This document is an Amendment (Amendment 003) to a federal contract specification for a Design/Bid/Build project at March Air Reserve Base in California involving the addition and alteration of Building 600 for a KC-46 Flight Simulator. The amendment modifies multiple specification sections, specifically updating submittal requirements and technical specifications for various building systems including wet pipe sprinkler systems, electrical heat tracing, seismic bracing, HVAC instrumentation and control, refrigerant piping, HVAC air distribution, water chillers, and decentralized unitary HVAC equipment.

Key technical changes include revisions to submittal paragraphs in sections like 21 13 13 (Wet Pipe Sprinkler Systems) and 23 09 00 (HVAC Instrumentation and Control), with specific updates to documentation requirements, design calculations, system descriptions, and technical specifications. The amendment also adds a new specification section (21 13 18) for Preaction Sprinkler Systems and makes technical modifications to existing sections to ensure compliance with current engineering standards and design requirements for the KC-46 Flight Simulator facility project.

View the file

Other files for this federal contract opportunity

Other files attached to March Air Reserve Base, CA B600 Flight Simulator, newest first.
File Type Posted
Bid Opening Results - W912QR25BA016.pdf PDF
W912QR25BA016_Plans-0005.pdf PDF
2nd Site Visit Sign In Sheet B600.pdf PDF
W912QR25BA016_Specs-0004.pdf PDF
W912QR25BA016_Plans-0004.pdf PDF
W912QR25BA016_Specs-0002.pdf PDF
W912QR25BA016_Plans-0002.pdf PDF
W912QR25BA016-0001.pdf PDF
Sign in B600 8 July Site walk.pdf PDF
W912QR25BA016_SID-0000.pdf PDF
W912QR25BA016_FFE-0000.pdf PDF
W912QR25BA016_Specs_Vol1-0000.pdf PDF
W912QR25BA016_Specs_Vol2-0000.pdf PDF
W912QR25BA016_Plans-0000.pdf PDF
W912QR25BA016_Specs_Vol3-0000.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 2

0003 07 AUG 2025 504650

W912QR

W072 ENDIST LOUISVILLE

KO CONTRACTING DIVISION, 600 DR MARTIN LUTHER KING JR PL

LOUISVILLE, KY 40202-2230

UNITED STATES

LINDSAY LAWRENCE, EMAIL: LINDSAY.B.LAWRENCE@USACE.ARMY.MIL

SCD: PAS:

W912QR25BA016

26 JUN 2025

SEE SECTION G - CONTRACT ADMINISTRATION DATA

SEE SCHEDULE

W912QR25BA016_Specs-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

W912QR25BA0160003

Page 2 of2

Block 14 (Description of Amendment/Modification): Solicitation W912QR25RA036 for the Design /Bid/Build for the Addition/ Alteration of Building 600 for KC-46 Flight Simulator at March ARB, CA is hereby amended as follows:

a) The following SPECIFICATION SECTIONS have been revised and replaced in their entirety:

KC-46A B600 Flight Simulator (PN PDPG 221013):

SUBMITTAL REGISTER

21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

Paragraph 1.3 SUBMITT ALS has been modified.

23 05 15 ELECTRICAL HEAT TRACING

Paragraph 1.3 SUBMITTALS has been modified.

23 05 48.19 SEISMIC BRACING, SUPPORTS, AND ANCHORAGE FOR MECHANICAL SYSTEMS

Paragraph 1.3 SUBMITTALS has been modified.

23 09 00 INSTRUMENTATION AND CONTROL FOR HV AC

Paragraph 1.6 SUBMITTALS has been modified.

23 23 00 REFRRIGERANT PIPING

Paragraph 1.2 SUBMITTALS has been modified.

23 30 00 HV AC AIR DISTRIBUTION

Paragraph 1.3 SUBMITTALS has been modified.

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

Paragraph 1.2 SUBMITTALS has been modified.

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

Paragraph 1.3 SUBMITTALS has been modified.

23 81 00 DECENTRALIZED UNITARY HV AC EQUIPMENT

Paragraph 1.3 SUBMITTALS has been modified.

b) The following SPECIFICATION SECTIONS have been added in their entirety:

21 13 18 PREACTION SPRINKLER SYSTEMS, FIRE PROTECTION

c) All other terms and conditions remain unchanged.

