Questions and Answers Solicitation Number: W912PQ-19-B-8001 Project Title: Addition to Flight Training Unit Building 641 Project Number: HAAW169006 Current as of 7 March 2019

Number
Question
Answer
1
Spec 01 35 26 mentions a requirement for SSHO and QCM. Please confirm the project requires (3) separate individuals as Project Superintendent, SSHO and QCM on site at all times or could the superintendent carry the responsibility as SSHO?
The Project Superintendent may be the SSHO if they meet all the requirements in the specification and perform all the duties listed.
2
Spec 01 32 01.00 10: Is RMS 3.0 being utilized for this contract for submittals, payment, QC ect?
RMS 3.0 will not be used to track project submittals and payments. Submittals will be tracked using the submittal register included in section 01 33 00. QC requirements are defined in section 01 45 00.00 10. Invoicing and payment procedures will be in accordance with NGB standards.
3
Spec 01 32 01.00 10: Is Primavera P6 a requirement for this project?
Per the Specification if Primavera P6 is not used then the Contractor must provide (2) stand alone PC's , software, and training for whichever scheduling software they choose to use. (PC's will be returned at close of project).The Base currently utilizes Microsoft Project as its Project scheduling software and no stand alone PC's, licenses, or training would need to be provided.
4
Spec 01 33 29: It mentions an attachment 1, HPSB Checklist to be filled out by the contractor. Please provide if this indeed required for the project.
Although the Project will not be registered and will not pursue LEED certification through USGBC it will be a requirement of the contractor to track performance on the construction credits for LEED and UFC 1-200-02 HPSB requirements. Construction credits/requirements to be tracked by the contractor include: UFC 1-200-02:

HPSB III.3.4

HPSB IV.5

HPSB IV.6

HPSB V.1

HPSB V.4

HPSB V.5

HPSB V.6

LEED 2009:

SS Prerequisite 1 MR Credits 1.1, 1.2, 2.1, 2.2, 4.1, 4.2, 5.1, 5.2 &7 EQ Credits 3.1, 3.2, 4.1, 4.2, 4.3, 4.4 ID Credits 1.1, 1.2, 1.3 (Reference attch. ANG Design Score Sheet & LEED Checklist)

5
Spec 01 50 00: Para 3.6 mentions a Government Field Office. Please confirm this is required to be provided by the Contractor.
The Contractor is not obligated to provide a Government Field Office. He is, however, responsible for providing an Administrative Field Office as outlined in Spec 01 50 00 para 3.5.2. The Government facilities such as offices and warehouses will not be available to the Contractor for this use.
6
Please provide a geotechnical report with boring samples for the excavation area for the addition.
A geotechnical report will not be provided. Any and all information needed to bid this project can be found in the specifications and drawings.
7
Is there any contaminated soil that have been identified by the government in the excavation area that would require special procedures for testing and disposal?
None known.