07_27_10.00_10.pdf
PDF 20 KB Posted
- Attached to
- Addition to Flight Training Unit Building 641
- Solicitation number
- W912PQ-19-B-8001
About this file
Spec Section 07 27 10.00 10
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAAW169006 Add t o Fl i ght Tr ai ni ng Uni t Bui l di ng 641 98279 Hancock Fi el d Ai r Nat i onal Guar d Base, Syr acuse, NY
SECTI ON 07 27 10. 00 10
BUI LDI NG AI R BARRI ER SYSTEM
05/14
PART 1 GENERAL
1. 1 SUMMARY
Thi s Sect i on speci f i es t he const r uct i on and qual i t y cont r ol of t he i nst al l at i on of an ai r bar r i er syst em. Const r uct t he ai r bar r i er syst em i ndi cat ed, t aki ng r esponsi bi l i t y f or t he means, met hods, and wor kmanshi p of t he i nst al l at i on of t he ai r bar r i er syst em. The ai r bar r i er must be cont i guous and connect ed acr oss al l sur f aces of t he encl osed ai r bar r i er envel ope i ndi cat ed. The maxi mum l eakage r equi r ement s of i ndi v i dual ai r bar r i er component s and mat er i al s ar e speci f i ed i n t he ot her Speci f i cat i on Sect i ons cover i ng t hese i t ems.
1. 2 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s Speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er enced wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM D4541 ( 2017) St andar d Test Met hod f or Pul l - Of f St r engt h of Coat i ngs Usi ng Por t abl e Adhesi on Test er s
1. 3 DEFINITIONS
The f ol l owi ng t er ms as t hey appl y t o t hi s Sect i on:
1. 3. 1 Ai r Bar r i er Accessor y
Pr oduct s desi gnat ed t o mai nt ai n ai r t i ght ness bet ween ai r bar r i er mat er i al s, ai r bar r i er assembl i es and ai r bar r i er component s, t o f ast en t hem t o t he st r uct ur e of t he bui l di ng, or bot h ( e. g. , seal ant s, t apes, backer r ods, t r ansi t i on membr anes, f ast ener s, st r appi ng, pr i mer s) .
1. 3. 2 Ai r Bar r i er Assembl y
The combi nat i on of ai r bar r i er mat er i al s and ai r bar r i er accessor i es t hat ar e desi gnat ed and desi gned wi t hi n t he envi r onment al separ at or t o act as a cont i nuous bar r i er t o t he movement of ai r t hr ough t he envi r onment al separator.
1. 3. 3 Ai r Bar r i er Component
Pr e- manuf act ur ed el ement s such as wi ndows, door s, damper s and ser vi ce el ement s t hat ar e i nst al l ed i n t he envi r onment al separ at or .
1. 3. 4 Ai r Bar r i er Envel ope
The combi nat i on of ai r bar r i er assembl i es and ai r bar r i er component s, connect ed by ai r bar r i er accessor i es t hat ar e desi gned t o pr ovi de a
SECTI ON 07 27 10. 00 10 Page 1 cont i nuous bar r i er t o t he movement of ai r t hr ough an envi r onment al separ at or . Ther e may be mor e t han one ai r bar r i er envel ope i n a s i ngl e bui l di ng. Al so known as Ai r Bar r i er Syst em.
1. 3. 5 Ai r Bar r i er Mat er i al
A bui l di ng mat er i al t hat i s desi gned and const r uct ed t o pr ovi de t he pr i mar y r esi st ance t o ai r f l ow t hr ough an ai r bar r i er assembl y.
1. 3. 6 Ai r Bar r i er Syst em
Same as AI R BARRI ER ENVELOPE.
1. 3. 7 Ai r Leakage Rat e
The r at e of ai r f l ow ( CFM) dr i ven t hr ough a uni t sur f ace ar ea ( sq. f t . ) of an assembl y or syst em by a uni t st at i c pr essur e di f f er ence ( Pa) acr oss t he assembl y. ( Exampl e: 0. 25 CFM/ sq. f t . @ 75 Pa)
1. 3. 8 Ai r Leakage
The t ot al ai r f l ow ( CFM) dr i ven t hr ough t he ai r bar r i er syst em by a uni t st at i c pr essur e di f f er ence ( Pa) acr oss t he ai r bar r i er envel ope. ( Exampl e:
6500 CFM @ 75 Pa)
1. 3. 9 Ai r Per meance
The r at e of ai r f l ow ( CFM) t hr ough a uni t ar ea ( sq. f t . ) of a mat er i al dr i ven by uni t st at i c pr essur e di f f er ence ( Pa) acr oss t he mat er i al . ( Exampl e:
0. 004 CFM/ sq. f t . @ 75 Pa) .
1. 3. 10 Envi r onment al Separ at or
The par t s of a bui l di ng t hat separ at e t he cont r ol l ed i nt er i or envi r onment f r om t he uncont r ol l ed ext er i or envi r onment , or t hat separ at e spaces wi t hi n a bui l di ng t hat have di ssi mi l ar envi r onment s. Al so known as t he Cont r ol Layer.
1. 4 PREPARATORY PHASE OR PRECONSTRUCTI ON CONFERENCE
Or gani ze pr e- const r uct i on conf er ences bet ween t he ai r bar r i er i nspect or and t he Subcont r act or s i nvol ved i n t he const r uct i on of or penet r at i on of t he ai r bar r i er syst em t o di scuss wher e t he wor k of each Subcont r act or begi ns and ends, t he sequence of i nst al l at i on, and each Subcont r act or ' s r esponsi bi l i t y t o ensur e ai r t i ght j oi nt s, j unct ur es, penet r at i ons and t r ansi t i ons bet ween mat er i al s. Di scuss t he pr oduct s, and assembl i es of pr oduct s speci f i ed i n t he di f f er ent sect i ons t o be i nst al l ed by t he di f f er ent Subcont r act or s.
1. 5 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SECTI ON 07 27 10. 00 10 Page 2
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
3. 1 QUALI TY CONTROL
3. 1. 1 Document at i on and Repor t i ng
Document t he ent i r e i nst al l at i on pr ocess on dai l y Job Si t e r epor t s. These r epor t s i ncl ude i nf or mat i on on t he I nst al l er , subst r at es, subst r at e pr epar at i on, pr oduct s used, ambi ent and subst r at e t emper at ur e, t he l ocat i on of t he ai r bar r i er i nst al l at i on, t he r esul t s of t he qual i t y cont r ol pr ocedur es, and t est i ng r esul t s.
3. 1. 2 Qual i t y Cont r ol Test i ng and I nspect i on
Conduct t he f ol l owi ng t est s and i nspect i ons as appl i cabl e i n t he pr esence of t he Cont r act i ng Of f i cer dur i ng i nst al l at i on of t he ai r bar r i er syst em, and submi t qual i t y cont r ol r epor t s as i ndi cat ed bel ow.
a. Pr ovi de a Dai l y Repor t of Obser vat i ons wi t h a copy t o t he Cont r act i ng Officer.
b. I nspect t o assur e cont i nui t y of t he ai r bar r i er syst em t hr oughout t he bui l di ng encl osur e and t hat al l gaps ar e cover ed, t he cover i ng i s st r uct ur al l y sound, and al l penet r at i ons ar e seal ed al l owi ng f or no i nf i l t r at i on or exf i l t r at i on t hr ough t he ai r bar r i er syst em.
c. I nspect t o assur e st r uct ur al suppor t of t he ai r bar r i er syst em t o wi t hst and desi gn ai r pr essur es.
d. I nspect t o assur e masonr y sur f aces r ecei v i ng ai r bar r i er mat er i al s ar e smoot h, c l ean, and f r ee of cavi t i es, pr ot r usi ons and mor t ar dr oppi ngs, wi t h mor t ar j oi nt s st r uck f l ush or as r equi r ed by t he manuf act ur er of t he ai r bar r i er mat er i al .
e. I nspect and t est t o assur e Si t e condi t i ons f or appl i cat i on t emper at ur e, and dr yness of subst r at es ar e wi t hi n gui del i nes.
f . I nspect t o assur e subst r at e sur f aces ar e pr oper l y pr i med i f appl i cabl e and i n accor dance wi t h manuf act ur er ' s i nst r uct i ons. Pr i mi ng must ext end at l east 2 i nches beyond t he ai r bar r i er mat er i al t o make i t obvi ous t hat t he pr i mer was appl i ed t o t he subst r at e bef or e t he ai r bar r i er material.
g. I nspect t o assur e l aps i n mat er i al s ar e at l east a 2- i nch mi ni mum, shi ngl ed i n t he cor r ect di r ect i on or mast i c appl i ed i n accor dance wi t h manuf act ur er ' s r ecommendat i ons, and wi t h no f i shmout hs.
h. I nspect t o assur e t hat a r ol l er has been used t o enhance adhesi on.
I dent i f y any def ect s such as f i shmout hs, wr i nkl es, ar eas of l ost adhesi on, and i mpr oper cur i ng. Not e t he i nt ended r emedy f or t he deficiencies.
i . Measur e appl i cat i on t hi ckness of l i qui d appl i ed mat er i al s t o assur e t hat manuf act ur er ' s Speci f i cat i ons f or t he speci f i c subst r at e ar e met .
SECTI ON 07 27 10. 00 10 Page 3 j . I nspect t o assur e t hat t he cor r ect mat er i al s ar e i nst al l ed f or compatibility.
k. I nspect t o assur e pr oper t r ansi t i ons f or change i n di r ect i on and st r uct ur al suppor t at gaps.
l . I nspect t o assur e pr oper connect i on bet ween assembl i es ( membr ane and seal ant s) f or c l eani ng, pr epar at i on and pr i mi ng of sur f aces, st r uct ur al suppor t , i nt egr i t y and cont i nui t y of seal .
m. Per f or m adhesi on t est s f or f l ui d- appl i ed and sel f - adher ed ai r bar r i er membr anes t o assur e t hat t he manuf act ur er ' s speci f i ed adhesi on st r engt h pr oper t i es ar e met . Det er mi ne t he bond st r engt h of coat i ngs t o subst r at e i n accor dance wi t h ASTM D4541.
3. 2 REPAI R AND PROTECTI ON
Upon compl et i on of i nspect i on, t est i ng, sampl e r emoval and si mi l ar ser vi ces, r epai r damaged const r uct i on and r est or e subst r at es, coat i ngs and f i ni shes. Pr ot ect const r uct i on exposed by or f or qual i t y cont r ol ser vi ce act i v i t i es, and pr ot ect r epai r ed const r uct i on.
- - End of Sect i on - -
SECTI ON 07 27 10. 00 10 Page 4
File details come from the government source that posted it.