W912QR25BA016_Plans-0004.pdf

PDF 2 MB Posted

Attached to
March Air Reserve Base, CA B600 Flight Simulator Federal contract opportunity
Solicitation number
W912QR25BA016
Issued by
Department of the Army Corps of Engineers Engineering District Louisville

About this file

These architectural detail drawings from the US Army Corps of Engineers provide technical specifications for roofing and wall construction, specifically focusing on gutter details, roof membrane installation, and concrete masonry unit (CMU) wall base and section details. The drawings, dated March 2025 and marked as a Certified Final Design Submittal, include precise technical specifications such as polyvinyl-chloride roofing membrane (fully adhered), pre-finished metal flashing, air barrier transitions, and detailed layering of construction materials including insulation, sealants, stucco, metal lath, and structural components. The technical drawings (Sheet A-512 and A-530) provide cross-sectional views and detailed annotations for roof and wall interfaces, including specifications for gutters, downspouts, metal deck connections, and wall assemblies with cold-formed metal stud framing.

View the file

Other files for this federal contract opportunity

Other files attached to March Air Reserve Base, CA B600 Flight Simulator, newest first.
File Type Posted
Bid Opening Results - W912QR25BA016.pdf PDF
W912QR25BA016_Plans-0005.pdf PDF
2nd Site Visit Sign In Sheet B600.pdf PDF
W912QR25BA016_Specs-0004.pdf PDF
W912QR25BA016_Specs-0003.pdf PDF
W912QR25BA016_Plans-0002.pdf PDF
W912QR25BA016_Specs-0002.pdf PDF
W912QR25BA016-0001.pdf PDF
Sign in B600 8 July Site walk.pdf PDF
W912QR25BA016_Specs_Vol3-0000.pdf PDF
W912QR25BA016_SID-0000.pdf PDF
W912QR25BA016_FFE-0000.pdf PDF
W912QR25BA016_Specs_Vol1-0000.pdf PDF
W912QR25BA016_Specs_Vol2-0000.pdf PDF
W912QR25BA016_Plans-0000.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1'

0"

1/2" / 1'-0"

POLYVINYL-CHLORIDE ROOFING

MEMBRANE, FULLY ADHERED

CONTINUOUS SEALANT

HOT - AIR WELD , TYP

FLASHING MEMBRANE STRIP

PRE-FINISHED METAL FLASHING

SELF-ADHERED AIR BARRIER

TRANSITION MEMBRANE

CONTINUOUS SEALANT

PRE-FINISHED METAL FLASHING

METAL EDGE DRIP WITH CLEAT

CONTINUOUS SEALANT WITH

BACKER ROD

POLYVINYL-CHLORIDE ROOFING

MEMBRANE, FULLY ADHERED

SELF-ADHERED AIR BARRIER

TRANSITION MEMBRANE EXTEND

TO BACK OF COMPOSITE BOARD

METAL DECK, RE: STRUCTURAL

WALL LINER SYSTEM OVER BATT

INSULATION AND COLD-FORMED

METAL STUD PER

MANUFACTURER'S

RECOMMENDED INSTALLATION,

RE: SPECS 07 21 16

MINERAL WOOL INSULATION AT

ALL JOINTS AND FLUTE ON ROOF

DECK

R-6.28 BATT INSULATION

PRE-FINISHED METAL SOFFIT

PANEL ATTACHED TO

CONTINUOUS ANGLE EACH SIDE

OF PANEL

1/2" COVER BOARD,

MECHANICALLY FASTENED

R-33 RIGID INSULATION,

MECHANICALLY FASTENED

7/8" CEMENT STUCCO

ON METAL LATH

FLUID -APPLIED AIR BARRIER

CONCRETE MASONRY UNIT RE:

PLAN AND STRUCTURAL

METAL PLATE, RE: STRUCTURAL

SELF-ADHERED AIR BARRIER

TRANSITION MEMBRANE

PRE-FINISHED METAL

GUTTER 6"W X 4 1/2"D

AIR/ WATER BARRIER TRANSITION,

COORDINATE AT DECK

3/4" THK. COMPOSITE BOARD

CONTINUOUS PRESSURE

TREATED BLOCKING

PRE-FINISHED SHEET METAL

COVER AT END OF OVERHANG

METAL STRAINER

DOWNSPOUT 4" W X 4" D

TOS LOW ROOF

16' - 5"

M

IN 8"

4" MIN

7/8" CEMENT STUCCO

ON METAL LATH

FLUID -APPLIED AIR BARRIER

METAL FLASHING

POLYVINYL-CHLORIDE ROOFING

MEMBRANE, FULLY ADHERED

BASE FLASHING

TERMINATION BAR OVER

WATER CUT-OFF MASTIC

FASTENED @ 8" OC

WEEP CASING BEAD

POLYVINYL-CHLORIDE ROOFING

MEMBRANE, FULLY ADHERED

HOT AIR WELD

1/2" COVER BOARD,

MECHANICALLY FASTENED

R-33 RIGID INSULATION,

MECHANICALLY FASTENED

METAL DECK, RE: STRUCTURAL

CONCRETE MASONRY UNIT RE:

PLAN AND STRUCTURAL

BATT INSULATION

WALL LINER SYSTEM OVER BATT

INSULATION AND COLD-FORMED

METAL STUD PER

MANUFACTURER'S

RECOMMENDED INSTALLATION,

RE: SPECS 07 21 16

CONTINUOUS STEEL LEDGER, RE:

STRUCTURAL

ANCHOR BOLT, RE: STRUCTURAL

SELF-ADHERED AIR BARRIER

TRANSITION MEMBRANE

PROTECT (E) ROOF MEMBRANE

CONTINUOUS SEALANT

POLYVINYL-CHLORIDE ROOFING

MEMBRANE, FULLY ADHERED

FLASHING STRIP

PRE-FINISHED METAL FLASHING

CONTINUOUS SEALANT

SELF-ADHERED AIR

BARRIER TRANSITION

MEMBRANE @ EDGE

PRE-FINISHED METAL

GUTTER 5"W X 4 1/2" D

CLEAT

CONTINUOUS SEALANT

PRE-FINISHED METAL

FLASHING

3/4" THK. COMPOSITE

BOARD

FASTEN CLEAT TO EXISTING

STRUCTURE

M

IN

1/

2"

PROTECT (E) EIFS EXTERIOR WALL AND FINISH

DOWNSPOUT 4" W X 4" D

GALVANIZED GUTTER STRAP

STRAINER FOR DEBRIS

EXISTING NAILER

4"

COUNTERFLASHING

T.

O

. P

AR

AP

ET

1'

0" V

IF

MIN

4"

60 MIL X 12 EPDM BELLOWS WITH

3/4" CLOSED CELL FOAM (SJC - 8)

SJC-8

8" SSJ

1/4" STAINLESS STEEL SCREW 8"

OC WITH MASTIC OVER SCREW

CONTINUOUS SEALANT

POLYVINYL-CHLORIDE ROOFING

MEMBRANE, FULLY ADHERED

BASE FLASHING

HOT AIR WELD

POLYVINYL-CHLORIDE ROOFING

MEMBRANE, FULLY ADHERED

1/2" COVER BOARD,

MECHANICALLY FASTENED

CONTINUOUS SEALANT

R-33 RIGID INSULATION,

MECHANICALLY FASTENED

METAL DECK, RE:

STRUCTURAL

CMU, RE: PLAN AND

STRUCTURAL

(E) EIFS EXTERIOR

WALL TO REMAIN

CONTINUOUS SEALANT

PRE-FINISHED METAL COPING

CONTINUOUS PRESSURE TREATED

BLOCKING AS REQUIRED

CLEAT

GASKETED CONNECTOR

TO PARAPET - LOW

ROOF

18' - 0"

CUT (E) EIFS

EXTRUSION WITH WEEPHOLE PER

EIFS MANUFACTURER

RECOMMENDATION

METAL FLASHING

.020 REINFORCED

POLYETHELENE

VAPOR BARRIER

OUTLINE OF (E) CUT EFIS

FOR INSTALLATION OF

SEISMIC COVER

EDGE TRIM AS

REQUIRED

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C :\U se rs

\s ke nn ed y4 \O ne D riv e

- B ur ns

M cD on ne ll\ D oc um en ts

\P D

PG

_B

0S

IM

_A _s ke nn ed y4

N

BE

.rv t 8/

/2

8:

:1

AM

A-512

R O

O F

D

ET

AI

LS

M

AR

C H

A

IR

R

ES

ER

VE

B

AS

E, C

A

LO

U

IS

VI

LL

E D

IS

TR

IC

T

D R

M

AR

TI

N

L U

TH

ER

K

IN

G J

R P

L, LO

U

IS

VI

LL

E, K

EN

TU

C

KY

, 4

BU

R

N S

AN

D

M cD

O N

N

EL

L

W

AR

D

P

AR

KW

AY

KA

N

SA

S C

IT

Y, M

IS

SO

U

R I 6

C .V

AL

IN

O

C .V

AL

IN

O

M .B

ET

Z

KE

VI

N K

IM

M

AR

C H

C

ER

TI

FI

ED

F

IN

AL

D

ES

IG

N

S U

BM

IT

TA

L

AD

D

IT

IO

N

AL

TE

R

AT

IO

N

O F

BU

IL

D

IN

G

F

O R

F

LI

G H

T

SI

M U

LA

TO

R

PD

PG

P

SCALE: 3" = 1'-0"H1 ROOF DETAIL

SCALE: 3" = 1'-0"A1 ROOF DETAIL

SCALE: 3" = 1'-0"J11 GUTTER DETAIL AT EXISTING ROOF

SCALE: 3" = 1'-0"A11 ROOF DETAIL

0 3" 6" 9"

0 3" 6" 9"

0 3" 6" 9" 0 3" 6" 9"

C

ER

TI

FI

ED

F

IN

AL

D

ES

IG

N S

U

BM

IT

TA

L

/0 5/

AM

M

EN

D

/1 3/

W

2Q R

BA

6_

Pl an s-

TOS BOT

31' - 5"

MIN

4"

PRE-FINISHED METAL

COPING

REQUIRED CONTINUOUS PRESSURE

TREATED BLOCKING

GROMMETED FASTENER

FASTENED @ 12" OC

R-33 RIGID INSULATION,

MECHANICALLY FASTENED

POLYVINYL-CHLORIDE ROOFING

MEMBRANE, FULLY ADHERED

BASE FLASHING, EXTEND TO

UNDERSIDE OF METAL COPING

HOT AIR WELD

POLYVINYL-CHLORIDE ROOFING

MEMBRANE, FULLY ADHERED

1/2" COVER BOARD,

MECHANICALLY FASTENED

METAL DECK, RE:

STRUCTURAL

R-6.28 BATT INSULATION

WALL LINER SYSTEM OVER BATT

INSULATION AND COLD-FORMED

METAL STUD PER

MANUFACTURER'S

RECOMMENDED INSTALLATION,

RE: SPECS 07 21 16

7/8" CEMENT STUCCO

ON METAL LATH

CONTINUOUS SEALANT

METAL LATH

FLUID -APPLIED AIR BARRIER

LIGHTNING PROTECTION CONDUIT

RE: ELECTRICAL

GRID

CONCRETE MASONRY UNIT RE:

PLAN AND STRUCTURAL

CLEAT

CONTINUOUS STEEL LEDGER, RE:

STRUCTURAL

1/2" / 1'-0"

1/

2"

/4 " V

IF

01_LEVEL_FF

0' - 0"

FIRST FLOOR

0' - 0"

METAL FLASHING

WEEP CASING BEAD

SLOPE

CONCRETE PAVEMENT

RE: CIVIL

VAPOR BARRIER RE:

STRUCTURAL

SUBGRADE RE:

STRUCTURAL

7/8" CEMENT STUCCO

ON METAL LATH

FLUID -APPLIED AIR BARRIER ,

PAINT TO MATCH STUCCO COLOR

CONCRETE MASONRY UNIT RE:

PLAN AND STRUCTURAL

R-6.28 BATT INSULATION

CONCRETE STEM WALL RE:

STRUCTURAL

CONTINUOUS SEALANT

COMPRESSIBLE FILLER

PROTECTION BOARD

DRAINAGE BOARD

CONTINUOUS DAMPROOFING TOCONCRETE STEM WALL, EXTEND

TO TOP OF FOOTING

VAPOR BARRIER RE:

STRUCTURAL

SELF-ADHERED AIR BARRIER

TRANSITION MEMBRANE

5/8" GYPSUM BOARD TO 10'-0"

HIGH. VINYL SHEET ABOVE 10'-0"

COLD-FORMED METAL STUD

FRAMING, RE: DELEGATED DESIGN

SUBMITTAL

GRID

(INCLUDING GYP BOARD)

R-8.9 CMU ASSEMBLY R-VALUE

RESILIENT BASE RE: FINISH SCHEDULE

2"

FLUID -APPLIED AIR

BARRIER , PAINT TO

MATCH STUCCO

COLOR

01_LEVEL_FF

0' - 0"

FIRST FLOOR

0' - 0"

CONCRETE MASONRY UNIT RE:

PLAN AND STRUCTURAL

SEALED CONCRETE

SLAB RE: STRUCTURAL

CONTINUOUS SEALANT

OVER CONTROL JOINT

RE: STRUCTURAL

5/8" GYPSUM BOARD

COLD-FORMED METAL STUD

FRAMING, RE: DELEGATED DESIGN

SUBMITTAL ON 2 1/2": METAL STUD

FURRING

RAISED ACCESS FLOOR,

BOLTED-STRINGER, PEDESTAL

TYPE

RESILIENT BASE RE:

FINISH SCHEDULE

VAPOR BARRIER RE:

STRUCTURAL

SUBGRADE RE:

STRUCTURAL

PROTECTION BOARD

COMPRESSIBLE FILLER

RESILIENT BASE RE: FINISH

SCHEDULE

FINISH FLOOR RE:

FINISH SCHEDULE

1'

1/

2"

CONTINUOUS DAMPROOFING

EXTEND TO TOP OF FOOTING

BOT COMPUTER ROOM

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C :\U se rs

\s ke nn ed y4 \O ne D riv e

- B ur ns

M cD on ne ll\ D oc um en ts

\P D

PG

_B

0S

IM

_A _s ke nn ed y4

N

BE

.rv t 8/

/2

8:

:1

AM

A-530

SE

C

TI

O

N D

ET

AI

LS

M

AR

C H

A

IR

R

ES

ER

VE

B

AS

E, C

A

LO

U

IS

VI

LL

E D

IS

TR

IC

T

D R

M

AR

TI

N

L U

TH

ER

K

IN

G J

R P

L, LO

U

IS

VI

LL

E, K

EN

TU

C

KY

, 4

BU

R

N S

AN

D

M cD

O N

N

EL

L

W

AR

D

P

AR

KW

AY

KA

N

SA

S C

IT

Y, M

IS

SO

U

R I 6

C .V

AL

IN

O

C .V

AL

IN

O

M .B

ET

Z

KE

VI

N K

IM

M

AR

C H

C

ER

TI

FI

ED

F

IN

AL

D

ES

IG

N

S U

BM

IT

TA

L

AD

D

IT

IO

N

AL

TE

R

AT

IO

N

O F

BU

IL

D

IN

G

F

O R

F

LI

G H

T

SI

M U

LA

TO

R

PD

PG

P

SCALE: 3" = 1'-0"H1 COPING DETAIL

SCALE: 3" = 1'-0"A1 CMU WALL BASE DETAIL

0 3" 6" 9"

0 3" 6" 9"

SCALE: 3" = 1'-0"A11 WALL SECTION DETAIL

0 3" 6" 9"

C

ER

TI

FI

ED

F

IN

AL

D

ES

IG

N S

U

BM

IT

TA

L

/0 5/

AM

M

EN

D

/1 3/

W

2Q R

BA

6_

Pl an s-

File details come from the government source that posted it. Updated .