SPECIFICATIONS TABLE OF CONTENTS

P2# 504650 Addition/Alteration of B600 for Flight Simulator March Air Reserve Base

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 10 00 PRICE BREAKOUT SCHEDULE

00 80 00.00 06 04/21, CHG 1: 06/23 SPECIAL PROVISIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK

01 32 01.00 06 10/23 PROJECT SCHEDULE

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 33 29.00 06 11/17 SUSTAINABILITY REPORTING

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 11/16, CHG 2: 08/19 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

01 45 04.10 06 CONTRACTOR QUALITY CONTROL

01 45 35 11/20 SPECIAL INSPECTIONS

01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING

01 50 00 11/20, CHG 1: 08/21 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS AND

PERMITS

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DEMOLITION AND DECONSTRUCTION

02 81 00 TRANSPORTATION AND DISPOSAL OF

HAZARDOUS MATERIALS

02 82 00 ASBESTOS REMEDIATION

02 83 00 LEAD REMEDIATION

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 6: 11/23 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

05 05 23.16 08/18 STRUCTURAL WELDING

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 51 00 08/23 METAL STAIRS

05 51 33 02/16, CHG 2: 02/18 METAL LADDERS

05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

PROJECT TABLE OF CONTENTS

Certified Final Status

Vol. I

Vol. II

Certified Final StatusAmendment 0002 - Certified Final13

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING

07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION

07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION

07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS

07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 54 19 02/13, CHG 3: 02/21 POLYVINYL-CHLORIDE ROOFING

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

07 95 00 SEISMIC/EXPANSION CONTROL

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS

08 51 13 05/19 ALUMINUM WINDOWS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00 05/19 GLAZING

DIVISION 09 - FINISHES

09 06 00 08/22 SCHEDULES FOR FINISHES

09 24 23 08/17, CHG 2: 11/18 CEMENT STUCCO

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 51 00 08/20 ACOUSTICAL CEILINGS

09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

09 68 00 11/17, CHG 2: 08/20 CARPETING

09 69 13 11/15, CHG 1: 08/18 RIGID GRID ACCESS FLOORING

09 90 00 02/21 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 08/20 INTERIOR SIGNAGE

10 26 00 08/20 WALL AND DOOR PROTECTION

10 44 16 11/19 FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

12 24 13 08/20 ROLLER WINDOW SHADES

12 50 00.13 10 08/17, CHG 1: 11/18 FURNITURE AND FURNITURE INSTALLATION

12 59 00 08/17, CHG 1: 08/18 SYSTEMS FURNITURE

DIVISION 14 - CONVEYING EQUIPMENT

14 42 00 03/24 WHEELCHAIR LIFTS

DIVISION 21 - FIRE SUPPRESSION

21 13 18 08/20 PREACTION SPRINKLER SYSTEMS, FIRE

PROJECT TABLE OF CONTENTS

Certified Final Status

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

Amendment 003************************************************************

************************************************************Amendment 003

WET PI

PROTECTION

PROTECTION

DIVISION 22 - PLUMBING

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 01 30.41 05/22 HVAC SYSTEM CLEANING

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 05/22, CHG 2: 08/24 ELECTRICAL HEAT TRACING

23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING, SUPPORTS, AND

ANCHORAGE FOR MECHANICAL SYSTEMS

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 08 00 05/23 COMMISSIONING OF MECHANICAL AND

PLUMBING SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 21 23 08/17 HYDRONIC PUMPS

23 23 00 08/21 REFRIGERANT PIPING

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 08/09, CHG 6: 11/22 CHILLED, CHILLED-HOT, AND CONDENSER

WATER PIPING SYSTEMS

23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 81 23 11/20 COMPUTER ROOM AIR HANDLING UNITS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 05/21 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - HVAC AND AMI

25 05 11.02 05/21 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - FIRE PROTECTION

DIVISION 26 - ELECTRICAL

26 05 26.00 40 08/19 GROUNDING AND BONDING FOR ELECTRICAL

SYSTEMS

26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

26 05 73 08/23 POWER SYSTEM STUDIES

26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 41 00 08/23 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

PROJECT TABLE OF CONTENTS

Certified Final Status

Vol. III

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00.00 06 07/18 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT

32 05 33 08/17 LANDSCAPE ESTABLISHMENT

32 11 23 05/22 GRADED CRUSHED AGGREGATE BASE COURSE

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 92 19 08/17, CHG 1: 08/21 SEEDING

DIVISION 33 - UTILITIES

33 30 00 05/18 SANITARY SEWERAGE

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS

Certified Final StatusCertified Final StatusAmendment 0002 - Certified Final13

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 82 PAGES

MARCH ARB - SIM B600

00 80 00.00 06 SD-01 Preconstruction Submittals

1.14 GLocal Agency Check

1.12 GSF1413 Statement and

Acknowledgement

1.14 GFingerprints of all persons

employed or to be employed

SD-04 Samples

1.16 GEquipment Warranty Identification

Tags

SD-05 Design Data

1.37 GProgress Photographs

SD-07 Certificates

1.16 GWarranty of Construction

1.15 GNO ASBESTOS - CONTAINING

MATERIAL (ACM)

CERTIFICATION

1.15.1 GCertification for each individual

product installed and identified to contain mineral fibers that no asbestos-containing materials were installed

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 82 PAGES

00 80 00.00 06 1.15.1 GDocumentation to show that the products containing mineral fiber materials have been microscopically examined by an

AIHA- or NVLAP-certified laboratory and the lab has determined that the material does not contain asbestos

1.29 GInsurance

1.27 GSales and Use Tax

SD-11 Closeout Submittals

1.7.4 GPreliminary (Working) As-Built

Drawings

1.7.1 GFinal As-Built Drawings

1.7.1.2 GCAD Working As-Built Drawings

1.9.1 GEquipment-in-Place List

1.9.1 GMaintenance and Parts Data

1.16 GWarranty Management Plan

1.47 GCompletion of BUILDER Update

Form

01 11 00 SD-01 Preconstruction Submittals

1.7.1Utility Outage Requests

01 32 01.00 06 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 82 PAGES

01 32 01.00 06 3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 33 29.00 06 SD-01 Preconstruction Submittals

1.5.1.1 G SSustainability Action Plan

1.4 G SLEED AP BD+C

1.5.1.4 G SSustainability Progress Report

SD-11 Closeout Submittals

1.5.1.2 GFinal Sustainability eNotebook

1.5.1.2 GAmended Final Sustainability

eNotebook

1.5.1.2 G SFinal High Performance and

Sustainable Building Checklist

1.7.1.2 G SUSGBC GPA Certificates

01 35 26.00 06 SD-01 Preconstruction Submittals

1.7Accident Prevention Plan (APP)

1.7Fatigue Management Plan

1.7Bloodborne Pathogen Plan

1.7Exposure Control Plan

1.7Automatic External Defibrillator

(AED) Program

1.7Site Layout Plan

1.7Hearing Conservation Program

1.7Respiratory Protection Plan

1.7Health Hazard Control Program

1.7Hazard Communication Program

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 82 PAGES

01 35 26.00 06 1.7Process Safety Management

Plan

1.7Lead Compliance Plan &

Specifications

1.7Asbestos Abatement Plan &

Specifications

1.7Radiation Safety Program

1.7Abrasive Blasting Plan

1.7Heat Stress Monitoring Plan

1.7Cold Stress Monitoring Plan

1.7Indoor Air Quality Management

Plan

1.7Mold Remediation Plan

1.7Chromium (VI) Exposure

Evaluation

1.7Crystalline Silica Assessment

1.7Lighting Plan for Night Operations

1.7Traffic Control Plan

1.7Fire Prevention Plan

1.7Wild Land Fire Management Plan

1.7Arc Flash Hazard Analysis

1.7Assured Equipment Grounding

Control Program (AEGCP)

1.7Hazardous Energy Control Plan

1.7Standard Pre-Lift Plan (LHE)

1.7Critical Lift Plan - LHE

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 82 PAGES

01 35 26.00 06 1.7Fall Protection and Prevention

Plan

1.7Demolition/Renovation Plan (to include engineering survey)

1.7Rope Access Work Plan

1.7Excavation/Trenching Plan

1.7Erection and Removal Plan for

Formwork and Shoring

1.7Masonry Bracing Plan

1.7Steel Erection Plan

1.7Tree Felling/Maintenance

Program

1.7Site Safety and Health Plan

(HTRW)

1.7Confined Space Entry

Procedures

1.7Confined Space Program

1.8 G ROActivity Hazard Analysis (AHA)

1.5.1.1 G ROSite Safety and Health Officer

Qualifications(SSHO)

1.3 G ROCertified Safety

Professional/Certified Industrial

Hygienist Qualifications

1.12.7 G ROProof of qualification for Crane

Operators

1.12.7 G ROCritical Lift Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 82 PAGES

01 35 26.00 06 SD-06 Test Reports

1.12Reports

1.12.1Accident Reports

1.12.3Monthly Exposure Reports

1.12.5Crane Reports

1.12.4Regulatory Citations and

Violations

SD-07 Certificates

1.12.8Confined Space Entry Permit

1.13Hot work permit

1.12.6Crane Certificate of Compliance

01 45 04.10 06 SD-01 Preconstruction Submittals

3.2 G ROConstruction Quality Control Plan

01 45 35 SD-01 Preconstruction Submittals

3.1.2Written NDT Practices

SD-06 Test Reports

3.1.2Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1Certified Steel Fabricator

2.1Certificate of Compliance

1.5 GSpecial Inspector

3.1.2Qualification Records

SD-11 Closeout Submittals

3.1.2 GInterim Report

3.1.2 GComprehensive Final Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 82 PAGES

01 46 00.00 06 SD-01 Preconstruction Submittals

1.4 GCommissioning Specialists

1.9 GProject Schedule

SD-06 Test Reports

3.1.3 GConstruction Phase

Commissioning Plan

3.6 GBuilding Envelope Inspection

Checklists

3.1.6.2 GPre-Functional Checklists

1.7Issues Log

3.1.6.4Trend Log Report

3.7.1Post-Construction Trend Log

Report

3.6 GCommissioning Report

3.7 GPost-Construction

Commissioning Report

SD-07 Certificates

1.8 GCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.2 G DOSystems Training

3.3 G ROTraining Plan

3.3 G ROTraining Attendance Rosters

3.4 G DOSystems Manual

3.7 G DOPost-Construction Systems

Manual

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 82 PAGES

01 46 00.00 06 SD-11 Closeout Submittals

1.6 SFinal Commissioning Report

1.6 SFinal Construction Phase

Commissioning Plan

01 50 00 SD-01 Preconstruction Submittals

1.6.1.4 GContractor Computer

Cybersecurity Compliance

Statements

1.6.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

SD-03 Product Data

1.4 GBackflow Preventers

01 57 19.00 06 SD-01 Preconstruction Submittals

1.6.1Preconstruction Survey

1.11 GSolid Waste Management Permit

1.6.2 GRegulatory Notifications

1.7 GEnvironmental Protection Plan

1.7.9.1 GDirt and Dust Control Plan

1.6.5 GEmployee Training Records

1.6.4 GEnvironmental Manager

Qualifications

3.2.1 GStormwater Pollution Prevention

Plan (Swppp)

