ATTACHMENT_3_98279_SPECS-B-3-VOL_2.pdf

PDF 4 MB Posted

Attached to
Addition to Flight Training Unit Building 641
Solicitation number
W912PQ-19-B-8001
Issued by

About this file

Attachment 3 - Specifications, Volume 2

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New York Air National Guard

Project No. HAAW169006

Add to Flight Training Unit Building 641 174th Attack Wing

Hancock Field Air National Guard Base

Syracuse, NY

Project Manual

Volume 2 of 2

November 2018

Type B-3 Submittal

Bidder’s Name and Address

ADD TO FLIGHT TRAINING UNIT BUILDING 641

PROJECT NUMBER HAAW169006

174TH ATTACK WING

NEW YORK AIR NATIONAL GUARD

HANCOCK FIELD AIR NATIONAL GUARD BASE

SYRACUSE, NEW YORK

CERTIFICATION PAGE

SPECIFICATION INDEX

DOCUMENT / DIVISION

DESCRIPTION

DIVISION 01 GENERAL REQUIREMENTS

DIVISION 02

EXISTING CONDITIONS

DIVISION 03

DIVISION 04

DIVISION 05

DIVISION 06

CONCRETE

MASONRY

METALS

WOOD, PLASTICS, AND COMPOSITES

DIVISION 07

DIVISION 08

DIVISION 09

DIVISION 10

DIVISION 12

DIVISION 21

DIVISION 22

DIVISION 23

DIVISION 25

DIVISION 26

DIVISION 27

THERMAL AND MOISTURE PROTECTION

OPENINGS

FINISHES

SPECIALTIES

FURNISHINGS

FIRE SUPPRESSION

PLUMBING

HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

INTEGRATED AUTOMATION

ELECTRICAL

COMMUNICATIONS

DIVISION 28

DIVISION 31

DIVISION 32

DIVISION 33

ELECTRONIC SAFETY AND SECURITY

EARTHWORK

EXTERIOR IMPROVEMENTS

UTILITIES

CERTIFICATION(S)

11/16/18

HAAW169006 Add t o Fl i ght Tr ai ni ng Uni t Bui l di ng 641 98279 Hancock Fi el d Ai r Nat i onal Guar d Base, Syr acuse, NY

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRI CTI ONS

01 30 00 ADMI NI STRATI VE REQUI REMENTS

01 32 01. 00 10 PROJECT SCHEDULE

01 33 00 SUBMI TTAL PROCEDURES

01 33 29 SUSTAI NABI LI TY REPORTI NG

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00. 00 10 QUALI TY CONTROL

01 45 35 SPECI AL I NSPECTI ONS

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS

01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMI TTALS

01 78 23 OPERATI ON AND MAI NTENANCE DATA

01 91 00. 15 TOTAL BUI LDI NG COMMI SSI ONI NG

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 30 00 CAST- I N- PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 UNI T MASONRY

DI VI SI ON 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOI ST FRAMI NG

05 30 00 STEEL DECKS

05 40 00 COLD- FORMED METAL FRAMI NG

05 51 00 METAL STAI RS

05 52 00 METAL RAI LI NGS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 61 16 SOLI D SURFACI NG FABRI CATI ONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 11 13 BI TUMI NOUS DAMPPROOFI NG

07 21 13 BOARD AND BLOCK I NSULATI ON

07 22 00 ROOF AND DECK I NSULATI ON

07 42 63 FABRI CATED WALL PANEL ASSEMBLI ES

07 53 23 ETHYLENE- PROPYLENE- DI ENE- MONOMER ROOFI NG

07 60 00 FLASHI NG AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00. 00 06 JOI NT SEALANTS

07 95 00 EXPANSI ON CONTROL

PROJECT TABLE OF CONTENTS Page 1

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 44 00 CURTAI N WALL AND GLAZED ASSEMBLI ES

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMI C TI LI NG

09 51 00 ACOUSTI CAL CEI LI NGS

09 62 38 STATI C- CONTROL FLOORI NG

09 65 00 RESI LI ENT FLOORI NG

09 68 00 CARPETING

09 90 00 PAI NTS AND COATI NGS

DI VI SI ON 10 - SPECI ALTI ES

10 11 00 VI SUAL DI SPLAY UNI TS

10 14 00. 10 EXTERI OR SI GNAGE

10 14 00. 20 I NTERI OR SI GNAGE

10 21 13 TOI LET COMPARTMENTS

10 22 29 ACOUSTI CAL VERTI CAL FOLDI NG PANEL PARTI TI ONS

10 26 00 WALL AND DOOR PROTECTI ON

10 28 13 TOI LET ACCESSORI ES

DI VI SI ON 12 - FURNI SHI NGS

12 21 00 WI NDOW BLI NDS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13. 00 10 WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBI NG, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS

23 03 00. 00 20 BASI C MECHANI CAL MATERI ALS AND METHODS

23 05 15 COMMON PI PI NG FOR HVAC

23 05 48. 00 40 VI BRATI ON AND SEI SMI C CONTROLS FOR HVAC PI PI NG AND

EQUIPMENT

23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC

23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS

23 09 00 I NSTRUMENTATI ON AND CONTROL FOR HVAC

23 09 13 I NSTRUMENTATI ON AND CONTROL DEVI CES FOR HVAC

23 09 23. 02 BACNET DI RECT DI GI TAL CONTROL FOR HVAC AND OTHER BUI LDI NG

CONTROL SYSTEMS

23 11 25 FACI LI TY GAS PI PI NG

23 21 13. 00 20 LOW TEMPERATURE WATER ( LTW) HEATI NG SYSTEM

23 21 23 HYDRONI C PUMPS

23 23 00 REFRI GERANT PI PI NG

23 25 00 CHEMI CAL TREATMENT OF WATER FOR MECHANI CAL SYSTEMS

23 31 13. 00 40 METAL DUCTS

PROJECT TABLE OF CONTENTS Page 2

23 36 00. 00 40 AI R TERMI NAL UNI TS

23 37 13. 00 40 DI FFUSERS, REGI STERS, AND GRI LLS

23 52 00 HEATI NG BOI LERS

23 74 33. 00 40 PACKAGED, OUTDOOR, HEATI NG AND COOLI NG MAKEUP

AIR-CONDITIONERS

23 81 00. 00 20 UNI TARY AI R CONDI TI ONI NG EQUI PMENT

23 81 23. 00 20 COMPUTER ROOM AI R CONDI TI ONI NG UNI TS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 10 10 UTI LI TY MONI TORI NG AND CONTROL SYSTEM ( UMCS) FRONT END

AND I NTEGRATI ON

DI VI SI ON 26 - ELECTRI CAL

26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS

26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM

26 29 23 VARI ABLE FREQUENCY DRI VE SYSTEMS UNDER 600 VOLTS

26 51 00 I NTERI OR LI GHTI NG

26 56 00 EXTERI OR LI GHTI NG

DI VI SI ON 27 - COMMUNI CATI ONS

27 05 28. 36 40 CABLE TRAYS FOR COMMUNI CATI ONS SYSTEMS

27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM

27 51 16 PUBLI C ADDRESS SYSTEMS

27 54 00. 00 20 COMMUNI TY ANTENNA TELEVI SI ON ( CATV) SYSTEMS

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 08 10 ELECTRONI C SECURI TY SYSTEM ACCEPTANCE TESTI NG

28 10 05 ELECTRONI C SECURI TY SYSTEMS ( ESS)

28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 11 23 GRADED- CRUSHED AGGREGATE BASE COURSE

32 12 13 BI TUMI NOUS TACK AND PRI ME COATS

32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS

32 16 13 CONCRETE SI DEWALKS AND CURBS

32 17 23 PAVEMENT MARKI NGS

32 31 13 CHAI N LI NK FENCES AND GATES

32 92 19 SEEDING

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG

33 30 00 SANI TARY SEWERS

33 40 00 STORM DRAI NAGE UTI LI TI ES

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 3

SECTI ON 21 13 13. 00 10

WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON

05/09

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s Speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ASME I NTERNATI ONAL ( ASME)

ASME B16. 1 ( 2015) Gr ay I r on Pi pe Fl anges and Fl anged Fi t t i ngs Cl asses 25, 125, and 250

ASME B16. 11 ( 2016) For ged Fi t t i ngs, Socket - Wel di ng and Threaded

ASME B16. 21 ( 2011) Nonmet al l i c Fl at Gasket s f or Pi pe Flanges

ASME B16. 3 ( 2011) Mal l eabl e I r on Thr eaded Fi t t i ngs, Cl asses 150 and 300

ASME B16. 4 ( 2011) St andar d f or Gr ay I r on Thr eaded Fi t t i ngs; Cl asses 125 and 250

ASME B16. 9 ( 2012) St andar d f or Fact or y- Made Wr ought St eel But t wel di ng Fi t t i ngs

ASME B18. 2. 2 ( 2015) Nut s f or Gener al Appl i cat i ons:

Machi ne Scr ew Nut s, Hex, Squar e, Hex Fl ange, and Coupl i ng Nut s ( I nch Ser i es)

ASTM I NTERNATI ONAL ( ASTM)

ASTM A135/ A135M ( 2009; R2014) St andar d Speci f i cat i on f or El ect r i c- Resi st ance- Wel ded St eel Pi pe

ASTM A183 ( 2014) St andar d Speci f i cat i on f or Car bon St eel Tr ack Bol t s and Nut s

ASTM A193/ A193M ( 2016) St andar d Speci f i cat i on f or Al l oy- St eel and St ai nl ess St eel Bol t i ng Mat er i al s f or Hi gh- Temper at ur e Ser vi ce and Ot her Speci al Pur pose Appl i cat i ons

ASTM A449 ( 2014) St andar d Speci f i cat i on f or Hex Cap Scr ews, Bol t s, and St uds, St eel , Heat Tr eat ed, 120/ 105/ 90 ksi Mi ni mum Tensi l e St r engt h, Gener al Use

ASTM A47/ A47M ( 1999; R 2014) St andar d Speci f i cat i on f or Fer r i t i c Mal l eabl e I r on Cast i ngs

SECTI ON 21 13 13. 00 10 Page 1

ASTM A53/ A53M ( 2012) St andar d Speci f i cat i on f or Pi pe, St eel , Bl ack and Hot - Di pped, Zi nc- Coat ed, Wel ded and Seaml ess

ASTM A536 ( 1984; R 2014) St andar d Speci f i cat i on f or Duct i l e I r on Cast i ngs

ASTM A563 ( 2015) St andar d Speci f i cat i on f or Car bon and Al l oy St eel Nut s

ASTM A795/ A795M ( 2013) St andar d Speci f i cat i on f or Bl ack and Hot - Di pped Zi nc- Coat ed ( Gal vani zed) Wel ded and Seaml ess St eel Pi pe f or Fi r e Pr ot ect i on Use

ASTM F436 ( 2011) Har dened St eel Washer s

FM GLOBAL ( FM)

FM APP GUI DE ( updat ed on- l i ne) Appr oval Gui de http://www.approvalguide.com/

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 13 ( 2016; TI A 16- 1; TI A 16- 2; TI A 16- 3 2016;

Er r at a 17- 1; Er r at a 17- 2) St andar d f or t he I nst al l at i on of Spr i nkl er Syst ems

NFPA 24 ( 2016; ERTA 2016) St andar d f or t he I nst al l at i on of Pr i vat e Fi r e Ser v i ce Mai ns and Thei r Appur t enances

NFPA 291 ( 2016) Recommended Pr act i ce f or Fi r e Fl ow Test i ng and Mar ki ng of Hydr ant s

NFPA 72 ( 2016) Nat i onal Fi r e Al ar m and Si gnal i ng Code

NATI ONAL I NSTI TUTE FOR CERTI FI CATI ON I N ENGI NEERI NG TECHNOLOGI ES

(NICET)

NI CET 1014- 7 ( 2012) Pr ogr am Det ai l Manual f or Cer t i f i cat i on i n t he Fi el d of Fi r e Pr ot ect i on Engi neer i ng Technol ogy ( Fi el d Code 003) Subf i el d of Aut omat i c Spr i nkl er Syst em Layout

U. S. DEPARTMENT OF DEFENSE ( DOD)

UFC 3- 600- 01 ( 2016; wi t h Change 1) Fi r e Pr ot ect i on Engi neer i ng f or Faci l i t i es

UNDERWRI TERS LABORATORI ES ( UL)

UL Bl d Mat Di r ( updat ed cont i nuousl y onl i ne) Bui l di ng Mat er i al s Di r ect or y

UL Fi r e Pr ot Di r ( Updat ed Cont i nuousl y Onl i ne) Fi r e

SECTI ON 21 13 13. 00 10 Page 2

Pr ot ect i on Equi pment Di r ect or y

1. 2 SYSTEM DESCRI PTI ON

Desi gn and pr ovi de a new aut omat i c wet pi pe f i r e spr i nkl er syst em as i ndi cat ed on Pl ans. Fur ni sh pi pi ng of f set s, f i t t i ngs, and any ot her accessor i es as r equi r ed t o pr ovi de a compl et e i nst al l at i on and t o el i mi nat e i nt er f er ence wi t h ot her const r uct i on. I nst al l spr i nkl er syst em over and under duct s, pi pi ng and pl at f or ms when such equi pment can negat i vel y af f ect or di sr upt t he spr i nkl er di schar ge pat t er n and cover age. Pr ovi de wet pi pe spr i nkl er syst em i n ar eas i ndi cat ed on t he Dr awi ngs. Except as modi f i ed her ei n, t he syst em shal l be desi gned and i nst al l ed i n accor dance wi t h NFPA 13 and UFC 3- 600- 01. Pi pe s i zes whi ch ar e not i ndi cat ed on Dr awi ngs shal l be det er mi ned by hydr aul i c cal cul at i on. Desi gn any por t i ons of t he spr i nkl er syst em t hat ar e not i ndi cat ed on t he Dr awi ngs i ncl udi ng l ocat i ng spr i nkl er s, pi pi ng and equi pment , and s i ze pi pi ng and equi pment when t hi s i nf or mat i on i s not i ndi cat ed on t he Dr awi ngs or i s not speci f i ed her ei n.

The desi gn of t he spr i nkl er syst em shal l be based on hydr aul i c cal cul at i ons, and t he ot her pr ovi s i ons speci f i ed her ei n.

1. 2. 1 Hydr aul i c Desi gn

Hydr aul i cal l y desi gn t he syst em t o di schar ge mi ni mum densi t i es i ndi cat ed on t he Cont r act Dr awi ngs. Hydr aul i c cal cul at i ons shal l be i n accor dance wi t h t he Ar ea/ Densi t y Met hod of NFPA 13.

1. 2. 1. 1 Hose Demand

Add an al l owance f or ext er i or hose st r eams as i ndi cat ed on t he Cont r act Dr awi ngs t o t he spr i nkl er syst em demand at t he f i r e hydr ant c l osest t o t he poi nt wher e t he wat er ser vi ce ent er s t he bui l di ng.

1. 2. 1. 2 Basi s f or Cal cul at i ons

The desi gn of t he syst em shal l be based upon t he Cont r act or ' s r equi r ed hydr ant f l ow t est per NFPA 291.

1. 2. 1. 3 Hydr aul i c Cal cul at i ons

Submi t hydr aul i c cal cul at i ons, i ncl udi ng a dr awi ng showi ng hydr aul i c r ef er ence poi nt s and pi pe segment s and as out l i ned i n NFPA 13, except t hat cal cul at i ons shal l be per f or med by comput er usi ng sof t war e i nt ended speci f i cal l y f or f i r e pr ot ect i on syst em desi gn usi ng t he desi gn dat a shown on t he Dr awi ngs. Sof t war e t hat uses k- f act or s f or t ypi cal br anch l i nes i s not accept abl e. Cal cul at i ons shal l be based on t he wat er suppl y dat a obt ai ned f r om Sect i on 1. 2. 1. 2 t o subst ant i at e t hat t he desi gn ar ea used i n t he cal cul at i ons i s t he most demandi ng hydr aul i cal l y . I ncl ude a 12 psi pr essur e l oss acr oss t he backf l ow pr event er . Wat er suppl y cur ves and syst em r equi r ement s shal l be pl ot t ed on semi - l ogar i t hmi c gr aph paper so as t o pr esent a summar y of t he compl et e hydr aul i c cal cul at i on. Pr ovi de a summar y sheet l i s t i ng spr i nkl er s i n t he desi gn ar ea and t hei r r espect i ve hydr aul i c r ef er ence poi nt s, el evat i ons, act ual di schar ge pr essur es and act ual f l ows. El evat i ons of hydr aul i c r ef er ence poi nt s ( nodes) shal l be i ndi cat ed. Document at i on shal l i dent i f y each pi pe i ndi v i dual l y and t he nodes connect ed t her et o. I ndi cat e t he di amet er , l engt h, f l ow, vel oci t y, f r i c t i on l oss, number and t ype f i t t i ngs, t ot al f r i c t i on l oss i n t he pi pe, equi val ent pi pe l engt h and Hazen- Wi l l i ams coef f i c i ent f or each pi pe. For gr i dded syst ems, cal cul at i ons shal l show peaki ng of demand ar ea f r i c t i on l oss t o ver i f y t hat t he hydr aul i cal l y most demandi ng ar ea i s bei ng used.

SECTI ON 21 13 13. 00 10 Page 3

Al so f or gr i dded syst ems, a f l ow di agr am i ndi cat i ng t he quant i t y and di r ect i on of f l ows shal l be i ncl uded. A dr awi ng showi ng hydr aul i c r ef er ence poi nt s ( nodes) and pi pe desi gnat i ons used i n t he cal cul at i ons shal l be i ncl uded and shal l be i ndependent of Shop Dr awi ngs.

1. 2. 2 Spr i nkl er Cover age

Spr i nkl er s shal l be uni f or ml y spaced on br anch l i nes. I n bui l di ngs pr ot ect ed by aut omat i c spr i nkl er s, spr i nkl er s shal l pr ovi de cover age t hr oughout 100 per cent of t he bui l di ng. Thi s i ncl udes, but i s not l i mi t ed t o, t el ephone r ooms, el ect r i cal equi pment r ooms, boi l er r ooms, swi t chgear r ooms, t r ansf or mer r ooms, and ot her el ect r i cal and mechani cal spaces.

Cover age per spr i nkl er shal l be i n accor dance wi t h NFPA 13, except ext ended cover age spr i nkl er s ar e not per mi t t ed.

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on.

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 02 Shop Dr awi ngs

Shop Dr awi ngs; G ( al l )

As- Bui l t Dr awi ngs; G ( al l )

SD- 03 Pr oduct Dat a

Fi r e Pr ot ect i on Rel at ed Submi t t al s

Mat er i al s and Equi pment ; G

Spar e Par t s

Pr el i mi nar y Test s; G

Fi nal Accept ance Test ; G

On- Si t e Tr ai ni ng; G

Fi r e Pr ot ect i on Speci al i s t ; G

Spr i nkl er Syst em I nst al l er ; G

SD- 05 Desi gn Dat a

Hydr aul i c Cal cul at i ons; G

SD- 06 Test Repor t s

Pr el i mi nar y Test Repor t ; G

Fi nal Accept ance Test Repor t ; G

SD- 07 Cer t i f i cat es

I nspect i on by Fi r e Pr ot ect i on Speci al i s t ; G

SECTI ON 21 13 13. 00 10 Page 4

SD- 10 Oper at i on and Mai nt enance Dat a

Oper at i ng and Mai nt enance Manual s; G

1. 4 QUALI TY ASSURANCE

Compl i ance wi t h r ef er enced NFPA st andar ds i s mandat or y. I n t he event of a conf l i c t bet ween speci f i c pr ovi s i ons of t hi s Speci f i cat i on and appl i cabl e NFPA st andar ds, t hi s Speci f i cat i on gover ns. I nt er pr et r ef er ence t o " aut hor i t y havi ng j ur i sdi ct i on" t o mean t he Cont r act i ng Of f i cer .

1. 4. 1 Fi r e Pr ot ect i on Speci al i s t

Per f or m wor k speci f i ed i n t hi s Sect i on under t he super vi s i on of and cer t i f i ed by t he Fi r e Pr ot ect i on Speci al i s t who i s an i ndi v i dual r egi st er ed pr of essi onal engi neer who has passed t he f i r e pr ot ect i on engi neer i ng wr i t t en exami nat i on admi ni st er ed by t he Nat i onal Counci l of Exami ner s f or Engi neer i ng and Sur veys ( NCEES) or who i s cer t i f i ed as a Level I V Techni c i an by Nat i onal I nst i t ut e f or Cer t i f i cat i on i n Engi neer i ng Technol ogi es ( NI CET) i n t he Wat er Based Syst ems Layout subf i el d of Fi r e Pr ot ect i on Engi neer i ng Technol ogy i n accor dance wi t h NI CET 1014- 7. Submi t t he name and document at i on of cer t i f i cat i on of t he pr oposed Fi r e Pr ot ect i on Speci al i s t s, no l at er t han 14 days af t er t he Not i ce t o Pr oceed and pr i or t o t he submi t t al of t he Spr i nkl er Syst em Dr awi ngs and hydr aul i c cal cul at i ons.

The Fi r e Pr ot ect i on Speci al i s t shal l pr epar e and submi t a l i s t of t he f i r e pr ot ect i on r el at ed submi t t al s, no l at er t han 7 days af t er t he appr oval of t he Fi r e Pr ot ect i on Speci al i s t , f r om t he Cont r act Submi t t al Regi st er t hat r el at e t o t he successf ul i nst al l at i on of t he spr i nkl er syst ems( s) . The submi t t al s i dent i f i ed on t hi s l i s t shal l be accompani ed by a l et t er of appr oval s i gned and dat ed by t he Fi r e Pr ot ect i on Speci al i s t when submi t t ed t o t he Gover nment . The Fi r e Pr ot ect i on Speci al i s t shal l be r egul ar l y engaged i n t he desi gn and i nst al l at i on of t he t ype and compl exi t y of syst em speci f i ed i n t he Cont r act Document s, and shal l have ser ved i n a s i mi l ar capaci t y f or at l east t hr ee syst ems t hat have per f or med i n t he manner i nt ended f or a per i od of not l ess t han 6 mont hs.

1. 4. 2 Spr i nkl er Syst em I nst al l er

Wor k speci f i ed i n t hi s Sect i on shal l be per f or med by t he Spr i nkl er Syst em I nst al l er who i s r egul ar l y engaged i n t he i nst al l at i on of t he t ype and compl exi t y of syst em speci f i ed i n t he Cont r act Document s, and who has ser ved i n a s i mi l ar capaci t y f or at l east t hr ee syst ems t hat have per f or med i n t he manner i nt ended f or a per i od of not l ess t han 6 mont hs. Submi t t he name and document at i on of cer t i f i cat i on of t he pr oposed Spr i nkl er Syst em I nst al l er , concur r ent wi t h submi t t al of t he Fi r e Pr ot ect i on Speci al i s t Qualifications.

1. 4. 3 Shop Dr awi ngs

Shop Dr awi ngs shal l conf or m t o t he r equi r ement s est abl i shed f or wor ki ng pl ans as pr escr i bed i n NFPA 13. Submi t 3 copi es of t he Spr i nkl er Syst em Shop Dr awi ngs, no l at er t han 21 days pr i or t o t he st ar t of spr i nkl er syst em i nst al l at i on. Dr awi ngs shal l i nc l ude pl an and el evat i on v i ews demonst r at i ng t hat t he equi pment wi l l f i t t he al l ot t ed spaces wi t h c l ear ance f or i nst al l at i on and mai nt enance. Each set of dr awi ngs shal l i ncl ude t he f ol l owi ng:

a. Descr i pt i ve i ndex of dr awi ngs i n t he submi t t al wi t h dr awi ngs l i s t ed i n sequence by dr awi ng number . A l egend i dent i f y i ng devi ce symbol s, SECTI ON 21 13 13. 00 10 Page 5 nomencl at ur e, and convent i ons used.

b. Fl oor pl ans dr awn t o a scal e not l ess t han 1/ 8" = 1' - 0" whi ch c l ear l y show l ocat i ons of spr i nkl er s, r i ser s, pi pe hanger s, sei smi c separ at i on assembl i es, i nspect or ' s t est connect i ons, dr ai ns, and ot her appl i cabl e det ai l s necessar y t o c l ear l y descr i be t he pr oposed ar r angement . Each t ype of f i t t i ng used and t he l ocat i ons of bushi ngs, r educi ng coupl i ngs, and wel ded j oi nt s shal l be i ndi cat ed.

c. Act ual cent er - t o- cent er di mensi ons bet ween spr i nkl er s on br anch l i nes and bet ween br anch l i nes; f r om end spr i nkl er s t o adj acent wal l s; f r om wal l s t o br anch l i nes; f r om spr i nkl er f eed mai ns, cr oss- mai ns and br anch l i nes t o f i ni shed f l oor and r oof or cei l i ng. A det ai l shal l show t he di mensi on f r om t he spr i nkl er and spr i nkl er def l ect or t o t he cei l i ng i n f i ni shed ar eas.

d. Longi t udi nal and t r ansver se bui l di ng sect i ons showi ng t ypi cal br anch l i ne and cr oss- mai n pi pe r out i ng as wel l as el evat i on of each t ypi cal spr i nkl er above f i ni shed f l oor .

e. Det ai l s of each t ype of r i ser assembl y; pi pe hanger ; and el ect r i cal devi ces and i nt er connect i ng wi r i ng.

f . Annot at e pr oduct dat a descr i pt i ons t o show t he speci f i c model , t ype, and si ze of each i t em. Cat al og cut s shal l al so i ndi cat e UL l i s t i ng/ FM approval.

1. 5 DELI VERY, STORAGE, AND HANDLI NG

Al l equi pment del i ver ed and pl aced i n st or age shal l be housed i n a manner t o pr ecl ude any damage f r om t he weat her , humi di t y and t emper at ur e var i at i ons, di r t and dust , or ot her cont ami nant s. Addi t i onal l y, al l pi pes shal l ei t her be capped or pl ugged unt i l i nst al l ed.

1. 6 EXTRA MATERI ALS

Submi t spar e par t s dat a f or each di f f er ent i t em of mat er i al and equi pment speci f i ed. The dat a shal l i ncl ude a compl et e l i s t of par t s and suppl i es, wi t h cur r ent uni t pr i ces and sour ce of suppl y, and a l i s t of par t s r ecommended by t he manuf act ur er t o be r epl aced af t er 1 year and 3 year s of ser vi ce. I ncl ude a l i s t of speci al t ool s and t est equi pment r equi r ed f or mai nt enance and t est i ng of t he pr oduct s suppl i ed.

PART 2 PRODUCTS

2. 1 STANDARD PRODUCTS

Pr ovi de mat er i al s and equi pment whi ch ar e st andar d pr oduct s of a manuf act ur er r egul ar l y engaged i n t he manuf act ur e of such pr oduct s and t hat essent i al l y dupl i cat e i t ems t hat have been i n sat i sf act or y use f or at l east 2 year s pr i or t o bi d openi ng.

2. 2 NAMEPLATES

Al l equi pment shal l have a namepl at e t hat i dent i f i es t he manuf act ur er ' s name, addr ess, t ype or st y l e, model or ser i al number , and cat al og number .

SECTI ON 21 13 13. 00 10 Page 6

2. 3 REQUI REMENTS FOR FI RE PROTECTI ON SERVI CE

Pr ovi de Mat er i al s and Equi pment t hat have been t est ed by Under wr i t er s Labor at or i es, I nc. and ar e l i s t ed i n UL Fi r e Pr ot Di r or appr oved by Fact or y Mut ual and l i s t ed i n FM APP GUI DE. Wher e t he t er ms " l i s t ed" or " appr oved" appear i n t hi s Speci f i cat i on, such shal l mean l i s t ed i n UL Fi r e Pr ot Di r or FM APP GUI DE. Submi t manuf act ur er ' s cat al og dat a i ncl uded wi t h t he Spr i nkl er Syst em Dr awi ngs f or al l i t ems speci f i ed her ei n. The dat a shal l be hi ghl i ght ed t o show model , s i ze, opt i ons, et c. , t hat ar e i nt ended f or consi der at i on. Dat a shal l be adequat e t o demonst r at e compl i ance wi t h al l Cont r act Requi r ement s. I n addi t i on, pr ovi de a compl et e equi pment l i s t t hat i ncl udes equi pment descr i pt i on, model number and quantity.

2. 4 ABOVEGROUND PI PI NG COMPONENTS

Abovegr ound pi pi ng shal l be st eel .

2. 4. 1 St eel Pi pi ng Component s

2. 4. 1. 1 St eel Pi pe

Except as modi f i ed her ei n, st eel pi pe shal l be bl ack as per mi t t ed by NFPA 13 and shal l conf or m t o appl i cabl e pr ovi s i ons of ASTM A795/ A795M, ASTM A53/ A53M, or ASTM A135/ A135M. Pi pe shal l be Schedul e 40. Pi pe shal l be mar ked wi t h t he name of t he manuf act ur er , k i nd of pi pe, and ASTM designation.

2. 4. 1. 2 Fi t t i ngs f or Non- Gr ooved St eel Pi pe

Fi t t i ngs shal l be cast i r on conf or mi ng t o ASME B16. 4, st eel conf or mi ng t o ASME B16. 9 or ASME B16. 11, or mal l eabl e i r on conf or mi ng t o ASME B16. 3.

Fi t t i ngs i nt o whi ch spr i nkl er s, dr op ni ppl es or r i ser ni ppl es ( spr i gs) ar e scr ewed shal l be t hr eaded t ype. Pl ai n- end f i t t i ngs wi t h mechani cal coupl i ngs, f i t t i ngs t hat use st eel gr i ppi ng devi ces t o bi t e i nt o t he pi pe and segment ed wel ded f i t t i ngs shal l not be used.

2. 4. 1. 3 Gr ooved Mechani cal Joi nt s and Fi t t i ngs

Joi nt s and f i t t i ngs shal l be desi gned f or not l ess t han 175 psi ser vi ce and shal l be t he pr oduct of t he same manuf act ur er ; segment ed wel ded f i t t i ngs shal l not be used. Fi t t i ng and coupl i ng houses shal l be mal l eabl e i r on conf or mi ng t o ASTM A47/ A47M, Gr ade 32510; duct i l e i r on conf or mi ng t o ASTM A536, Gr ade 65- 45- 12. Gasket shal l be t he f l ush t ype t hat f i l l s t he ent i r e cavi t y bet ween t he f i t t i ng and t he pi pe. Nut s and bol t s shal l be heat - t r eat ed st eel conf or mi ng t o ASTM A183 and shal l be cadmi um pl at ed or z i nc el ect r opl at ed.

2. 4. 1. 4 Flanges

Fl anges shal l conf or m t o NFPA 13 and ASME B16. 1. Gasket s shal l be non- asbest os compr essed mat er i al i n accor dance wi t h ASME B16. 21, 1/ 16 i nch t hi ck, and f ul l f ace or sel f - cent er i ng f l at r i ng t ype.

2. 4. 1. 5 Bol t s, Nut , and Washer s

Bol t s shal l be conf or m t o ASTM A449, Type 1 and shal l ext end no l ess t han t hr ee f ul l t hr eads beyond t he nut wi t h bol t s t i ght ened t o t he r equi r ed t or que. Nut s shal l be hexagon t ype conf or mi ng t o ASME B18. 2. 2, SECTI ON 21 13 13. 00 10 Page 7

ASTM A193/ A193M, Gr ade 5, or ASTM A563, Gr ade C3 or DH3. Washer s shal l meet t he r equi r ement s of ASTM F436. Fl at c i r cul ar washer s shal l be pr ovi ded under al l bol t heads and nut s.

2. 4. 2 Pi pe Hanger s

Hanger s shal l be l i s t ed i n UL Fi r e Pr ot Di r or FM APP GUI DE and of t he t ype sui t abl e f or t he appl i cat i on, const r uct i on, and pi pe t ype and si zed t o be supported.

2. 4. 3 Valves

2. 4. 3. 1 Cont r ol Val ve and Gat e Val ve

Manual l y oper at ed spr i nkl er cont r ol val ve and gat e val ve shal l be out s i de st em and yoke ( OS&Y) t ype and shal l be l i s t ed i n UL Bl d Mat Di r or

FM APP GUI DE.

2. 4. 4 Aut omat i c Ai r Vent s

Pr ovi de aut omat i c ai r vent s, wi t hout el ect r oni c moni t or i ng. Pi pe t o ext er i or , or pr ovi de model wi t h secondar y val ve t hat aut omat i cal l y c l oses i n case of ai r vent f ai l ur e, wi t h v i sual i ndi cat or v i s i bl e f r om f l oor .

2. 5 DRAI N VALVES

Pr ovi de val ves wi t h br ass or br onze body. Gl obe val ves shal l be scr ew i n bonnet t ype wi t h i nt egr al seat and r enewabl e di sc. Bal l val ves shal l be f ul l por t wi t h bl owout - pr oof st em.

2. 6 SPRINKLERS

Spr i nkl er s wi t h i nt er nal O- r i ngs shal l not be used. Spr i nkl er s shal l be used i n accor dance wi t h t hei r l i s t ed cover age l i mi t at i ons. Temper at ur e c l assi f i cat i on shal l be as i ndi cat ed. Spr i nkl er s i n hi gh heat ar eas i ncl udi ng at t i c spaces or i n c l ose pr oxi mi t y t o uni t heat er s shal l have t emper at ur e c l assi f i cat i on i n accor dance wi t h NFPA 13. Ext ended cover age spr i nkl er s shal l not be used.

2. 7 ACCESSORIES

2. 7. 1 Spr i nkl er Cabi net

Spar e spr i nkl er s shal l be pr ovi ded i n accor dance wi t h NFPA 13 and shal l be packed i n a sui t abl e met al or pl ast i c cabi net . Spar e spr i nkl er s shal l be r epr esent at i ve of , and i n pr opor t i on t o, t he number of each t ype and t emper at ur e r at i ng of t he spr i nkl er s i nst al l ed. At l east one wr ench of each t ype r equi r ed shal l be pr ovi ded.

2. 7. 2 Pendent Spr i nkl er Escut cheon

Escut cheon shal l be adj ust abl e t wo- pi ece met al l i c t ype wi t h a dept h of l ess t han 3/ 4 i nch and sui t abl e f or i nst al l at i on on pendent spr i nkl er s. The escut cheon shal l have a f act or y f i ni sh t hat mat ches t he pendent spr i nkl er heads.

2. 7. 3 Pi pe Escut cheon

Escut cheon shal l be pol i shed chr omi um- pl at ed z i nc al l oy, or pol i shed

SECTI ON 21 13 13. 00 10 Page 8 chr omi um- pl at ed copper al l oy. Escut cheons shal l be ei t her one- pi ece or spl i t - pat t er n, hel d i n pl ace by i nt er nal spr i ng t ensi on or set scr ew.

2. 7. 4 Spr i nkl er Guar d

Guar d shal l be a st eel wi r e cage desi gned t o encase t he spr i nkl er and pr ot ect i t f r om mechani cal damage. Guar ds shal l be pr ovi ded on spr i nkl er s l ocat ed l ess t han 7 f eet above f i ni shed f l oor and as i ndi cat ed on Dr awi ngs.

2. 7. 5 I dent i f i cat i on Si gn

Val ve i dent i f i cat i on s i gn shal l be mi ni mum 6 i nches wi de by 2 i nches hi gh wi t h enamel baked f i ni sh on mi ni mum 18 gauge st eel or 0. 024 i nch al umi num wi t h r ed l et t er s on a whi t e backgr ound or whi t e l et t er s on r ed backgr ound.

Wor di ng of s i gn shal l i ncl ude, but not be l i mi t ed t o " mai n dr ai n, " " auxi l i ar y dr ai n, " " i nspect or ' s t est , " " al ar m t est , " " al ar m l i ne, " and si mi l ar wor di ng as r equi r ed t o i dent i f y oper at i onal component s.

PART 3 EXECUTI ON

3. 1 FI ELD MEASUREMENTS

Af t er becomi ng f ami l i ar wi t h al l det ai l s of t he wor k, ver i f y al l di mensi ons i n t he f i el d, and advi se t he Cont r act i ng Of f i cer of any di scr epancy bef or e per f or mi ng t he wor k.

3. 2 I NSTALLATI ON REQUI REMENTS

The i nst al l at i on shal l be i n accor dance wi t h t he appl i cabl e pr ovi s i ons of NFPA 13, NFPA 24 and publ i cat i ons r ef er enced t her ei n.

3. 3 I NSPECTI ON BY FI RE PROTECTI ON SPECI ALI ST

Pr i or t o cei l i ng i nst al l at i on and concur r ent wi t h t he Fi nal Accept ance Test Repor t , cer t i f i cat i on by t he Fi r e Pr ot ect i on Speci al i s t t hat t he spr i nkl er syst em i s i nst al l ed i n accor dance wi t h t he Cont r act Requi r ement s, i ncl udi ng s i gned appr oval of t he Pr el i mi nar y and Fi nal Accept ance Test Repor t s. The Fi r e Pr ot ect i on Speci al i s t shal l : 1) I nspect t he spr i nkl er syst em per i odi cal l y dur i ng t he i nst al l at i on t o ensur e t hat t he spr i nkl er syst em i s bei ng pr ovi ded and i nst al l ed i n accor dance wi t h t he Cont r act Requi r ement s,

2) Wi t ness t he pr el i mi nar y and f i nal t est s, and s i gn t he t est r esul t s, 3) Af t er compl et i on of t he syst em i nspect i ons and a successf ul f i nal t est , cer t i f y i n wr i t i ng t hat t he syst em has been i nst al l ed i n accor dance wi t h t he Cont r act Requi r ement s. Any di scr epancy shal l be br ought t o t he at t ent i on of t he Cont r act i ng Of f i cer i n wr i t i ng, no l at er t han t hr ee wor ki ng days af t er t he di scr epancy i s di scover ed.

3. 4 ABOVEGROUND PI PI NG I NSTALLATI ON

3. 4. 1 Pi pi ng i n Exposed Ar eas

I nst al l exposed pi pi ng wi t hout di mi ni shi ng exi t access wi dt hs, cor r i dor s or equi pment access. Exposed hor i zont al pi pi ng, i ncl udi ng dr ai n pi pi ng, shal l be i nst al l ed t o pr ovi de maxi mum headr oom.

3. 4. 2 Pi pi ng i n Fi ni shed Ar eas

I n ar eas wi t h suspended or dr opped cei l i ngs and i n ar eas wi t h conceal ed spaces above t he cei l i ng, pi pi ng shal l be conceal ed above cei l i ngs. Pi pi ng

SECTI ON 21 13 13. 00 10 Page 9 shal l be i nspect ed, t est ed and appr oved bef or e bei ng conceal ed. Ri ser s and si mi l ar ver t i cal r uns of pi pi ng i n f i ni shed ar eas shal l be conceal ed.

3. 4. 3 Pendent Spr i nkl er s

Dr op ni ppl es t o pendent spr i nkl er s shal l consi st of mi ni mum 1 i nch pi pe wi t h a r educi ng coupl i ng i nt o whi ch t he spr i nkl er shal l be t hr eaded.

Hanger s shal l be pr ovi ded on ar m- over s t o dr op ni ppl es suppl y i ng pendent spr i nkl er s when t he ar m- over exceeds 12 i nches. Wher e spr i nkl er s ar e i nst al l ed bel ow suspended or dr opped cei l i ngs, dr op ni ppl es shal l be cut such t hat spr i nk l er cei l i ng pl at es or escut cheons ar e of a uni f or m dept h t hr oughout t he f i ni shed space. The out l et of t he r educi ng coupl i ng shal l not ext end mor e t han 1 i nch bel ow t he under si de of t he cei l i ng. On pendent spr i nkl er s i nst al l ed bel ow suspended or dr opped cei l i ngs, t he di st ance f r om t he spr i nkl er def l ect or t o t he under si de of t he cei l i ng shal l not exceed 4 i nches. Recessed pendent spr i nkl er s shal l be i nst al l ed such t hat t he di st ance f r om t he spr i nkl er def l ect or t o t he under si de of t he cei l i ng shal l not exceed t he manuf act ur er ' s l i s t ed r ange and shal l be of uni f or m dept h t hr oughout t he f i ni shed ar ea. Pendent spr i nkl er s i n suspended cei l i ngs shal l be a mi ni mum of 6 i nches f r om cei l i ng gr i d.

3. 4. 4 Upr i ght Spr i nkl er s

Ri ser ni ppl es or " spr i gs" t o upr i ght spr i nkl er s shal l cont ai n no f i t t i ngs bet ween t he br anch l i ne t ee and t he r educi ng coupl i ng at t he spr i nk l er .

Ri ser ni ppl es exceedi ng 30 i nches i n l engt h shal l be i ndi v i dual l y suppor t ed.

3. 4. 5 Pi pe Joi nt s

Pi pe j oi nt s shal l conf or m t o NFPA 13, except as modi f i ed her ei n. Not mor e t han f our t hr eads shal l show af t er j oi nt i s made up. Wel ded j oi nt s wi l l be per mi t t ed, onl y i f wel di ng oper at i ons ar e per f or med as r equi r ed by NFPA 13 at t he Cont r act or ' s f abr i cat i on shop, not at t he Pr oj ect Const r uct i on Si t e.

Fl anged j oi nt s shal l be pr ovi ded wher e i ndi cat ed or r equi r ed by NFPA 13.

Gr ooved pi pe and f i t t i ngs shal l be pr epar ed i n accor dance wi t h t he manuf act ur er ' s l at est publ i shed speci f i cat i on accor di ng t o pi pe mat er i al , wal l t hi ckness and si ze. Gr ooved coupl i ngs, f i t t i ngs and gr oovi ng t ool s shal l be pr oduct s of t he same manuf act ur er . The di amet er of gr ooves made i n t he f i el d shal l be measur ed usi ng a " go/ no- go" gauge, ver ni er or di al cal i per , nar r ow- l and mi cr omet er , or ot her met hod speci f i cal l y appr oved by t he coupl i ng manuf act ur er f or t he i nt ended appl i cat i on. Gr oove wi dt h and di mensi on of gr oove f r om end of pi pe shal l be measur ed and r ecor ded f or each change i n gr oovi ng t ool set up t o ver i f y compl i ance wi t h coupl i ng manuf act ur er ' s t ol er ances.

3. 4. 6 Reducers

Reduct i ons i n pi pe s i zes shal l be made wi t h one- pi ece t aper ed r educi ng f i t t i ngs. The use of gr ooved- end or r ubber - gasket ed r educi ng coupl i ngs wi l l not be per mi t t ed. Bushi ngs shal l not be used.

3. 4. 7 Pi pe Penet r at i ons

Cut t i ng st r uct ur al member s f or passage of pi pes or f or pi pe- hanger f ast eni ngs wi l l not be per mi t t ed. Pi pes t hat must penet r at e concr et e or masonr y wal l s or concr et e f l oor s shal l be cor e- dr i l l ed and pr ovi ded wi t h pi pe s l eeves. Each sl eeve shal l be Schedul e 40 gal vani zed st eel , duct i l e i r on or cast i r on pi pe and shal l ext end t hr ough i t s r espect i ve wal l or f l oor and be cut f l ush wi t h each wal l sur f ace. Sl eeves shal l pr ovi de

SECTI ON 21 13 13. 00 10 Page 10 r equi r ed c l ear ance bet ween t he pi pe and t he s l eeve per NFPA 13. The space bet ween t he s l eeve and t he pi pe shal l be f i r ml y packed wi t h mi ner al wool i nsul at i on. Wher e pi pes penet r at e f i r e wal l s, f i r e par t i t i ons, or f l oor s, pi pes shal l be f i r e st opped i n accor dance wi t h Sect i on 07 84 00 FI RESTOPPI NG. I n penet r at i ons t hat ar e not f i r e- r at ed or not a f l oor penet r at i on, t he space bet ween t he s l eeve and t he pi pe shal l be seal ed at bot h ends wi t h pl ast i c wat er pr oof cement t hat wi l l dr y t o a f i r m but pl i abl e mass or wi t h a mechani cal l y adj ust abl e segment ed el ast omer seal .

3. 4. 8 Escutcheons

Escut cheons shal l be pr ovi ded f or pi pe penet r at i on of cei l i ngs and wal l s.

Escut cheons shal l be secur el y f ast ened t o t he pi pe at sur f aces t hr ough whi ch pi pi ng passes.

3. 4. 9 Drains

Mai n dr ai n pi pi ng shal l be pr ovi ded t o di schar ge at a saf e poi nt out s i de t he bui l di ng. Auxi l i ar y dr ai ns shal l be pr ovi ded as r equi r ed by NFPA 13.

3. 4. 10 I dent i f i cat i on Si gns

Si gns shal l be af f i xed t o each cont r ol val ve, i nspect or t est val ve, mai n dr ai n, auxi l i ar y dr ai n, t est val ve, and si mi l ar val ves as appr opr i at e or as r equi r ed by NFPA 13. Hydr aul i c desi gn dat a namepl at es shal l be per manent l y af f i xed t o each spr i nkl er r i ser as speci f i ed i n NFPA 13.

3. 4. 11 Aut omat i c Ai r Vent

I nst al l aut omat i c ai r vent at t he hi gh poi nt of t he spr i nkl er syst em t o aut omat i cal l y vent ai r f r om t he spr i nkl er syst em pi pi ng. I nst al l a bal l val ve i n t he pi pi ng upst r eam of t he aut omat i c ai r vent . Ai r vent s wi t h a v i sual i ndi cat or shal l be i nst al l ed such t hat i t i s v i s i bl e f r om t he f l oor . They shal l not be i nst al l ed above cei l i ngs, duct wor k, or ot her equipment.

3. 5 ELECTRI CAL WORK

Except as modi f i ed her ei n, el ect r i c equi pment and wi r i ng shal l be i n accor dance wi t h Sect i on 26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM. Al ar m si gnal wi r i ng connect ed t o t he bui l di ng f i r e al ar m cont r ol syst em shal l be i n accor dance wi t h Sect i on 28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM. Wi r i ng col or code shal l r emai n uni f or m t hr oughout t he system.

3. 6 PI PE COLOR CODE MARKI NG

Col or code mar k pi pi ng as speci f i ed i n Sect i on 09 90 00 PAI NTS AND COATI NGS.

3. 7 PRELI MI NARY TESTS

The syst em, i ncl udi ng t he under gr ound wat er mai ns, and t he abovegr ound pi pi ng and syst em component s, shal l be t est ed t o assur e t hat equi pment and component s f unct i on as i nt ended. Submi t pr oposed pr ocedur es f or Pr el i mi nar y Test s, no l at er t han 14 days pr i or t o t he pr oposed st ar t of t he t est s and pr oposed dat e and t i me t o begi n t he pr el i mi nar y t est s. The under gr ound and abovegr ound i nt er i or pi pi ng syst ems and at t ached appur t enances subj ect ed t o syst em wor ki ng pr essur e shal l be t est ed i n accor dance wi t h NFPA 13 and NFPA 24. Upon compl et i on of speci f i ed t est s, SECTI ON 21 13 13. 00 10 Page 11 submi t 3 copi es of t he compl et ed Pr el i mi nar y Test Repor t , no l at er t han 7 days af t er t he compl et i on of t he Test s. The Repor t shal l i ncl ude bot h t he Cont r act or ' s Mat er i al and Test Cer t i f i cat e f or Under gr ound Pi pi ng and t he Cont r act or ' s Mat er i al and Test Cer t i f i cat e f or Abovegr ound Pi pi ng. Al l i t ems i n t he Pr el i mi nar y Test s Repor t shal l be s i gned by t he Fi r e Pr ot ect i on Speci al i s t .

3. 7. 1 Abovegr ound Pi pi ng

3. 7. 1. 1 Hydr ost at i c Test i ng

Abovegr ound pi pi ng shal l be hydr ost at i cal l y t est ed i n accor dance wi t h NFPA 13 at not l ess t han 200 psi or 50 psi i n excess of maxi mum syst em oper at i ng pr essur e, whi chever i s gr eat er , and shal l mai nt ai n t hat pr essur e wi t hout l oss f or 2 hour s. Ther e shal l be no dr op i n gauge pr essur e or v i s i bl e l eakage when t he syst em i s subj ect ed t o t he hydr ost at i c t est . The t est pr essur e shal l be r ead f r om a gauge l ocat ed at t he l ow el evat i on poi nt of t he syst em or por t i on bei ng t est ed.

3. 7. 2 Test i ng of Al ar m Devi ces

a. Each wat er f l ow det ect or shal l be act i vat ed by t he f l ow of wat er .

b. Each val ve t amper swi t ch shal l be act i vat ed by par t i al l y c l osi ng t he associ at ed cont r ol val ve.

c. Coor di nat e wi t h DI VI SI ON 28 f or t est i ng t o be compl et ed per NFPA 72.

3. 7. 3 Mai n Dr ai n Fl ow Test

Fol l owi ng f l ushi ng of t he under gr ound pi pi ng, a mai n dr ai n t est shal l be made t o ver i f y t he adequacy of t he wat er suppl y. St at i c and r esi dual pr essur es shal l be r ecor ded on t he cer t i f i cat e speci f i ed i n Par agr aph " Submi t t al s" . I n addi t i on, a mai n dr ai n t est shal l be conduct ed each t i me af t er a mai n cont r ol val ve i s shut and opened.

3. 8 FI NAL ACCEPTANCE TEST

Begi n t he Fi nal Accept ance Test onl y when t he Pr el i mi nar y Test Repor t has been appr oved. Submi t pr oposed pr ocedur es f or Fi nal Accept ance Test , no l at er t han 14 days pr i or t o t he pr oposed st ar t of t he t est s, and pr oposed dat e and t i me t o begi n t he Test , submi t t ed wi t h t he pr ocedur es.

Not i f i cat i on shal l be pr ovi ded at l east 14 days pr i or t o t he pr oposed st ar t of t he t est . Not i f i cat i on shal l i ncl ude a copy of t he Cont r act or ' s Mat er i al & Test Cer t i f i cat es. The Fi r e Pr ot ect i on Speci al i s t shal l conduct t he Fi nal Accept ance Test and shal l pr ovi de a compl et e demonst r at i on of t he oper at i on of t he syst em. Thi s shal l i ncl ude oper at i on of cont r ol val ves and f l owi ng of i nspect or ' s t est connect i ons t o ver i f y oper at i on of associ at ed wat er f l ow al ar m swi t ches. Af t er oper at i on of cont r ol val ves has been compl et ed, t he mai n dr ai n t est shal l be r epeat ed t o assur e t hat cont r ol val ves ar e i n t he open posi t i on. Submi t As- Bui l t Shop Dr awi ngs, at l east 14 days af t er compl et i on of t he Fi nal Test s, updat ed t o r ef l ect as- bui l t condi t i ons af t er al l r el at ed wor k i s compl et ed. Dr awi ngs shal l be on r epr oduci bl e f ul l - s i ze myl ar f i l m. I n addi t i on, t he r epr esent at i ve shal l have avai l abl e copi es of As- Bui l t Dr awi ngs and cer t i f i cat es of t est s pr evi ousl y conduct ed. The i nst al l at i on shal l not be consi der ed accept ed unt i l i dent i f i ed di scr epanci es have been cor r ect ed and t est document at i on i s pr oper l y compl et ed and r ecei ved. Submi t 3 copi es of t he compl et ed Fi nal Accept ance Test Repor t no l at er t han 7 days af t er t he compl et i on of t he

SECTI ON 21 13 13. 00 10 Page 12

Fi nal Accept ance Test s. Al l i t ems i n t he Fi nal Accept ance Repor t shal l be s i gned by t he Fi r e Pr ot ect i on Speci al i s t as speci f i ed.

3. 9 ON- SI TE TRAI NI NG

The Fi r e Pr ot ect i on Speci al i s t shal l conduct a t r ai ni ng cour se f or oper at i ng and mai nt enance per sonnel as desi gnat ed by t he Cont r act i ng Of f i cer . Submi t pr oposed schedul e, at l east 14 days pr i or t o t he st ar t of r el at ed t r ai ni ng. Tr ai ni ng shal l be pr ovi ded f or a per i od of 4 hour s of nor mal wor ki ng t i me and shal l s t ar t af t er t he syst em i s f unct i onal l y compl et e and af t er t he Fi nal Accept ance Test . Submi t 6 Oper at i ng and Mai nt enance Manual s l i s t i ng st ep- by- st ep pr ocedur es r equi r ed f or syst em st ar t up, oper at i on, shut down, and r out i ne mai nt enance, at l east 14 days pr i or t o f i el d t r ai ni ng. The manual s shal l i ncl ude t he manuf act ur er ' s name, model number , par t s l i s t , l i s t of par t s and t ool s t hat shoul d be kept i n st ock by t he owner f or r out i ne mai nt enance i ncl udi ng t he name of a l ocal suppl i er , s i mpl i f i ed wi r i ng and cont r ol s di agr ams, t r oubl eshoot i ng gui de, and r ecommended ser vi ce or gani zat i on ( i ncl udi ng addr ess and t el ephone number ) f or each i t em of equi pment . Each ser vi ce or gani zat i on submi t t ed shal l be capabl e of pr ovi di ng 4 hour on- si t e r esponse t o a ser vi ce cal l on an emer gency basi s. The On- Si t e Tr ai ni ng shal l cover al l of t he i t ems cont ai ned i n t he appr oved manual s.

- - End of Sect i on - -

SECTI ON 21 13 13. 00 10 Page 13

SECTI ON 22 00 00

PLUMBI NG, GENERAL PURPOSE

11/15

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s Speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AI R- CONDI TI ONI NG, HEATI NG AND REFRI GERATI ON I NSTI TUTE ( AHRI )

AHRI 1010 ( 2002) Sel f - Cont ai ned, Mechani cal l y Ref r i ger at ed Dr i nki ng- Wat er Cool er s

AMERI CAN NATI ONAL STANDARDS I NSTI TUTE ( ANSI )

ANSI Z21. 10. 3/ CSA 4. 3 ( 2017) Gas- Fi r ed Wat er Heat er s Vol . I I I , St or age Wat er Heat er s Wi t h I nput Rat i ngs Above 75, 000 Bt u Per Hour , Ci r cul at i ng and Instantaneous

ANSI Z21. 22/ CSA 4. 4 ( 2015) Rel i ef Val ves f or Hot Wat er Suppl y Systems

AMERI CAN SOCI ETY OF HEATI NG, REFRI GERATI NG AND AI R- CONDI TI ONI NG

ENGI NEERS ( ASHRAE)

ASHRAE 189. 1 ( 2014; ERTA 1- 2 2015; ERTA 3- 4 2017)

St andar d f or t he Desi gn of Hi gh- Per f or mance Gr een Bui l di ngs Except Low- Ri se Resi dent i al Bui l di ngs

ASHRAE 90. 1 - I P ( 2016; ERTA 1- 8 2017; I NT 1- 5 2017) Ener gy St andar d f or Bui l di ngs Except Low- Ri se Resi dent i al Bui l di ngs

AMERI CAN SOCI ETY OF SANI TARY ENGI NEERI NG ( ASSE)

ASSE 1001 ( 2016) Per f or mance Requi r ement s f or At mospher i c Type Vacuum Br eaker s

ASSE 1011 ( 2004; Er r at a 2004) Per f or mance Requi r ement s f or Hose Connect i on Vacuum Br eaker s ( ANSI appr oved 2004)

ASSE 1012 ( 2009) Per f or mance Requi r ement s f or Backf l ow Pr event er wi t h an I nt er medi at e At mospher i c Vent - ( ANSI appr oved 2009)

ASSE 1013 ( 2011) Per f or mance Requi r ement s f or Reduced Pr essur e Pr i nci pl e Backf l ow Pr event er s and Reduced Pr essur e Fi r e Pr ot ect i on Pr i nc i pl e Backf l ow Pr event er s - ( ANSI appr oved 2010)

SECTI ON 22 00 00 Page 1

ASSE 1018 ( 2001) Per f or mance Requi r ement s f or Tr ap Seal Pr i mer Val ves - Pot abl e Wat er Suppl i ed ( ANSI Appr oved 2002

ASSE 1019 ( 2011; R 2016) Per f or mance Requi r ement s f or Wal l Hydr ant wi t h Backf l ow Pr ot ect i on and Fr eeze Resi st ance

ASSE 1020 ( 2004; Er r at a 2004; Er r at a 2004) Per f or mance Requi r ement s f or Pr essur e Vacuum Br eaker Assembl y ( ANSI Appr oved 2004)

ASSE 1037 ( 2015) Per f or mance Requi r ement s f or Pr essur i zed Fl ushi ng Devi ces ( Fl ushomet er s) f or Pl umbi ng Fi xt ur es

AMERI CAN WATER WORKS ASSOCI ATI ON ( AWWA)

AWWA 10084 ( 2017) St andar d Met hods f or t he Exami nat i on of Wat er and Wast ewat er

AWWA B300 ( 2010; Addenda 2011) Hypochl or i t es

AWWA B301 ( 2010) Li qui d Chl or i ne

AWWA C203 ( 2008) Coal - Tar Pr ot ect i ve Coat i ngs and Li ni ngs f or St eel Wat er Pi pel i nes - Enamel and Tape - Hot - Appl i ed

AWWA C606 ( 2015) Gr ooved and Shoul der ed Joi nt s

AWWA C651 ( 2014) St andar d f or Di s i nf ect i ng Wat er Mains

AWWA C652 ( 2011) Di s i nf ect i on of Wat er - St or age Facilities

AMERI CAN WELDI NG SOCI ETY ( AWS)

AWS A5. 8/ A5. 8M ( 2011; Amendment 2012) Speci f i cat i on f or Fi l l er Met al s f or Br azi ng and Br aze Wel di ng

AWS B2. 2/ B2. 2M ( 2016) Speci f i cat i on f or Br azi ng Pr ocedur e and Per f or mance Qual i f i cat i on

ASME I NTERNATI ONAL ( ASME)

ASME A112. 1. 2 ( 2012; R 2017) Ai r Gaps i n Pl umbi ng Syst ems ( For Pl umbi ng Fi xt ur es and Wat er - Connect ed Recept or s)

ASME A112. 19. 2/ CSA B45. 1 ( 2013) St andar d f or Vi t r eous Chi na Pl umbi ng Fi xt ur es and Hydr aul i c Requi r ement s f or Wat er Cl oset s and Ur i nal s

ASME A112. 19. 5 ( 2017) Fl ush Val ves and Spuds f or Wat er Cl oset s, Ur i nal s, and Tanks

SECTI ON 22 00 00 Page 2

ASME A112. 36. 2M ( 1991; R 2017) Cl eanout s

ASME A112. 6. 1M ( 1997; R 2017) Fl oor Af f i xed Suppor t s f or Of f - t he- Fl oor Pl umbi ng Fi xt ur es f or Publ i c Use

ASME A112. 6. 3 ( 2016) St andar d f or Fl oor and Tr ench Dr ai ns

ASME A112. 6. 4 ( 2003: R 2012) Roof , Deck and Bal cony Drains

ASME B16. 15 ( 2013) Cast Copper Al l oy Thr eaded Fi t t i ngs Cl asses 125 and 250

ASME B16. 18 ( 2012) Cast Copper Al l oy Sol der Joi nt Pr essur e Fi t t i ngs

ASME B16. 22 ( 2013) St andar d f or Wr ought Copper and Copper Al l oy Sol der Joi nt Pr essur e Fi t t i ngs

ASME B16. 23 ( 2011) Cast Copper Al l oy Sol der Joi nt Dr ai nage Fi t t i ngs - DWV

ASME B16. 29 ( 2012) Wr ought Copper and Wr ought Copper Al l oy Sol der Joi nt Dr ai nage Fi t t i ngs - DWV

ASME B16. 50 ( 2013) Wr ought Copper and Copper Al l oy Br aze- Joi nt Pr essur e Fi t t i ngs

ASME B31. 5 ( 2016) Ref r i ger at i on Pi pi ng and Heat Tr ansf er Component s

ASME B40. 100 ( 2013) Pr essur e Gauges and Gauge Attachments

ASME BPVC SEC I V ( 2010) BPVC Sect i on I V- Rul es f or Const r uct i on of Heat i ng Boi l er s

ASTM I NTERNATI ONAL ( ASTM)

ASTM A518/ A518M ( 1999; R 2012) St andar d Speci f i cat i on f or Cor r osi on- Resi st ant Hi gh- Si l i con I r on Castings

ASTM A74 ( 2017) St andar d Speci f i cat i on f or Cast I r on Soi l Pi pe and Fi t t i ngs

ASTM A888 ( 2017a) St andar d Speci f i cat i on f or Hubl ess Cast I r on Soi l Pi pe and Fi t t i ngs f or Sani t ar y and St or m Dr ai n, Wast e, and Vent Pi pi ng Appl i cat i ons

ASTM B117 ( 2016) St andar d Pr act i ce f or Oper at i ng Sal t Spr ay ( Fog) Appar at us

ASTM B32 ( 2008; R 2014) St andar d Speci f i cat i on f or Sol der Met al

SECTI ON 22 00 00 Page 3

ASTM B370 ( 2012) St andar d Speci f i cat i on f or Copper Sheet and St r i p f or Bui l di ng Const r uct i on

ASTM B584 ( 2014) St andar d Speci f i cat i on f or Copper Al l oy Sand Cast i ngs f or Gener al Applications

ASTM B813 ( 2016) St andar d Speci f i cat i on f or Li qui d and Past e Fl uxes f or Sol der i ng of Copper and Copper Al l oy Tube

ASTM B828 ( 2016) St andar d Pr act i ce f or Maki ng Capi l l ar y Joi nt s by Sol der i ng of Copper and Copper Al l oy Tube and Fi t t i ngs

ASTM B88 ( 2016) St andar d Speci f i cat i on f or Seaml ess Copper Wat er Tube

ASTM B88M ( 2016) St andar d Speci f i cat i on f or Seaml ess Copper Wat er Tube ( Met r i c)

ASTM C564 ( 2014) St andar d Speci f i cat i on f or Rubber Gasket s f or Cast I r on Soi l Pi pe and Fittings

ASTM C920 ( 2014a) St andar d Speci f i cat i…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.