This document is a comprehensive specification volume (Volume 2 of 3) for a Design-Bid-Build project involving an addition and alteration of Building 600 for Flight Simulators at March Air Reserve Base, California. The specification details a wide range of construction requirements across multiple divisions, including structural steel, metal framing, roofing, firestopping, flashing, and various architectural components. The project specifications indicate a certified final design dated 26 June 2025, with a solicitation number W912QR25BA016, and a requirement to maintain project documentation for 15 years after construction.
The specification volume provides extensive technical details for construction materials and installation methods, covering everything from concrete and masonry to electrical systems, HVAC, and specialized architectural elements like metal stairs, railings, and cabinet installations. Key specifications include requirements for structural components (such as steel decks and cold-formed metal framing), roofing materials (including polyvinyl-chloride roofing), and finish materials like plastic-laminate architectural cabinets. The document emphasizes precise installation techniques, material quality standards, and compliance with various industry and government standards, suggesting a highly technical and rigorous construction project for a military facility's flight simulator infrastructure.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Results - W912QR25BA016.pdf | ||
| W912QR25BA016_Plans-0005.pdf | ||
| 2nd Site Visit Sign In Sheet B600.pdf | ||
| W912QR25BA016_Plans-0004.pdf | ||
| W912QR25BA016_Specs-0004.pdf | ||
| W912QR25BA016_Specs-0003.pdf | ||
| W912QR25BA016_Specs-0002.pdf | ||
| W912QR25BA016_Plans-0002.pdf | ||
| W912QR25BA016-0001.pdf | ||
| Sign in B600 8 July Site walk.pdf | ||
| W912QR25BA016_Specs_Vol1-0000.pdf | ||
| W912QR25BA016_SID-0000.pdf | ||
| W912QR25BA016_FFE-0000.pdf | ||
| W912QR25BA016_Specs_Vol3-0000.pdf | ||
| W912QR25BA016_Plans-0000.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Addition/Alteration of Bldg 600 for Flight Simulators March Air Reserve Base,Ca
P2: 504650
Design-Bid-Build
Specifications Vol. 2 of 3(05-22) Certified Final Design
26 June 2025
W912QR25BA016
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR25BA016_Specs_Vol2-0000
P2# 504650 Addition/Alteration of B600 for Flight Simulator March Air Reserve Base
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00
00 80 00.00 06 04/21, CHG 1: 06/23
PRICE BREAKOUT SCHEDULE
SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 32 01.00 06 10/23 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/16, CHG 2: 08/19 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING
01 50 00 11/20, CHG 1: 08/21 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS AND
PERMITS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION AND DECONSTRUCTION
02 81 00 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
HAZARDOUS MATERIALS SURVEY
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 6: 11/23 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 00 08/23 METAL STAIRS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
PROJECT TABLE OF CONTENTS
Certified Final Status
Vol. II
Vol. I
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS
07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 54 19 02/13, CHG 3: 02/21 POLYVINYL-CHLORIDE ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
07 95 00 SEISMIC/EXPANSION CONTROL
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS
08 51 13 05/19 ALUMINUM WINDOWS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
DIVISION 09 - FINISHES
09 06 00 08/22 SCHEDULES FOR FINISHES
09 24 23 08/17, CHG 2: 11/18 CEMENT STUCCO
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 69 13 11/15, CHG 1: 08/18 RIGID GRID ACCESS FLOORING
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 08/20 INTERIOR SIGNAGE
10 26 00 08/20 WALL AND DOOR PROTECTION
10 44 16 11/19 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 24 13 08/20 ROLLER WINDOW SHADES
12 50 00.13 10 08/17, CHG 1: 11/18 FURNITURE AND FURNITURE INSTALLATION
12 59 00 08/17, CHG 1: 08/18 SYSTEMS FURNITURE
DIVISION 14 - CONVEYING EQUIPMENT
14 42 00 03/24 WHEELCHAIR LIFTS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 13 18 08/20 PREACTION SPRINKLER SYSTEMS, FIRE
PROJECT TABLE OF CONTENTS
Certified Final Status
PROTECTION
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 01 30.41 05/22 HVAC SYSTEM CLEANING
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 05/22, CHG 2: 08/24 ELECTRICAL HEAT TRACING
23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING, SUPPORTS, AND
ANCHORAGE FOR MECHANICAL SYSTEMS
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00 05/23 COMMISSIONING OF MECHANICAL AND
PLUMBING SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 21 23 08/17 HYDRONIC PUMPS
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09, CHG 6: 11/22 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 23 11/20 COMPUTER ROOM AIR HANDLING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - HVAC AND AMI
25 05 11.02 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - FIRE PROTECTION
DIVISION 26 - ELECTRICAL
26 05 26.00 40 08/19 GROUNDING AND BONDING FOR ELECTRICAL
SYSTEMS
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 05 73 08/23 POWER SYSTEM STUDIES
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 41 00 08/23 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
PROJECT TABLE OF CONTENTS
Certified Final Status
Vol. III
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00.00 06 07/18 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 23 05/22 GRADED CRUSHED AGGREGATE BASE COURSE
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 92 19 08/17, CHG 1: 08/21 SEEDING
DIVISION 33 - UTILITIES
33 30 00 05/18 SANITARY SEWERAGE
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS
Certified Final Status
SECTION 05 05 20
POST-INSTALLED CONCRETE AND MASONRY ANCHORS
05/22
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 355.2 (2007) Qualification of Post-Installed Mechanical Anchors in Concrete and Commentary
ACI 355.4 (2023) Qualification of Post-Installed Adhesive Anchors in Concrete (ACI 355.4) and Commentary
ASTM INTERNATIONAL (ASTM)
ASTM A153/A153M (2023) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A193/A193M (2023) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications
ASTM A615/A615M (2022) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM E488/E488M (2022) Standard Test Methods for Strength of Anchors in Concrete Elements
ASTM F1554 (2020) Standard Specification for Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2021) International Building Code
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2024) Safety and Occupational Health (SOH) requirements
1.2 APPLICABILITY
This guide specification covers the requirements for all anchors that are
SECTION 05 05 20 Page 1 post-installed into hardened concrete, concrete masonry, or brick. This guide specification does not cover through bolts, powder or pneumatic actuated nails, or cast in anchors. Refer to Section 05 50 13 MISCELLANEOUS METAL FABRICATIONS for requirements of through bolts, powder or pneumatic actuated nails, or cast in anchors.
1.3 DEFINITIONS
1.3.1 Anchor
"Anchor" includes steel elements post-installed into hardened concrete, concrete masonry, or brick and used to transmit applied loads.
1.3.2 Periodic Special Inspections
"Periodic Special Inspection" as used herein means that, as a minimum, the Post-Installed Anchor Special Inspector must perform inspections in accordance with this specification.
1.3.3 Continuous Special Inspections
"Continuous Special Inspection" as used herein means that the Post-Installed Anchor Special Inspector observes the drilling and cleaning of holes, the injection of adhesive into the holes, and the insertion of anchors into the holes. When applicable for the type of installation, or as indicated in the project drawings, "Continuous Special Inspection" also includes observation of measures to secure the anchor during the adhesive curing period.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Installer Qualifications; G
Post-Installed Anchor Special Inspector Qualifications; G
SD-03 Product Data
Mechanical Anchors in Concrete; G AE
Adhesive Anchor System in Concrete; G AE
Mechanical and Adhesive Anchors in Masonry; G AE
Non-Shrink, Non-Metallic Grout; G AE
SD-06 Test Reports
Post-Installed Anchor Special Inspections Report; G
SD-07 Certificates
Post-Installed Anchor Certification; G
SECTION 05 05 20 Page 2
SD-08 Manufacturer's Instructions
Manufacturer's Printed Installation Instructions; G
Manufacturer's Material Safety Data Sheets
1.5 QUALITY ASSURANCE
Perform all work in accordance with EM 385-1-1 and all manufacturer's instructions and recommendations. To protect personnel from overexposure to toxic materials, conform to the applicable manufacturer's Material Safety Data Sheets (MSDS) or local regulation. Submit the MSDS for epoxies and other potentially hazardous materials.
1.5.1 Qualifications
The submittals must identify individuals who will be working on this contract and their relevant experience and training. Do not make changes in approved personnel without prior approval of the Contracting Officer.
1.5.1.1 Installer Qualifications
Each worker engaged in the installation of post-installed anchors must have satisfactorily completed an applicable certification program or equivalent instruction program through the manufacturer or manufacturer's representative for all anchoring products they will install. A manufacturer's representative must train all installers per the installation instructions as listed in the ICC-ES Evaluation Report for the anchor being installed. Training must consist of a review and performance test of the complete installation process, including but not limited to:
(1) Hole drilling procedure
(2) Hole preparation & cleaning technique
(3) Adhesive injection technique & dispenser training / maintenance
(4) Anchor/threaded rod preparation and installation
(5) Rebar dowel preparation and installation
(6) Proof loading/torquing
(7) Installation in horizontal and upward orientations
Submit certification for each worker showing that they have completed the above training within three years prior to onsite work. Certification must include organization or manufacturer's name, instructor's name and qualifications, trainee's name, list of instruction received, date of instruction, and confirmation of successful performance tests.
1.5.1.2 Post-Installed Anchor Special Inspector Qualifications
The Contractor must retain the services of a third party Special Inspector independent of the installing contractor and manufacturer. The individual(s) who perform special inspections for post-installed anchors must meet all Installer Qualification requirements and have a minimum of 1
SECTION 05 05 20 Page 3 year of experience as a Special Inspector on previous projects involving similar scope of work. Submit resumes, pertinent information, past experience, and training.
1.6 DELIVERY, STORAGE, AND HANDLING
1.6.1 Packing, Shipping, Handling, and Unloading
Deliver products to job site in manufacturer's or distributor's original packaging undamaged, complete with installation instructions. Inspect materials delivered to site for damage. Unload and store with minimal handling.
1.6.2 Storage
Protect, store, and handle materials in accordance with manufacturer's recommendations to prevent damage or deterioration. Do not allow chemical materials to freeze. Remove materials that have not be stored in accordance with the manufacturer's recommendations, including expired materials, from the job site.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Post-Installed Anchors
Provide anchors of the type, effective embedment, and diameter indicated on contract drawings. Minimum spacing and concrete edge distances must be as shown on contract drawings. Design values listed must be as tested according to ASTM E488/E488M for the substrate type, substrate moisture condition, concrete aggregate type (normal weight or lightweight concrete), and concrete/masonry strength. If more than one type of anchor is to be used on a project, clearly indicate on the submittal where each type of anchor will be used.
2.1.1.1 Post-Installed Anchor Certification
Submit product information with recommended design values and physical characteristics for each type anchor shown on the drawings.
Provide certified test reports showing compliance with specified performance characteristics and physical properties. Anchors must have one of the following certifications:
(1) ICC-ES Evaluation Report indicating conformance with current applicable ICC ES Acceptance Criteria
(2) Third party Evaluation Report in conformance with ACI 355.2 or ACI 355.4 , as applicable. Third party must be accredited under ISO/IEC 17025 by a recognized accreditation body conforming to the requirements of ISO/IEC 17011 in accordance with ACI 355.4 ."
2.1.1.2 Manufacturer's Printed Installation Instructions
Submit manufacturer's instructions for each anchor type shown on the drawings.
SECTION 05 05 20 Page 4
2.1.1.3 Mechanical Anchors in Concrete
Anchors must have been tested and qualified for performance in cracked and uncracked concrete in accordance with ACI 355.2 .
Anchors must be galvanized in accordance with ASTM A153/A153M or stainless steel in accordance with ASTM A193/A193M unless otherwise indicated.
2.1.1.4 Adhesive Anchor System in Concrete
Use an adhesive to bond steel anchors to concrete. The adhesive must be a moisture insensitive, structural adhesive. Anchors must have been tested and qualified for performance in cracked and uncracked concrete, horizontal and overhead applications, and long term creep in accordance with ACI 355.4 .
Threaded rod anchors must meet the requirements of ASTM F1554 Grade 36, unless otherwise indicated. Threaded rods must be galvanized in accordance with ASTM A153/A153M or stainless steel in accordance with ASTM A193/A193M unless otherwise indicated. Reinforcing bars must meet the requirements of ASTM A615/A615M Grade 60.
Adhesive anchors must have the below characteristic bond strengths for uncracked and cracked concrete in 3000 psi concrete with maximum short term temperatures of 130 degrees F and maximum long term temperatures of 110 degrees F:
ANCHOR Tau,uncr (characteristic bond strength, uncracked concrete)
Tau,cr (characteristic bond strength, cracked concrete)
(psi) (psi)
___" diameter threaded rod 2,380 1,280
1/2" diameter threaded rod 2,300 1,270
5/8" diameter threaded rod 2,210 1,260
#4 reinforcing bar 1,740 1,360
#5 reinforcing bar 1,720 1,390
#6 reinforcing bar 1,690 1,410
2.1.1.5 Mechanical and Adhesive Anchors in Masonry
Anchors must have been tested and qualified, by a third party, specifically for performance in filled concrete masonry to match the project's actual base material.
Adhesives must be moisture insensitive, low creep, structural adhesive.
Threaded rods must meet the requirements of ASTM F1554 Grade 36 unless otherwise indicated.
SECTION 05 05 20 Page 5
Anchors must be galvanized in accordance with ASTM A153/A153M or stainless steel in accordance with ASTM A193/A193M unless otherwise indicated.
2.2 EQUIPMENT
Assemble at the site of the work, sufficient equipment that is dependable, appropriate and adequate to accomplish the work specified. Maintain the equipment in good working condition.
PART 3 EXECUTION
3.1 ANCHORING AND REINFORCING
Install anchors in accordance with the spacing and edge clearances indicated on the drawings. Anchor capacity is also highly dependent on proper installation. Follow all manufacturer and Evaluation Report installation instructions.
3.1.1 Drilling and Installing Mechanical Anchors
Drill holes for anchors using drilling equipment and bits suitable for the intended purpose, in accordance with Manufacturer's published installation instructions. Diameter of holes must be as recommended by the anchor manufacturer. Unless otherwise shown on the Drawings, all holes must be drilled perpendicular to the concrete surface. Deviations more than 6 degrees from perpendicular are not acceptable. Unless otherwise specified, do not drill holes in concrete or masonry until concrete, mortar, or grout has achieved full design strength. Mechanical anchors must not be installed in concrete that is less than 7 days old.
Clean holes, install anchors and set anchors in place in accordance with the manufacturer's recommendations. Protect threads and anchor from damage during anchor installation. Ensure proper embedment and placement in accordance with contract documents and all other work. Aim wedges away from any concrete edges that are less than 9 inches from centerline of hole.
Tighten nuts against smooth washers to the manufacturer's recommended torque, using a calibrated torque wrench. Following attainment of 10 percent of the specified torque, 100 percent of the specified torque must be reached within 7 or less complete turns of the nut. If the specified torque is not achieved within the required number of turns, the anchor must be removed and replaced unless otherwise directed by the Engineer of Record.
3.1.2 Drilling and Installing Adhesive Anchors
Drill holes for anchors using drilling equipment and bits suitable for the intended purpose, in accordance with Manufacturer's Printed Installation Instructions and Evaluation Report installation instructions. Diameter of holes must be as recommended by the anchor manufacturer. Unless otherwise shown on the drawings, all holes must be drilled perpendicular to the concrete surface. Deviations more than 10 degrees from perpendicular are not acceptable. Unless otherwise specified, do not drill holes in concrete or masonry until concrete, mortar, or grout has achieved full design strength. Adhesive anchors must not be installed in concrete that is less than 21 days old.
Clean holes, place grout, and install anchors in accordance with anchor
SECTION 05 05 20 Page 6 manufacturer's recommendations. Remove excess adhesive after the anchor has been set in place. Remove spills on adjacent surfaces. Protect threads and anchor from damage during anchor installation. Ensure proper embedment and placement in accordance with contract documents and all other work. Do not disturb or load anchors before manufacturer specified cure time has elapsed.
Adhesives must be stored at temperatures prescribed by the manufacturer and must not be used beyond the expiration date.
3.1.3 Unused or Repairs to Drilled Holes
Any holes made for anchors that are not used must be filled with non-shrink, non metallic grout suitable for the orientation and size of hole and have a minimum compressive strength of 4000 psi. Repair must completely fill hole and be flush with existing concrete or masonry.
Place in accordance with manufacturer's recommended instructions. Final anchor positions must not be within1 inch of repair patches.
3.2 EMBEDDED ITEMS
Existing reinforcing bars or other embedded items in the structure may conflict with specified anchor locations. Existing reinforcing and embedded items must not be damaged during installation of post-installed anchors .
The Contractor must review the project drawings and must use Radar detection systems (such as Hilti Ferroscan), X-Ray, or other appropriate means to accurately locate the position of reinforcing bars and embedded items at the locations of the anchors in the field. Scanning method must provide enough accuracy and precision to locate the space between rebar.
Structural integrity of existing concrete or masonry must not be impaired by investigating method.
Create a template at each anchor connection location prior to fabricating holes in connection plates. Template must be made by locating existing reinforcing with an approved reinforcement detection system.
3.3 TESTS AND INSPECTIONS
3.3.1 Mechanical Anchors
For mechanical anchors, periodic special inspections are required.
Inspections must be in accordance with ICC IBC and the Evaluation Report.
Mechanical Anchors must be inspected during installation, to verify anchor type, anchor dimensions, base material type, drill bit, hole dimensions, hole cleaning procedures, anchor spacing, edge distances, base material thickness, base material age, effective embedment, tightening torque, adherence to the manufacturer's printed installation instructions, and any additional items recommended in the Evaluation Report.
For mechanical anchors whose strength is dependent on a minimum installation torque, the installer under the supervision of the Special Inspector must torque test the anchors with a calibrated torque wrench.
Perform torque testing immediately on the first three anchors of each type and size, for each installer, and a minimum of 10 percent of randomly selected anchors. Anchor selection will be determined by the Post-Installed Anchor Special Inspector.
SECTION 05 05 20 Page 7
For mechanical anchors whose strength is not dependent on a minimum installation torque, the Special Inspector must perform proof loading on the first three anchors of each type and size, for each installer and a minimum of 10 percent of randomly selected anchors. Anchor selection will be determined by the Contracting Officer. Perform confined tension proof load testing in accordance with ASTM E488/E488M . Use incremental loading for tensile test. Maintain proof load for a minimum of 10 seconds.
Consider anchors to have failed if displacement exceeds 0.1 inch D/10, where D is the nominal anchor diameter, or if any of the failure modes listed in ASTM E488/E488M occur.
Proof loads must be the minimum of the value shown on the drawings. Proof loads must be 50 percent of the tension capacity of the anchor unless indicated otherwise.
3.3.2 Adhesive Anchors
For adhesive anchors, periodic special inspection are required as a minimum. Where adhesive anchors are used to resist sustained tension in horizontal or upwardly inclined orientations, or where the findings of the Evaluation Report for the adhesive anchor product require it, continuous special inspection is needed. Inspections must be in accordance with ICC IBC and the Evaluation Report.
Adhesive anchors must be inspected during installation, to verify anchor type, anchor dimensions, base material type, base material age, drill bit, hole dimensions, hole cleaning procedures, anchor spacing, edge distances, base material thickness, effective embedment, tightening torque, adhesive mixing, filling of the hole with adhesive, adherence to the manufacturer's printed installation instructions, and any additional items recommended in the Evaluation Report.
The Special Inspector must perform proof loading on the first three anchors of each type and size, for each installer and a minimum of 10 percent of randomly selected anchors. Anchor selection will be determined by the Contracting Officer. Perform confined tension proof load testing in accordance with ASTM E488/E488M . Use incremental loading for tensile test. Maintain proof load for a minimum of 10 seconds. Consider anchors to have failed if displacement exceeds 0.1 inch D/10, where D is the nominal anchor diameter, or if any of the failure modes listed in ASTM E488/E488M occur.
Adhesive anchors and capsule anchors must not be torque tested.
Proof loads must be the minimum of the value shown on the contract drawings.
Proof loads must be 50 percent of the tension capacity of the anchor unless indicated otherwise.
3.3.3 Action Required from Failed Tests/Inspections
Immediately report failed anchor locations and test results to the Contracting Officer. Anchors that fail to meet proof/torque load or installation requirements must be regarded as malfunctioning. Do not re-use holes unless specifically allowed by manufacturer's published instructions and approved by the Post-Installed Anchor Special Inspector.
If any of the tested anchors fail to achieve the specified torque or proof load within the limits of the contract documents, test a minimum of two
SECTION 05 05 20 Page 8 adjacent anchors for each anchor that fails.
Continuously special inspect and proof load/torque test any replacement anchors.
Fill unused anchor holes and patch failed anchor locations in accordance with this specification. Prior to performing the repair, the Contractor must submit to the Contracting Officer for approval, the proposed fill and patch materials.
Additional tests, repairs, delays, or modification of work to accommodate failed tests will be at no cost to the Government.
3.3.4 Post-Installed Anchor Special Inspections Report
Report the results of all inspections biweekly. Submit report as an electronic PDF file to the Contracting Officer for review by the Engineer of Record. The report must include the following:
(1) Exact locations of the inspected and tested work
(2) Inspector's name
(3) Date of inspection
(4) Summary of work completed during the inspection period
(5) Test results
(6) Statement by the Special Inspector that clearly identifies the tested anchors as being acceptable or rejected.
(7) Statement by the Special Inspector confirming that the materials and installation procedures conform with the approved contract documents and the manufacturer's published installation instructions.
3.4 DUST CONTROL
Control dust resulting from demolition to prevent the spread of dust and avoid creation of a nuisance in the surrounding area. Do not use water when it will result in, or create, hazardous or objectionable conditions such as ice, flooding, or pollution.
-- End of Section --
SECTION 05 05 20 Page 9
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 05 05 20 Page 10
SECTION 05 05 23.16
STRUCTURAL WELDING
08/18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 341 (2016) Seismic Provisions for Structural Steel Buildings
AISC 360 (2016) Specification for Structural Steel Buildings
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
ANSI/ASNT CP-189 (2020) ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel
AMERICAN WELDING SOCIETY (AWS)
AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination
AWS D1.1/D1.1M (2020; Errata 1 2021) Structural Welding Code - Steel
AWS D1.3/D1.3M (2018) Structural Welding Code - Sheet Steel
AWS D1.4/D1.4M (2011) Structural Welding Code - Reinforcing Steel
AWS D1.8/D1.8M (2016) Structural Welding Code—Seismic Supplement
AWS D14.4/D14.4M (2012) Specification for Welded Joints for Machinery and Equipment
AWS QC1 (2016) Specification for AWS Certification of Welding Inspectors
AWS Z49.1 (2021) Safety in Welding and Cutting and Allied Processes
ASTM INTERNATIONAL (ASTM)
ASTM E165/E165M (2018) Standard Practice for Liquid Penetrant Examination for General Industry
SECTION 05 05 23.16 Page 1
ASTM E709 (2021) Standard Guide for Magnetic Particle Testing
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Welding Quality Assurance Plan; G
SD-03 Product Data
Welding Procedure Qualifications; G
Welder, Welding Operator, and Tacker Qualification
Previous Qualifications
Pre-Qualified Procedures; G
Welding Electrodes and Rods
SD-06 Test Reports
Nondestructive Testing
Weld Inspection Log
SD-07 Certificates
Certified Welding Procedure Specifications (WPS)
Certified Procedure Qualification Records (PQR)
Certified Welder Performance Qualifications (WPQ)
Certified Welding Inspector
Nondestructive Testing Personnel
1.3 QUALITY ASSURANCE
Except for pre-qualified (in accordance with AWS D1.1/D1.1M ) and previously qualified procedures, each Contractor performing welding must record in detail and qualify the welding procedure specification for any welding procedure followed in the fabrication of weldments. Conform welding procedure qualifications to AWS D1.1/D1.1M and to the specifications in this section. Submit for approval copies of the welding procedure specification and the procedure qualification records for each type of welding being performed. Submission of the welder, welding operator, or tacker qualification test records is also required. Approval of any procedure, however, does not relieve the Contractor of the sole responsibility for producing a finished structure meeting all the
SECTION 05 05 23.16 Page 2 specified requirements. Submit this information on the forms in Annex M of AWS D1.1/D1.1M . Individually identify and clearly reference on the detail drawings and erection drawings all welding procedure specifications, or suitably key them to the contract drawings. In case of conflict between this specification and AWS D1.1/D1.1M , this specification governs.
1.3.1 General Requirements
Fabricate work in an AISC Certified Fabrication Plant, Category BU or a City of Los Angeles Approved Fabricator licensed for the type of work being performed. Erect work by an AISC Certified Erector, Category CSE.
a. For Structural Projects, provide documentation of the following:
(1) Component Thickness 1/8 inch and greater: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D1.1/D1.1M and
AWS D1.8/D1.8M .
(2) Component Thickness Less than 1/8 inch: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D1.3/D1.3M .
(3) Reinforcing Steel: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D1.4/D1.4M .
b. For other applications, provide documentation of the following:
(1) Submit two copies of the Certified Welding Procedure Specifications (WPS), and Certified Procedure Qualification Records (PQR) to the Contracting Officer.
(2) Submit two copies of the Certified Welder Performance Qualifications (WPQ) to the Contracting Officer within fifteen calendar days prior to any employee welding on the project material.
(3) Machinery: Qualification documents (WPS, PQR, and WPQ) in accordance with AWS D14.4/D14.4M .
1.3.2 Previous Qualifications
Welding procedures previously qualified by test in accordance with AWS D1.1/D1.1M , may be accepted for this contract without re-qualification, upon receipt of the test results, if the following conditions are met:
a. Testing was performed by an approved testing laboratory, technical consultant, or the Contractor's approved quality control organization.
b. The qualified welding procedure conforms to the requirements of this specification and is applicable to welding conditions encountered under this contract.
c. The welder, welding operator, and tacker qualification tests conform to the requirements of this specification and are applicable to welding conditions encountered under this contract.
SECTION 05 05 23.16 Page 3
1.3.3 Pre-qualified Procedures
Welding procedures which are considered pre-qualified as specified in AWS D1.1/D1.1M will be accepted without further qualification. Submit for approval a listing or an annotated drawing to indicate the joints not pre-qualified. Procedure qualification is mandatory for these joints.
1.3.4 Welder, Welding Operator, and Tacker Qualification
Each welder, welding operator, and tacker assigned to work on this contract must be qualified in accordance with the applicable requirements of AWS D1.1/D1.1M and as specified in this section. Welders, welding operators, and tackers who make acceptable procedure qualification test welds will be considered qualified for the welding procedure used within the applicable essential variables for welder qualification.
1.3.4.1 Previous Personnel Qualifications
At the discretion of the Contracting Officer, welders, welding operators, and tackers qualified by test within the previous 6 months may be accepted for this contract without re-qualification if all the following conditions are met:
a. Copies of the welding procedure specifications, the procedure qualification test records, and the welder, welding operator, and tacker qualification test records are submitted and approved in accordance with the specified requirements for detail drawings.
b. Testing was performed by an approved testing laboratory, technical consultant, or the Contractor's approved quality control organization.
c. The welder, welding operator, and tacker qualification tests conform to the requirements of this specification and are applicable to welding conditions encountered under this contract.
1.3.4.2 Certificates
Before assigning any welder, welding operator, or tacker to work under this contract, submit the names and certification that each individual is qualified as specified. State in the certification the type of welding and positions for which the welder, welding operator, or tacker is qualified, the code and procedure under which the individual is qualified, the date qualified, and the name of the firm and person certifying the qualification tests. Keep the certification current, on file, and furnish 3 copies.
1.3.4.3 Renewal of Qualification
Re-qualification of a welder or welding operator is required under any of the following conditions:
a. It has been more than 6 months since the welder or welding operator has used the specific welding process for which he is qualified.
b. There is specific reason to question the welder or welding operator's ability to make welds that meet the requirements of these specifications.
c. The welder or welding operator was qualified by an employer other than
SECTION 05 05 23.16 Page 4 those firms performing work under this contract, and a qualification test has not been taken within the past 12 months. Submit as evidence of conformance all records showing periods of employment, name of employer where welder, or welding operator, was last employed, and the process for which qualified.
d. A tacker who passes the qualification test is considered eligible to perform tack welding indefinitely in the positions and with the processes for which he/she is qualified, unless there is some specific reason to question the tacker's ability or there has been a gap greater than 6 months since he/she last used the process. In such a case, the tacker is required to pass the prescribed tack welding test.
1.3.5 Inspector Qualification
Submit certificates indicating that certified welding inspectors meet the requirements of AWS QC1. Submit qualifications for nondestructive testing personnel in accordance with the requirements of ANSI/ASNT CP-189 for Levels I or II in the applicable nondestructive testing method. Level I inspectors must have direct supervision of a Level II inspector.
1.3.6 Symbols and Safety
Use symbols in accordance with AWS A2.4 , unless otherwise indicated.
Follow safe welding practices and safety precautions during welding in conformance with AWS Z49.1 .
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Conform the design of welded connections to AISC 360 and AISC 341 , unless otherwise indicated or specified. Material with welds will not be accepted unless the welding is specified or indicated on the drawings or otherwise approved. Perform welding as specified in this section, except where additional requirements are shown on the drawings or are specified in other sections. Do not commence welding until welding procedures, inspectors, nondestructive testing personnel, welders, welding operators, and tackers have been qualified and the submittals approved by the Contracting Officer. Perform all testing at or near the work site.
Maintain records of the test results obtained in welding procedure, welder, welding operator, and tacker performance qualifications.
2.1.1 Pre-erection Conference
Hold a pre-erection conference prior to the start of the field welding, to bring all affected parties together and to gain a naturally clear understanding of the project and the Welding Procedure Specifications (WPS) (submitted for all welding, including welding done using pre-qualified procedures). Mandatory attendance is required by all Contractor's welding production and inspection personnel and appropriate Government personnel. Include as items for discussion: Responsibilities of various parties; welding procedures and processes to be followed;
welding sequence (both within a joint and joint sequence within the building); inspection requirements and procedures, both visual and nondestructive testing; welding schedule; and other items deemed necessary by the attendees.
SECTION 05 05 23.16 Page 5
2.2 WELDING EQUIPMENT AND MATERIALS
Provide all welding equipment, welding electrodes and rods, welding wire, and fluxes capable of producing satisfactory welds when used by a qualified welder or welding operator. Provide welding equipment and materials that comply with the applicable requirements of AWS D1.1/D1.1M and AWS D1.8/D1.8M . Submit product data on welding electrodes and rods.
PART 3 EXECUTION
3.1 WELDING OPERATIONS
3.1.1 Requirements
Conform workmanship and techniques for welded construction to the requirements of AWS D1.1/D1.1M , AWS D1.8/D1.8M and AISC 360 . When AWS D1.1/D1.1M , AWS D1.8/D1.8M and the AISC 360 specification conflict, the requirements of AWS D1.8/D1.8M govern.
3.1.2 Identification
Identify all welds in one of the following ways:
a. Submit written records to indicate the location of welds made by each welder, welding operator, or tacker.
b. Identify all work performed by each welder, welding operator, or tacker with an assigned number, letter, or symbol to identify welds made by that individual. The Contracting Officer may require welders, welding operators, and tackers to apply their symbol next to the weld by means of rubber stamp, felt-tipped marker with waterproof ink, or other methods that do not cause an indentation in the metal. Place the identification mark for seam welds adjacent to the weld at 3 foot intervals. Identification with die stamps or electric etchers is not allowed.
3.2 QUALITY CONTROL
Perform testing using an approved inspection or testing laboratory or technical consultant; or if approved, the Contractor's inspection and testing personnel may be used instead of the commercial inspection or testing laboratory or technical consultant. A Certified Welding Inspector must perform visual inspection on 100 percent of all welds. Document this inspection in the Visual Weld Inspection Log. Test 100 percent of CJP welds using ultrasonic testing per Table 6.2 or 6.3 of AWS D1.1/D1.1M .
Randomly test 100 percent of all PJP and fillet welds or as indicated by magnetic particle or dye penetrant testing. Verify the welds conform to paragraph STANDARDS OF ACCEPTANCE. Conform procedures and techniques for inspection with applicable requirements of AWS D1.1/D1.1M , AWS D1.8/D1.8M , ASTM E165/E165M , and ASTM E709. Submit a Welding Quality Assurance Plan and records of tests and inspections.
3.3 STANDARDS OF ACCEPTANCE
Conform dimensional tolerances for welded construction, details of welds, and quality of welds with the applicable requirements of AWS D1.1/D1.1M , AWS D1.8/D1.8M and the contract drawings. Submit all records of nondestructive testing.
SECTION 05 05 23.16 Page 6
3.3.1 Nondestructive Testing
The welding is subject to inspection and tests in the mill, shop, and field. Inspection and tests in the mill or shop do not relieve the Contractor of the responsibility to furnish weldments of satisfactory quality. When materials or workmanship do not conform to the specification requirements, the Government reserves the right to reject material or workmanship or both at any time before final acceptance of the structure containing the weldment. Any indication of a defect is regarded as a defect, unless re-evaluation by nondestructive methods or by surface conditioning shows that no unacceptable defect is present. Submit all records of nondestructive testing in accordance with paragraph STANDARDS
OF ACCEPTANCE.
3.3.2 Destructive Tests
Make all repairs when metallographic specimens are removed from any part of a structure. Employ only qualified welders or welding operators, and use the proper joints and welding procedures, including peening or heat treatment if required, to develop the full strength of the members and joints cut and to relieve residual stress.
3.4 GOVERNMENT INSPECTION AND TESTING
In addition to the inspection and tests performed by the Contractor for quality control, the Government will perform inspection and testing for acceptance to the extent determined by the Contracting Officer. The work may be performed by the Government's own forces or under a separate contract for inspection and testing. The Government reserves the right to perform supplemental nondestructive and destructive tests to determine compliance with paragraph STANDARDS OF ACCEPTANCE.
3.5 CORRECTIONS AND REPAIRS
If inspection or testing indicates defects in the weld joints, repair defective welds using a qualified welder or welding operator as applicable. Conduct corrections in accordance with the requirements of AWS D1.1/D1.1M , AWS D1.8/D1.8M and the specifications. Repair all defects in accordance with the approved procedures. Repair defects discovered between passes before additional weld material is deposited. Wherever a defect is removed and repair by welding is not required, blend the affected area into the surrounding surface to eliminate sharp notches, crevices, or corners. After a defect is thought to have been removed, and before re-welding, examine the area by suitable methods to ensure that the defect has been eliminated. Repaired welds must meet the inspection requirements for the original welds.
-- End of Section --
SECTION 05 05 23.16 Page 7
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 05 05 23.16 Page 8
SECTION 05 12 00
STRUCTURAL STEEL
08/18, CHG 2: 05/21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 207 (2016; R 2017) Certification Standard for Steel Fabrication and Erection, and Manufacturing of Metal Components
AISC 303 (2016) Code of Standard Practice for Steel Buildings and Bridges
AISC 325 (2017) Steel Construction Manual
AISC 326 (2009) Detailing for Steel Construction
AISC 341 (2016) Seismic Provisions for Structural Steel Buildings
AISC 360 (2016) Specification for Structural Steel Buildings
AISC 420 (2010) Certification Standard for Shop Application of Complex Protective Coating Systems
AISC DESIGN GUIDE 10 (1997) Erection Bracing of Low-Rise Structural Steel Buildings
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B46.1 (2020) Surface Texture, Surface Roughness, Waviness and Lay
AMERICAN WELDING SOCIETY (AWS)
AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination
AWS D1.1/D1.1M (2020; Errata 1 2021) Structural Welding Code - Steel
AWS D1.8/D1.8M (2016) Structural Welding Code—Seismic Supplement
ASTM INTERNATIONAL (ASTM)
ASTM A6/A6M (2022) Standard Specification for General
SECTION 05 12 00 Page 1
Requirements for Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling
ASTM A29/A29M (2020) Standard Specification for General Requirements for Steel Bars, Carbon and Alloy, Hot-Wrought
ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel
ASTM A53/A53M (2024) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A123/A123M (2022) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A143/A143M (2007; R 2020) Standard Practice for Safeguarding Against Embrittlement of Hot-Dip Galvanized Structural Steel Products and Procedure for Detecting Embrittlement
ASTM A500/A500M (2023) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A563 (2021; E 2022a) Standard Specification for Carbon and Alloy Steel Nuts
ASTM A572/A572M (2021; E 2021) Standard Specification for High-Strength Low-Alloy Columbium-Vanadium Structural Steel
ASTM A780/A780M (2021) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM A992/A992M (2020) Standard Specification for Structural Steel Shapes
ASTM B695 (2021) Standard Specification for Coatings of Zinc Mechanically Deposited on Iron and Steel
ASTM C827/C827M (2016) Standard Test Method for Change in Height at Early Ages of Cylindrical Specimens of Cementitious Mixtures
ASTM C1107/C1107M (2020) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM F436/F436M (2019) Standard Specification for Hardened Steel Washers Inch and Metric Dimensions
ASTM F844 (2019) Standard Specification for Washers, Steel, Plain (Flat), Unhardened for
SECTION 05 12 00 Page 2
General Use
ASTM F959/F959M (2017a) Standard Specification for Compressible-Washer-Type Direct Tension Indicators for Use with Structural Fasteners, Inch and Metric Series
ASTM F1136/F1136M (2011) Standard Specification for Zinc/Aluminum Corrosion Protective Coatings for Fasteners
ASTM F1554 (2020) Standard Specification for Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength
ASTM F2329/F2329M (2015) Standard Specification for Zinc Coating, Hot-Dip, Requirements for Application to Carbon and Alloy Steel Bolts, Screws, Washers, Nuts, and Special Threaded Fasteners
ASTM F2833 (2011; R 2017) Standard Specification for Corrosion Protective Fastener Coatings with Zinc Rich Base Coat and Aluminum Organic/Inorganic Type
ASTM F3125/F3125M (2019) Standard Specification for High Strength Structural Bolts and Assemblies, Steel and Alloy Steel, Heat Treated, Inch Dimensions 120 ksi and 150 ksi Minimum Tensile Strength, and Metric Dimensions 830 MPa and 1040 MPa Minimum Tensile Strength
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC PA 1 (2016) Shop, Field, and Maintenance Coating of Metals
SSPC Paint 20 (2019) Zinc-Rich Primers (Type I, Inorganic, and Type II, Organic)
SSPC Paint 29 (2002; E 2004) Zinc Dust Sacrificial Primer, Performance-Based
SSPC SP 3 (2018) Power Tool Cleaning
SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-301-01 (2023) Structural Engineering
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR Part 1926, Subpart R Steel Erection
SECTION 05 12 00 Page 3
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Erection and Erection Bracing Drawings; G AE
SD-02 Shop Drawings
Fabrication Drawings Including Details of Connections; G AE
SD-03 Product Data
Shop Primer
Welding Electrodes and Rods
Direct Tension Indicator Washers
Non-Shrink Grout
Tension Control Bolts
SD-05 Design Data
Shoring and Temporary Bracing; G AE
SD-06 Test Reports
Class B Coating
Bolts, Nuts, and Washers
Direct Tension Indicator Washer Inspection Reports
Bolt Testing Reports
SD-07 Certificates
Steel
Bolts, Nuts, and Washers
Structural Steel Fabricator Quality Certification
AISC Structural Steel Erector Quality Certification
Welding Procedure Specifications (WPS)
1.3 AISC QUALITY CERTIFICATION
Work must be fabricated by an AISC Certified Structural Steel Fabricator, in accordance with AISC 207 , Category BU or a City of Los Angeles Approved Fabricator licensed for the type of work being performed. Submit Structural Steel Fabricator quality certification.
SECTION 05 12 00 Page 4
Work must be erected by an AISC Structural Steel Certified Erector, in accordance with AISC 207 , Category CSE. Submit AISC Structural Steel erector quality certification.
1.4 SEISMIC PROVISIONS
Provide the structural steel system in accordance with AISC 341 , Chapter J as amended by UFC 3-301-01 .
1.5 QUALITY ASSURANCE
1.5.1 Preconstruction Submittals
1.5.1.1 Erection and Erection Bracing Drawings
Submit erection drawings and erection plan for record purposes. Indicate the sequence of erection, temporary shoring and bracing. The erection drawings must conform to AISC 303 . Erection drawings must be reviewed, stamped and sealed by a registered professional engineer.
1.5.2 Fabrication Drawing Requirements
Submit fabrication drawings for approval prior to fabrication. Prepare in accordance with AISC 303 , AISC 326 and AISC 325 . Fabrication drawings must not be reproductions of contract drawings.