W912QR25BA016_Plans-0000.pdf
PDF 26 MB Posted
- Attached to
- March Air Reserve Base, CA B600 Flight Simulator Federal contract opportunity
- Solicitation number
- W912QR25BA016
About this file
This file is a comprehensive set of architectural and engineering plans for the addition and alteration of Building 600 at March Air Reserve Base in California, specifically for a Flight Simulator facility. The detailed plan set, marked as a "Certified Final Design Submittal" dated March 2025, includes multiple volumes covering structural, civil, architectural, mechanical, electrical, and plumbing designs for a renovation project. The documents show the project involves modifications to an existing building, with a focus on creating a new flight simulator space, including detailed foundation work, wall reinforcements, utility modifications, and equipment pad installations.
The plans indicate a Type IIB construction with a Business and Storage occupancy classification, designed to meet International Building Code 2021 standards and Department of Defense building requirements. The project encompasses approximately 27,838 square feet across two floors, with specific attention to seismic considerations, wind load calculations, and precise structural reinforcement details. Key technical components include new concrete foundations, masonry wall reinforcements, steel framing, roof deck modifications, and specialized equipment pads for simulator installation. The design incorporates detailed provisions for utility routing, electrical systems, fire protection, and mechanical infrastructure to support the flight simulator facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Results - W912QR25BA016.pdf | ||
| W912QR25BA016_Plans-0005.pdf | ||
| 2nd Site Visit Sign In Sheet B600.pdf | ||
| W912QR25BA016_Plans-0004.pdf | ||
| W912QR25BA016_Specs-0004.pdf | ||
| W912QR25BA016_Specs-0003.pdf | ||
| W912QR25BA016_Plans-0002.pdf | ||
| W912QR25BA016_Specs-0002.pdf | ||
| W912QR25BA016-0001.pdf | ||
| Sign in B600 8 July Site walk.pdf | ||
| W912QR25BA016_Specs_Vol1-0000.pdf | ||
| W912QR25BA016_Specs_Vol2-0000.pdf | ||
| W912QR25BA016_Specs_Vol3-0000.pdf | ||
| W912QR25BA016_SID-0000.pdf | ||
| W912QR25BA016_FFE-0000.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
VOLUME:
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C
U s e rs
\e m fe rn a n d e z \O n e D ri v e
B u rn s
M c D o n n e ll\
D o c u m e n ts
\P D
P G
B
S
IM
G e m fe rn a n d e z b u rn s m c d .c o m
.r v t
/5
/2
:2
:2
P M
G-001
C O
V E
R S
H E
E T
M A
R C
H A
IR
R
E S
E R
V E
B A
S E
C
A L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
B U
R N
S A
N D
M c D
O N
N E
L L
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
IS
S
O U
R I
E F
E R
N A
N D
E Z
E F
E R
N A
N D
E Z
M B
E T
Z
B M
A R
IN
O
M A
R C
H
A D
D
IT
IO
N
A
L T
E R
A T
IO
N
O F
B U
IL
D
IN
G
F
O R
F L
IG
H T
S
IM
U L A
T O
R
P D
P G
P
LOUISVILLE DISTRICT
MARCH AIR RESERVE BASE, CA
ADDITION / ALTERATION OF BUILDING 600 FOR FLIGHT SIMULATOR
PDPG221013
CERTIFIED FINAL DESIGN SUBMITTAL
P2#: 504650
MARCH 2025
C
E R
T
IF
IE
D
F
IN
A L D
E S
I G N
S U
B M
IT
T
A L
/0
/2
KEVIN KIMM
C-33500
01-31-27
26 June 2025
W912QR25BA016
W
2Q R
BA
6_
Pl an s-
ARIMS: 200A Disposition: Maintain for 15yrs after construction
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C
U s e rs
\e m fe rn a n d e z \O n e D ri v e
B u rn s
M c D o n n e ll\
D o c u m e n ts
\P D
P G
B
S
IM
G e m fe rn a n d e z b u rn s m c d .c o m
.r v t
/5
/2
:2
:2
P M
G-002
S H
E E
T I
N D
E X
M A
R C
H A
IR
R
E S
E R
V E
B A
S E
C
A L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
B U
R N
S A
N D
M c D
O N
N E
L L
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
IS
S
O U
R I
E F
E R
N A
N D
E Z
E F
E R
N A
N D
E Z
M B
E T
Z
B M
A R
IN
O
M A
R C
H
C E
R T
IF
IE
D F
IN
A
L D
E S
IG
N
S U
B M
IT
T
A L
A D
D
IT
IO
N
A
L T
E R
A T
IO
N
O F
B U
IL
D
IN
G
F
O R
F L
IG
H T
S
IM
U L A
T O
R
P D
P G
SHEET LIST
SHEET NUMBER SHEET TITLE
GENERAL
G-001 COVER SHEET
G-002 SHEET INDEX
LIFE SAFETY
GI001 LIFE SAFETY NARRATIVE AND BUILDING CODE ANALYSIS (IBC 2021)
GI101 LIFE SAFETY FIRST FLOOR PLAN
GI102 LIFE SAFETY SECOND FLOOR PLAN
CIVIL
GC001 GENERAL CONSTRUCTION NOTES - 1
GC002 GENERAL CONSTRUCTION NOTES - 2
GC003 NOTES, LEGEND, AND ABBREVIATIONS
GC004 CIVIL LEGEND AND ABBREVIATIONS
GC005 LOCATION AND VICINITY MAP
GC101 HAUL ROUTE PLAN
V-101 EXISTING CONDITIONS PLAN
B-101 BORE HOLE LOCATION PLAN
B-102 BORE HOLE LOGS
CD101 DEMOLITION PLAN
C-101 CODE COMPLIANCE PLAN
CS101 CIVIL SITE PLAN
CS110 HORIZONTAL CONTROL PLAN
CS111 ENLARGED HORIZONTAL CONTROL PLAN
CS501 CIVIL DETAILS - 1
CS502 CIVIL DETAILS - 2
CS503 CIVIL DETAILS - 3
CS504 CIVIL DETAILS - 4
CG101 GRADING PLAN
CG110 EROSION CONTROL PLAN
CG301 SITE SECTIONS
CG501 EROSION CONTROL DETAILS
CU101 CIVIL UTILITY PLAN
CU501 CIVIL UTILITY DETAILS
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES
S-002 GENERAL STRUCTURAL NOTES
S-003 LEGEND & ABBREVIATIONS
S-004 WIND LOADING DIAGRAM
S-100 OVERALL FOUNDATION/ GROUND FLOOR PLAN
S-101 FOUNDATION/ GROUND FLOOR PLAN - AREA A
S-102 ROOF FRAMING PLAN - AREA A
S-201 SHEAR WALL ELEVATIONS
S-202 SHEAR WALL ELEVATIONS
S-203 SHEAR WALL ELEVATIONS
S-211 WALL ELEVATIONS
S-301 BUILDING SECTIONS
S-401 ENLARGED PLANS
S-501 STANDARD CONCRETE DETAILS
S-502 STANDARD CONCRETE DETAILS
S-503 STANDARD CONCRETE DETAILS
S-504 STANDARD CONCRETE DETAILS
S-505 CONCRETE DETAILS
S-506 CONCRETE DETAILS
S-507 CONCRETE DETAILS
S-511 STANDARD MASONRY DETAILS
S-512 STANDARD MASONRY DETAILS
S-521 STANDARD STEEL DETAILS
S-522 STANDARD STEEL DETAILS
S-523 STANDARD STEEL DETAILS
S-524 STANDARD STEEL DETAILS
S-541 SEISMIC BRACING NOTES AND DETAILS
ARCHITECTURAL
AG001 ARCHITECTURAL LEGENDS AND ABBREVIATIONS
AG002 ARCHITECTURAL GENERAL NOTES
AD100 DEMOLITION PLAN - OVERALL
AD101 DEMOLITION PLAN - AREA A
AD110 DEMOLITION ROOF PLAN - OVERALL
AD151 DEMOLITION REFLECTED CEILING PLAN - AREA A
A-100 OVERALL GROUND FLOOR PLAN
A-101 GROUND FLOOR PLAN - AREA A
A-110 ROOF PLAN - OVERALL
A-111 ROOF PLAN - AREA A
A-150 REFLECTED CEILING PLAN - OVERALL
A-151 REFLECTED CEILING PLAN - AREA A
A-201 EXTERIOR ELEVATIONS
A-202 EXTERIOR ELEVATIONS
A-301 BUILDING SECTION
A-302 BUILDING SECTION
A-303 BUILDING SECTION
A-310 WALL SECTIONS
A-311 WALL SECTIONS
A-312 WALL SECTIONS
A-401 ENLARGED PLANS
A-500 PARTITION TYPES
A-501 PARTITION DETAILS
A-502 PARTITION DETAILS
A-510 PENETRATION DETAILS
A-511 PENETRATION DETAILS
A-512 ROOF DETAILS
A-513 ROOF DETAILS
A-514 ROOF DETAILS
A-515 ROOF DETAILS
A-530 SECTION DETAILS
A-531 SECTION DETAILS
A-541 DETAILS - STAIRS AND WHEELCHAIR LIFT
A-543 DETAILS - SEISMIC COVER
A-544 DETAILS - SEISMIC COVER
A-550 CEILING DETAILS
A-551 CEILING DETAILS
A-552 CEILING DETAILS
A-601 DOOR TYPES AND SCHEDULE
A-602 DOOR DETAILS
A-603 DOOR DETAILS
A-604 WINDOW SCHEDULE AND DETAILS
A-701 ROOM FINISH SCHEDULE AND LEGEND
A-710 GROUND FLOOR FINISH PLAN - AREA A
A-720 INTERIOR ELEVATIONS AND DETAILS
A-721 SIGNAGE PLAN - AREA A
A-729 SIGNAGE SCHEDULE AND DETAILS
SHEET LIST
SHEET NUMBER SHEET TITLE
ELECTRICAL
E-001 ELECTRICAL LEGEND AND NOTES
E-002 ELECTRICAL LEGEND AND NOTES
E-100 ELECTRICAL PLAN - OVERALL
ED101 ELECTRICAL SITE DEMOLITION PLAN
ED102 ELECTRICAL DEMOLITION PLAN
ED601 ELECTRICAL DEMOLITION ONE-LINE
ES101 ELECTRICAL SITE PLAN
EG101 ELECTRICAL GROUNDING PLAN
EG102 ELECTRICAL LIGHTNING PROTECTION PLAN
EG103 ELECTRICAL LIGHTNING PROTECTION ISOMETRIC VIEW
EG501 ELECTRICAL GROUNDING DETAILS
EG502 ELECTRICAL GROUNDING DETAILS
EG601 ELECTRICAL GROUNDING RISER DIAGRAM
EL101 ELECTRICAL LIGHTING PLAN
EL102 ELECTRICAL LIGHTING CONTROL PLAN
EL501 ELECTRICAL LIGHTING DETAILS
EP101 ELECTRICAL POWER PLAN
EP102 MECHANICAL POWER PLAN
EP401 ELECTRICAL ENLARGED PLAN
EP601 ELECTRICAL ONE-LINE DIAGRAMS
EP602 ELECTRICAL PANEL SCHEDULES
EP603 ELECTRICAL PANEL SCHEDULES
EP604 ELECTRICAL PANEL SCHEDULES
EP701 ELECTRICAL SCHEDULES
TELECOMMUNICATIONS
T-001 TELECOMMUNICATIONS LEGEND
T-002 SECURITY SYSTEMS LEGEND, NOTES, & ABBREVIATIONS
T-101 TELECOMMUNICATIONS OVERALL PLAN
TN101 TELECOMMUNICATIONS PLAN - AREA A
TN401 TELECOMMUNICATIONS ENLARGED PLANS
TN501 TELECOMMUNICATIONS DETAILS
TN502 TELECOMMUNICATIONS DETAILS
TN503 TELECOMMUNICATIONS DETAILS
TN505 SECURITY DETAILS
C
E R
T
IF
IE
D
F
IN
A L D
E S
I G N
S U
B M
IT
T
A L
/0
/2
KEVIN KIMM
C-33500
01-31-27
SHEET LIST
SHEET NUMBER SHEET TITLE
INTERIORS
I-100 GROUND FLOOR FURNITURE PLAN - OVERALL
I-101 GROUND FLOOR FURNITURE PLAN - AREA A
FIRE PROTECTION
F-001 FIRE ALARM NOTES, LEGEND AND ABBREVIATIONS
FD101 FIRE ALARM FIRST FLOOR DEMOLITION PLAN
FD102 FIRE SUPPRESSION FIRST FLOOR DEMOLITION PLAN
FA101 FIRE ALARM FIRST FLOOR PLAN
FA501 FIRE ALARM DETAILS
FA502 FIRE ALARM DETAILS
FA601 FIRE ALARM ONE-LINE DIAGRAM
FX001 FIRE SUPPRESSION NOTES, LEGEND AND ABBREVIATIONS
FX101 FIRE SUPPRESSION FIRST FLOOR PLAN
FX601 FIRE SUPPRESSION RISER DIAGRAM
PLUMBING
P-001 PLUMBING GENERAL NOTES, ABBREVIATIONS
PD100 PLUMBING DEMOLITION PLAN - DOMESTIC WATER, COMPRESSED AIR AND NATURAL GAS
PD101 PLUMBING DEMOLITION PLAN - CONDENSATE, WASTE, AND VENT - AREA A
PD102 PLUMBING DEMOLITION ENLARGED PLAN - MECHANICAL YARD - DOMESTIC WATER, GAS &
COMPRESSED AIR
P-100 PLUMBING NEW WORK PLAN - DOMESTIC WATER, RO WATER, COMPRESSED AIR, AND
BREATHING AIR - AREA A
P-101 PLUMBING NEW WORK PLAN - WASTE, VENT, AND CONDENSATE - AREA A
P-102 PLUMBING NEW WORK PLAN - STORM DRAIN - AREA A
P-103 PLUMBING NEW WORK ROOF PLAN - AREA A
P-301 PLUMBING SECTIONS
P-302 PLUMBING SECTIONS
P-401 PLUMBING ENLARGED PLANS - MECHANICAL YARD
P-402 PLUMBING ENLARGED PLANS - WST BAY
P-403 PLUMBING ENLARGED PLANS - COMPUTER RM 156 & PARTIAL BOT 162
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-602 PLUMBING SCHEDULES
P-701 PLUMBING DOMESTIC WATER RISER DIAGRAM
P-702 PLUMBING WASTE & VENT RISER DIAGRAM
P-703 PLUMBING RO WATER SYSTEM RISER DIAGRAM
P-704 PLUMBING COMPRESSED AIR RISER DIAGRAM
P-705 PLUMBING CONDENSATE RISER DIAGRAM
P-706 PLUMBING STORM DRAIN RISER DIAGRAM
P-901 PLUMBING ISOMETRIC -RO SYSTEM WST BAY
MECHANICAL
M-001 MECHANICAL GENERAL NOTES, ABBREVIATIONS
MD100 HVAC DEMOLITION PLAN - OVERALL
MD101 HVAC DEMOLITION PLAN - AREA A
MD102 HVAC DEMOLITION PARTIAL ENLARGED PLAN - AREA A
MD701 HVAC DEMOLITION - ISOMETRIC HVAC PIPING DIAGRAM
M-100 HVAC NEW WORK PLAN - OVERALL
M-101 HVAC NEW WORK PLAN - AREA A
M-102 HVAC PIPING NEW WORK PLAN - AREA A
M-103 HVAC PIPING NEW WORK PLAN - ISOMETRIC HVAC PIPING DIAGRAM
M-301 HVAC SECTIONS - MECHANICAL YARD
M-302 HVAC SECTION - WST BAY EAST
M-303 HVAC SECTION - WST BAY SOUTH
M-304 HVAC SECTIONS - COMPUTER RM 156
M-305 HVAC SECTIONS - COMPUTER RM 156
M-306 HVAC SECTION - BOT BAY
M-307 HVAC SECTION - BOT BAY LOOKING NORTH
M-401 HVAC NEW WORK ENLARGED PLAN - MECHANICAL YARD
M-402 HVAC NEW WORK ENLARGED PLAN - WST 135 & ELECTRICAL 136
M-403 HVAC PIPING NEW WORK ENLARGED PLAN - WST 135 & ELECTRICAL 136
M-404 HVAC NEW WORK ENLARGED PLAN - COMPUTER RM 156
M-405 HVAC PIPING NEW WORK ENLARGED PLAN - PARTIAL COMPUTER RM 156 & PARTIAL BOT
M-406 HVAC NEW WORK ENLARGED PLAN - BOT 162
M-407 HVAC CHILLED WATER FLOW DIAGRAM
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-503 HVAC DETAILS
M-504 HVAC DETAILS
M-505 HVAC DETAILS
M-601 HVAC SCHEDULES
M-602 HVAC SCHEDULES
M-603 HVAC SCHEDULES
M-604 HVAC SCHEDULES
M-700 HVAC CONTROLS LEGEND
M-701 HVAC CONTROLS NETWORK ARCHITECTURE AND OCCUPANCY SCHEDULES
M-702 HVAC CONTROLS - MISC POINTS
M-703 HVAC CONTROLS - VAV AHU CONTROL SCHEMATIC
M-704 HVAC CONTROLS - VAV AHU CONTROL SEQUENCE
M-705 HVAC CONTROLS - VAV AHU POINTS LIST
M-706 HVAC CONTROLS - VAV TERMINAL UNITS
M-707 HVAC CONTROLS - COMPUTER ROOM AIR HANDLING UNITS
M-708 HVAC CONTROLS - DUCTLESS SPLIT SYSTEM HEAT PUMP
M-709 HVAC CONTROLS - CHILLED WATER SYSTEM
M-710 CHILLED WATER SYSTEM POINTS LIST
M-901 HVAC ISOMETRIC - MECHANICAL YARD
W
2Q R
BA
6_
Pl an s-
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C
R e v it P ro je c ts
\P D
P G
B
S
IM
F jlw u c h k o .r v t
/5
/2
:3
:4
A
M
GI001
L
IF
E S
A F
E T
Y N
A R
R A
T
IV
E A
N D
B U
IL
D
IN
G
C O
D E
A N
A L Y
S
IS
IB
C
M A
R C
H A
IR
R
E S
E R
V E
B A
S E
C
A L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
B U
R N
S A
N D
M c D
O N
N E
L L
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
IS
S
O U
R I
A Y
E U
N G
C C
A S
H
M B
E T
Z
R V
E N
T E
IC
H
E R
M A
R C
H
C E
R T
IF
IE
D F
IN
A
L D
E S
IG
N
S U
B M
IT
T
A L
A D
D
IT
IO
N
A
L T
E R
A T
IO
N
O F
B U
IL
D
IN
G
F
O R
F L
IG
H T
S
IM
U L A
T O
R
P D
P G
1. APPLICABLE CODES AND STANDARDS
ABBREVIATIONS TITLE EDITION
IBC INTERNATIONAL BUILDING CODE 2021
IEBC INTERNATIONAL EXISTING BUILDING CODE 2021
NFPA 1 FIRE CODE 2021
NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS 2021
NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS 2022
NFPA 24 STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND
THEIR APPURTENANCES
NFPA 70 NATIONAL ELECTRICAL CODE 2023
NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE 2022
NFPA 80 STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES 2019
NFPA 90A STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND
VENTILATING SYSTEMS
NFPA 101 LIFE SAFETY CODE 2021
UFC 1-200-01 DOD BUILDING CODE 1 SEPTEMBER,
UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES CHANGE 6, 6
MAY, 2021
UFC 4-010-01 DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS CHANGE 1, 6
MAY, 2021
UFC 4-021-01 DESIGN AND O&M: MASS NOTIFICATION SYSTEMS CAHNGE 1, 01
JANUARY, 2010
ECB 2018-17 NEW REQUIREMENTS FOR VISUAL NOTIFICATION FOR MASS NOTIFICATION
SYSTEMS
20 JANUARY,
DAFMAN 91-203 AIR FORCE OCCUPATIONAL SAFETY, FIRE, AND HEALTH STANDARDS 25 MARCH, 2022
3. CLASSIFICATION OF OCCUPANCY
AREAS OCCUPANCY IBC NFPA 101
ADMIN, BOT BAY, BRIEFING, CLASSIFIED
VIEWING, CLASSROOM, COMMS, COMPUTER
ROOM, CORRIDOR, INSTRUCTOR, ISSSO,
LEAD INSTRUCTOR, LEARNING CENTER,
LOBBY, LOBBY/BREAK ROOM, MMEN,
MX-REPAIR, P-PTT, PO/QAR, SCHED,
SIMULATOR BAY, SITE
MANAGER/SCHEDULER, SITE MGR, SPACE,
UNASSIGNED, VESTIBULE, WOMEN, WST
KC46 BAY
BUSINESS, GROUP B 304.1 6.1.11
C.G, CBT, DIRTY ROOM, ELEC/MECH,
HYDRAULIC ROOM MECHANICAL, LOAD
MASTER, MAIN. MGR, MAINTENANCE, PARTS
STORAGE, RDS, SECURE STORAGE,
STOCKROOM, STORAGE, TMS,
JANITOR/STORAGE
MODERATE-HAZARD STORAGE, GROUP
S-1
311.2 6.1.13
6. MODIFIED ALLOWABLE HEIGHT (IBC 504)
OCCUPANCY
BUILDING
FACTOR
MODIFIED ALLOWABLE HEIGHT (FT /
STORY) ACTUAL HEIGHT (FT/STORY)
B / S-1* S 75 / 3 39/2
2. TYPE OF CONSTRUCTION (IBC TABLE 601)
BUILDING ELEMENT
TYPE OF
CONSTRUCTION
FIRE RESISTANCE
RATING
PRIMARY STRUCTURAL FRAME IIB 0 HR
BEARING EXTERIOR WALL IIB 0 HR
BEARING INTERIOR WALL IIB 0 HR *
NON-BEARING EXTERIOR WALL IIB 0 HR
NON-BEARING INTERIOR WALL IIB 0 HR *
FLOOR CONSTRUCTION INCLUDING SUPPORTING BEAMS AND
JOISTS
IIB 0 HR *
ROOF CONSTRUCTION INCLUDING SUPPORTING BEAMS AND JOISTS IIB 0 HR
8. BUILDING SEPARATION (IBC TABLE 705.5)
OCCUPANCY ELEVATION
RESTRICTIVE FIRE
SEPARATION DISTANCE (FT)
FIRE RESISTIVE RATING OF
EXTERIOR WALL
B/ S-1 NORTH/SOUTH/WEST/EAST ≥ 10 NO RATING
10. OCCUPANT LOAD CALCULATIONS (NFPA 101)
FLOOR AREA FUNCTION OF SPACE
AREA
(SF)
OCCUPANT
LOAD FACTOR
(SF/PERSON) OCCUPANTS
LEVEL 1 ADMIN, BOT BAY, CLASSIFIED VIEWING,
COMMS, COMPUTER ROOM,
CORRIDOR, INSTRUCTOR, ISSO, LEAD
INSTRUCTOR, LOBBY, LOBBY/ BREAK
ROOM, MEN, MX - REPAIR, P-PTT, PO /
QAR, SCHED, SIMULATOR BAY, SITE
MANAGER / SCHEDULER, SITE MGR,
VESTIBULE, WOMEN, WST KC46 BAY
BUSINESS AREAS 17,063 150 114
LEVEL 1 BREAK ROOM, BRIEFING ROOMS,
CLASSROM, LEARNING CENTER
ASSEMBLY WITHOUT
FIXED SEATING
630 15 42
LEVEL 1 C.G, CBT, DIRTY ROOM, LOAD MASTER,
MAINT. MGR, MAINTENANCE, PARTS
STORAGE, RDS, SECURE STORAGE,
STOCKROOM, STORAGE, TMS
ACCESSORY
STORAGE
5,017 300 17
LEVEL 1 ELEC / MECH, ELECTRICAL, HYDRAULIC
ROOM MECHANICAL, MECHANICAL
STORAGE 1,029 500 3
LEVEL 1 TOTAL 23,739 176
LEVEL 2 CORRIDOR, LOBBY, MEN'S TOILET,
STAIRS, VESTIBULE, WOMEN'S TOILET
BUSINESS AREAS 4,097 150 28
LEVEL 2 JANITOR / STORAGE ACCESSORY
STORAGE
1,320 300 5
LEVEL 2 BREAK ROOM, BRIEFING ROOMS ASSEMBLY WITHOUT
FIXED SEATING
1,044 15 70
LEVEL 2 MECHANICAL ROOM STORAGE 1,294 500 3
LEVEL 2 TOTAL 4,099 106
11. OCCUPANT LOAD SUMMARY AND MINIMUM EXITS FROM FLOOR
FLOOR GROSS AREA (SF) OCCUPANTS
REQUIRED EXITS
(NFPA 101)
REQUIRED EXIT SEPARATION
(NFPA 101)
LEVEL 1 23,739 177 2 1/3 DIAGONAL
LEVEL 2 4,099 107 2 1/3 DIAGONAL
7. PROTECTION FROM HAZARDS AND OTHER PASSIVE FIRE PROTECTION
AREA REQUIRED RATING CODE
MECHANICAL ROOM, CLASSROOM,
COMPUTER ROOM
0 HOUR SMOKE PARTITION NFPA 101 SECTION
38.3.2.1, 8.7.1.2
SIMULATOR 1 HR FIRE BARRIER DAFMAN 91-203
EXISTING EGRESS STAIRWAY 1/2 HR FIRE BARRIER (1 HR PROVIDED) NFPA 39.3.1.1, 8.6.5
9. OPENING PROTECTION FOR FIRE AND SMOKE RESISTIVE
CONSTRUCTION
COMPONENT
FIRE DOOR / SHUTTER
ASSEMBLIES DUCT PENETRATIONS
OTHER
PENETRATIONS NFPA 101
1 HR FIRE
BARRIER
3/4 HR 1-1/2 HR FIRE DAMPER ONLY
ON TRANSFER DUCTS IN H
OCCUPANCIES
1 HR 8.5.4, 8.5.5.2.1,
8.5.6.3
0 HR SMOKE
PARTITION
0 HR (SELF CLOSING) SMOKE DAMPER ON TRANSFER
DUCT ONLY
0 HR IBC TABLE
716.1(2)
IBC 717.5.2
NFPA 90A 5.3.1.1
IBC TABLE
717.3.2.1
IBC 714.4.1
1 HR FIRE
BARRIER FOR
SHAFT
ENCLOSURE
1 HR 1-1/2 HR FIRE/SMOKE DAMPER 1 HR IBC 716.1,
717.5.3
12. MINIMUM EXITS OR EXIT ACCESSES FROM A SPACE OR AREA
(NFPA 101 7.4.1)
OCCUPANCY
OCCUPANT LOAD PERMITTING ONE
EXIT
OCCUPANT LOAD REQUIRING
TWO EXITS CODE
BUSINESS LESS THAN 100' COMMON PATH 100' OR GREATER COMMON PATH 38.2.4, 38.2.4.3
STORAGE LESS THAN 100' COMMON PATH 100' OR GREATER COMMON PATH TABLE 42.2.5
* BASED OFF OF TYPE IIB CONSTRUCTION
5. MODIFIED ALLOWABLE AREA (IBC 506.2)
OCCUPANCY
BUILDING
FACTOR
ALLOWABLE AREA
(SQFT) *
FRONTAGE
INCREASE
(SQFT)
MODIFIED
ALLOWABLE AREA
(SQFT)
ACTUAL
AREA (SQFT)
B SM 69,000 17,250 86,250 21,160
S-1 SM 52,500 13,125 65,652 8,660
13. COMMON PATH, DEAD-END, AND TRAVEL DISTANCE LIMITS
OCCUPANCY COMMON PATH LIMIT (FT) DEAD END LIMIT (FT) TRAVEL DISTANCE LIMIT (FT)
BUSINESS 100 50 300
STORAGE, ORDINARY
HAZARD
100 100 400
14. MINIMUM EGRESS WIDTHS
COMPONENT REQUIREMENT WIDTH (IN) NFPA 101
EXISTING STAIRS MINIMUM WIDTH PER COMPONENT 36 TABLE 7.2.2.2.1.1
(b)
DOORS IN EGRESS ACCESS PER COMPONENT 32 7.2.1
CORRIDOR SERVING LESS THAN 50 OCCUPANTS PER COMPONENT 36 7.1.3.1
CORRIDOR FOR ACCESS TO ELECTRICAL /
MECHANICAL SYSTEMS
PER COMPONENT 28 7.14.3.4
OTHER EGRESS COMPONENTS PER PERSON 0.2 TABLE 7.3.3.1
STAIRWAYS PER PERSON 0.3 TABLE 7.3.3.1
15. MAXIMUM EGRESS COMPONENT CAPACITY
FLOOR COMPONENT
RESTRICTING EGRESS
COMPONENT / WIDTH
MAXIMUM OCCUPANT
CAPACITY OF COMPONENT
OCCUPANT
LOADING
LEVEL 2 2 STAIRS STAIR / 44 INCHES 146 107
16. MINIMUM INTERIOR FINISH RATINGS (NFPA 101)
OCCUPANCY
EXIT ENCLOSURE AND EXIT
PASSAGEWAYS CORRIDORS
ROOMS AND ENCLOSED
SPACES
BUISNESS, STORAGE CLASS C CLASS C CLASS C
17. FIRE SUPPRESSION REQUIREMENTS (UFC 3-600-01, 9-7,9-10,9-17)
SPRINKLERS STANDPIPE FIRE EXTINGUISHERS
WET-PIPE AND PREACTION
SPRINKLER SYSTEMS PROVIDED IN
THE EXISTING SPACES. EXPANSION
PROVIDED WITH WET-PIPE AND
PREACTION SPRINKLER SYSTEMS.
NOT REQUIRED FIRE EXTINGUISHERS PROVIDED
THROUGHOUT THE EXISTING
FACILITY. EXPANSION PROVIDED
WITH NEW FIRE EXTINGUISHERS
* FOR NONSEPARATED OCCUPANCIES THE MOST RESTRICTIVE OCCUPANCY LIMITATIONS ARE USED.
* EXCEPT AS REQUIRED FOR OCCUPANCY SEPARATION, INCIDENTAL USE, AND OTHER PASSIVE FIRE
PROTECTION.
4. OCCUPANCY SEPARATION
FLOOR / OCCUPANCY SEPARATION SEPARATION RATING IBC
LEVEL 1 / B / S-1 NONSEPARATED 0 HR BARRIER 508.3.3
LEVEL 2 / B / S-1 NONSEPARATED 0 HR BARRIER 508.3.3
18. MINIMUM REQUIRED FIRE FLOW (UFC 3-600-01, NFPA 1)
FIRE FLOW AREA (SF) TYPE OF CONSTRUCTION MINIMUM FIRE FLOW (GPM) FLOW DURATION (HR)
31,494 II(000) 1,000 2
19. FIRE EXTINGUISHER DISTRIBUTION (NFPA 10)
OCCUPANCY
PRIMARY CLASSIFICATION
OF FIRE AND HAZARD
MINIMUM
RATING
MINIMUM FLOOR
AREA PER A (SQFT) MAX TRAVEL DISTANCE (FT)
BUSINESS CLASS A:C - ORDINARY 2-A 1,500 75
STORAGE CLASS A - ORDINARY 4-A 1,000 75
SIM BAYS CLASS C - ORDINARY 2A10B:C 1,500 75
20. FIRE ALARM REQUIREMENTS (UFC 3-600-01, 9-18)
MANUAL INITIATION AUTOMATIC INITIATION OCCUPANT NOTIFICATION
PROVIDED PROVIDED REQUIRED*
* HORN STROBES WITH CLEAR LENS (FA) AND AMBER ALERT STROBES WITH SPEAKER (MNS) PROVIDED
THROUGHOUT THE FACILITY AND EXPANDED IN THE SCOPE OF WORK AREA.
C
E R
T
IF
IE
D
F
IN
A L D
E S
I G N
S U
B M
IT
T
A L
/0
/2
EXP:03/31/2027
3/5/2025
W
2Q R
BA
6_
Pl an s-
DN
CP
C P
CP
CP
CBT
LEAD
INSTRUCTOR
SCHED
LEAD
INSTRUCTOR
VEST.
INSTRUCTORS
ADMIN
SITE MGR.
CORR
VEST.
117A
PARTS STORAGE
LOBBY
STORAGE
CLASSIFIED
VIEWING
RDS
CORR
TMS
109 MAINT MGR
SECURE
STORAGE
STOCKROOM
MAINTENANCE
CORR
DIRTY ROOM
LOAD MASTER
COMPUTER
ROOM
PO/QAR
WOMEN
MEN
C.G.
MECH.
125 Space
SITE MGR /
SCHED
ISSO
139A
MX - OFFICE
MX - REPAIR
LOBBY/BREAK
CORR
INSTRUCTOR
SUITE-1
143-1
BRIEFING
BRIEFING
CORR-1
134-1
CORR
P-PTT
UNASSIGNED
WST KC46 BAY-1
135-1
CORR
CORR
BRIEFING
BRIEFING
COMMS
LEARNING
CENTER
CLASSROOM
BOT BAY
COMPUTER
ROOM
ELECTRICAL
SIMULATOR BAY
MECHANICAL
ELEC./MECH.
HYDRAULIC
ROOM
MECHANICAL
STAIR
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 121.5
A.1
139.7
A.2
36"
72"
36"
72"
36"
72"
36"
36"
36"
36"
16'
36"
72"
36"
36"
36"
72"
36"
36"
36"
72"
36"
72"
36"
72"
36"
72"
36"
36"
Space
MECHANICAL
YARD
45'
36"
36"
96'CP:84'
106'CP:50'
C P
:1
86'
FE:SR
FE:SR
F E
:F R
EXISTING EXTERIOR
STAIRWAY IN
COMPLIANCE WITH NFPA
101 SECTION 7.2.2.5.2.
FE:SR
1 HR FIRE BARRIER
FIRE AND SMOKE RESISTIVE CONSTRUCTION
REQUIRED WIDTH
EXIT CAPACITY
OCCUPANTS SERVED
COMMON PATH
OF TRAVEL
TRAVEL
DISTANCE
EGRESS
PATH
COMMON PATH
TERMINATION
POINT
PORTABLE FIRE EXTINGUISHERS
EXIT DOOR
PROVIDED WIDTH
32"
36"
44"
54"
DOOR EGRESS TAG STAIR EGRESS TAG
EGRESS PATH
DEAD END CORRIDOR
10'
TERMINATION OF
DEAD END CORRIDOR
DEAD END DISTANCE
ACCESSORY STORAGE
AREAS
BUSINESS AREAS
1 PERSON / 300 SQFT GROSS
1 PERSON / 150 SQFT GROSS
50'CP:25'
EXTINGUISHER TYPE
A:B:C: TYPE DRY CHEMICAL
4A-20B:C
ASSEMBLY LESS
CONCENTRATED
1 PERSON / 15 SQFT NET
FE: FIRE EXITINGUISHER
FR: FULLY RECESSED CABINET
SR: SEMI-RECESSED CABINET
FE:SR
EXIT SIGNS, CEILING: ARROW INDICATES EGRESS
EXIT SIGNS
KEY PLAN
PLAN NORTH
A B
GENERAL SHEET NOTES
LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C
R e v it P ro je c ts
\P D
P G
B
S
IM
F jlw u c h k o .r v t
/5
/2
:3
:4
A
M
GI101
L
IF
E S
A F
E T
Y F
IR
S
T F
L O
O R
P L A
N
M A
R C
H A
IR
R
E S
E R
V E
B A
S E
C
A L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
B U
R N
S A
N D
M c D
O N
N E
L L
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
IS
S
O U
R I
A Y
E U
N G
C C
A S
H
M B
E T
Z
R V
E N
T E
IC
H
E R
M A
R C
H
C E
R T
IF
IE
D F
IN
A
L D
E S
IG
N
S U
B M
IT
T
A L
A D
D
IT
IO
N
A
L T
E R
A T
IO
N
O F
B U
IL
D
IN
G
F
O R
F L
IG
H T
S
IM
U L A
T O
R
P D
P G
0 4' 8' 16' 24'
SCALE: 3/32" = 1'-0"
A1
LIFE SAFETY FIRST FLOOR PLAN
1. REFER TO ARCHITECTURAL LEGEND FOR ADDITIONAL
INFORMATION REGARDING SYMBOLS AND ABBREVIATIONS.
2. REFER TO GI001 FOR LIFE SAFETY NARRATIVE AND BUILDING
CODE ANALYSIS.
3. REFER TO THE FIRE SUPPRESSION AND ALARM PLANS FOR
LOCATION OF FIRE PROTECTION DEVICES.
4. FINAL LOCATIONS OF FIRE EXTINGUISHERS SHALL BE
APPROVED BY THE AHJ PRIOR TO INSTALLATION. EXISTING
FIRE EXTINGUISHER LAYOUT HAS NOT BEEN EVALUATED.
5. EXISTING BUILDING IS IN COMPLIANCE WITH EXISTING
OCCUPANCY IN NFPA101 AND NEW WORK WILL NOT IMPACT
ANY EXISTING EGRESS.
C
E R
T
IF
IE
D
F
IN
A L D
E S
I G N
S U
B M
IT
T
A L
/0
/2
EXP:03/31/2027
3/5/2025
W
2Q R
BA
6_
Pl an s-
C
CP
MECHANICAL
ROOM
BREAK ROOM
STAIR NO. 1
LOBBY
VESTIBULE
JANITOR / STOR.
MEN'S TOILET
WOMEN'S TOILET
CORRIDOR
VESTIBULE
BRIEFING ROOM
BRIEFING ROOM
BRIEFING ROOM
BRIEFING ROOM
STAIR NO. 2
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
A
B
C
D
E
F
2 3 4 5 6 7 8
A.1
Space
Space
C P
:7
EXISTING EXTERIOR
STAIRWAY IN
COMPLIANCE WITH NFPA
101 SECTION 7.2.2.5.2.
27' - 4 3/8"
1 HR FIRE BARRIER
FIRE AND SMOKE RESISTIVE CONSTRUCTION
REQUIRED WIDTH
EXIT CAPACITY
OCCUPANTS SERVED
COMMON PATH
OF TRAVEL
TRAVEL
DISTANCE
EGRESS
PATH
COMMON PATH
TERMINATION
POINT
PORTABLE FIRE EXTINGUISHERS
EXIT DOOR
PROVIDED WIDTH
32"
36"
44"
54"
DOOR EGRESS TAG STAIR EGRESS TAG
EGRESS PATH
DEAD END CORRIDOR
10'
TERMINATION OF
DEAD END CORRIDOR
DEAD END DISTANCE
50'CP:25'
EXTINGUISHER TYPE
A:B:C: TYPE DRY CHEMICAL
4A-20B:C
ACCESSORY STORAGE
AREAS
BUSINESS AREAS
1 PERSON / 300 SQFT GROSS
1 PERSON / 150 SQFT GROSS
ASSEMBLY LESS
CONCENTRATED
1 PERSON / 15 SQFT NET
EXIT SIGNS
EXIT SIGNS, CEILING: ARROW INDICATES EGRESS
KEY PLAN
PLAN NORTH
A B
GENERAL SHEET NOTES
LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
C
R e v it P ro je c ts
\P D
P G
B
S
IM
F jlw u c h k o .r v t
/5
/2
:3
:4
A
M
GI102
L
IF
E S
A F
E T
Y S
E C
O N
D F
L O
O R
P L A
N
M A
R C
H A
IR
R
E S
E R
V E
B A
S E
C
A L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
B U
R N
S A
N D
M c D
O N
N E
L L
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
IS
S
O U
R I
A Y
E U
N G
C C
A S
H
M B
E T
Z
R V
E N
T E
IC
H
E R
M A
R C
H
C E
R T
IF
IE
D F
IN
A
L D
E S
IG
N
S U
B M
IT
T
A L
A D
D
IT
IO
N
A
L T
E R
A T
IO
N
O F
B U
IL
D
IN
G
F
O R
F L
IG
H T
S
IM
U L A
T O
R
P D
P G
0 4' 8' 16'SCALE: 1/8" = 1'-0"A4
LIFE SAFETY SECOND FLOOR PLAN
1. REFER TO ARCHITECTURAL LEGEND FOR ADDITIONAL
INFORMATION REGARDING SYMBOLS AND ABBREVIATIONS.
2. REFER TO GI001 FOR LIFE SAFETY NARRATIVE AND BUILDING
CODE ANALYSIS.
3. REFER TO THE FIRE SUPPRESSION AND ALARM PLANS FOR
LOCATION OF FIRE PROTECTION DEVICES.
4. EXISTING SECOND FLOOR FIRE EXTINGUISHER LAYOUT IS
OUT OF SCOPE AND HAS NOT BEEN EVALUATED. EXISTING
FIRE EXTINGUISHERS TO REMAIN.
C
E R
T
IF
IE
D
F
IN
A L D
E S
I G N
S U
B M
IT
T
A L
/0
/2
EXP:03/31/2027
3/5/2025
W
2Q R
BA
6_
Pl an s-
GENERAL NOTES
COORDINATION AND COMMUNICATION
ACCESS AND STAGING
TRAFFIC CONTROL
EQUIPMENT AND STOCKPILE HEIGHT
1. SEE DRAWING CS110 FOR HORIZONTAL AND VERTICAL CONTROL BENCHMARK INFORMATION.
2. ALL DIMENSIONS, ELEVATIONS, AND STATIONS ARE IN FEET, UNLESS INDICATED OTHERWISE.
3. CALLOUTS, COORDINATES, AND DIMENSIONS ARE POINTED TO OR MEASURED TO STRUCTURE
CENTER, EDGE OF PAVEMENT, BACK OF CURB, OR OUTSIDE FACE OF FOUNDATION WALL,
UNLESS INDICATED OTHERWISE.
4. SEE SPECIFICATIONS FOR GUIDANCE ON WORK AUTHORIZATION AND INSPECTION.
5. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS/SPECIFICATIONS AND
FEDERAL REGULATIONS AND LOCAL AND GOVERNMENT CODES. ANY DISCREPANCIES FOUND IN
THE PLANS, SPECIFICATIONS, AND REGULATIONS SHALL BE FORMALIZED IN WRITING IN
ACCORDANCE WITH THE SPECIFICATIONS.
1. ACCESS AND HAUL ROUTES FOR ALL CONTRACTOR PERSONNEL, VEHICLES, EQUIPMENT, AND
DELIVERIES ARE ILLUSTRATED ON DRAWINGS. SEE SHEET GC101 FOR HAUL ROUTES AND
ENTRY POINTS. SEE SPECIFICATION 00 80 00.00 06 SPECIAL PROVISIONS FOR ACCESS AND
PERMITTING REQUIREMENTS.
2. CONTRACTOR SHALL MAINTAIN ACCESS AND HAUL ROUTES TO BE FREE FROM DEBRIS CAUSED
FROM CONSTRUCTION ACTIVITIES ON A DAILY BASIS.
3. CONTRACTOR SHALL RESTRICT ALL OPERATIONS TO AREAS WITHIN THE CONSTRUCTION
LIMITS. ANY EXCEPTIONS SHALL BE IN ACCORDANCE WITH SPECIFICATION 00 80 00.00 06
SPECIAL PROVISIONS.
4. CONTRACTOR SHALL PROVIDE TEMPORARY CONSTRUCTION FENCING AROUND THE ENTIRE
SITE DURING CONSTRUCTION.
5. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STAGING AND STOCKPILE AREA FOR
MATERIALS AND EQUIPMENT. ALL LAYOUT AND STOCK PILES SHALL BE IN ACCORDANCE WITH
SPECIFICATION 00 80 00.00 06 SPECIAL PROVISIONS.
6. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, CONTRACTOR'S EQUIPMENT AND
VEHICLES SHALL BE PARKED IN THE STAGING AREA.
7. THE CONSTRUCTION SITE IS WITHIN A SECURE BASE. ANY ACCESS TO THE BASE REQUIRES
SPECIFIC BASE ACCESS. THIS REQUIREMENT APPLIES TO CONTRACTORS, SUB CONTRACTORS,
VENDORS, AND DELIVERY DRIVERS. CONSULT SPECIAL PROVISION FOR GUIDANCE ON BASE
ACCESS.
8. ALL CONTRACTOR VEHICLES AND PERSONNEL SHALL BE RESPONSIBLE FOR COORDINATING
WITH THE BASE SECURITY OFFICE IN OBTAINING PROPER SECURITY CLEARANCE AND BADGING
PRIOR TO ENTERING SECURE AREAS.
9. ACCESS POINTS, HAUL ROUTES, STAGING AREA, AND ANY OTHER AREAS DISTURBED BY THE
CONTRACTOR SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER TO THE
SATISFACTION OF THE COR.
1. CONTRACTOR SHALL APPOINT A PRIMARY CONSTRUCTION SUPERINTENDENT, SUBJECT TO THE
APPROVAL OF THE COR, WHO SHALL BE PRESENT ON THE CONSTRUCTION SITE AT ALL TIMES
DURING WORKING HOURS AND ACCESSIBLE AT ALL TIMES WHILE WORK IS IN PROGRESS. THE
PRIMARY CONSTRUCTION SUPERINTENDENT SHALL BE DESIGNATED THE RESPONSIBLE
CONTRACTOR'S REPRESENTATIVE WHO SHALL BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE
CONTRACTOR'S PRIMARY CONSTRUCTION REPRESENTATIVE IS NOT AVAILABLE ON THE
CONSTRUCTION SITE, AN ALTERNATE REPRESENTATIVE SHALL BE PROVIDED. CONTRACTOR
SHALL PROVIDE NAMES AND CONTACT INFORMATION OF REPRESENTATIVES TO THE COR
PRIOR TO THE START OF CONSTRUCTION ACTIVITIES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT COORDINATION BETWEEN
SUBCONTRACTORS AND WITH THE COR.
3. THE FOLLOWING CONTACT INFORMATION IS PROVIDED FOR CONTRACTOR'S USE IN CASE OF
AN EMERGENCY:
a. EMERGENCY 911
b. COR ###-###-#### (NUMBER TO BE PROVIDED AT NTP. CONTRACTOR TO REQUEST)
1. ALL FENCING, TRAFFIC, SIGNING, AND STAGING SHALL BE APPROVED BY THE GOVERNMENT
AND IN COMPLIANCE WITH SPECIFICATIONS AND SPECIAL PROVISIONS PRIOR TO BEING
BROUGHT ONTO THE BASE.
2. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH COMPANY DESIGNS,
INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY VISIBLE. CONTRACTOR SHALL PROVIDE
EACH VEHICLE WITH A FLAG ATTACHED TO THE VEHICLE WHICH SHOULD BE AT LEAST 3 FEET
SQUARE HAVING INTERNATIONAL ORANGE AND WHITE CHECKERED PATTERN SO THAT THE
FLAG IS EASILY VISIBLE.
3. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES TO SOUND AN
ALARM WHEN MOVING IN REVERSE.
4. ONLY RUBBER-TIRE VEHICLES WILL BE ALLOWED ON EXISTING PAVEMENT-TO-REMAIN.
5. NO PEDESTRIAN TRAFFIC SHALL BE ALLOWED THROUGH THE CONSTRUCTION LIMITS.
6. ADVANCE NOTIFICATION OF ROAD CLOSURE SHALL BE IN ACCORDANCE WITH SPECIFICATION
00 80 00.00 06 SPECIAL PROVISIONS.
7. ANY CHANGE OR REMOVAL OF DIRECTION SIGNAGE BARRICADES OR FENCES SHALL BE
APPROVED BY THE COR AND IN COMPLIANCE WITH SPECIFICATIONS AND SPECIAL PROVISIONS
PRIOR TO BEING BROUGHT ONTO THE BASE.
8. CONTRACTOR SHALL ATTEND ANY SPONSOR-MANDATED VEHICLE OPERATOR OR FOREIGN
OBJECT DEBRIS/DAMAGE (FOD) CONTROL TRAINING COURSE.
9. ANY DAMAGE TO ROADS AND PAVEMENTS-TO-REMAIN DUE TO CONSTRUCTION EQUIPMENT OR
TRAFFIC SHALL BE REPAIRED TO RESTORE THE ROADS AND PAVEMENTS TO THEIR ORIGINAL
CONDITION TO THE SATISFACTION OF THE COR.
1. THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION EQUIPMENT OPERATING IN AN
AIRCRAFT OPERATIONS AREA IS GOVERNED BY FEDERAL AVIATION ADMINISTRATION (FAA)
ADVISORY CIRCULAR AC 150/5370-2E AND AC 150/5300-13 (CURRENT EDITIONS). WHEN
EQUIPMENT IS EXPECTED TO PENETRATE THE AIRFIELD APPROACH SURFACES OR WHEN
CRANES WILL BE USED ON-SITE, CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 45 DAYS
TO THE COR AND BASE AIRFIELD OPERATIONS PRIOR TO THE START OF CONSTRUCTION TO
COORDINATE THE SUBMITTAL OF FAA FORM 7460-1 TO THE FAA REGIONAL OFFICE.
PERMISSION TO USE CRANES SHALL BE ISSUED BY BASE AIRFIELD OPERATIONS AND IN
ACCORDANCE WITH SPECIFICATION 00 80 00.00 06 SPECIAL PROVISIONS AND APPROVED BY
THE FAA.
2. DURING PERIODS OF LOW VISIBILITY, VEHICLES AND EQUIPMENT SHALL BE IDENTIFIED BY AN
APPROPRIATELY SIZED FLASHING OR STEADY BURNING AMBER BEACON MOUNTED ON THE
UPPERMOST PART OF THE VEHICLE OR EQUIPMENT SUCH THAT IT IS CONSPICUOUS FROM ANY
DIRECTION INCLUDING FROM THE AIR. IF A VEHICLE OR PIECE OF EQUIPMENT IS NOT
FURNISHED WITH SUCH A BEACON, IT MUST BE ESCORTED INTO THE AIRCRAFT OPERATIONS
AREA BY A PROPERLY LIT VEHICLE.
3. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES SHALL HAVE BOOMS OR ARMS
LOWERED TO THEIR LOWEST ELEVATION.
4. CONTRACTOR SHALL NOT STOCKPILE CONSTRUCTION MATERIALS, SPOILS, OR DEBRIS IN ANY
AREA WHERE SUCH STOCKPILES WOULD PENETRATE AVIATION SURFACES. ALL STOCKPILES
ADJACENT TO AIRCRAFT OPERATIONS AREA SHALL BE IDENTIFIED WITH A 360-DEGREE RED
OBSTRUCTION LIGHT PLACED AT THE HIGHEST POINT OF THE STOCKPILE. STOCKPILING OF
MATERIAL WITHIN THE AIRFIELD SAFETY AREAS IS PROHIBITED.
1. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT EDITION OF OSHA REGULATIONS, EM
385-1-1 SAFETY AND HEALTH REQUIREMENTS MANUAL, LATEST EDITION, AND THE STATE OF
CALIFORNIA LAWS CONCERNING EXCAVATION.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL EXCAVATION, TRENCHING,
AND SHORING ARE PERFORMED IN A MANNER THAT COMPLIES WITH LOCAL REGULATIONS AND
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS FOR
CONSTRUCTION.
3. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE PROMINENTLY
MARKED WITH ORANGE BARRICADES WITH FLASHING RED LIGHTS ACCEPTABLE TO THE COR.
4. ADVANCE WRITTEN NOTIFICATION AND APPROVAL SHALL BE OBTAINED PRIOR TO PROCEEDING
WITH ANY EXCAVATIONS IN ACCORDANCE WITH THE SPECIAL PROVISIONS.
5. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY BE REQUIRED.
CONTRACTOR SHALL ASSUME THAT ALL GROUND WATER ENCOUNTERED DURING EXCAVATION
IS CONTAMINATED AND SHALL BE PUMPED INTO CONTAINERS AND STORED FOR TESTING AND
DISPOSAL. CONTRACTOR TO PROVIDE VERIFICATION OF LEGALLY DISPOSING CONTAMINATED
GROUDNWATER, AS WELL AS INCORPORATING THE PUMPING AND DISPOSAL OF 20,000
GALLONS OF CONTAMINATED GROUNDWATER INTO THEIR BID.
6. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON-HAND AND READY FOR PLACING
THEREIN. AS SOON AS POSSIBLE AFTER THE MATERIAL HAS BEEN PLACED AND WORK
APPROVED, BACKFILL AND COMPACT TRENCHES AS SPECIFIED.
1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO OCCUPATIONAL
SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS AND EM 385-1-1 SAFETY AND
HEALTH REQUIREMENTS MANUAL, LATEST EDITION.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AND PAY FOR ALL APPLICABLE
PERMITS, FEES AND LICENSES FOR CONSTRUCTION AND EQUIPMENT.
3. THE CONTRACTOR SHALL PERFORM ON-SITE INSPECTIONS THROUGHOUT THE PROJECT AND
REMEDY ANY SAFETY CONCERNS IMMEDIATELY.
4. THERE SHALL BE NO PERMANENT WASTE SITES ON BASE PROPERTY. ANY TEMPORARY WASTE
AREA SHALL BE APPROVED BY THE COR AND SHALL BE KEPT IN AN ORDERLY CONDITION.
REMOVAL OF WASTE THAT IS NOT PROPERLY MAINTAINED IS SUBJECT TO THE DIRECTION OF
THE COR.
5. CONTRACTOR SHALL COORDINATE THE RELOCATION OF ANY GOVERNMENT-OWNED
EQUIPMENT WITH THE COR.
6. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIREMENTS WITH STATE AND
LOCAL AUTHORITIES AND SUBMITTING DOCUMENTS FOR PERMITTING FOR EROSION, SEDIMENT
CONTROL, AND STORMWATER POLLUTION PREVENTION.
7. EROSION CONTROL DEVICES SHALL BE USED FOR THE ACCESS AND HAUL ROUTES, STAGING
AREA, AND ANY MATERIAL STOCKPILES WHEN NECESSARY TO CONTROL EROSION AND STORM
WATER RUNOFF. SEE DRAWING CG501 FOR EROSION AND SEDIMENT CONTROL
REQUIREMENTS.
8. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT
RESULTING FROM WIND CONDITIONS.
9. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO LIMIT DUST CAUSED BY
CONSTRUCTION ACTIVITIES TO A LIMIT ACCEPTABLE TO BASE AIRFIELD OPERATIONS. THE
CONTRACTOR SHALL CONTROL BLOWING DUST ON THE PROJECT SITE FROM ANY HAUL ROUTE
OR WORK AREA REGARDLESS OF SOURCE.
10. WILDLIFE ATTRACTANTS, SUCH AS TRASH AND FOOD SCRAPS, FROM CONSTRUCTION
PERSONNEL AND ACTIVITIES SHALL BE REMOVED FROM THE PROJECT LIMITS.
11. ALL PLANNED EXCAVATION SHALL BE REVIEWED BY THE COR FOR POTENTIAL MONITORING BY
TRIBAL NATIONS, ANY EXCAVATIONS THAT QUALIFY REQUIRE NOTIFICATION AND PAID
MONITORING IN ACCORDANCE WITH THE SPECIAL PROVISIONS.
12. GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS WASTE RESULTING FROM CONTRACTOR'S
OPERATIONS OR ACTIVITIES SHALL BE PROPERLY DISPOSED OF IN ACCORDANCE WITH THE
SPECIFICATIONS AND LOCAL REGULATORY REQUIREMENTS AND PROPERLY REMOVED FROM
THE PROJECT PROPERTY. IF HAZARDOUS MATERIALS ARE ENCOUNTERED OR UNCOVERED
DURING CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COR.
13. ADVANCE WRITTEN NOTIFICATION OF UTILITY DISRUPTIONS SHALL BE IN ACCORDANCE WITH
THE SPECIAL PROVISIONS.
14. FAILURE TO COMPLY WITH BASE OPERATIONS AND THE COR SAFETY REQUIREMENTS SHALL
RESULT IN THE SUSPENSION OF CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY CONCERNS ARE
ADDRESSED BY THE CONTRACTOR TO THE SATISFACTION OF THE COR.
15. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY PLAN OR BASE
OPERATIONS SHALL IMMEDIATELY BE REMOVED FROM THE WORK AREA AND SHALL NOT BE
PERMITTED TO RETURN THROUGHOUT THE REMAINDER OF THE PROJECT.
1. CONTRACTOR SHALL FURNISH A CONSTRUCTION SAFETY PLAN AND PROPOSED PROJECT
SCHEDULE TO THE COR FOR REVIEW. SUCH REVIEW SHALL NOT HOLD THE COR RESPONSIBLE.
THE SAFETY PLAN SHALL IDENTIFY THE FOLLOWING ITEMS:
a. PROPOSED ACCESS POINTS, HAUL ROUTES, AND STAGING AREA.
b. LOCATION AND TYPE OF BARRICADES OR OTHER TRAFFIC CONTROL DEVICES.
c. AREAS TO WHICH CONSTRUCTION OPERATIONS SHALL BE LIMITED, ALONG WITH PROPOSED
MEASURES TO MINIMIZE THE POSSIBILITY OF CONTRACTOR EQUIPMENT AND WORKERS
ACCIDENTALLY ENTERING THE AVIATION OPERATIONS AREA.
d. METHODS BY WHICH THE CONTRACTOR SHALL COMMUNICATE WITH THE BASE, AIRFIELD, AND THE COR.
e. PRIMARY CONSTRUCTION SUPERINTENDENT CONTACT INFORMATION.
f. ANY REQUESTED TEMPORARY AMENDMENTS TO THE BASE AIRFIELD SECURITY PLAN FOR
SPECIAL CONDITION OR MODIFICATIONS.
1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING A STORM WATER PERMIT FOR LAND
DISTURBANCE OF MORE THAN 1 ACRE PRIOR TO CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR COORDINATING WITH LOCAL AUTHORITIES TO COMPLETE AND SUBMIT THE
STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR APPROVAL. LOCAL AUTHORITIES
INCLUDE BUT ARE NOT LIMITED TO COUNTY AND CITY STORMWATER MANAGEMENT GROUPS.
CONTRACTOR SHALL COORDINATE ALL ENVIRONMENTAL AND STORM WATER
CORRESPONDENCE, DOCUMENTATION, AND PERMITTING WITH COR. THE STORMWATER
PERMITTING PROCESS MAY INCLUDE THE FOLLOWING:
a. SUBMIT STORM WATER QUALITY PERMIT APPLICATION FEE.
b. SUBMIT MPDES GENERAL CONSTRUCTION PERMIT.
c. SUBMIT STORM WATER POLLUTION PREVENTION PLAN.
d. SUBMIT AFFIDAVIT STATING PROPERTY OWNER'S COMMITMENT TO COMPLY WITH STORM
WATER QUALITY MANAGEMENT PLAN AND LOCAL REGULATIONS FOR STORM WATER
QUALITY MANAGEMENT.
e. SUBMIT COPY OF APPROVED PROJECT DRAWING SET.
2. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS TO COMPLY WITH ALL FEDERAL, STATE, AND LOCAL REGULATORY REQUIREMENTS. THE PERMITTING PROCESS MAY INCLUDE
THE SUBMISSION OF THE FOLLOWING TYPES OF PERMITS:
a. EROSION AND SEDIMENT CONTROL.
b. STORMWATER MANAGEMENT.
c. WATER POLLUTION.
d. FLOODPLAIN MANAGEMENT.
e. DISCHARGE PERMIT.
f. WETLANDS.
g. SOLID AND HAZARDOUS WASTE.
h. CLEARING.
i. DIG PERMIT AF103.
j. TRAFFIC.
k. AIR QUALITY.
l. AIR EMISSIONS.
m. DRINKING WATER.
n. FUEL TANKS.
o. HISTORIC, CULTURAL, AND ARCHAEOLOGICAL PRESERVATION.
p. NOISE ABATEMENT.
q. ENDANGERED SPECIES.
r. AIRPORT HAZARD/AIRFIELD SAFETY CLEARANCES.
s. WELDING PERMIT (HOT WORK) FOR ANY WELDING OR CUTTING OPERATIONS.
EXCAVATION AND TRENCHES
OTHER SAFETY REQUIREMENTS
CONTRACTOR SAFETY PLAN SUBMITTALS
CONTRACTOR PERMITTING REQUIREMENTS
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S, C
A
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
-0
5-
:1
4:
pm
M
AR
C H
A
IR
R
ES
ER
VE
B
AS
E, C
A
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
L U
TH
ER
K
IN
G J
R P
L, LO
U
IS
VI
LL
E, K
EN
TU
C
KY
, 4
BU
R
N S
AN
D
M cD
O N
N
EL
L
W
AR
D
P
AR
KW
AY
KA
N
SA
S C
IT
Y, M
IS
SO
U
R I 6
C
ER
TI
FI
ED
F
IN
AL
D
ES
IG
N
S U
BM
IT
TA
L
AD
D
IT
IO
N
AL
TE
R
AT
IO
N
O F
BU
IL
D
IN
G
F
O R
F
LI
G H
T
SI
M U
LA
TO
R
PD
PG
US Army Corps of Engineers ® z :\C lie nt s\
AN
F\ U
SC
O
E\ Lr
L\
_s im fu t\D es ig n\ C iv il\
Sh ee ts \B
0S
IM
\P
D
PG
_B
0_
G C
1.
dw g
La yo ut : G
C
U se r:
pm av al os
M
AR
C H
C
ER
TI
FI
ED
F
IN
AL
D
ES
IG
N S
U
BM
IT
TA
L
/0 5/
S.
S
H
IR
E
P.
A
VA
LO
S
J.
D
YE
M . B
ET
Z
G
EN
ER
AL
C O
N
ST
R U
C
TI
O N
N O
TE
S
- 1
GC001
W
2Q R
BA
6_
Pl an s-
1. SOIL EROSION AND SEDIMENT CONTROLS ARE MEASURES USED TO REDUCE THE AMOUNT OF
SOIL PARTICLES THAT ARE CARRIED OFF AN AREA AND DEPOSITED INTO A DRAINAGE
COLLECTION SYSTEM OR INTO A BODY OF WATER. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ENSURING THAT EROSION AND SEDIMENTATION ARE CONTROLLED TO THE EXTENT
PRACTICABLE. ALL APPLICABLE SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
IMPLEMENTED AND MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION ACTIVITIES.
PRIOR TO INITIATING CONSTRUCTION IN AN AREA, ALL TEMPORARY EROSION AND SEDIMENT
CONTROL PRACTICES SHALL BE IN PLACE. UPON PROJECT COMPLETION ALL TEMPORARY SOIL
EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED.
2. TEMPORARY EROSION CONTROL SHALL BE THE CONTRACTOR'S RESPONSIBILITY, WHO SHALL
UTILIZE APPROPRIATE BEST MANAGEMENT PRACTICES (BMPS). THOSE BMPS SHALL CONSIST
OF SILT FENCE, WATTLES OR OTHER MEANS TO CONTROL EROSION AS NEEDED. THE
CONTRACTOR SHALL PROVIDE AND FOLLOW THE EROSION AND SWPPP PLANS AS NEEDED.
3. CONTRACTOR SHALL PLACE SILT FENCE AS SHOWN ON CG110 PRIOR TO BEGINNING WORK.
THE DEVICES SHALL BE PLACED DOWN-SLOPE OF DISTURBED AREAS WHERE SHEET EROSION
WOULD OCCUR. SILT FENCE SHALL BE CLEANED AND REPAIRED WHEN SEDIMENT BUILDUP
REACHES ONE-THIRD OF SILT FENCE HEIGHT. AFTER SIGNIFICANT RUNOFF EVENTS, THE
CONTRACTOR SHALL INSPECT ALL EROSION CONTROL STRUCTURES FOR SILT BUILD-UP THAT
INTERFERES WITH THE PERFORMANCE OF THE EROSION CONTROL STRUCTURE AND REPAIR
OR REPLACE THOSE STRUCTURES, AS NECESSARY.
4. ALL STORM DRAIN INLETS SHALL BE PROTECTED BY APPROPRIATE BMPS DURING
CONSTRUCTION, UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGE TO THE INLETS HAVE
BEEN STABILIZED.
5. ALL EXISTING DRAIN INLETS SHALL HAVE INLET PROTECTION INSTALLED IN ACCORDANCE WITH
DETAIL A2 ON DRAWING CG501. EROSION PROTECTION MAY BE REMOVED WHEN VEGETATION
IS ESTABLISHED.
6. SEE DRAWING CG501 FOR ADDITIONAL DETAILS ON EROSION AND SEDIMENT CONTROL.
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S, C
A
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
-0
5-
:1
4:
pm
M
AR
C H
A
IR
R
ES
ER
VE
B
AS
E, C
A
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
L U
TH
ER
K
IN
G J
R P
L, LO
U
IS
VI
LL
E, K
EN
TU
C
KY
, 4
BU
R
N S
AN
D
M cD
O N
N
EL
L
W
AR
D
P
AR
KW
AY
KA
N
SA
S C
IT
Y, M
IS
SO
U
R I 6
C
ER
TI
FI
ED
F
IN
AL
D
ES
IG
N
S U
BM
IT
TA
L
AD
D
IT
IO
N
AL
TE
R
AT
IO
N
O F
BU
IL
D
IN
G
F
O R
F
LI
G H
T
SI
M U
LA
TO
R
PD
PG
US Army Corps of Engineers ®
Z :\C lie nt s\
AN
F\ U
SC
O
E\ Lr
L\
_S
IM
FU
T\
D es ig n\
C iv il\ Sh ee ts
\B
0S
IM
\P D
PG
_B
0_ G
C
1.
dw g La yo ut
: G C
U se r:
pm av al os
M
AR
C H
EXISTING CONDITIONS NOTES
1. THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES AS INDICATED HAVE BEEN
OBTAINED FROM EXISTING RECORDS AND FIELD SURVEYS. UNDERGROUND STRUCTURES
AND UTILITIES MAY BE PRESENT WHICH ARE NOT DOCUMENTED OR LOCATED.
2. THE CONTRACTOR SHALL FIELD-CHECK ALL EXISTING CONDITIONS AND BE THOROUGHLY
FAMILIAR WITH THE SITE BEFORE ANY WORK COMMENCES. ANY DISCREPANCIES IN THE
DRAWINGS SHALL BE IMMEDIATELY REPORTED TO THE COR IN WRITING BEFORE ANY
FURTHER WORK COMMENCES.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD-VERIFY EXISTING STRUCTURES, UTILITIES, AND SURVEY INFORMATION, AND TO TAKE NECESSARY PRECAUTIONS DURING
DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL VERIFY EXISTENCE AND MARK
LOCATIONS OF ALL UTILITIES, INCLUDING SERVICE CONNECTIONS TO UNDERGROUND
UTILITIES, PRIOR TO BEGINNING WORK. CONTRACTOR SHALL CONTACT THE COR AND ALL
ASSOCATED UTILITY COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION OF UTILITIES.
THERE IS NO GUARANTEE, EITHER EXPRESSED OR IMPLIED, THAT THE LOCATIONS, SIZE AND
TYPE OF MATERIAL OF EXISTING UNDERGROUND UTILITIES INDICATED ARE REPRESENTATIVE
OF THOSE TO BE ENCOUNTERED DURING CONSTRUCTION.
4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE COR OF OPERATIONAL
PLANS. IN THE EVENT AN UNEXPECTED UTILITY OR STRUCTURE INTERFERENCE OR
CONFLICT IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHAL IMMEDIATELY
NOTIFY THE COR. ANY UTILITY SERVICES OR STRUCTURES DISTURBED BY THE
CONTRACTOR'S OPERATIONS SHALL BE RESTORED IMMEDIATELY AT CONTRACTOR'S
EXPENSE TO THE SATISFACTION OF THE COR.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS NOT TO BE DAMAGED DURING
DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED
OR DISTURBED ITEMS TO THE SATISFACTION OF THE COR.
1. ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY MATERIALS SHALL BE DISPOSED OF
OFF BASE.
2. LOCATIONS NOTED FOR DEBRIS REMOVAL MAY CONTAIN ANY OF THE FOLLOWING MATERIALS:
AGGREGATE, CONCRETE, ASPHALT, MASONRY, FOUNDATIONS, REBAR, FENCE MATERIAL,
PIPING, AND MISCELLANEOUS STRUCTURES. LARGE PIECES OF MATERIAL MAY NEED TO BE
CRUSHED AND/OR BROKEN UP FURTHER IN ORDER TO BE HAULED AWAY TO AN APPROVED OF
CALIFORNIA APPROVED WASTE DISPOSAL SITE.
3. CONTRACTOR SHALL COORDINATE LIMITS OF SAWCUT AND PAVEMENT REMOVAL WITH
PROPOSED PAVEMENT LAYOUT AND JOINTING PLAN. EXISTING PAVEMENT EDGES SHALL BE
SAWCUT IN LOCATIONS SHOWN TO PROVIDE CLEAN EDGES FOR CONSTRUCTION OF PROPOSED
PAVEMENT. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
4. PAVEMENT REMOVAL LIMITS SHALL BE TO THE NEAREST EXISTING PAVEMENT JOINT TO THE
GREATEST EXTENT POSSIBLE TO PREVENT PARTIAL PANEL REMOVAL. PAVEMENT REMOVAL
SHALL INCLUDE REMOVAL OF PAVEMENT AND ANY SUBBASE MATERIAL PRESENT.
5. ANY DAMAGE TO PAVEMENT AREAS DESIGNATED TO REMAIN SHALL BE REPAIRED OR REMOVED
AND REPLACED AT NO ADDITIONAL COST TO THE GOVERNMENT.
6. CONTRACTOR SHALL PRESERVE EXISTING TREES AND VEGETATION WHENEVER PRACTICABLE.
CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT ROOT SYSTEMS OF
SHRUBS, PLANTS AND TREES ALONG THE AREA OF EXCAVATION.
7. EXISTING VEGETATION AND FACILITIES WHICH ARE NOT INDICATED TO BE REMOVED SHALL BE
PROTECTED FROM DEMOLITION OR OTHER CONSTRUCTION ACTIVITIES.
8. SPECIAL HANDLING AND CONSIDERATION SHALL BE REQUIRED FOR EXCAVATED SOILS
THOUGHT TO CONTAIN PETROLEUM-BASED/CONTAMINATED/HAZARDOUS SUBSTANCES.
CONTRACTOR SHALL PERIODICALLY MONITOR EXCAVATED SOILS. SOILS SHALL BE TREATED
ON SITE OR DISPOSED OF PROPERLY IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL
REQUIREMENTS AND THE PROJECT SPECIFICATIONS. CONTRACTOR SHALL COORDINATE
REMOVAL OF PETROLEUM-BASED/CONTAMINATED/HAZARDOUS MATERIALS WITH COR.
1. CONTRACTOR SHALL COORDINATE WITH THE COR PRIOR TO REMOVAL OF EXISTING UTILITIES
IN SERVICE. RELOCATED UTILITIES SHALL BE CONSTRUCTED BEFORE REMOVAL OF EXISTING
UTILITIES TO ENSURE UNINTERRUPTED SERVICE TO THE FACILITIES SERVED BY THE UTILITY.
ALL RELOCATIONS SHALL BE COORDINATED WITH THE COR.
2. UTILITY CAPPING METHODS SHALL BE IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS FOR SPECIFIC PIPE MATERIAL IN SERVICE. ALL CAPPING SHALL BE
INSPECTED AND APPROVED BY THE COR AND UTILITY OWNER.
3. ALL STRUCTURES, VALVES, ETC. TO REMAIN SHALL BE PROTECTED AND ADJUSTED TO FINISH
GRADE UNLESS SPECIFICALLY NOTED ON THE DRAWINGS.
4. IN AREAS OF UTILITY REMOVAL OF ABANDONED LINES, THE PORTION OF EXISTING ABANDONED
LINES TO REMAIN SHALL BE CAPPED OR PLUGGED AND SLURRY FILLED WITH CLSM OR
REMOVED.
GENERAL DEMOLITION NOTES
UTILITY DEMOLITION NOTES
1. BUILDING COORDINATES ARE POINTED TO OR MEASURED AT THE CENTER OF BUILDING
COLUMNS. CONTRACTOR SHALL COORDINATE BEARINGS OF BUILDING GRID LINES WITH
STRUCTURAL DRAWINGS.
2. CONTRACTOR SHALL COORDINATE BUILDING ENTRANCES, EGRESSES, WALKWAYS, AND
DOORWAY LOCATIONS WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS.
3. SEE ARCHITECTURAL/STRUCTURAL/MECHANICAL/ELECTRICAL DRAWINGS FOR MISCELLANEOUS
SITE EQUIPMENT AND PADS.
4. SEE SHEET CS110 FOR DIMENSIONS OF PROPOSED WORK.
1. PROPOSED ELEVATIONS INDICATED ARE FOR TOP OF FINAL GRADE, PAVEMENT, OR
STRUCTURE UNLESS INDICATED OTHERWISE.
2. ELEVATION DENOTED AS “MATCH” ARE INTENDED TO MEET EXISTING GRADE ELEVATIONS.
CONTRACTOR SHALL VERIFY ELEVATIONS AT TIE-INS AND MATCH POINTS PRIOR TO BEGINNING
CONSTRUCTION.
3. EXTERIOR FINISH GRADES AT BUILDING ENTRANCES AND DOORWAY THRESHOLDS SHALL BE
MAXIMUM 0.25 INCHES BELOW BUILDING FINISH FLOOR IF A VERTICAL THRESHOLD IS PROVIDED, AND SHALL BE MAXIMUM 0.5 INCHES BELOW BUILDING FINISH FLOOR IF A BEVELED THRESHOLD
IS PROVIDED, UNLESS INDICATED OTHERWISE.
4. EXTERIOR FINISH GRADES ADJACENT TO BUILDING SHALL BE 6.00 INCHES BELOW BUILDING
FINISH FLOOR UNLESS INDICATED OTHERWISE.
5. ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION. ANY
DRAINAGE FEATURE OR STRUCTURE DISTURBED DURING CONSTRUCTION SHALL BE RESTORED
TO EXISTING CONDITIONS OR BETTER SUBJECT TO THE APPROVAL OF COR.
6. SURFACES AROUND FACILITY SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE AWAY FROM
BUILDINGS AND PAVEMENTS.
7. THE CONTRACTOR SHALL REMOVE STANDING WATER FROM THE PROJECT WORK LIMITS AS
NECESSARY TO PROTECT SUBGRADE, SUBBASE, AND/OR BASE COURSE OF NEW PAVEMENT,
SURROUNDING PAVEMENT-TO-REMAIN, OR OTHER COMPLETED WORKS.
8. TOP ELEVATION OF ALL UTILITY STRUCTURES TO REMAIN SHALL BE ADJUSTED ACCORDINGLY
TO FINISH GRADE ELEVATION.
9. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE RE-VEGETATED IN ACCORDANCE WITH
THE SPECIFICATIONS.
10. SEE DRAWING CG501 FOR RECOMMENDED BEST PRACTICES FOR SEDIMENT AND EROSION
CONTROL.
FINAL GRADING AND CLEAN UP
AFTER COMPLETION OF FINAL GRADING, THE DISTURBED AREAS SHALL BE REVEGETATED. ALL
TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES SHALL BE REMOVED UPON PROJECT
COMPLETION. TRAPPED SEDIMENT AND OTHER DISTURBED SOIL AREAS RESULTING FROM THE
DISPOSITION OF TEMPORARY CONTROL MEASURES SHALL BE PERMANENTLY STABILIZED TO
PREVENT FURTHER EROSION AND SEDIMENTATION.
SECURITY REQUIREMENTS
1. ALL CONTRACTOR EMPLOYEES SHALL CARRY CONTRACTOR PHOTO IDENTIFICATION AT ALL
TIMES WHILE WORKING INSIDE THE BASE SECURE PERIMETER.
2. CONTRACTOR EMPLOYEES SHALL COMPLY WITH ANY INTEGRATED DEFENSE MEASURES THAT
MAY BE NECESSARY DURING CONTINGENCY OPERATIONS. THIS INCLUDES, BUT IS NOT LIMITED
TO, VEHICLE INSPECTIONS, IDENTIFICATION CHECKS, ETC.
3. CONTRACTOR AND EMPLOYEE IDENTIFICATION CREDENTIALS: DUE TO THE NATURE OF THE
MILITARY MISSION AT MARCH ARB, STRINGENT SECURITY PROCEDURES ARE ESTABLISHED TO
ENSURE MISSION SUCCESS. PART OF THE MISSION ASSURANCE PIECE IS TO CONDUCT
IDENTITY PROOFING AND VETTING PROCESS INCLUDES AN EXTENSIVE CRIMINAL HISTORY
CHECK TO DETERMINE THE INDIVIDUAL'S FITNESS FOR AUTHORIZATION TO ENTER THE
INSTALLATION.
4. EMPLOYEES WILL BE IDENTITY-PROOFED AND VETTED EACH TIME A PASS AND/OR CREDENTIAL
IS ISSUED. SECURITY FORCES PERSONNEL MAY ALSO CONDUCT RANDOM SCREENING AT ANY
TIME.
5. BASE ACCESS CREDENTIALS: THE CONTRACTOR SHALL SUBMIT ALL MARCH ARB FORMS PRIOR
TO ACCESS NEEDED ONTO THE BASE. IF THE EMPLOYEE WILL BE REQUIRED TO DRIVE ON THE
INSTALLATION, HE/SHE MUST PRESENT A VALID DRIVER'S LICENSE, STATE VEHICLE
REGISTRATION AND PROOF OF INSURANCE. FURTHER, THE VEHICLES AND EQUIPMENT MAY BE
RENDERED IMMOBILE WHEN NOT IN OPERATION BY THE REMOVAL OF IGNITION KEYS OR BY
OTHER READILY REVERSIBLE MEANS. CONTRACTOR VEHICLES ARE SUBJECT TO SEARCH
PRIOR TO ENTERING, WHILE TRANSITING AND/OR WHILE EXITING THE INSTALLATION.
6. ALL CONTRACTOR VEHICLES AND PERSONNEL MAY BE SEARCHED BY MARCH ARB SECURITY
POLICE WHEN ENTERING THE BASE AND MAY EXPERIENCE DELAYS. ALL PERSONNEL ENTERING
MARCH ARB MUST HAVE A VALID PHOTO ID PER BASE SECURITY REQUIREMENTS. ALL
CONTRACTOR VEHICLES AND PERSONNEL SHALL BE RESPONSIBLE FOR COORDINATING WITH
THE BASE SECURITY OFFICER IN OBTAINING PROPER SECURITY CLEARANCE AND BADGING
PRIOR TO ENTERING SECURE AREAS.
GENERAL SITE NOTES
GENERAL GRADING NOTES
7. IF THE CONTRACT REQUIRES WORK TO BE DONE IN CONTROLLED OR RESTRICTED AREAS ON
THE INSTALLATION, ACCESS, TO THOSE AREAS WILL REQUIRE COORDINATION WITH AND
APPROVAL BY ORGANIZATIONS CONTROLLING THOSE AREAS. MORE DETAILED INFORMATION
MAY BE REQUESTED FROM THE CONTRACTING OFFICER UPON AWARD OF THE CONTRACT.
8. ALL VARIATIONS IN PROJECT CONDITION, LOCATIONS, AND CONFIGURATIONS, AND ANY OTHER
CHANGES OR DEVIATIONS FROM THE INFORMATION PRESENTED ON THE ORIGINAL, APPROVED
CONSTRUCTION DRAWINGS SHALL BE NOTED. THIS INCLUDES BURIED OR CONCEALED
CONSTRUCTION AND UTILITY FEATURES THAT WERE REVEALED DURING CONSTRUCTION.
9. CONTRACTORS, CONTRACTOR'S EMPLOYEES, AND OTHER PERSONNEL ON-SITE MUST COMPLY
WITH THE CONSTRUCTION SECURITY PLAN.
1. CONSTRUCTION ACTIVITY POLLUTION PREVENTION IS REQUIRED FOR THIS PROJECT.
PREVENTION OF POLLUTION RESULTING FROM CONSTRUCTION ACTIVITIES SHALL BE
ACCOMPLISHED BY CONTROLLING SOIL EROSION, WATERWAY SEDIMENTATION, AND AIRBORNE
DUST GENERATION. CONTRACTOR SHALL ENSURE THAT NO SEDIMENT RESULTING FROM
CONSTRUCTION ACTIVITIES INFRINGES ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL
COORDINATE EROSION AND SEDIMENT CONTROL WITH OTHER CONSTRUCTION ENTITIES
PERFORMING WORK ON ADJACENT PROPERTIES. SEE CONTRACT SPECIFICATIONS.
PETROLEUM PRODUCTS
1. ALL ON-SITE VEHICLES SHALL BE MONITORED FOR PETROLEUM LEAKS AND SHALL RECEIVE
PROPER PREVENTATIVE MAINTENANCE TO REDUCE THE CHANCE OF LEAKAGE. PETROLEUM
PRODUCTS SHALL BE STORED IN TIGHTLY-SEALED CONTAINERS THAT ARE CLEARLY LABELED.
ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY. WASTE OIL AND OTHER
PETROLEUM PRODUCTS SHALL NOT BE DISCHARGED ONTO THE GROUND OR INTO WATER
BODIES. PETROLEUM PRODUCTS USED ON-SITE SHALL BE APPLIED ACCORDING TO THE
MANUFACTURER RECOMMENDATIONS.
NIGHT WORK
1. WORK LIGHTS FOR NIGHT WORK ON THE BASE SHALL BE POSITIONED SUCH THAT THE LIGHT
WILL NOT BE DIRECTED TOWARD THE CONTROL TOWER OR AIRCRAFT UTILIZING THE RUNWAY
AND AIRFIELD INCLUDING APPROACHES. COORDINATE WITH BASE OPERATIONS AND REQUEST
ACTIVITY 5 DAYS IN ADVANCE.
2. CONTRACTOR SHALL COORDINATE WITH COR FOR ANY PROPOSED NIGHTWORK AND
DELIVERIES OUTSIDE OF NORMAL COMMERCIAL GATE WORKING HOURS. APPROVAL AND A
MINIMUM OF FOURTEEN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .