1 Safety Standards
Comply with all applicable Federal, State, and local requirements for protecting the safety of the Contractor's employees, building occupants, and the environment. In particular, follow all applicable standards of the Occupational Safety and Health Administration (OSHA) when working in accordance with this specification, and EM 385-1-1 .
1.4.5.2 Occupant Safety
Employ no processes or materials in such a manner that introduce additional hazards into occupied spaces.
1.4.5.3 Disposal of Debris
Dispose of all debris removed from the HVAC System in accordance with applicable Federal, State and local requirements.
SECTION 23 01 30.41 Page 4
1.5 PROJECT/SITE CONDITIONS
1.5.1 Mechanical Drawings
Obtain one copy of the following documents:
a. Project drawings and specifications.
b. Approved construction revisions pertaining to the HVAC system.
c. Any existing indoor air quality (IAQ) assessments or environmental reports prepared for the facility.
Submit a NADCA Work Execution Schedule to the Contracting Officer within 10 working days of the contract award.
1.5.2 Site Conditions
This Section is included to cover cleaning of limited existing-to-remain ductwork and air terminals serving rooms renovated by project but not receiving new HVAC. Refer to plan drawings for exact extent of cleaning required. In general, cleaning is limited to interior surface of ductwork, duct fittings, duct accessories, air terminals, and duct lining (if any) from renovated rooms up to 25 feet upstream of all renovated rooms. Cleaning of existing air handling units is not required.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Perform the services specified here in accordance with the current published standards of the National Air Duct Cleaners Association ( NADCA, NADCA ASCS, NADCA ACR and NADCA HVAC Inspection Manual ).
a. All terms in this specification have their meaning defined as stated in the NADCA Standards.
b. Follow NADCA Standards with no modifications or deviations being allowed. Remove visible surface contaminants and deposits from within the HVAC system in strict accordance with these specifications.
3.1 PREPARATION
3.1.1 HVAC System Inspections And Site Preparations
3.1.1.1 HVAC System Evaluation
Prior to the commencement of any cleaning work, perform a visual inspection of the HVAC system in the presence of the Contracting Officer to determine appropriate methods, tools, and equipment required to satisfactorily complete this project. Cleanliness inspection should include air handling units and representative areas of HVAC system components and ductwork. In HVAC systems that include multiple air handling units, a representative sample of units should be inspected.
Notify the Contracting Officer 10 days prior to the planned inspection.
As part of evaluation, record photographs and videos of each inspection location to document the "as found" condition prior to cleaning.
SECTION 23 01 30.41 Page 5
Document damaged system components found during the inspection and submit to the Contracting Officer, clearly labeled "Record of Existing Conditions."
3.1.1.2 Site Evaluation and Preparations
Conduct without negatively impacting indoor environment through excessive disruption of settled dust, microbial amplification or other debris. In cases where contamination is suspected, and/or in sensitive environments where even small amounts of contaminant may be of concern, implement environmental engineering control measures.
Conduct a site evaluation, and establish a specific, coordination plan which details how each area of the building is protected during the various phases of the project.
3.2 APPLICATION
3.2.1 General HVAC System Cleaning Requirements
3.2.1.1 Containment
Collect debris removed during cleaning and take precautions to ensure that debris is not otherwise dispersed outside the HVAC system during the cleaning process.
3.2.1.2 Particulate Collection
Where the Particulate Collection Equipment (PCE) is exhausting inside the building, use HEPA filtration with 99.97 percent collection efficiency for 0.3-micron size (or greater). When the PCE is exhausting outside the building, undertake mechanical cleaning operations only with PCE, including adequate filtration to contain debris removed from the HVAC system. When the PCE is exhausting outside the building, take precautions to locate the equipment down wind and away from all air intakes and other points of entry into the building.
3.2.1.3 Controlling Odors
Take all reasonable measures to control offensive odors and/or mist vapors during the cleaning process.
3.2.1.4 Component Cleaning
Employ cleaning methods such that all HVAC system components are Visibly Clean as defined in applicable standards. Upon completion, return all components to those settings recorded just prior to cleaning operations.