SD-06 Test Reports

3.7.1.1.2Laboratory Analysis

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 82 PAGES

01 57 19.00 06 3.2.2.2Inspection Reports

3.7.2.1 GSolid Waste Management Report

SD-07 Certificates

1.6.5 GEmployee Training Records

SD-11 Closeout Submittals

3.2.2.3 GStormwater Pollution Prevention

Plan Compliance Notebook

3.2.2.4 GStormwater Notice of Termination

3.7.1 GWaste Determination

Documentation

3.7.4.6 GDisposal Documentation for

Hazardous and Regulated Waste

1.6.5 GAssembled Employee Training

Records

1.11 GSolid Waste Management Permit

3.7.2.1 GSolid Waste Management Report

3.7.4.1 GHazardous Waste/Debris

Management

1.6.2 GRegulatory Notifications

3.7.2.1 GSales Documentation

3.7.2.1Contractor Certification

3.2.2.4As-Built Topographic Survey

01 74 19 SD-01 Preconstruction Submittals

1.6 GConstruction Waste Management

Plan

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 82 PAGES

01 74 19 1.8.2Quarterly Reports

1.8.3Annual Report

SD-11 Closeout Submittals

1.9 GFinal Construction Waste

Diversion Report

01 78 23 SD-10 Operation and Maintenance

Data

1.3 GO&M Database

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.11Existing Conditions

SD-07 Certificates

1.7 GNotification

SD-11 Closeout Submittals

3.3.4Receipts

02 81 00 SD-03 Product Data

2.1.1Packaging Notifications

3.1Hazardous Waste Management

Plan

3.2Onsite Hazardous Waste

Management

3.3Notices of Non-Compliance and

Notices of Violation

SD-06 Test Reports

3.7Recordkeeping

3.7Exception Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 82 PAGES

02 81 00 3.8Spill Response

SD-07 Certificates

1.4.1Transportation and Disposal

Coordinator

1.4.2Training

1.4.3Certification

3.3.3Shipping Documents and

Packagings Certification

3.3.4Security Plan

3.3.5Certificates of Disposal

3.6Waste Minimization

02 82 00 SD-03 Product Data

1.2.2Amended Water

1.3.9Safety Data Sheets (SDS) for All

Materials

2.1Encapsulants

3.1.2.1Respirators

3.1.7Local Exhaust Equipment

3.1.7Pressure Differential Automatic

Recording Instrument

3.1.8Vacuums

SD-06 Test Reports

1.5.5Air Sampling Results

1.5.6Pressure Differential Recordings for Local Exhaust System

3.2.10.5Clearance Sampling

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 82 PAGES

02 82 00 3.3.3.2Asbestos Disposal Quantity

Report

SD-07 Certificates

1.3.4Employee Training

1.3.5Notifications

1.3.7Respiratory Protection Program

1.3.10Asbestos Hazard Abatement Plan

1.3.11Testing Laboratory

1.3.12Landfill Approval

1.3.12Delivery Tickets

1.3.12Waste Shipment Records

1.3.13Transporter Certification

1.3.14Medical Certification

1.5.1Private Qualified Person

Documentation

1.5.2Designated Competent Person

1.5.3Worker's License

1.5.4Contractor's License

1.5.9Federal, State or Local Citations on Previous Projects

2.1Encapsulants

3.1Equipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3Water Filtration Equipment

3.1.8Vacuums

3.1.8Ventilation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 82 PAGES

02 82 00 SD-11 Closeout Submittals

1.3.5Permits

1.3.5Notifications

1.3.7.1Respirator Program Records

1.5.7Protective Clothing

Decontamination Quality Control

Records

1.5.8Protective Clothing

Decontamination Facility

Notification

1.7.1Rental Equipment

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1Competent Person

1.5.1.2Training Certification

1.5.2.3Occupational and Environmental

Assessment Data Report

1.5.2.4Medical Examinations

1.5.2.8Lead Waste Management Plan

1.5.3Licenses, Permits and

Notifications

1.5.4Occupant Protection Plan

1.5.2.2Lead Compliance Plan

3.5.2.1Written Evidence of TSD

Approval

SD-03 Product Data

1.6.1Respirators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 82 PAGES

02 83 00 1.6.4Vacuum Filters

2.1Materials and Equipment

2.1.1Expendable Supplies

SD-06 Test Reports

1.3.3Sampling and Analysis

1.5.2.3Occupational and Environmental

Assessment Data Report

1.5.2.3Sampling Results

SD-07 Certificates

1.5.1.3Testing Laboratory

1.5.1.4Third Party Consultant

Qualifications

SD-11 Closeout Submittals

3.5.2.1Hazardous Waste Manifest

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.5 GQuality Control Program

1.6.6 GQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8 GLaboratory Accreditation

SD-02 Shop Drawings

1.6.2.1 G AEReinforcing Steel

SD-03 Product Data

2.4.5 G AEJoint Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 82 PAGES

03 30 00 2.4.4 G AEJoint Filler

2.3.1Cementitious Materials

2.4.6 G AEVapor Retarder and Vapor Barrier

2.4.1Concrete Curing Materials

2.6Reinforcement

2.4.3.1 G AELiquid Chemical Floor Hardeners

and Sealers

2.3.4Admixtures

2.2.2Waterstops

1.8.1Local/Regional Materials

2.2.3Biodegradable Form Release

Agent

2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 G AEConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.14.3.3 G AECompressive Strength Tests

3.14.3.5Unit Weight of Structural

Concrete

3.14.3.6Chloride Ion Concentration

3.14.3.1Slump Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 82 PAGES

03 30 00 2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.9Welder Qualifications

1.6.3.3VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.4Safety Data Sheets

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.3.1 G AELiquid Chemical Floor Hardeners

and Sealers

2.4.5Joint Sealants

2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.3.2.1 G ROCut CMU

3.4.1.1 GAE RODetail Drawings

SD-03 Product Data

1.5.1 G ROHot Weather Procedures

1.5.2 G ROCold Weather Procedures

2.2.2.2.1 GAE ROCement

2.4.1.1 GAE ROCementitious Materials

SD-04 Samples

1.3.1.1 G ROMock-Up Panel

2.2.2.2 GAE ROConcrete Masonry Units (CMU)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 82 PAGES

04 20 00 2.4.1.4 GAE ROAdmixtures for Masonry Mortar

2.6.2 GAE ROAnchors, Ties, and Bar

Positioners

SD-05 Design Data

2.1.2 GAE ROMasonry Compressive Strength

2.2.2.4Fire-Rated Concrete Masonry

Units

3.2.4 GAE ROBracing Calculations

SD-06 Test Reports

2.2.2.4Fire-Rated Concrete Masonry

Units

3.6.1.1Field Testing of Grout

3.6.1.2Prism Tests

SD-07 Certificates

1.3.2Special Masonry Inspector

Qualifications

2.2.2.2Concrete Masonry Units (CMU)

2.4.1.1Cementitious Materials

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

1.3.1.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 82 PAGES

04 20 00 SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

2.2.2.2.2 S RORecycled Content

05 05 20 SD-01 Preconstruction Submittals

1.5.1.1 GInstaller Qualifications

1.5.1.2 GPost-Installed Anchor Special

Inspector Qualifications

SD-03 Product Data

2.1.1.3 G AEMechanical Anchors in Concrete

2.1.1.4 G AEAdhesive Anchor System in

Concrete

2.1.1.5 G AEMechanical and Adhesive

Anchors in Masonry

3.1.3 G AENon-Shrink, Non-Metallic Grout

SD-06 Test Reports

3.3.4 GPost-Installed Anchor Special

Inspections Report

SD-07 Certificates

2.1.1.1 GPost-Installed Anchor

Certification

SD-08 Manufacturer’s Instructions

2.1.1.2 GManufacturer's Printed

Installation Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 82 PAGES

05 05 20 1.5Manufacturer's Material Safety

Data Sheets

05 05 23.16 SD-01 Preconstruction Submittals

3.2 GWelding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification

1.3.2Previous Qualifications

1.3.3 GPre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports

3.3Nondestructive Testing

3.2Weld Inspection Log

SD-07 Certificates

1.3.1Certified Welding Procedure

Specifications (WPS)

1.3.1Certified Procedure Qualification

Records (PQR)

1.3.1Certified Welder Performance

Qualifications (WPQ)

1.3.5Certified Welding Inspector

1.3.5Nondestructive Testing Personnel

05 12 00 SD-01 Preconstruction Submittals

1.5.1.1 G AEErection and Erection Bracing

Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 82 PAGES

05 12 00 SD-02 Shop Drawings

1.5.2 G AEFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.1.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.2Tension Control Bolts

SD-05 Design Data

1.5.2 G AEShoring and Temporary Bracing

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

1.3Structural Steel Fabricator Quality

Certification

1.3AISC Structural Steel Erector

Quality Certification

3.4Welding Procedure Specifications

(WPS)

05 30 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 82 PAGES

05 30 00 1.3.3 G AEFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.1.4Galvanizing Repair Paint

2.2.13Mechanical Fasteners

2.1.4Touch-Up Paint

1.3.2Welding Equipment

1.3.2Welding Rods and Accessories

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Welder Qualifications

1.3.2Welding Procedures

1.3.1Manufacturer's Certificate

05 40 00 SD-02 Shop Drawings

1.6.1 G AEFraming Components

SD-03 Product Data

2.1Studs, Joists

SD-05 Design Data

1.6.2 G AEMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.1.1Welds

05 50 13 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 82 PAGES

05 50 13 2.5 G AECover Plates and Frames

2.6 G AEExpansion Joint Covers

2.7 G AEFloor Gratings

2.8 G AEBollards/Pipe Guards

2.10 G AEAngles and Plates

2.11 G AERoof Hatches

SD-03 Product Data

2.4Corner Guards

2.5 G AECover Plates and Frames

2.6 G AEExpansion Joint Covers

2.7 G AEFloor Gratings

2.11 G AERoof Hatches

2.11.1 G AERoof Hatch Safety Rail System

2.9 G AEDownspout Terminations

2.1 SRecycled Content

SD-04 Samples

2.6Expansion Joint Covers

05 51 00 SD-02 Shop Drawings

2.1 G AEIron and Steel Hardware

2.1 G AESteel Shapes, Plates, Bars, and

Strips

2.2.1 G AEMetal Stair System

1.4.1 G AEFabrication Drawings

SD-03 Product Data

2.2.3 GProtective Coating

2.3.1 GSteel Stairs

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 82 PAGES

05 51 00 SD-05 Design Data

1.4.2 GDesign Calculations For Steel

Framing and Connections

SD-06 Test Reports

2.5 GMill Test Reports

SD-07 Certificates

1.3.1 G AEWelding Procedures

1.3.1 G AEWelder Qualification

SD-08 Manufacturer’s Instructions

2.2.3 G AEProtective Coating

05 51 33 SD-02 Shop Drawings

2.4 GAE ROLadders

SD-03 Product Data

2.4 GAE ROLadders

2.4.2 GAE ROLadder Safety Devices

SD-07 Certificates

1.3 G ROFabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 G ROFabrication Drawings

1.5.1 G ROFabrication Drawings

3.2 G ROIron and Steel Hardware

3.2 G ROSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 82 PAGES

05 52 00 2.2.1 G ROStructural-Steel Plates, Shapes, and Bars

2.2.2 G ROStructural-Steel Tubing

2.2.4 G ROCold-Finished Steel Bars

2.2.3 G ROHot-Rolled Carbon Steel Bars

2.2.5 G ROCold-Drawn Steel Tubing

1.2.1 G AEMasonry Anchorage Devices

2.1.2 G ROProtective Coating

2.2.8 G ROSteel Railings and Handrails

1.2.1 G ROAnchorage and Fastening

Systems

SD-05 Design Data

1.5.2 GDesign Calculations For Steel

Connections

SD-06 Test Reports

1.4.1 GWelding Inspection Results

SD-07 Certificates

1.4.1 G ROWelding Procedures

1.4.2 G ROWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 10 00 SD-02 Shop Drawings

3.2.1.1 G RONailing Strips

SD-03 Product Data

1.8 GFire-retardant Treatment

2.2.1.1 GComposite Siding Boards

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 82 PAGES

06 10 00 2.3.2 GAdhesives

SD-06 Test Reports

1.4.1Preservative-treated

SD-07 Certificates

1.11.1Certificates of Grade

1.7Preservative Treatment

SD-10 Operation and Maintenance

Data

3.3Take-back Program

06 41 16.00 10 SD-02 Shop Drawings

2.9Shop Drawings

3.1Installation

SD-03 Product Data

2.1Wood Materials

2.9.7.3Finish Schedule

1.5.2Certification

SD-04 Samples

2.3Plastic Laminates

2.6Cabinet Hardware

SD-07 Certificates

1.5Quality Assurance

3.1Laminate Clad Casework

SD-11 Closeout Submittals

1.3LEED Documentation

06 61 16 SD-02 Shop Drawings

2.1 GDetail Fabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 82 PAGES

06 61 16 3.1 GInstallation

SD-03 Product Data

2.1.1 GSolid Polymer

2.2.2 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 GMaterial

2.3.5 GCounter Tops

SD-06 Test Reports

2.1.1Test Report Results

SD-07 Certificates

1.4.1Qualifications

2.1.1 SIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

2.1.1 GSolid Polymer

07 11 13 SD-07 Certificates

1.3Materials

07 21 16 SD-03 Product Data

2.1Blanket Insulation

2.2Wall Liner System

2.1.2 SRecycled Content for Insulation

Materials

2.3Sill Sealer Insulation

2.5Vapor Retarder

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 82 PAGES

07 21 16 2.6Pressure Sensitive Tape

2.7Accessories

SD-07 Certificates

2.1.4 SIndoor Air Quality for Insulation

Materials

2.7.1 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.3.1Insulation

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

1.3 GVerification of Existing Conditions

SD-03 Product Data

2.1 GInsulation

1.4 GCover Board

2.4 GFasteners

2.3 GMoisture Control

2.1.2 SRecycled Content For Insulation

SD-06 Test Reports

1.8.1 GFlame Spread Rating

SD-07 Certificates

1.6 GInstaller Qualifications

2.1.3 SIndoor Air Quality For Insulation

SD-08 Manufacturer’s Instructions

2.4 GFasteners

2.1 GInsulation

07 27 19.01 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 82 PAGES

07 27 19.01 1.6.1 GQualifications of Manufacturer

1.6.2 GQualifications of Installer

SD-02 Shop Drawings

1.3 GSelf-adhering Air Barrier

SD-03 Product Data

1.3 GSelf-adhering Air Barrier

2.2 GPrimers, Adhesives, and Mastics

1.3.2 GSafety Data Sheets

SD-04 Samples

1.3 GSelf-adhering Air Barrier

SD-06 Test Reports

1.5 GField Peel Adhesion Test

1.3.4 GFlame Propagation of Wall

Assemblies

1.3.4 GFlame Spread and Smoke

Developed Index Ratings

3.4.1 GSite Inspections and Testing

SD-07 Certificates

1.3 GSelf-adhering Air Barrier

SD-08 Manufacturer’s Instructions

1.3 GSelf-adhering Air Barrier

2.2 GPrimers, Adhesives, and Mastics

07 27 26 SD-01 Preconstruction Submittals

1.7.1 GQualifications of Manufacturer

1.7.2 GQualifications of Installer

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 82 PAGES

07 27 26 1.3 GFluid-Applied Membrane Air

Barrier

SD-03 Product Data

1.3 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

2.2 GPrimers, Adhesives, and Mastics

2.6 GReinforcement

1.3.2 GSafety Data Sheets

SD-04 Samples

1.3.3 GMockup

SD-06 Test Reports

1.5 GCapillary Moisture Test

1.3.4 GField Peel Adhesion Test

1.3.4 GFlame Propagation of Wall

Assemblies

1.3.4 GFlame Spread and Smoke

Developed Index Ratings

3.4.1 GSite Inspections

SD-07 Certificates

1.3 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

SD-08 Manufacturer’s Instructions

1.3 GFluid-Applied Membrane Air

Barrier

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 82 PAGES

07 27 26 2.3 GTransition Membrane

2.2 GPrimers, Adhesives, and Mastics

07 54 19 SD-02 Shop Drawings

1.6 GDetail Drawings

1.6 GRoof Plan

SD-03 Product Data

3.3.2 GPVC Roofing Membrane

2.1.2 SEnergy Star Label for roof

membrane

2.1.4Bonding Adhesive

1.5.3Flashing

3.3.2.2Flashing

2.1.10Roof Insulation

2.1.8Pre-Manufactured Accessories

2.1.1Information Card

SD-05 Design Data

1.3.1 GWind Uplift Resistance

SD-07 Certificates

1.5.1Qualification of Manufacturer

1.5.2Qualifications of Applicator

1.3.1Wind Uplift Resistance

2.1.1Minimum Polymer Thickness

2.1.6Minimum Polymer Thickness

1.10 GSample

SD-08 Manufacturer’s Instructions

3.3 GApplication Method

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 82 PAGES

07 54 19 2.1.6 GMembrane Flashing

3.4.2 GMembrane Flashing

3.3.4Perimeter Attachment

2.1.7.2Auxiliary Fasteners

2.1.8Pre-Manufactured Accessories

SD-11 Closeout Submittals

1.10 GWarranty

2.1.1 GInformation Card

3.9 GInstructions to Government

Personnel

07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

3.1.13 GGutters

3.1.14 GDownspouts

3.1.21 GExpansion Joints

3.1.17 GSplash Pans

3.1.15 GFlashing for Roof Drains

3.1.9 GBase Flashing

3.1.10 GCounterflashing

3.1.22 GFlashing at Roof Penetrations

and Equipment Supports

2.2.9 GReglets

3.1.23 GCopings

3.1.12 GDrip Edges

3.1.16 GConductor Heads

3.1.18 GOpen Valley Flashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 82 PAGES

07 60 00 3.1.19 GEave Flashing

2.1 SRecycled Content

SD-03 Product Data

2.2.7 GCool Roof

SD-04 Samples

1.4.2 GFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 GQuality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 GCleaning and Maintenance

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .