This document is an Amendment of Solicitation/Modification of Contract for a Design/Build project for the Addition/Alteration of Building 600 for a Flight Simulator at March ARB, California. The amendment (Number 0005) extends the Proposal Due Date from 1:00 PM ET on 28 August 2025 to 1:00 PM ET on 03 September 2025. Key changes include revisions to two plan sheets (CD101 Demolition Plan and CS101 Civil Site Plan), with updates to general notes about repairing irrigation systems and hydroseeding, and a replacement of the previous Wage Decision CA20250025 dated 06 June 2025 with a new version dated 22 August 2025. The solicitation is issued by the U.S. Army Corps of Engineers, Louisville District, with the contract number W912QR25BA016.

View the file

Other files for this federal contract opportunity

Other files attached to March Air Reserve Base, CA B600 Flight Simulator, newest first.
File Type Posted
Bid Opening Results - W912QR25BA016.pdf PDF
2nd Site Visit Sign In Sheet B600.pdf PDF
W912QR25BA016_Plans-0004.pdf PDF
W912QR25BA016_Specs-0004.pdf PDF
W912QR25BA016_Specs-0003.pdf PDF
W912QR25BA016_Plans-0002.pdf PDF
W912QR25BA016_Specs-0002.pdf PDF
W912QR25BA016-0001.pdf PDF
Sign in B600 8 July Site walk.pdf PDF
W912QR25BA016_Specs_Vol1-0000.pdf PDF
W912QR25BA016_Specs_Vol2-0000.pdf PDF
W912QR25BA016_Specs_Vol3-0000.pdf PDF
W912QR25BA016_SID-0000.pdf PDF
W912QR25BA016_FFE-0000.pdf PDF
W912QR25BA016_Plans-0000.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 2

0005 25 AUG 2025 504650

W912QR

W072 ENDIST LOUISVILLE

KO CONTRACTING DIVISION, 600 DR MARTIN LUTHER KING JR PL

LOUISVILLE, KY 40202-2230

UNITED STATES

LINDSAY LAWRENCE, EMAIL: LINDSAY.B.LAWRENCE@USACE.ARMY.MIL

SCD: PAS:

W912QR25BA016

26 JUN 2025

SEE SECTION G - CONTRACT ADMINISTRATION DATA

SEE SUMMARY OF CHANGES

W912QR25BA016_Plans-0005

b) The following PLAN SHEETS have been revised and replaced in their entirety:

CD101 DEMOLITION PLAN

General note 9 added to repair damaged irrigation system and maintain the existing turf though hand-watering or repaired irrigation throughout construction.

CS101 CIVIL SITE PLAN

Sheet Keynote 23 added to callout hydroseed and restore irrigation system damaged during demolition.

c

28 03 Sep d)

Wage Decision CA20250025, dated 06 June 2025 is hereby revised, and replaced in its entirety by Wage Decision CA20250025, dated 22 August 2025.

a) The Proposal Due Date has been extended from 1:00 PM ET 28 August 2025 to 1:00 PM ET 03 September 2025.

CONCRETE REMOVAL

TREE REMOVAL

DEMOLISH CURB AND GUTTER

ABANDON EXISTING UTILITY IN PLACE

MISCELLANEOUS REMOVAL

UNDERGROUND UTILITY REMOVAL

CLEARING AND GRUBBING

WALL DEMOLITION

UTILITY TRENCH

C O

M M

W W

W W

W

WWW

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

G

GGGGG

G

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E E

E E

E E

E E

E

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

COMMCOMMCOMM

COMM

COMM

COMM

COMM

COMM

COMM

C O

M M

C O

M M

C O

M M

COMM

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

SD

SD

CO

CO

W W

IR

T

W W W W W W W W W W W W W W W W W W W W W W W W W W W W

WWW

W W

W

W W

W W

W W

W W

W W

W W

W W

SAN SAN SAN SAN SAN SAN SAN SAN

W W W W W W W W W W W W W W W W W W W W W W W W W W W

W W

W

E

E E

E

E E

E E

E E

E

EE

E E

E E

E

E E E E E E E E E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E E

E E

E

E E E E E E E E E E E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E E

E E

E E

E

EE

E E

E E

E

E E E E E E E E E E

E E

E

E

E

E E E E E E E E E

E E E E

E

E

E

E

E

E E

E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E

E E

E E

E E

E

E E E E E E E E E E E E

C O

M M

C O

M M

C O

M M

COMM

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

COMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMM

C O

M M

C O

M M

C O

M M

G

G G

G G

G

G

G G

G G

G G

G G

G G

G G

G

G G

CATVCATVCATVCATVCATV

CO

EP EP

EP

EP

CUSTOMS WAY

4TH

STR

EET

4TH

STR

EET

CUSTOMS WAY

EX BUILDING B600

APPROX. LIMITS OF

PROJECT PDPG221013

15.84'

10.04'

.4

2'

.9 1'

8.

38.72'

SEE MECHANICAL AND

ELECTRICAL PLANS FOR

RELOCATED UTILITIES

EXISTING CATCH BASIN

SEE MECHANICAL PLANS FOR

EQUIPMENT DEMOLITION

SEE PLUMBING PLANS FOR

WATER PIPE DEMOLITION

PROTECT COMM IN PLACE

PROTECT COMM IN PLACE

ALIGN SAWCUT WITH

EDGE OF BUILDING

1 TRENCH AND REPAIR FOR UTILITY LINE

2 DEMOLISH EX LIGHT POLE AND ASSOCIATED

JUNCTION/PULL BOX

3 DEMOLISH EX EQUIPMENT PADS

4 DEMOLISH EX WALL

5 DEMOLISH EX CURB AND GUTTER FOR DRAIN OPENING

6 DEMOLISH EX TREE

7 DEMOLISH EX POWER POLE

8 DEMOLISH EX SIDEWALK

9 DEMOLISH AND REPLACE EX VALLEY GUTTER

10 SAWCUT PAVEMENT

11 DEMOLISH ELECTRICAL LINE

12 ABANDON ELECTRICAL LINE IN PLACE

13 DEMOLISH EX FENCE

14 CLEARING AND GRUBBING

15 CONTRACTOR TO VERIFY

ELEVATION OF THE GROUND

WATER SURFACE AND NOTIFY

THE CONTRACTING OFFICER IF THE

WATER SURFACE ELEVATION IS

GREATER THAN 1504.19'

A1 DEMOLITION PLAN

SCALE 1" = 20"

LEGEND

GENERAL SHEET NOTES

PLAN

NORTH

PLAN

NORTH

20' 40'0

1. SEE DEMOLITION AND UTILITY NOTES ON GC002/GC003.

2. SEE SHEET ED101 FOR ELECTRICAL DEMOLITION

3. SEE SHEET MD101 FOR HVAC DEMOLITION

4. SEE SHEETS PD100, PD101, AND PD102 FOR PLUMBING

DEMOLITION PLANS.

5. IF ANY MATERIAL THOUGHT TO CONTAIN HAZARDOUS

MATERIAL IS ENCOUNTERED DURING DEMOLITION, ALL

DEMOLITION SHALL IMMEDIATELY BE HALTED AND THE COR

SHALL BE NOTIFIED. DEMOLITION SHALL BE STOPPED UNTIL

THE MATERIAL CAN BE IDENTIFIED AS A NON ACM/LBP OR

NON-HAZARDOUS

6. IF THE UNKNOWN LIMITS OF A UTILITY LINE TO BE DEMOLISHED

IS UNCOVERED DURING CONSTRUCTION, DETERMINE

DEMOLITION LIMITS WITH COR PRIOR TO REMOVAL.

7. INSTALL NEW UTILITY LINES PRIOR TO DEMOLITION OF

EXISTING LINES REQUIRING RELOCATION. COORDINATE UTILITY

DEMOLITION PLANS AND PROPOSED UTILITY PLANS. ALL

EXISTING UTILITY SERVICES TO REMAIN MUST REMAIN

OPERATIONAL THROUGHOUT CONSTRUCTION. COORDINATE

INSTALLATION OF SANITARY, INDUSTRIAL WASTE, WATER,

NATURAL GAS, ELECTRICAL, AND COMMUNICATIONS WITH

DEMOTION/REMOVAL OF EXISTING UTILITIES TO CLEAR THE

PROJECT AREA FOR THE BUILDING ADDITION AND OTHER SITE

IMPROVEMENTS. LIMIT SHUTDOWN TO DURATIONS AND

DATE/TIMES APPROVED BY THE COR AND BASE CE

8. MAINTAIN EROSION CONTROL THROUGHOUT CONSTRUCTION.

THE EXISTING SITE IS TURF WHICH PROVIDES HIGH QUALITY

EROSION MEASURES. TURF SHOULD BE REPLACED AS SOON

AS POSSIBLE AFTER WORK IS COMPLETE TO AVOID

UNNECESSARY RISK OF EROSION

9. REPAIR DAMAGED IRRIGATION SYSTEM AND MAINTAIN

EXISTING TURF THROUGH HAND-WATERING OR REPAIRED

IRRIGATION THROUGHOUT CONSTRUCTION

1 0

AM

EN

D

C

ER

TI

FI

ED

F

IN

AL

D

ES

IG

N

S U

BM

IT

TA

L

/2

0/

/0 5/

S.

SH

IR

E

P.

AV

AL

O

S

J.

D

YE

M .B

ET

Z

D

EM

O

LI

TI

O

N P

LA

N

CD101

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S, C

A

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

-2

0-

:3

0:

am

M

AR

C H

A

IR

R

ES

ER

VE

B

AS

E, C

A

LO

U

IS

VI

LL

E D

IS

TR

IC

T

D R

M

AR

TI

N

L U

TH

ER

K

IN

G J

R P

L, LO

U

IS

VI

LL

E, K

EN

TU

C

KY

, 4

BU

R

N S

AN

D

M cD

O N

N

EL

L

W

AR

D

P

AR

KW

AY

KA

N

SA

S C

IT

Y, M

IS

SO

U

R I 6

C

ER

TI

FI

ED

F

IN

AL

D

ES

IG

N

S U

BM

IT

TA

L

AD

D

IT

IO

N

AL

TE

R

AT

IO

N

O F

BU

IL

D

IN

G

F

O R

F

LI

G H

T

SI

M U

LA

TO

R

PD

PG

P

US Army Corps of Engineers ®

Z :\C lie nt s\

AN

F\ U

SC

O

E\ Lr

L\

_S

IM

FU

T\

D es ig n\

C iv il\ Sh ee ts

\B

0S

IM

\P D

PG

_B

0_ C

D

1.

dw g La yo ut

: C D

D

EM

O

LI

TI

O

N P

LA

N

U se r:

pm av al os

M

AR

C H

W

2Q R

BA

6_

Pl an s-

1 INSTALL CONCRETE SIDEWALK (SEE NOTE 1)

2 INSTALL CONCRETE DRIVEWAY

3 INSTALL BOLLARDS

4 INSTALL 3' WIDE VEGETATED SWALE

5 INSTALL CONCRETE CURB CUT FLUME

6 INSTALL CONCRETE STAIRCASE

7 INSTALL CONCRETE SPLASH BLOCK

8 INSTALL EQUIPMENT PADS PER S-101

9 INSTALL VALLEY GUTTER (SEE NOTE 2)

CS502

C1

CS502

J1

CS502

A8

CS502

M1

CS501

E16

CS502

K13

CS502

E8

CS503

A16

CS502

A1

CS502

B15

10 INSTALL HANDHOLE PER ES101

11 INSTALL JOINTS PER CS111

12 INSTALL JOINTS PER CS111

13 INSTALL 6" VERTICAL CURB

14 INSTALL ROCK SWALE

15 INSTALL REDWOOD HEADER

16 INSTALL DRIVEWAY RAMP SECTION

17 INSTALL CURB TAPER

18 INSTALL RIP RAP

19 INSTALL SPILLWAY

20 INSTALL PCC SLAB

21 INSTALL GRAVEL SECTION

22 INSTALL UTILITY PROTECTION

23 HYDROSEED AND RESTORE

IRRIGATION SYSTEM DAMAGED

DURING DEMOLITION

CS501

K16

CS502

E15

CS502

E1

CS502

L8

CS504

M1

CS504

E9

CS504

M9

CS504

A1

CS501

A8

EP EP

EP

EP

CUSTOMS WAY

4TH

STR

EET

4TH

STR

EET

CUSTOMS WAY

C O

M M

W W

W W

W

WWW

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

G

GGGGG

G

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E E

E E

E E

E E

E

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

COMMCOMMCOMM

COMM

COMM

COMM

COMM

COMM

COMM

C O

M M

C O

M M

C O

M M

COMM

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

SD

SD

CO

CO

W W

IR

T

W W W W W W W W W W W W W W W W W W W W W W W W W W W W

W W

W

W W

W W

W W

W W

W W

W W

W W

SAN SAN SAN SAN SAN SAN SAN SAN

W W W W W W W W W W W W W W W W W W W W W W W W W W W

W W

W

E

E E

E

E E

E E

E E

E

EE

E E

E E

E

E E E E E E E E E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E E

E E

E

E E E E E E E E E E E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E E

E E

E E

E

EE

E E

E E

E

E E E E E E E E E E

E E

E

E

E

E E E E E E E E

E E

E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E

E E

E E

E E

E

E E E E E E E E E E E E

C O

M M

C O

M M

C O

M M

COMM

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

COMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMM

C O

M M

C O

M M

C O

M M

G

G G

G G

G

G

G G

G G

G G

G G

G G

G G

G

G G

CATVCATVCATVCATVCATV

CO

EX BUILDING B600

EXISTING DRAIN INLET

HYDROSEED

PLANTED

TURF SLOPE

PROTECT COMM IN PLACE

E E E E E E E E

E E

E E

E E

E

E

E

APPROX. LIMITS OF

PROJECT PDPG221013

HYDROSEED

PLANTED

TURF SLOPE

DETENTION BASIN

DETENTION

BASIN

PROTECT

COMM IN

PLACE 15

EXISTING FIRE

DEPARTMENT

CONNECTION

A1 CIVIL SITE PLAN

SCALE 1" = 20"

LEGEND

GENERAL SHEET NOTES

PLAN

NORTH

PLAN

NORTH

20' 40'0

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S, C

A

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

-2

0-

:4

4:

am

M

AR

C H

A

IR

R

ES

ER

VE

B

AS

E, C

A

LO

U

IS

VI

LL

E D

IS

TR

IC

T

D R

M

AR

TI

N

L U

TH

ER

K

IN

G J

R P

L, LO

U

IS

VI

LL

E, K

EN

TU

C

KY

, 4

BU

R

N S

AN

D

M cD

O N

N

EL

L

W

AR

D

P

AR

KW

AY

KA

N

SA

S C

IT

Y, M

IS

SO

U

R I 6

C

ER

TI

FI

ED

F

IN

AL

D

ES

IG

N

S U

BM

IT

TA

L

AD

D

IT

IO

N

AL

TE

R

AT

IO

N

O F

BU

IL

D

IN

G

F

O R

F

LI

G H

T

SI

M U

LA

TO

R

PD

PG

P

US Army Corps of Engineers ®

Z :\C lie nt s\

AN

F\ U

SC

O

E\ Lr

L\

_S

IM

FU

T\

D es ig n\

C iv il\ Sh ee ts

\B

0S

IM

\P D

PG

_B

0_ C

S1

.d w g La yo ut

: C S1

C

IV

IL

S

IT

E

PL

AN

U se r:

pm av al os

M

AR

C H

1 0

AM

EN

D

C

ER

TI

FI

ED

F

IN

AL

D

ES

IG

N

S U

BM

IT

TA

L

/2

0/

/0 5/

S.

S

H

IR

E

P.

A

VA

LO

S

J.

D

YE

M . B

ET

Z

C

IV

IL

S

IT

E

PL

AN

CS101

1. COORDINATE LIMITS OF NEW SIDEWALK WITH

DEMOLITION OF EXISTING SIDEWALK SHOWN ON CD101.

2. COORDINATE LIMITS OF NEW VALLEY GUTTER WITH

DEMOLITION OF EXISTING VALLEY GUTTER SHOWN ON

CD101.

3. SEE SHEETS GC001-GC004 FOR GENERAL SITE NOTES

4. REFER TO STRUCTURAL PLANS FOR EQUIPMENT PAD

DIMENSIONS AND DETAILS.

5. SEE SHEET CS111 FOR SITE DIMENSIONING.

PCC PAVEMENT

HYDROSEED TURF

STRUCTURAL EQUIPMENT PAD

SHEET KEYNOTES

W

2Q R

BA

6_

Pl an s-

CD101 - DEMOLITION PLAN
CS101 - CIVIL SITE PLAN
W912QR25BA016-0005-CT.pdf
SF 30
Summary Of Changes
00 00 00
General Decision Number: CA20250025 08/22/2025

File details come from the government source that posted it. Updated .