3.2.1.5 Air-Volume Control Devices
Mark the position of dampers and any air-directional mechanical devices inside the HVAC system prior to cleaning and, upon completion, restore to their marked position.
3.2.1.6 Service Openings
Utilize service openings, as required for proper cleaning, at various points of the HVAC system for physical and mechanical entry, and inspection. Utilize the existing service openings already installed in
SECTION 23 01 30.41 Page 6 the HVAC system where possible.
Create other openings where needed, created and resealed in conformance with NADCA Standard 05. Place closures so they do not significantly hinder, restrict, alter the air-flow within the system, or compromise the structural integrity of the system. Properly insulate closures to prevent heat loss/gain or condensation on surfaces within the system. Conform construction techniques used in the creation of openings to requirements of applicable building and fire codes, and applicable NFPA, SMACNA and NADCA Standards. Cutting service openings into flexible duct is not permitted. Disconnect flexible duct at the ends as needed for proper cleaning and inspection.
Reseal rigid fiber glass ductboard duct systems in accordance with NAIMA recommended practices; NAIMA AH112, NAIMA AH122, and NAIMA AH127. Only closure techniques which comply with UL 181 , UL 181A , or UL 181B are suitable for fiber glass duct system closures.
Provide access doors for openings that need to be re-opened for future inspection or remediation. Clearly mark all service openings, capable of being re-opened for future inspection or remediation, and report their location in project report documents.
3.2.1.7 Ceiling Sections (Tile)
Carefully remove and reinstall ceiling sections to gain access to HVAC systems during the cleaning process. Replace any damaged ceiling sections caused by the removal at no cost to the Government.
3.2.1.8 Air Distribution Devices (Registers, Grilles and Diffusers)
Clean all air distribution devices.
3.2.1.9 Duct Systems
a. Create service openings in the system as necessary in order to accommodate cleaning of otherwise inaccessible areas.
b. Mechanically clean all duct systems to remove all visible contaminants, such that the systems are capable of passing NADCA Cleaning Verification Testings Standards.
c. Any exposed edges in internal duct lining within duct, including but not limited to interfaces with externally insulated duct, must be fully protected, sealed and encapsulated to prevent future erosion.
3.2.2 Mechanical Cleaning Methodology
3.2.2.1 Source Removal Cleaning Methods
Clean the HVAC system using Source Removal mechanical cleaning methods designed to extract contaminants from within the HVAC system and safely remove contaminants from the facility. Select Source Removal methods which will render the HVAC System Visibly Clean and capable of passing NADCA cleaning verification methods Standards and other specified standards and tests, in accordance with all general requirements. Use no cleaning method, or combination of methods, which could potentially damage components of the HVAC system or negatively alter the integrity of the system.
SECTION 23 01 30.41 Page 7
Incorporate the use of vacuum collection devices that are operated continuously during cleaning for all methods used. Connect a vacuum device to the downstream end of the section being cleaned through a predetermined opening. Use a vacuum collection device of sufficient power to render all areas being cleaned under negative pressure, such that containment of debris and the protection of the indoor environment is assured.
Equip all vacuum devices exhausting air inside the building, including hand-held vacuums and wet-vacuums, with HEPA filters (minimum efficiency).
Equip all vacuum devices exhausting air outside the facility with Particulate Collection including adequate filtration to contain Debris removed from the HVAC system, in a manner that does not allow contaminants to re-enter the facility. Release of debris outdoors which violates any outdoor environmental standards, codes or regulations is not allowed.
All methods require mechanical agitation devices to dislodge debris adhered to interior HVAC system surfaces, such that debris may be safely conveyed to vacuum collection devices. Acceptable methods include those which will not potentially damage the integrity of the ductwork, nor damage porous surface materials such as liners inside the ductwork or system components.
3.2.2.2 Methods of Cleaning Fibrous Glass Insulated Components
Thoroughly clean glass insulation elements present in any equipment or ductwork with HEPA vacuuming equipment. Clean while the HVAC system is under constant negative pressure, and not permitted to get wet in accordance with applicable NADCA and NAIMA standards and recommendations.
Do not use cleaning methods that cause damage to fibrous glass components or renders the system capable of passing Cleaning Verification Tests NADCA Standards.
Provide surface treatment for insulation for sections of internally-lined duct. Select and apply encapsulates, coatings, and insulation repair products to completely restore surface integrity of fibrous glass surfaces in accordance with applicable standards and manufacturer's installation instructions.
3.2.2.3 Damaged Fibrous Glass Material
If there is any evidence of damage, deterioration, delamination, friable material, mold or fungus growth, or moisture such that fibrous glass materials cannot be restored by cleaning or resurfacing with an acceptable insulation repair coating, identify them to the Contracting Officer for replacement.
When requested or specified, remediate exposed damaged insulation in air handlers and/or ductwork requiring replacement.
If insulation is damaged as a result of this work under this specification, notify Contracting Officer and initiate a meeting with same to determine options for repair or replacement of insulation.
SECTION 23 01 30.41 Page 8
3.2.2.4 Replacement Material
If replacement of fiber glass materials is required, conform all materials to applicable industry codes and standards, including those of UL and
SMACNA 1966.
Replacement of damaged insulation is not covered by this specification.
Refer to Section 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS.
3.2.2.5 Antimicrobial Agents and Coatings
Perform application of antimicrobial agents used to control the growth of fungal or bacteriological contaminants after the removal of surface deposits and debris. Perform mold remediation in accordance with
ANSI/IICRC S520 .
Use only antimicrobial agents registered by the U.S. Environmental Protection Agency ( EPA 402-F-91-102 ) ( EPA 402-C-01-001 ) specifically for use within HVAC system.
Apply antimicrobial agents in strict accordance with manufacturer's instructions.
Use only antimicrobial coating products, for both porous and non-porous surfaces, which are EPA registered, water soluble solutions with supporting efficacy data and SDS records.
Apply antimicrobial coatings according to manufacturer's instructions.
Spray coatings directly onto interior ductwork surfaces, rather than "fog" downstream onto surfaces. Achieve a continuous film on the surface treated by the coating application, and apply in strict accordance with manufacturer's minimum millage surface application rate standards for effectiveness.
3.3 FIELD QUALITY CONTROL
3.3.1 CLEANLINESS VERIFICATION
3.3.1.1 General
Verification of HVAC System cleanliness is determined after mechanical cleaning and before the application of any treatment or introduction of any treatment-related substance to the HVAC system, including antimicrobial agents and coatings.
3.3.1.2 Visual Inspection
Visually inspect the HVAC system to ensure that no visible contaminants are present.
If no contaminants are evident through visual inspection, consider the HVAC system clean; however, further verification of the system cleanliness through wipe testing analysis testing may be requested at the discretion of the Contracting Officer.
If visible contaminants are evident through visual inspection, re-clean those portions of the system where contaminants are visible, and subject to re-inspection for cleanliness.
SECTION 23 01 30.41 Page 9
As part of inspection, record photographs and videos of inspection locations to document post-cleaning condition.
3.3.2 Post-Project Report
At the conclusion of the project, provide a Testing Procedures Summary and Post-Project Report indicating the following:
a. Success of the cleaning project, as verified through visual inspection.
b. Areas of the system found to be damaged and/or in need of repair.
-- End of Section --
SECTION 23 01 30.41 Page 10
SECTION 23 03 00.00 20
BASIC MECHANICAL MATERIALS AND METHODS
08/10, CHG 3: 08/18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM B117 (2019) Standard Practice for Operating Salt Spray (Fog) Apparatus
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C2 (2023) National Electrical Safety Code
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2021) Motors and Generators
NEMA MG 10 (2017) Energy Management Guide for Selection and Use of Fixed Frequency Medium AC Squirrel-Cage Polyphase Induction Motors
NEMA MG 11 (1977; R 2012) Energy Management Guide for Selection and Use of Single Phase Motors
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2023) National Electrical Code
1.2 RELATED REQUIREMENTS
This section applies to all sections of Divisions: 21, FIRE SUPPRESSION;
22, PLUMBING; and 23, HEATING, VENTILATING, AND AIR CONDITIONING of this project specification, unless specified otherwise in the individual section.
1.3 QUALITY ASSURANCE
1.3.1 Material and Equipment Qualifications
Provide materials and equipment that are standard products of manufacturers regularly engaged in the manufacture of such products, which are of a similar material, design and workmanship. Standard products must have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year use must include applications of equipment and materials under similar circumstances and of similar size. The product must have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2 year period.
SECTION 23 03 00.00 20 Page 1
1.3.2 Alternative Qualifications
Products having less than a two-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6,000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.
1.3.3 Service Support
The equipment items must be supported by service organizations. Submit a certified list of qualified permanent service organizations for support of the equipment which includes their addresses and qualifications. These service organizations must be reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
1.3.4 Manufacturer's Nameplate
For each item of equipment, provide a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.
1.3.5 Modification of References
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "must" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction", or words of similar meaning, to mean the Contracting Officer.
1.3.5.1 Definitions
For the International Code Council (ICC) Codes referenced in the contract documents, advisory provisions must be considered mandatory, the word "should" is interpreted as "must." Reference to the "code official" must be interpreted to mean the "Contracting Officer." References to the "owner" must be interpreted to mean the "Contracting Officer." For leased facilities, references to the "owner" must be interpreted to mean the "lessor." References to the "permit holder" must be interpreted to mean the "Contractor."
1.3.5.2 Administrative Interpretations
For ICC Codes referenced in the contract documents, the provisions of Chapter 1, "Administrator," do not apply. These administrative requirements are covered by the applicable Federal Acquisition Regulations (FAR) included in this contract and by the authority granted to the Officer in Charge of Construction to administer the construction of this project. References in the ICC Codes to sections of Chapter 1, must be applied appropriately by the Contracting Officer as authorized by his administrative cognizance and the FAR.
1.4 DELIVERY, STORAGE, AND HANDLING
Handle, store, and protect equipment and materials to prevent damage before and during installation in accordance with the manufacturer's recommendations, and as approved by the Contracting Officer. Replace damaged or defective items.
SECTION 23 03 00.00 20 Page 2
1.5 ELECTRICAL REQUIREMENTS
Furnish motors, controllers, disconnects and contactors with their respective pieces of equipment. Motors, controllers, disconnects and contactors must conform to and have electrical connections provided under Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Furnish internal wiring for components of packaged equipment as an integral part of the equipment.
Extended voltage range motors will not be permitted. Controllers and contactors shall have a maximum of 120 volt control circuits, and must have auxiliary contacts for use with the controls furnished. When motors and equipment furnished are larger than sizes indicated, the cost of additional electrical service and related work must be included under the section that specified that motor or equipment. Power wiring and conduit for field installed equipment must be provided under and conform to the requirements of Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.
1.6 ELECTRICAL INSTALLATION REQUIREMENTS
Electrical installations must conform to IEEE C2 , NFPA 70 , and requirements specified herein.
1.6.1 New Work
Provide electrical components of mechanical equipment, such as motors, motor starters (except starters/controllers which are indicated as part of a motor control center), control or push-button stations, float or pressure switches, solenoid valves, integral disconnects, and other devices functioning to control mechanical equipment, as well as control wiring and conduit for circuits rated 100 volts or less, to conform with the requirements of the section covering the mechanical equipment.
Extended voltage range motors are not to be permitted. The interconnecting power wiring and conduit, control wiring rated 120 volts (nominal) and conduit, and the electrical power circuits must be provided under Division 26, except internal wiring for components of package equipment must be provided as an integral part of the equipment. When motors and equipment furnished are larger than sizes indicated, provide any required changes to the electrical service as may be necessary and related work as a part of the work for the section specifying that motor or equipment.
1.6.2 Modifications to Existing Systems
Where existing mechanical systems and motor-operated equipment require modifications, provide electrical components under Division 26.
1.6.3 High Efficiency Motors
1.6.3.1 High Efficiency Single-Phase Motors
Unless otherwise specified, single-phase fractional-horsepower alternating-current motors must be high efficiency types corresponding to the applications listed in NEMA MG 11.
1.6.3.2 High Efficiency Polyphase Motors
Unless otherwise specified, polyphase motors must be selected based on high efficiency characteristics relative to the applications as listed in NEMA MG 10. Additionally, polyphase squirrel-cage medium induction motors
SECTION 23 03 00.00 20 Page 3 with continuous ratings must meet or exceed energy efficient ratings in accordance with Table 12-6C of NEMA MG 1.
1.6.4 Three-Phase Motor Protection
Provide controllers for motors rated one 1 horsepower and larger with electronic phase-voltage monitors designed to protect motors from phase-loss, undervoltage, and overvoltage. Provide protection for motors from immediate restart by a time adjustable restart relay.
1.7 INSTRUCTION TO GOVERNMENT PERSONNEL
When specified in other sections, furnish the services of competent instructors to give full instruction to the designated Government personnel in the adjustment, operation, and maintenance, including pertinent safety requirements, of the specified equipment or system.
Instructors must be thoroughly familiar with all parts of the installation and must be trained in operating theory as well as practical operation and maintenance work.
Instruction must be given during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation. The number of man-days (8 hours per day) of instruction furnished must be as specified in the individual section.
When more than 4 man-days of instruction are specified, use approximately half of the time for classroom instruction. Use other time for instruction with the equipment or system.
When significant changes or modifications in the equipment or system are made under the terms of the contract, provide additional instruction to acquaint the operating personnel with the changes or modifications.
1.8 ACCESSIBILITY
Install all work so that parts requiring periodic inspection, operation, maintenance, and repair are readily accessible. Install concealed valves, expansion joints, controls, dampers, and equipment requiring access, in locations freely accessible through access doors.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 PAINTING OF NEW EQUIPMENT
New equipment painting must be factory applied or shop applied, and must be as specified herein, and provided under each individual section.
3.1.1 Factory Painting Systems
Manufacturer's standard factory painting systems may be provided subject to certification that the factory painting system applied will withstand 125 hours in a salt-spray fog test, except that equipment located outdoors must withstand 500 hours in a salt-spray fog test. Salt-spray fog test must be in accordance with ASTM B117, and for that test the acceptance criteria must be as follows: Immediately after completion of the test, the paint must show no signs of blistering, wrinkling, or cracking, and no
SECTION 23 03 00.00 20 Page 4 loss of adhesion; and the specimen must show no signs of rust creepage beyond 0.125 inch on either side of the scratch mark.
The film thickness of the factory painting system applied on the equipment must not be less than the film thickness used on the test specimen. If manufacturer's standard factory painting system is being proposed for use on surfaces subject to temperatures above 120 degrees F, the factory painting system must be designed for the temperature service.
3.1.2 Shop Painting Systems for Metal Surfaces
Clean, pretreat, prime and paint metal surfaces; except aluminum surfaces need not be painted. Apply coatings to clean dry surfaces. Clean the surfaces to remove dust, dirt, rust, oil and grease by wire brushing and solvent degreasing prior to application of paint, except metal surfaces subject to temperatures in excess of 120 degrees F must be cleaned to bare metal.
Where more than one coat of paint is specified, apply the second coat after the preceding coat is thoroughly dry. Lightly sand damaged painting and retouch before applying the succeeding coat. Color of finish coat must be aluminum or light gray.
a. Temperatures Less Than 120 Degrees F: Immediately after cleaning, the metal surfaces subject to temperatures less than 120 degrees F must receive one coat of pretreatment primer applied to a minimum dry film thickness of 0.3 mil, one coat of primer applied to a minimum dry film thickness of 1 mil; and two coats of enamel applied to a minimum dry film thickness of 1 mil per coat.
b. Temperatures Between 120 and 400 Degrees F: Metal surfaces subject to temperatures between 120 and 400 degrees F must receive two coats of 400 degrees F heat-resisting enamel applied to a total minimum thickness of 2 mils.
-- End of Section --
SECTION 23 03 00.00 20 Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 23 03 00.00 20 Page 6
SECTION 23 05 15
ELECTRICAL HEAT TRACING
05/22, CHG 2: 08/24
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D2308 (2007; R 2013) Standard Specification for Thermoplastic Polyethylene Jacket for Electrical Wire and Cable
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 515 (2017) Standard for the Testing, Design, Installation, and Maintenance of Electrical Resistance Heat Tracing for Industrial Applications
1.2 GENERAL REQUIREMENTS
a. Submit Records of Existing Conditions consisting of the results of Contractor's survey of work area conditions and features of existing structures and facilities within and adjacent to the jobsite.
Commencement of work constitutes acceptance of the existing conditions.
b. Submit Fabrication Drawings for pipes, valves and specialties consisting of fabrication and assembly details to be performed in the factory.
c. Include with Listing of Product Installations for piping systems identification of at least 5 units, similar to those proposed for use, that have been in successful service for a minimum period of 5 years.
Include in the list purchaser, address of installation, service organization, and date of installation.
d. Submit Record Drawings for pipe accessories providing current factual information including deviations and amendments to the drawings, and concealed and visible changes in the work.
e. Submit Connection Diagrams for pipe specialties indicating the relations and connections of devices and apparatus by showing the general physical layout of all controls, the interconnection of one system (or portion of system) with another, and internal tubing, wiring, and other devices.
f. Submit Coordination Drawings for pipe specialties showing coordination of work between different trades and with the structural and architectural elements of work. Detail all drawings sufficiently to show overall dimensions of related items, clearances, and relative locations of work in allotted spaces. Indicate on drawings where
SECTION 23 05 15 Page 1 conflicts or clearance problems exist between various trades.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Record Drawings; G, AE
Connection Diagrams; G, AE
Coordination Drawings; G, AE
Fabrication Drawings; G, AE
Installation Drawings; G, AE
SD-03 Product Data
Electrical Heat Tracing; G, AE
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals; G, AE
1.4 QUALITY ASSURANCE
1.4.1 Material and Equipment Qualifications
Provide materials and equipment that are standard products of manufacturers regularly engaged in the manufacture of such products, which are of a similar material, design and workmanship. Provide standard products in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year use includes applications of equipment and materials under similar circumstances and of similar size. Ensure the product has been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2 year period.
1.4.2 Alternative Qualifications
Products having less than a two-year field service record are acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.
1.4.3 Service Support
Ensure the equipment items are supported by service organizations. Submit a certified list of qualified permanent service organizations for support of the equipment which includes their addresses and qualifications.
Select service organizations that are reasonably convenient to the equipment installation and able to render satisfactory service to the
SECTION 23 05 15 Page 2
W912QR25BA016_Specs_Vol3-0000 brmarino Line equipment on a regular and emergency basis during the warranty period of the contract.
1.4.4 Manufacturer's Nameplate
Provide a nameplate on each item of equipment bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent is not acceptable.
1.4.5 Modification of References
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer.
1.4.5.1 Definitions
For the International Code Council (ICC) Codes referenced in the contract documents, advisory provisions are considered mandatory, the word "should" is interpreted as "shall." Reference to the "code official" is interpreted to mean the "Contracting Officer." For Navy owned property, interpret references to the "owner" to mean the "Contracting Officer."
For leased facilities, references to the "owner" is interpreted to mean the "lessor." References to the "permit holder" are interpreted to mean the "Contractor."
1.4.5.2 Administrative Interpretations
For ICC Codes referenced in the contract documents, the provisions of Chapter 1, "Administrator," do not apply. These administrative requirements are covered by the applicable Federal Acquisition Regulations (FAR) included in this contract and by the authority granted to the Officer in Charge of Construction to administer the construction of this project. References in the ICC Codes to sections of Chapter 1, are applied as appropriate by the Contracting Officer and as authorized by his administrative cognizance and the FAR.
1.5 DELIVERY, STORAGE, AND HANDLING
Handle, store, and protect equipment and materials to prevent damage before and during installation in accordance with the manufacturer's recommendations, and as approved by the Contracting Officer. Replace damaged or defective items.
1.6 ELECTRICAL REQUIREMENTS
Furnish controllers, disconnects and contactors with their respective pieces of equipment. Ensure controllers, disconnects and contactors conform to and have electrical connections provided under Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Furnish internal wiring for components of packaged equipment as an integral part of the equipment. Provide controllers and contactors with a maximum of 120 volt control circuits, and auxiliary contacts for use with the controls furnished. When equipment furnished is larger than sizes indicated, include the cost of additional electrical service and related work under the section that specified that motor or equipment. Provide power wiring and conduit for
SECTION 23 05 15 Page 3 field installed equipment under and conform to the requirements of Section
26 20 00 INTERIOR DISTRIBUTION SYSTEM.
1.7 INSTRUCTION TO GOVERNMENT PERSONNEL
When specified in other sections, furnish the services of competent instructors to give full instruction to the designated Government personnel in the adjustment, operation, and maintenance, including pertinent safety requirements, of the specified equipment or system.
Provide instructors thoroughly familiar with all parts of the installation and trained in operating theory as well as practical operation and maintenance work.
Give instruction during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation. The number of man-days (8 hours per day) of instruction furnished is as specified in the individual section. When more than four man-days of instruction are specified, use approximately half of the time for classroom instruction. Use other time for instruction with the equipment or system.
When significant changes or modifications in the equipment or system are made under the terms of the contract, provide additional instruction to acquaint the operating personnel with the changes or modifications.
1.8 ACCESSIBILITY
Install all work so that parts requiring periodic inspection, operation, maintenance, and repair are readily accessible. Install concealed valves, expansion joints, controls, dampers, and equipment requiring access, in locations freely accessible through access doors.
PART 2 PRODUCTS
2.1 ELECTRICAL HEAT TRACING
Provide heat trace systems for pipes, valves, and fittings that are in accordance with IEEE 515 and be UL listed. System include all necessary components, including heaters and controls to prevent freezing.
Provide self-regulating heaters consisting of two 16 AWG tinned-copper bus wires embedded in parallel in a self-regulating polymer core that varies its power output to respond to temperature along its length. Ensure heater is able to be crossed over itself without overheating. Obtain approval before used directly on plastic pipe. Cover heater with a radiation cross-linked modified polyolefin dielectric jacket in accordance with ASTM D2308.
Provide heater with self-regulating factor of at least 90 percent, in order to provide energy conservation and to prevent overheating.
Operate heater on line voltages of 120 volts without the use of transformers.
Size Heater according to the following table:
Pipe Size
SECTION 23 05 15 Page 4
(Inch, Diameter) 25 degrees F
1 inch or less 0.9 watts per foot
Control systems by an ambient sensing thermostat set at 40 degrees F either directly or through an appropriate contactor.
PART 3 EXECUTION
3.1 HEAT TRACE CABLE INSTALLATION
Field apply heater tape and cut to fit as necessary, linearly along the length of pipe after piping has been pressure tested and approved by the Contracting Officer. Secure the heater to piping with cable ties. Label thermal insulation on the outside, "Electrical Heat Trace."
Install power connection, end seals, splice kits and tee kit components in accordance with IEEE 515 to provide a complete workable system. Terminate connection to the thermostat and ends of the heat tape in a junction box.
Ensure cable and conduit connections are raintight.
3.2 HEAT TRACE CABLE TESTS
Test heat trace cable system in accordance with IEEE 515 after installation and before and after installation of the thermal insulation.
Test heater cable using a 1000 vdc megger. Minimum insulation resistance is 20 to 1000 megohms regardless of cable length.
3.3 OPERATION AND MAINTENANCE
Provide Operation and Maintenance Manuals consistent with manufacturer's standard brochures, schematics, printed instructions, general operating procedures and safety precautions. Submit test data that is clear and readily legible.
-- End of Section --
SECTION 23 05 15 Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 23 05 15 Page 6
SECTION 23 05 48.19
SEISMIC BRACING, SUPPORTS, AND ANCHORAGE FOR MECHANICAL SYSTEMS
05/18, CHG 2: 08/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .