Drawings_Burns_and_Mac.pdf
PDF 21 MB Posted
- Solicitation number
- W912PQ-16-B-0001
About this file
Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attendance_Sheet.pdf | ||
| OF_1419_Page_2.pdf | ||
| OF_1419_Page_1.pdf | ||
| OF_1419_Page_3.pdf | ||
| IFB_Questions_19-23_Response.pdf | ||
| IFB_Questions_25-36_Response.pdf | ||
| IFB_Questions_24.pdf | ||
| IFB_Question_17-18_Response.pdf | ||
| Boring_Location_Plan.pdf | ||
| IFB_Questions_4-16_Response.pdf | ||
| Boring_Log_B101.pdf | ||
| W912PQ-16-B-0001.pdf | ||
| Boring_Log_B103.pdf | ||
| Boring_Log_B102.pdf | ||
| 2016_08_23_12_55_31.pdf | ||
| PREBID_Slides_-_Hangar_A.pptx | PPTX presentation | |
| RFI_Questions_1-3.pdf | ||
| Wage_Determination.pdf | ||
| W912PQ-16-B-0001.pdf | ||
| Addendum_1_to_Specifications.pdf | ||
| Specifications_Vol_1.pdf | ||
| Specifications_Vol_2.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
descriptiondateno. by ckd
Gabreski Air National Guard Base 106th Rescue Wing
Repair & Add To Fuel Cell Complex, Building 370 Air National Guard
Contract Drawings
79705
Contract WKVB142002/ WKVB139016
May 2016
C O P Y R I G H T
B U
R N
S
M c D
O N
N E
L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
Francis S. Gabreski Airport Westhampton Beach, NY
New York
VICINITY MAP
N.T.S.
LOCATION MAP
N.T.S.
10 NORTH PARK PLACE, SUITE 330
MORRISTOWN, NJ 07960
(973) 884-8701
LICENSEE NO. 000165
I:\USAIRNG\79705\CAD\WKSPACE\79705-CVR.DWG 5/19/2016 8:56 AM CREED
0 05/27/16 CR 100% SUBMITTAL
ISSUED FOR BID
BB
PROJECT
VICINITY
PROJECT
LOCATION
NOT FOR CONSTRUCTION
creed Polygon descriptiondateno. by ckd
C O P Y R I G H
B U
R N
D
O N
N E
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
0 05/27/16 CR 100% SUBMITTAL
ISSUED FOR BID
BB
10 NORTH PARK PLACE, SUITE 330
MORRISTOWN, NJ 07960
(973) 884-8701
LICENSEE NO. 000165
I:\USAIRNG\79705\CAD\WKSPACE\79705-NDX.DWG 5/27/2016 2:29 PM CREED
Contract Drawings
ELECTRICAL DRAWINGS
GENERAL DRAWINGSGENERAL DRAWINGS
COVER
MECHANICAL DRAWINGS
CIVIL DRAWINGS
TITLEDWG. NO.
INDEX
ARCHITECTURAL DRAWINGS
STRUCTURAL DRAWINGS
TITLEDWG. NO.
AG001 LEGEND & ABBREVIATIONS
AG002 PROJECT SCOPE DELINEATION PLAN
AD011 OVERALL DEMOLITION PLANS
AD101 DEMOLITION PLAN
AD102 DEMOLITION PLAN
AD103 DEMOLITION PLAN
A-011 OVERALL FLOOR PLAN
A-015 OVERALL ROOF PLAN
A-101 DIMENSIONED FLOOR PLAN
A-102 DIMENSIONED FLOOR PLAN
A-103 DIMENSIONED FLOOR PLAN
A-104 DIMENSIONED FLOOR PLAN
A-151 REFLECTED CEILING PLAN
A-152 REFLECTED CEILING PLAN
A-153 REFLECTED CEILING PLAN
A-154 REFLECTED CEILING PLAN
A-155 FALL PROTECTION PLAN
A-201 EXTERIOR BUILDING ELEVATIONS
A-251 ENLARGED ELEVATIONS
A-301 BUILDING SECTIONS
A-302 BUILDING SECTIONS
A-305 FALL PROTECTION SECTIONS
A-311 WALL SECTIONS
A-312 WALL SECTIONS
A-351 SECTION DETAILS
A-401
ELEVATOR PLANS, SECTIONS AND DETAILS
A-431 TOILET PLANS AND ELEVATIONS
A-432 MILLWORK DETAILS
A-451 PLAN DETAILS
A-501 PARTITION TYPES
A-502 PARTITION TYPES
A-511 PARTITION TYPE DETAILS
A-521 PENETRATION DETAILS
A-522 PENETRATION DETAILS
A-561 CEILING DETAILS
A-562 CEILING DETAILS
A-581 ROOF DETAILS
A-601 DOOR SCHEDULES
A-611 DOOR DETAILS
A-612 DOOR DETAILS
A-651 WINDOW AND LOUVER SCHEDULE
A-652 LOUVER DETAILS
A-701 ROOM FINISH SCHEDULE
A-741 SIGNAGE SCHEDULE
I-101 EQUIPMENT / FURNITURE AREA PLAN
I-102 EQUIPMENT / FURNITURE AREA PLAN
I-103 EQUIPMENT / FURNITURE AREA PLAN
I-601 EQUIPMENT SCHEDULE
E-000
ELECTRICAL ABBREVIATIONS, LEGENDS AND NOTES
E-001
ELECTRICAL ABBREVIATIONS, LEGENDS AND NOTES
E-002 ELECTRICAL SITE PLAN NOTES
ED100 ELECTRICAL SITE PLAN DEMOLITION
ES100 ELECTRICAL SITE PLAN
ED101 GROUND FLOOR - AREA A - DEMOLITION PLAN
ED102 GROUND FLOOR - AREA B - DEMOLITION PLAN
ED103 MEZZANINE - AREAS A & B - DEMOLITION POWER PLAN
EP101 GROUND FLOOR - HAZARDOUS LOCATION PLAN
EP102 GROUND FLOOR - AREA A - POWER PLAN
EP103 GROUND FLOOR - AREA B - POWER PLAN
EP104 GROUND FLOOR - AREA C - POWER PLAN
EP105 MEZZANINE - AREAS A & B - POWER PLAN
EP106 GROUND FLOOR - AREA A - MECHANICAL EQUIPMENT POWER PLAN
EP107 GROUND FLOOR - AREA B - MECHANICAL EQUIPMENT POWER PLAN
EP108 GROUND FLOOR - AREA C - MECHANICAL EQUIPMENT POWER PLAN
EP109 MEZZANINE - AREAS A & B - MECHANICAL EQUIPMENT POWER PLAN
EP110 ROOF - MECHANICAL EQUIPMENT POWER PLAN
EL101 GROUND FLOOR - AREA A - LIGHTING PLAN
EL102 GROUND FLOOR - AREA B - LIGHTING PLAN
EL103 GROUND FLOOR - AREA C - LIGHTING PLAN
EL104 MEZZANINE - AREAS A & B - LIGHTING PLAN
EG101 GROUND FLOOR - AREA A GROUNDING PLAN
EG102 GROUND FLOOR - AREA B GROUNDING PLAN
EG103 GROUND FLOOR - AREA C GROUNDING PLAN
E-401 ELECTRICAL POWER ENLARGED FLOOR PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
E-601 ELECTRICAL ONE-LINE DIAGRAM - DEMOLITION - SHEET 1
E-602 ELECTRICAL ONE-LINE DIAGRAM - DEMOLITION - SHEET 2
E-603 ELECTRICAL ONE-LINE DIAGRAM - SHEET 1
E-604 ELECTRICAL ONE-LINE DIAGRAM - SHEET 2
E-901 PANEL SCHEDULES
E-902 PANEL SCHEDULES
E-903 PANEL SCHEDULES
E-904 PANEL SCHEDULES
E-905 LIGHTING FIXTURE SCHEDULE
T-000
COMMUNICATIONS/IDS & CCTV ABBREVIATIONS, LEGENDS AND
NOTES
T-101 GROUND FLOOR - AREA A - COMMUNICATIONS PLAN
T-102 GROUND FLOOR - AREA B - COMMUNICATIONS PLAN
T-103 GROUND FLOOR - AREA C - COMMUNICATIONS PLAN
T-104 MEZZANINE - AREAS A & B - COMMUNICATIONS PLAN
T-105 GROUND FLOOR - AREA A - SECURITY PLAN
T-106 GROUND FLOOR - AREA B - SECURITY PLAN
T-107 GROUND FLOOR - AREA C - SECURITY PLAN
T-401 COMMUNICATIONS - ENLARGED PLANS
T-501 COMMUNICATIONS DETAILS
T-502 COMMUNICATIONS DETAILS
T-503 IDS DETAILS
T-601 COMMUNICATIONS ELEVATION
T-602 RISER DIAGRAMS - COMMUNICATIONS/IDS & CCTV PLAN
S-001 GENERAL NOTES
S-002 GENERAL NOTES & ABBREVIATIONS
S-003 WIND ISOMETRIC
S-004 STANDARD MASONRY DETAILS
S-005 STANDARD MASONRY DETAILS
S-006 STANDARD CONCRETE DETAILS
S-007 STANDARD CONCRETE DETAILS
S-008 STANDARD STEEL DETAILS
S-011
OVERALL FLOOR PLAN, GROUND FLOOR AND MEZZANINE, HANGAR
AND PEMB
S-015
OVERALL ROOF PLAN, HANGAR AND PEMB
S-101
FLOOR PLAN, PEMB, AREA C
S-102
FOUNDATION PLAN, PEMB, AREA C
S-201
HANGAR-NORTH WALL, SECTION
S-401
ELEVATOR, PLANS AND SECTIONS
S-402
ELEVATOR, SECTIONS AND DETAILS
S-403
ELEVATED WALKWAY, PLAN AND SECTIONS
S-501
FOUNDATION SECTIONS AND DETAILS, PEMB
S-502
PARIAL ROOF ROOF PLANS, SECTIONS AND DETAILS
S-503 ATFP FRAMING DETAILS
S-504 MISC STEEL DETAILS
M-001
MECHANICAL GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
MD101 MECHANICAL DEMO PLAN
M-101 GROUND FLOOR - MECHANICAL DUCTWORK PLAN - AREA A&C
M-102 GROUND FLOOR - MECHANICAL DUCTWORK PLAN - AREA B
M-103 MEZZANINE LEVEL - MECHANICAL DUCTWORK PLAN
M-104 ROOF - MECHANICAL PLAN - AREA A
M-105 ROOF - MECHANICAL PLAN - AREA B
MP101 GROUND FLOOR - MECHANICAL PIPING PLAN -AREA A&C
MP102 GROUND FLOOR - MECHANICAL PIPING PLAN -AREA B
MP103 MEZZANINE LEVEL - MECHANICAL PIPING PLAN
M-301 SECTIONS
M-302 SECTIONS
M-303 SECTIONS
M-401 BOILER & COMPRESSOR ROOM ENLARGED PLAN & SECTIONS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-505 MECHANICAL DETAILS
M-506 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-603 MECHANICAL SCHEDULES
M-604 MECHANICAL SCHEDULES
M-650 HEATING HOT WATER FLOW DIAGRAM
M-700
CONTROLS SYMBOLS, ABBREVIATIONS & LEGEND
M-701 CONTROLS
M-702 CONTROLS
M-703 CONTROLS
M-704 CONTROLS
M-705 CONTROLS
M-706 CONTROLS
M-707 CONTROLS
M-708 CONTROLS
M-709 CONTROLS
P-001
PLUMBING GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
PD101 GROUND FLOOR PLUMBING DEMOLITION PLAN - AREA A
PD102 GROUND FLOOR PLUMBING DEMOLITION PLAN - AREA B
P-101 PLUMBING GROUND FLOOR PLAN - BELOW SLAB - AREA A
P-102 PLUMBING GROUND FLOOR PLAN - BELOW SLAB - AREA B
P-103 PLUMBING GROUND FLOOR PLAN - BELOW SLAB - AREA C
P-104 PLUMBING GROUND FLOOR PLAN - ABOVE SLAB - AREA A
P-105 PLUMBING GROUND FLOOR PLAN - ABOVE SLAB - AREA B
P-106 PLUMBING GROUND FLOOR PLAN - ABOVE SLAB - AREA C
P-107 PLUMBING MEZZANINE FLOOR PLAN
P-108
PLUMBING GROUND FLOOR PLAN - COMPRESSED AIR & NATURAL GAS
- AREA A
P-109
PLUMBING GROUND FLOOR PLAN - COMPRESSED AIR & NATURAL GAS
- AREA B
P-110
PLUMBING GROUND FLOOR PLAN - COMPRESSED AIR & NATURAL GAS
- AREA C
P-401 ENLARGED PLUMBING FLOOR PLANS - BELOW SLAB
P-402 ENLARGED PLUMBING FLOOR PLAN - BELOW SLAB
P-403 ENLARGED PLUMBING FLOOR PLANS - ABOVE SLAB
P-404 ENLARGED PLUMBING FLOOR PLAN - ABOVE SLAB
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-503 PLUMBING DETAILS
P-504 PLUMBING DETAILS
P-601 PLUMBING SCHEUDULES
P-602 PLUMBING SCHEUDULES
P-603 PLUMBING SCHEUDULES
P-701 SANITARY RISER DIAGRAM - EXISTING HANGAR AREA
P-702 SANITARY RISER DIAGRAM - ADDITION
P-703 DOMESTIC RISER DIAGRAM - EXISTING HANGAR AREA
P-704 DOMESTIC RISER DIAGRAM - ADDITION
P-705 NATURAL GAS RISER DIAGRAM - EXISTING HANGAR AREA
P-706 NATURAL GAS RISER DIAGRAM - ADDITION
New York Air National Guard Repair & Add To Fuel Cell Complex, Building 370
F-011 BUILDING CODE AND LIFE SAFETY CRITERIA
F-012 OVERALL LIFE SAFETY PLANS
FD101 FIRE SUPPRESSION DEMOLITION
FD102 FIRE SUPPESSION DEMOLITION
FD103 FIRE SUPPRESSION DEMOLITION
FD104 FIRE ALARM DEMOLITION
FD105 FIRE ALARM DEMOLITION
FD106 FIRE ALARM DEMOLITION
FA000
FIRE ALARM / MASS NOTIFICATION & FOAM RELEASE SYSTEM LEGENDS,
ABBREVIATIONS AND DESIGN CRITERIA
FA001 GENERAL FIRE ALARM AND MASS NOTIFICATION NOTES
FA101 GROUND FLOOR - AREA A - FIRE ALARM & MASS NOTIFICATION PLAN
FA102 GROUND FLOOR - AREA B - FIRE ALARM & MASS NOTIFICATION PLAN
FA103 GROUND FLOOR - AREA C - FIRE ALARM & MASS NOTIFICATION PLAN
FA104 MEZZANINE - FIRE ALARM & MASS NOTIFICATION PLAN
FA501 FIRE ALARM DETAILS
FA601 FIRE ALARM RISER
FA901 FIRE ALARM MATRIX
FA902 FIRE ALARM MATRIX
FX001
FIRE SUPPRESSION NOTES, LEGEND AND ABBREVIATIONS
FX101 FIRE SUPPRESSION
FX102 FIRE SUPPRESSION
FX103 FIRE SUPPRESSION
FX104 FIRE SUPPRESSION
FX601 FIRE SUPPRESSION ONE LINE DIAGRAM
MECHANICAL DRAWINGS
TITLEDWG. NO.
ARCHITECTURAL DRAWINGS ELECTRICAL DRAWINGS
TITLEDWG. NO.
G-001
ACCESS AND SAFETY PLAN
G-002
GENERAL NOTES AND ABBREVIATIONS
CD101
DEMOLITION PLAN
CS101
SITE PLAN
CS501
SITE DETAILS
CS502
SITE DETAILS
CG101
GRADING PLAN
CG102
GRADING PLAN
CU101
UTILITY PLAN
CU501
UTILITY DETAILS
CU502
UTILITY DETAILS
CE101
EROSION AND SEDIMENT CONTROL PLAN
CE102
EROSION AND SEDIMENT CONTROL PLAN
CE501
EROSION AND SEDIMENT CONTROL NOTES AND DETAILS
TITLEDWG. NO.
TITLEDWG. NO.
TITLEDWG. NO.
LIFE SAFETY / FIRE DRAWINGS
TITLEDWG. NO.
TITLEDWG. NO.
X
X
X
X
X
X
S
T
O
P
XX
O
D
R
I
V
E
R
H
E
A
R
O
A
D
MOEN STREET
LOD
LO
D
LOD
L O D
L O D
LOD
LOD LOD
L O D
LOD
LOD LOD
LOD
L O D
L O D
LODLOD
X
X
X X X X
X X
XXXXXXXX
X X
LOD
LOD
LO
D
LO
D
L O
DL
O D
LOD
L O D
L O D
L O D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD LOD LOD LOD
LOD LOD LOD LOD
L O D
L O D
LOD
L O D
L O D
LOD
L O D
L O D
LODLODLOD
LOD
X
X X
X
X X
X
X X X X
N:246,846.164
E:1,359,105.469
N:246,866.854
E:1,359,123.436
N:246,883.029
E:1,359,104.986
N:246,899.939
E:1,359,112.712
N:246,959.622
E:1,359,166.651
N:246,977.290
E:1,359,172.247
N:247,037.335
E:1,359,223.120
N:247,014.323
E:1,359,249.626
N:247,155.787
E:1,359,372.968
N:246,751.484
E:1,359,213.741
N:246,819.279
E:1,359,300.961
N:246,828.576
E:1,359,290.520
N:246,785.452
E:1,359,270.825
N:246,769.344
E:1,359,193.317
N:246,762.703
E:1,359,223.698
N:247,132.369
E:1,359,398.768
REPAIR AND ADD TO FUEL CELL HANGAR
WKVB142002
NEW YORK AIR NATIONAL GUARD
106TH RESCUE WING
GABRESKI AIR NATIONAL GUARD BASE
WEST HAMPTON, NY
79705
WKVB139016
by
1 1312111098765432
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date description
RI
A DRUG AN
LAOIT
A N
LICENSEE NO. 000165
973-884-8701
MORRISTOWN, NEW JERSEY 07960
10 NORTH PARK PLACE, SUITE 330
I:\USAIRNG\79705\CAD\CIVIL\79705-G001.DWG 5/26/2016 1:37 PM LMGUERIN
PRELIMINARY - NOT
FOR CONSTRUCTION
C O
P Y
R I G
H
MARCH 28, 2016 S. CATONE
L. GUERIN T. VOORHEES
ACCESS AND SAFETY PLAN
G-001 0 79705-G001.dwg
B U
R N
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
N
O
R
T
H
SCALE IN FEET
100' 200'
STAGING
AREA
PROJECT LOCATION
TENSION WIRE
LINE POSTBRACE
2TEMPORARY SECURITY FENCE
NOT TO SCALE
END BAY
10'-0" (MAXIMUM)
MULTIPLES OF
10'-0" (MAXIMUM)
CORNER
POST
CHAIN LINK
FABRIC
TRUSS
ROD
RUBBER TIRE FILLED WITH
CONCRETE (TYPICAL)
NOTE:
1. FENCING WITHIN AIRFIELD AREA
SHALL BE PROVIDED WITH 3 STRANDS
OF BARBED WIRE AT THE TOP FENCE.
2. FENCE POST WITHIN THE AIRFIELD
AREA SHALL BE DRIVEN TO A DEPTH
OF 3 FEET IN LANDSCAPED AREAS AND
SUPPORTED BY CONCRETE FILLED
RUBBER TIRES ON PAVED AREAS.
1DOUBLE SWING GATE
NOT TO SCALE
MULTIPLES OF
10'-0" MAXIMUM
END BAY 10'-0" (MAXIMUM)
BARBED WIRE AT
AIRFIELD AREAS ONLY.
BOTTOM RAIL
LINE POST
TOP RAIL
BRACE
TRUSS
RODS
CHAIN
LINK
FABRIC
FINISH
GRADE
ANGLE OR
CORNER POST
T
Y P
SEE
NOTE 2
12"
9"
MIN
MIN
FINISH GRADE
PLUNGER ROD CATCH
M I N
CONCRETE
FOOTING (TYP)
TEMPORARY SECURITY FENCE IN PAVEMENT
TEMPORARY SECURITY FENCE IN LANDSCAPED AREAS
BARBED WIRE AT
AIRFIELD AREAS ONLY.
CONSTRUCTION ACCESS PLAN
AINSET
SCALE IN FEET
40'20' 80'
N
O
R
T
H
TEMPORARY SECURITY FENCE
NOTE:
1. GATE LOCATION DETERMINED
BY CONTRACTOR.
CONSTRUCTION
FENCE (TYP.)
0 05/27/16 LP LM 100% SUBMITTAL
ISSUED FOR BID
AutoCAD SHX Text
FIRE CONNECT
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC RAMP
AutoCAD SHX Text
RET. WALL
AutoCAD SHX Text
RET. WALL
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
CONC RET WALL
AutoCAD SHX Text
AutoCAD SHX Text
ROOF OVER
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
CONC
AutoCAD SHX Text
COMM TOWER
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC BLDG
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
CONC
AutoCAD SHX Text
BUILDING 345
AutoCAD SHX Text
6" CND
AutoCAD SHX Text
6" CND
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
MSNRY WALL
AutoCAD SHX Text
MSNRY WALL
AutoCAD SHX Text
MSNRY WALL
AutoCAD SHX Text
MSNRY WALL
AutoCAD SHX Text
MSNRY WALL
AutoCAD SHX Text
MSNRY WALL
AutoCAD SHX Text
BUILDING 370
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
MSNRY WALL
AutoCAD SHX Text
6" CND
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
ROOF DR
AutoCAD SHX Text
TANK SWITCH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
GATE SWITCH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ROOF DR
AutoCAD SHX Text
ROOF DR
AutoCAD SHX Text
ROOF DR
AutoCAD SHX Text
ROOF DR
AutoCAD SHX Text
ROOF DR
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
ROOF DR
AutoCAD SHX Text
R/O CONC STOOP
AutoCAD SHX Text
ELEC CND
AutoCAD SHX Text
CONC
AutoCAD SHX Text
F-102 DISPLAY
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text
GATE POST
AutoCAD SHX Text
MSNRY WALL
AutoCAD SHX Text
5" CND (4)
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
SAN. C.O & TRAP
AutoCAD SHX Text
ROOF DR
AutoCAD SHX Text
ROOF DR
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
ROOF DR
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
ROOF DR
AutoCAD SHX Text
PLAQUES CONC PADS
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
STEEL VAULT
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
MET SHED ON CONC PAD
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
ROOF OVER
AutoCAD SHX Text
STOR CONT
AutoCAD SHX Text
CONCRETE PAVEMENT
AutoCAD SHX Text
G MOTR
AutoCAD SHX Text
10' STEEL FENCE
AutoCAD SHX Text
ROOF OVER
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
WOOD PLATFORM
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
CONCRETE PAVEMENT
AutoCAD SHX Text
CONCRETE PAVEMENT
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC RAMP
AutoCAD SHX Text
STEEL SHED
AutoCAD SHX Text
BIKE RACK
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
BLK WALL
AutoCAD SHX Text
BLK WALL
AutoCAD SHX Text
BLK WALL
AutoCAD SHX Text
BLK WALL
AutoCAD SHX Text
CONC STEPS & LANDING
AutoCAD SHX Text
BLK WALL
AutoCAD SHX Text
BLK WALL
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
ROOF OVER
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
CONC
AutoCAD SHX Text
GATE
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
STEEL SHED
AutoCAD SHX Text
ASPH
AutoCAD SHX Text '6 C.L.F.
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
BUILDING 369
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
CONC
AutoCAD SHX Text
GATE
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
CONC
AutoCAD SHX Text
G MOTR
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
PLANTED AREA
AutoCAD SHX Text
BLK COPING
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
PLANTED AREA
AutoCAD SHX Text
4" TREE
AutoCAD SHX Text
4" TREE
AutoCAD SHX Text
36" TREE
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text 8' C.L.F.
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
BLK WALL
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
CONC
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
CONC PAD/ AC UNITS
AutoCAD SHX Text
BRICK PIERS
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text 8' C.L.F.
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
8' STEEL FENCE ON CONC FOOTING
AutoCAD SHX Text
8' STEEL FENCE ON CONC FOOTING
AutoCAD SHX Text
4' STEEL FENCE
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ON CONC FOOTING
AutoCAD SHX Text 8' C.L.F.
AutoCAD SHX Text
CONC
AutoCAD SHX Text
STEEL SHEDS
AutoCAD SHX Text
BUILDING 369
AutoCAD SHX Text
RET WALL
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
CONC APRON
AutoCAD SHX Text
CONC
AutoCAD SHX Text
HELICOPTER DISPLAY
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
SWING GATE AND TRAFFIC SIGNAL ON CONCRETE BASE
AutoCAD SHX Text
CONC
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
STONE SHLD
AutoCAD SHX Text
STONE SHLD
AutoCAD SHX Text
STONE SHLD
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
BRICK PIERS
AutoCAD SHX Text
GATE
AutoCAD SHX Text
PLANTER
AutoCAD SHX Text
PLANTER
AutoCAD SHX Text
ASPH
AutoCAD SHX Text 8' C.L.F.
AutoCAD SHX Text
GATE
AutoCAD SHX Text
BUILDING 424
AutoCAD SHX Text
BUILDING 358
AutoCAD SHX Text
GATE HOUSE 327
AutoCAD SHX Text
COMMERCIAL VEHICLE INSPECTION 328
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
MAIL 254
AutoCAD SHX Text
BUILDING 369
AutoCAD SHX Text
BUILDING 370
AutoCAD SHX Text
BUILDING 424
AutoCAD SHX Text
BUILDING 424
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text U
AutoCAD SHX Text
WV
AutoCAD SHX Text U
AutoCAD SHX Text U
AutoCAD SHX Text
GM
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text U
AutoCAD SHX Text
EM
AutoCAD SHX Text
EM
AutoCAD SHX Text
GV
AutoCAD SHX Text
WV
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text
GV
AutoCAD SHX Text S
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
EM
AutoCAD SHX Text
EM
AutoCAD SHX Text T
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text
WV
AutoCAD SHX Text S
AutoCAD SHX Text
WV
AutoCAD SHX Text D
AutoCAD SHX Text
4" TREE
AutoCAD SHX Text
AutoCAD SHX Text 45.47
AutoCAD SHX Text
FIRE CONNECT
AutoCAD SHX Text
FIRE CONNECT
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
5" TREE
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
AutoCAD SHX Text 51.18
AutoCAD SHX Text
UNDERGROUND TELEPHONE
AutoCAD SHX Text
UT3 B VAULT
AutoCAD SHX Text
AutoCAD SHX Text 51.43
AutoCAD SHX Text
UNDERGROUND WATER LINE
AutoCAD SHX Text
UW6 UWV
AutoCAD SHX Text
AutoCAD SHX Text 50.27
AutoCAD SHX Text
UNDERGROUND WATER LINE
AutoCAD SHX Text
UW6 UWV
AutoCAD SHX Text
AutoCAD SHX Text 57.10
AutoCAD SHX Text
HOTBOX CL 2.5X1
AutoCAD SHX Text
HOTBOX CL 2.5X1
AutoCAD SHX Text
4" TREE
AutoCAD SHX Text
AutoCAD SHX Text 54.13
AutoCAD SHX Text
UNDERGROUND ELECTRIC
AutoCAD SHX Text
UE9 ULP 30IN
AutoCAD SHX Text
AutoCAD SHX Text 51.64
AutoCAD SHX Text
UNDERGROUND ELECTRIC
AutoCAD SHX Text
UE9 UEPB 1X1
AutoCAD SHX Text
4" TREE
AutoCAD SHX Text
10" TREE
AutoCAD SHX Text
5" TREE
AutoCAD SHX Text
8" TREE
AutoCAD SHX Text
10" TREE
AutoCAD SHX Text
8" TREE
AutoCAD SHX Text
TRP TREE
AutoCAD SHX Text
TRP" TREE
AutoCAD SHX Text
AutoCAD SHX Text 53.77
AutoCAD SHX Text
UNDERGROUND WATER LINE
AutoCAD SHX Text
UW6 UWV
AutoCAD SHX Text
5" TREE
AutoCAD SHX Text
TRP TREE
AutoCAD SHX Text
TRP TREE
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
5" TREE
AutoCAD SHX Text
5" TREE
AutoCAD SHX Text
5" TREE
AutoCAD SHX Text
5" TREE
AutoCAD SHX Text
BLDG 345
AutoCAD SHX Text
RIM=51.44
AutoCAD SHX Text
RIM=51.71
AutoCAD SHX Text
RIM=51.68
AutoCAD SHX Text
5" TREE
AutoCAD SHX Text
5" TREE
AutoCAD SHX Text
5" TREE
AutoCAD SHX Text
5" TREE
AutoCAD SHX Text
5" TREE
AutoCAD SHX Text 8 #
AutoCAD SHX Text
SIREN
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
3" TREE
AutoCAD SHX Text
3" TREE
AutoCAD SHX Text
3" TREE
AutoCAD SHX Text
3" TREE
AutoCAD SHX Text
3" TREE
AutoCAD SHX Text
3" TREE
AutoCAD SHX Text
3" TREE
AutoCAD SHX Text
3" TREE
AutoCAD SHX Text
3" TREE
AutoCAD SHX Text
3" TREE
AutoCAD SHX Text
3" TREE
AutoCAD SHX Text
3" TREE
AutoCAD SHX Text
STOP
AutoCAD SHX Text # 9
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
8" TREE
AutoCAD SHX Text
10" TREE
AutoCAD SHX Text
12" TREE
AutoCAD SHX Text 52 #
AutoCAD SHX Text #C51
AutoCAD SHX Text
BLDG 345
AutoCAD SHX Text
RIM=51.06
AutoCAD SHX Text
SOLAR LIGHT POLE
AutoCAD SHX Text
F-102 PLANE
AutoCAD SHX Text
RIM=52.04
AutoCAD SHX Text #55
AutoCAD SHX Text #54
AutoCAD SHX Text #54
AutoCAD SHX Text #53
AutoCAD SHX Text #45
AutoCAD SHX Text
LIPA #46
AutoCAD SHX Text
RIM=55.44
AutoCAD SHX Text
SOLAR LIGHT POLE
AutoCAD SHX Text
EM
AutoCAD SHX Text
6" CND
AutoCAD SHX Text
6" CND
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
MSNRY WALL
AutoCAD SHX Text
MSNRY WALL
AutoCAD SHX Text
MSNRY WALL
AutoCAD SHX Text
MSNRY WALL
AutoCAD SHX Text
MSNRY WALL
AutoCAD SHX Text
MSNRY WALL
AutoCAD SHX Text
BUILDING 370
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
MSNRY WALL
AutoCAD SHX Text
6" CND
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
ROOF DR
AutoCAD SHX Text
ROOF OVER
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
CONC PAD
AutoCAD SHX Text
CONC RAMP
AutoCAD SHX Text
STEEL SHED
AutoCAD SHX Text
BLK WALL
AutoCAD SHX Text
BLK WALL
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
CONC
AutoCAD SHX Text
GATE
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
ASPH
AutoCAD SHX Text '6 C.L.F.
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
CONC
AutoCAD SHX Text
G MOTR
AutoCAD SHX Text
CONC WALK
AutoCAD SHX Text
4" TREE
AutoCAD SHX Text
CONC CURB
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
GATE
AutoCAD SHX Text 8' C.L.F.
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
BUILDING 370
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text W
AutoCAD SHX Text
MON
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text
EM
AutoCAD SHX Text
EM
AutoCAD SHX Text
GV
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text 51.18
AutoCAD SHX Text
UNDERGROUND TELEPHONE
AutoCAD SHX Text
UT3 B VAULT
AutoCAD SHX Text
4" TREE
AutoCAD SHX Text
10" TREE
AutoCAD SHX Text
5" TREE
AutoCAD SHX Text
8" TREE
AutoCAD SHX Text
10" TREE
AutoCAD SHX Text
6" TREE
AutoCAD SHX Text
3" TREE
AutoCAD SHX Text
EM
REPAIR AND ADD TO FUEL CELL HANGAR
WKVB142002
NEW YORK AIR NATIONAL GUARD
106TH RESCUE WING
GABRESKI AIR NATIONAL GUARD BASE
WEST HAMPTON, NY
79705
WKVB139016
by
1 1312111098765432
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date description
RI
A DRUG AN
LAOIT
A N
LICENSEE NO. 000165
973-884-8701
MORRISTOWN, NEW JERSEY 07960
10 NORTH PARK PLACE, SUITE 330
I:\USAIRNG\79705\CAD\CIVIL\79705-G001.DWG 5/26/2016 1:37 PM LMGUERIN
PRELIMINARY - NOT
FOR CONSTRUCTION
C O
P Y
R I G
H
MARCH 28, 2016 S. CATONE
L. GUERIN T. VOORHEES
GENERAL NOTES AND ABBREVIATIONS
G-002 A 79705-G001.dwg
B U
R N
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
ACCESS AND SAFETY NOTES
I. ACCESS AND STAGING
1. ACCESS AND HAUL ROUTES FOR ALL CONTRACTOR
PERSONNEL, VEHICLES, EQUIPMENT, AND DELIVERIES ARE
ILLUSTRATED ON THE CONSTRUCTION ACCESS PLAN AND ARE
SUBJECT TO THE APPROVAL OF AIRPORT AND THE
CONTRACTING OFFICER. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO COORDINATE OFF-SITE HAUL ROUTES
WITH THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER
THE AFFECTED ROUTE. ACCESS ROUTES AND HAUL ROUTES
ARE SUBJECT TO CHANGE AT THE DIRECTION OF THE
CONTRACTING OFFICER AND MAY CHANGE BASED ON
OPERATIONAL REQUIREMENTS OF THE AIRPORT.
2. LOCATION OF ACCESS/HAUL ROADS ARE AS INDICATED ON THE
ACCESS AND SAFETY PLAN (SHEET G001).
3. ALL HAUL ROADS SHALL BE MAINTAINED SUCH THAT
UNOBSTRUCTED ACCESS WILL BE PROVIDED AT ALL TIMES
FROM THE ROAD TO THE STAGING AREA AND FROM THE
STAGING AREA TO THE WORK SITE. THE MAINTENANCE OF
HAUL ROADS SHALL BE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR AT NO ADDITIONAL COST TO THE
GOVERNMENT.
4. CONTRACTOR SHALL COORDINATE HIS/HER ACTIVITIES
THROUGHOUT THE PROJECT IN A MANNER THAT ALLOWS
EMERGENCY ACCESS TO ALL EXISTING ROADWAYS AT ALL
TIMES WITHOUT DELAYS TO EMERGENCY VEHICLE'S RESPONSE
TIME.
5. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO
CONSTRUCTION ACTIVITIES, CONTRACTOR SHALL NOTIFY
AIRPORT, POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER
EMERGENCY SERVICES OF THE CLOSURE.
6. CONTRACTOR SHALL RESTRICT ALL OPERATIONS TO AREAS
WITHIN THE CONSTRUCTION LIMITS UNLESS COORDINATED
OTHERWISE WITH THE CONTRACTING OFFICER.
7. CONTRACTOR SHALL MAINTAIN THE ACCESS ROUTE TO BE
FREE FROM DEBRIS CAUSED FROM CONSTRUCTION ACTIVITY
ON A DAILY BASIS.
8. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STAGING
AND STOCKPILE AREA FOR MATERIALS AND EQUIPMENT.
LOCATION OF CONTRACTOR'S STAGING SHALL BE AS
ILLUSTRATED ON THE CONSTRUCTION ACCESS PLAN AND IS
SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER.
CONTRACTOR MAY SUBMIT ALTERNATIVES TO THE STAGING
AREA LOCATIONS AS SHOWN. CONTRACTOR'S STAGING AREA
IS SUBJECT TO CHANGE AT THE DIRECTION OF THE
CONTRACTING OFFICER.
9. CONTRACTOR SHALL USE STAGING AREA FOR MATERIAL
STORAGE AND VEHICLE PARKING. CONTRACTOR VEHICLE AND
EQUIPMENT SHALL ONLY BE WITHIN THE DESIGNATED STAGING
AREA.
10.LOCATION OF CONTRACTOR'S STAGING AREA SHALL BE AS
SHOWN ON PLAN. WHEN NOT ENGAGED IN CONSTRUCTION
ACTIVITY, THE CONTRACTOR'S CONSTRUCTION EQUIPMENT
AND VEHICLES SHALL BE PARKED IN THE CONTRACTOR'S
STAGING AREA.
11. ALL CONTRACTOR VEHICLES AND PERSONNEL MAY BE
SEARCHED BY SECURITY POLICE WHEN ENTERING THE BASE
AND MAY EXPERIENCE DELAYS.
12.STAGING AREA AND ANY OTHER AREA DISTURBED BY
CONTRACTOR DURING CONSTRUCTION SHALL BE SEEDED
AND MULCHED, AND RETURNED TO ORIGINAL OR BETTER
CONDITION UPON CONCLUSION OF CONSTRUCTION ACTIVITIES.
13.CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48
HOURS TO THE CONTRACTING OFFICER REGARDING
CONSTRUCTION DELIVERIES PRIOR TO THOSE DELIVERIES.
DELIVERIES SHALL BE SCHEDULED MONDAY-FRIDAY, 8:00 AM
TO 3:00 PM.
14.CONTRACTOR SHALL PROVIDE AND INSTALL A
PROFESSIONALLY PAINTED SIGN, MEETING CONTRACTING
OFFICER APPROVAL, AT THE CONSTRUCTION ENTRANCE TO
DIRECT MATERIAL SUPPLIERS AND EMPLOYEES TO THE
CONSTRUCTION SITE. THE SIGN SHALL CONFORM TO DIVISION I
OF THE PROJECT'S SPECIFICATIONS.
15.SITE SHALL BE CLOSED OFF THROUGH THE USE OF
TEMPORARY FENCE AT THE CONTRACTOR'S EXPENSE.
16. ADDITIONAL SECURITY ACCESS PROCEDURES WILL BE
ADDRESSED AT THE PRE-CONSTRUCTION MEETING.
II. COORDINATION AND COMMUNICATION
1. CONTRACTOR SHALL APPOINT A CONSTRUCTION
SUPERINTENDENT, SUBJECT TO THE APPROVAL OF THE
CONTRACTING OFFICER, WHO SHALL BE PRESENT ON THE
CONSTRUCTION SITE AT ALL TIMES DURING WORKING HOURS
WHILE SUBCONTRACTORS ARE ON SITE. THE
SUPERINTENDENT SHALL BE DESIGNATED THE RESPONSIBLE
CONTRACTOR'S REPRESENTATIVE WHO SHALL BE AVAILABLE
ON A 24-HOUR BASIS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
CONSTANT COORDINATION BETWEEN ANY SUBCONTRACTORS
AND THE CONTRACTING OFFICER. ALL CONSTRUCTION
ACTIVITIES PLANNED BY THE CONTRACTOR SHALL BE
REVIEWED AND APPROVED BY AIRPORT AND THE
CONTRACTING OFFICER.
3. THE FOLLOWING CONTACT INFORMATION IS PROVIDED FOR
CONTRACTOR'S USE IN CASE OF AN EMERGENCY:
a. EMERGENCY 911
b. AIRPORT MANAGER, ANTHONY CEGLIO 631-852-8095
c. VILLAGE OF WESTHAMPTON BEACH
PUBLIC WORKS 631-288-2011
d. POLICE DEPARTMENT 631-288-3444
e. POLICE CHIEF RAYMOND DEAN 631-723-7333
f. FIRE DEPARTMENT 631-723-7333
III. TRAFFIC CONTROL
1. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE
MARKED WITH COMPANY PAINT DESIGNS, INSIGNIAS OR
OTHER COMPANY MARKINGS, WHICH ARE CLEARLY VISIBLE.
2. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC
SIGNALING DEVICES TO SOUND AN ALARM WHEN MOVING IN
REVERSE.
3. ONLY RUBBER-TIRED VEHICLES SHALL BE ALLOWED ON
EXISTING PAVEMENT THAT IS TO REMAIN.
4. NO PEDESTRIAN TRAFFIC INSIDE THE CONSTRUCTION LIMITS
WILL BE PERMITTED.
5. ANY DAMAGE TO ROADS AND PAVEMENT DUE TO
CONSTRUCTION EQUIPMENT OR CONSTRUCTION TRAFFIC
SHALL BE REPAIRED TO THEIR ORIGINAL CONDITION BY THE
CONTRACTOR AT HIS/HER OWN EXPENSE TO THE
SATISFACTION OF THE CONTRACTING OFFICER.
6. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CORDON OFF
THE CONSTRUCTION WORK AREAS BY TEMPORARY FENCE
APPROVED BY THE CONTRACTING OFFICER.
7. CONTRACTOR SHALL PROVIDE EACH VEHICLE WITH A FLAG
ATTACHED TO THE VEHICLE WHICH SHOULD BE AT LEAST 3
FEET SQUARE HAVING INTERNATIONAL ORANGE AND WHITE
CHECKERED PATTERN SO THAT THE FLAG IS EASILY VISIBLE.
8. PRIOR TO THE REMOVAL OF BARRICADES AND TRAFFIC
CONTROL DEVICES, THE CONTRACTOR SHALL REQUEST THE
CONTRACTING OFFICER TO SCHEDULE AN INSPECTION.
9. CONTRACTOR SHALL ATTEND ANY AIRPORT-MANDATED
VEHICLE OPERATOR OR FOREIGN OBJECT DEBRIS/DAMAGE
(FOD) CONTROL TRAINING COURSE.
IV. AIRFIELD OPERATIONS COORDINATION
1. CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS
INDICATED IN FEDERAL AVIATION ADMINISTRATION (FAA)
ADVISORY CIRCULAR (AC) 150/5370-2F, OPERATIONAL SAFETY
ON AIRPORTS DURING CONSTRUCTION (CURRENT EDITION).
COORDINATE AIRPORT SPECIFIC REQUIREMENTS WITH
AIRPORT MANAGEMENT.
2. CONTRACTOR SHALL NOT ACCESS THE AIRCRAFT OPERATIONS
AREA WITHOUT CLEARANCE FROM AIRPORT AND THE
CONTRACTING OFFICER, AND SHALL CONDUCT WORK IN SUCH
A MANNER TO ENSURE A MINIMUM HINDRANCE TO AVIATION
OPERATIONS. CONTRACTOR SHALL PROVIDE A MINIMUM
NOTICE OF 4 DAYS TO AIRPORT FOR ACCESS TO AN AIRCRAFT
OPERATIONS AREA. PEDESTRIAN TRAFFIC AND PRIVATELY
OWNED VEHICLES SHALL NOT BE ALLOWED IN THE AIRCRAFT
OPERATIONS AREA (AOA).
V. EQUIPMENT AND STOCKPILE HEIGHT
1. THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION
EQUIPMENT OPERATING IN AN AIRCRAFT OPERATIONS AREA IS
GOVERNED BY FEDERAL AVIATION ADMINISTRATION (FAA)
ADVISORY CIRCULAR AC 150/5370-2F AND AC 150/5300-13
(CURRENT EDITIONS). WHEN EQUIPMENT IS EXPECTED TO
PENETRATE THE AIRFIELD APPROACH SURFACES OR WHEN
CRANES WILL BE USED ON-SITE, CONTRACTOR SHALL PROVIDE
A MINIMUM NOTICE OF 45 DAYS TO THE CONTRACTING OFFICER
AND AIRPORT PRIOR TO THE START OF CONSTRUCTION TO
COORDINATE THE SUBMITTAL OF FAA FORM 7460-1 TO THE FAA
REGIONAL OFFICE. THE CONTRACTOR SHALL SUBMIT A 7460-1
FOR ANY EQUIPMENT EXCEEDING 20 FEET ABOVE GROUND
LEVEL. PERMISSION TO USE CRANES SHALL BE ISSUED BY
AIRPORT AND THE CONTRACTING OFFICER AFTER APPROVAL
BY THE FAA.
2. DURING PERIODS OF LOW VISIBILITY, VEHICLES AND
EQUIPMENT SHALL BE IDENTIFIED BY AN APPROPRIATELY
SIZED FLASHING OR STEADY BURNING AMBER BEACON
MOUNTED ON THE UPPER MOST PART OF THE VEHICLE OR
EQUIPMENT SUCH THAT IT IS CONSPICUOUS FROM ANY
DIRECTION INCLUDING FROM THE AIR. IF A VEHICLE OR PIECE
OF EQUIPMENT IS NOT FURNISHED WITH SUCH A BEACON, IT
MUST BE ESCORTED INTO THE AIRCRAFT OPERATIONS AREA
BY A PROPERLY LIGHTED VEHICLE.
3. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES SHALL
HAVE BOOMS OR ARMS LOWERED TO THEIR LOWEST
ELEVATION.
4. CONTRACTOR SHALL NOT STOCKPILE CONSTRUCTION
MATERIALS, SPOILS, OR DEBRIS IN ANY AREA WHERE SUCH
STOCKPILES WOULD PENETRATE AVIATION SURFACES. ALL
STOCKPILES ADJACENT TO AIRCRAFT OPERATIONS AREA
SHALL BE IDENTIFIED WITH A 360-DEGREE RED OBSTRUCTION
LIGHT PLACED AT THE HIGHEST POINT OF THE STOCKPILE.
STOCKPILING OF MATERIAL WITHIN THE AIRFIELD SAFETY
AREAS IS PROHIBITED. THE CONTRACTOR SHALL NOT
STOCKPILE CONSTRUCTION MATERIALS, SPOILS DEBRIS, OR
REFUSE IN ANY AREA WHERE SUCH STOCKPILES ARE WITHIN
250 FEET OF RUNWAY CENTERLINE OR 75 FEET OF A TAXIWAY
CENTERLINE, THE CONTRACTOR SHALL SUBMIT A 7460-1 FOR
ANY STOCKPILE HEIGHTS EXCEEDING 20 FEET ABOVE GROUND
LEVEL.
5. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER
TO PREVENT ITS MOVEMENT BY WIND FORCES.
VI. EXCAVATION AND TRENCHES
1. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT
EDITION OF OSHA REGULATIONS AND THE STATE LAWS
CONCERNING EXCAVATION.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT
ALL EXCAVATION, TRENCHING, AND SHORING ARE PERFORMED
IN A MANNER THAT COMPLIES WITH LOCAL REGULATIONS AND
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
REGULATIONS FOR CONSTRUCTION.
3. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48
HOURS TO THE CONTRACTING OFFICER AND ASSOCIATED
UTILITY COMPANIES AND AGENCIES BEFORE PROCEEDING
WITH ANY EXCAVATION.
4. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS
MAY BE REQUIRED.
5. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS
ON-HAND AND READY FOR PLACING THEREIN. AS SOON AS
POSSIBLE AFTER THE MATERIAL HAS BEEN PLACED AND WORK
APPROVED, BACKFILL AND COMPACT TRENCHES AS SPECIFIED.
6. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION
SITE SHALL BE PROMINENTLY MARKED WITH ORANGE
BARRICADES WITH FLASHING AMBER LIGHTS ACCEPTABLE TO
THE CONTRACTING OFFICER.
VII. EROSION AND SEDIMENT CONTROL NOTES
BEST MANAGEMENT PRACTICES
1. CONSTRUCTION ACTIVITY POLLUTION PREVENTION IS
REQUIRED FOR THIS PROJECT. PREVENTION OF POLLUTION
RESULTING FROM CONSTRUCTION ACTIVITIES SHALL BE
ACCOMPLISHED BY CONTROLLING SOIL EROSION, WATERWAY
SEDIMENTATION, AND AIRBORNE DUST GENERATION.
CONTRACTOR SHALL ENSURE THAT NO SEDIMENT RESULTING
FROM CONSTRUCTION ACTIVITIES INFRINGES ONTO ADJACENT
PROPERTIES. CONTRACTOR SHALL COORDINATE EROSION
AND SEDIMENT CONTROL WITH OTHER CONSTRUCTION
ENTITIES PERFORMING WORK ON ADJACENT PROPERTIES.
2. SOIL EROSION AND SEDIMENT CONTROLS ARE MEASURES
USED TO REDUCE THE AMOUNT OF SOIL PARTICLES THAT ARE
CARRIED OFF AN AREA AND DEPOSITED INTO A DRAINAGE
COLLECTION SYSTEM OR INTO A BODY OF WATER. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT
EROSION AND SEDIMENTATION ARE CONTROLLED TO THE
EXTENT PRACTICABLE. ALL APPLICABLE SOIL EROSION AND
SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED AND
MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION
ACTIVITIES. PRIOR TO INITIATING CONSTRUCTION IN AN AREA,
ALL TEMPORARY EROSION AND SEDIMENT CONTROL
PRACTICES SHALL BE IN PLACE. UPON PROJECT COMPLETION
ALL TEMPORARY SOIL EROSION AND SEDIMENT CONTROL
MEASURES SHALL BE REMOVED.
3. THIS PROJECT SHALL BE CONSTRUCTED IN COMPLIANCE WITH
THE SOIL EROSION AND SEDIMENTATION CONTROL MEASURES
AS ESTABLISHED AND APPROVED BY NEW YORK STATE
DEPARTMENT OF ENVIRONMENTAL CONSERVATION.
4. TEMPORARY EROSION CONTROL SHALL BE THE
CONTRACTOR'S RESPONSIBILITY, WHO SHALL UTILIZE
APPROPRIATE BEST MANAGEMENT PRACTICES (BMPS). THOSE
BMPS SHALL CONSIST OF SILT FENCE, WATTLES OR OTHER
MEANS TO CONTROL EROSION AS NEEDED. THE CONTRACTOR
SHALL PROVIDE AND FOLLOW THE EROSION AND SWPPP PLANS
AS NEEDED.
5. CONTRACTOR SHALL PLACE SILT FENCE AS SHOWN ON
DRAWING CE101 AND CE102 PRIOR TO BEGINNING WORK. THE
DEVICES SHALL BE PLACED DOWN-SLOPE OF DISTURBED
AREAS WHERE SHEET EROSION WOULD OCCUR. SILT FENCE
SHALL BE CLEANED AND REPAIRED WHEN SEDIMENT BUILDUP
REACHES ONE-THIRD OF SILT FENCE HEIGHT. AFTER
SIGNIFICANT RUNOFF EVENTS, THE CONTRACTOR SHALL
INSPECT ALL EROSION CONTROL STRUCTURES FOR SILT
BUILD-UP THAT INTERFERES WITH THE PERFORMANCE OF THE
EROSION CONTROL STRUCTURE AND REPAIR OR REPLACE
THOSE STRUCTURES, AS NECESSARY.
6. ALL STORM DRAIN INLETS SHALL BE PROTECTED BY
APPROPRIATE BMPS DURING CONSTRUCTION, UNTIL ALL
SOURCES WITH POTENTIAL FOR DISCHARGE TO THE INLETS
HAVE BEEN STABILIZED.
7. ALL EXISTING DRAIN INLETS SHALL HAVE SILT PROTECTION
INSTALLED IN ACCORDANCE WITH DETAILS 2 AND 3 ON
DRAWING CE501. EROSION PROTECTION MAY BE REMOVED
WHEN VEGETATION IS ESTABLISHED.
8. TEMPORARY CHECK DAMS MAY BE PLACED IN DRAINAGE
SWALES TO LIMIT THE AMOUNT OF SEDIMENT THAT TRAVELS
DOWNSTREAM. THESE DEVICES MUST BE MAINTAINED AND THE
SEDIMENT REMOVED BEHIND THE DEVICE ON A REGULAR
BASIS TO REMAIN EFFECTIVE.
9. SEE DRAWING CE501 FOR ADDITIONAL DETAILS ON EROSION
AND SEDIMENT CONTROL.
CONSTRUCTION ACCESS
THE SITE SHALL HAVE ROADS AND ACCESS DRIVES OF
SUFFICIENT WIDTH AND LENGTH TO PREVENT SEDIMENT FROM
TRACKING ONTO PUBLIC ROADWAYS. SEDIMENT SHALL BE
REMOVED IMMEDIATELY FROM THE ROAD BY SHOVELING OR
SWEEPING WHEN SEDIMENT IS TRANSPORTED ONTO A PUBLIC
ROAD SURFACE OR OTHER PAVED AREA BY EQUIPMENT OR
VEHICLES EXITING THE CONSTRUCTION SITE. BULK CLEARING OF
ACCUMULATED SEDIMENT SHALL BE TRANSPORTED TO A
CONTROLLED SEDIMENT DISPOSAL AREA OR THE POINT OF
LIKELY ORIGIN BEFORE THE END OF EACH WORK DAY. ROAD
WASHING SHALL BE ALLOWED ONLY AFTER THE SEDIMENT IS
REMOVED IN THE ABOVE MANNER.
FINAL GRADING AND CLEAN UP
AFTER COMPLETION OF FINAL GRADING, THE DISTURBED AREAS
SHALL BE REVEGETATED. ALL TEMPORARY EROSION AND
SEDIMENT CONTROL DEVICES SHALL BE REMOVED UPON
PROJECT COMPLETION. TRAPPED SEDIMENT AND OTHER
DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF
TEMPORARY CONTROL MEASURES SHALL BE PERMANENTLY
STABILIZED TO PREVENT FURTHER EROSION AND
SEDIMENTATION.
PETROLEUM PRODUCTS
ALL ON-SITE VEHICLES SHALL BE MONITORED FOR PETROLEUM
LEAKS AND SHALL RECEIVE PROPER PREVENTATIVE
MAINTENANCE TO REDUCE THE CHANCE OF LEAKAGE.
PETROLEUM PRODUCTS SHALL BE STORED IN TIGHTLY-SEALED
CONTAINERS THAT ARE CLEARLY LABELED. ALL SPILLS SHALL BE
CLEANED UP IMMEDIATELY AFTER DISCOVERY. WASTE OIL AND
OTHER PETROLEUM PRODUCTS SHALL NOT BE DISCHARGED
ONTO THE GROUND OR INTO WATER BODIES. PETROLEUM
PRODUCTS USED ON-SITE SHALL BE APPLIED ACCORDING TO THE
MANUFACTURER RECOMMENDATIONS.
STORM WATER PERMIT
CONTRACTOR IS RESPONSIBLE FOR OBTAINING A STORM WATER
PERMIT FOR LAND DISTURBANCE OF MORE THAN 1 ACRE PRIOR
TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR
COORDINATING WITH LOCAL AUTHORITIES TO COMPLETE AND
SUBMIT THE STORM WATER POLLUTION PREVENTION PLAN
(SWPPP) FOR APPROVAL. CONTRACTOR IS RESPONSIBLE FOR ALL
FEES ASSOCIATED WITH SUBMITTAL OF THE PERMIT AT NO
ADDITIONAL COST TO THE GOVERNMENT. THE PERMITTING
PROCESS MAY INCLUDE THE FOLLOWING:
1. SUBMIT STORM WATER QUALITY PERMIT APPLICATION FEE TO
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL
CONSERVATION.
2. SUBMIT AFFIDAVIT STATING PROPERTY OWNER'S COMMITMENT
TO COMPLY WITH STORM WATER QUALITY MANAGEMENT PLAN
AND NYSDEC REGULATIONS FOR STORM WATER QUALITY
MANAGEMENT.
3. SUBMIT NEW YORK POLLUTION DISCHARGE ELIMINATION
SYSTEM (SPDES) GENERAL PERMIT NO. GP-01-10-001 AND
NOTICE-OF-INTENT (NOI) FORM TO
NYDEC, BUREAU OF WATER
PERMITS 625 BROADWAY, 4TH FLOOR
ALBANY, NY 12233-3505.
VIII. OTHER SAFETY REQUIREMENTS
1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT
CONFORM TO OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) REGULATIONS.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN
AND PAY FOR ALL APPLICABLE PERMITS, FEES AND LICENSES
FOR CONSTRUCTION AND EQUIPMENT.
3. THE CONTRACTOR SHALL PERFORM ON-SITE INSPECTIONS
THROUGHOUT THE PROJECT AND REMEDY ANY SAFETY
CONCERNS IMMEDIATELY.
4. CONTRACTOR SHALL MAINTAIN AT ALL TIMES ONE FIRE LANE
FREE FROM OBSTRUCTION AND MAINTAIN ACCESS TO THE
BASE.
5. THERE SHALL BE NO PERMANENT WASTE SITES ON AIRPORT
PROPERTY. ANY TEMPORARY WASTE AREA SHALL BE
APPROVED BY THE CONTRACTING OFFICER AND SHALL BE
KEPT IN AN ORDERLY CONDITION. REMOVAL OF WASTE
THAT IS NOT PROPERLY MAINTAINED IS SUBJECT TO THE
DIRECTION OF THE CONTRACTING OFFICER.
6. DEBRIS-WASTE AND LOOSE MATERIALS CAPABLE OF CAUSING
DAMAGE TO AIRCRAFT AND HELICOPTER LANDING GEAR,
PROPELLERS AND ROTORS OR OF BEING INGESTED BY JET
ENGINES SHALL NOT BE LEFT WITHIN ACTIVE AIRCRAFT
MOVEMENT AREAS. MATERIAL DROPPED WITHIN THESE AREAS
SHALL BE REMOVED CONTINUOUSLY DURING WORKING
HOURS.
7. CONTRACTOR SHALL COORDINATE THE RELOCATION OF ANY
CLIENT-OWNED EQUIPMENT WITH THE CONTRACTING OFFICER.
8. EROSION CONTROL DEVICES SHALL BE USED FOR THE ACCESS
AND HAUL ROUTES, STAGING AREA, AND ANY MATERIAL
STOCKPILES WHEN NECESSARY TO CONTROL EROSION AND
STORM WATER RUNOFF. SEE EROSION AND SEDIMENT
CONTROL DRAWINGS FOR EROSION AND SEDIMENT CONTROL
REQUIREMENTS.
9. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO LIMIT
DUST CAUSED BY CONSTRUCTION ACTIVITIES TO A LIMIT
ACCEPTABLE TO AIRPORT. THE CONTRACTOR SHALL CONTROL
BLOWING DUST ON THE PROJECT SITE FROM ANY HAUL ROUTE
OR WORK AREA.
10. WILDLIFE ATTRACTANTS, SUCH AS TRASH AND FOOD SCRAPS,
FROM CONSTRUCTION PERSONNEL AND ACTIVITIES SHALL BE
REMOVED FROM THE PROJECT LIMITS ON A DAILY BASIS.
11.GASOLINE, DIESEL FUEL, OIL, AND OTHER HAZARDOUS WASTE
RESULTING FROM CONTRACTOR'S OPERATIONS OR ACTIVITIES
SHALL BE PROPERLY DISPOSED OF IN ACCORDANCE WITH THE
SPECIFICATIONS AND LOCAL REGULATORY REQUIREMENTS
AND PROPERLY REMOVED FROM THE PROJECT PROPERTY. IF
HAZARDOUS MATERIALS ARE ENCOUNTERED OR UNCOVERED
DURING CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.
12.IF CONSTRUCTION REQUIRES THE DISRUPTION OR
DISCONNECTION OF ANY WATER LINES OR FIRE HYDRANTS ON
PROJECT PROPERTY OR ADJOINING PROPERTY, THE
CONTRACTOR SHALL PROVIDE A MINIMUM ADVANCE NOTICE OF
48 HOURS TO THE LOCAL FIRE AUTHORITY AND ALL OTHER
EMERGENCY SERVICES.
13.FAILURE TO COMPLY WITH AIRPORT AND THE CONTRACTING
OFFICER SAFETY REQUIREMENTS SHALL RESULT IN THE
SUSPENSION OF CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY
CONCERNS ARE ADDRESSED BY THE CONTRACTOR TO THE
SATISFACTION OF THE CONTRACTING OFFICER.
14. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH
SAFETY PLAN SHALL IMMEDIATELY BE REMOVED FROM THE
WORK AREA AND SHALL NOT BE PERMITTED TO RETURN
THROUGHOUT THE REMAINDER OF THE PROJECT.
IX. CONTRACTOR SAFETY PLAN SUBMITTAL
1. CONTRACTOR SHALL FURNISH A CONSTRUCTION SAFETY PLAN
WITH HIS/HER PROJECT SCHEDULE. THE SAFETY PLAN SHALL
CONFORM TO DIVISION I OF THE PROJECT SPECIFICATIONS
AND IDENTIFY THE FOLLOWING ITEMS:
a. PROPOSED ACCESS POINTS, STAGING AREA AND HAUL
ROUTES.
b. TEMPORARY MARKINGS TO BE USED, IF ANY.
c. LOCATION AND TYPE OF BARRICADES OR OTHER TRAFFIC
CONTROL DEVICES.
d. METHODS BY WHICH THE CONTRACTOR WILL
COMMUNICATE WITH THE BASE.
e. AREAS TO WHICH CONSTRUCTION OPERATIONS SHALL BE
LIMITED, ALONG WITH PROPOSED MEASURES TO MINIMIZE
THE POSSIBILITY OF CONTRACTOR EQUIPMENT AND
WORKERS ACCIDENTALLY ENTERING THE AIRCRAFT
OPERATIONS AREA.
f. PRIMARY CONSTRUCTION SUPERINTENDENT CONTACT
INFORMATION.
g. ANY REQUESTED TEMPORARY AMENDMENTS TO THE
AIRPORT SECURITY PLAN FOR SPECIAL CONDITION OR
MODIFICATIONS.
2. ANY PROPOSED CHANGES TO THE SAFETY PLAN MUST BE
SUBMITTED TO THE CONTRACTING OFFICER FOR REVIEW
PRIOR TO IMPLEMENTATION.
X. GENERAL NOTES
1. SPECIFIC AREA LIMITS AS INDICATED ON CONSTRUCTION
ACCESS PLAN ARE APPROXIMATE.
2. THE CONTRACTOR SHALL MAINTAIN ON THE SITE ONE SET OF
RED LINE "AS CONSTRUCTED" DRAWINGS. THE SET SHALL BE
DELIVERED TO THE CONTRACTING OFFICER NO LATER THAN
SEVEN (7) CALENDAR DAYS AFTER THE FINAL INSPECTION.
3. ALL WORK SHALL BE CONSTRUCTED IN COMPLIANCE WITH THE
GENERAL PERMIT # GP-01-10-001 FOR STORMWATER
DISCHARGE. CONTRACTOR IS RESPONSIBLE FOR
COORDINATING ALL REQUIREMENTS WITH STATE AND LOCAL
AUTHORITIES AND SUBMITTING DOCUMENTS FOR PERMITTING.
4. THE CONTRACTOR SHALL REMOVE STANDING WATER FROM
THE PROJECT WORK LIMITS AS NECESSARY TO PROTECT THE
SUBGRADE, SUBBASE, AND/OR BASE COURSE OF THE
PROPOSED PAVEMENT AREAS, SURROUNDING
PAVEMENT-TO-REMAIN, OR OTHER COMPLETED WORKS. NO
DIRECT OR SEPARATE PAYMENT SHALL BE MADE FOR THIS
DEWATERING EFFORT AS THE COST IS INCIDENTAL TO THE
PROJECT.
5. THE CONTRACTOR SHALL CONTACT ALL ASSOCIATED UTILITY
COMPANIES AND AGENCIES PRIOR TO COMMENCEMENT OF
WORK FOR THE LOCATION OF UTILITIES (CALL 811).
COORDINATE ACCESS OF UTILITY COMPANY PERSONNEL WITH
BASE.
6. THE LOCATION OF STRUCTURES AND UNDERGROUND UTILITIES
AS INDICATED HAVE BEEN OBTAINED FROM EXISTING RECORDS
AND FIELD SURVEYS. UNDERGROUND STRUCTURES AND
UTILITIES MAY BE PRESENT WHICH ARE NOT DOCUMENTED OR
LOCATED. EXISTING UTILITIES SHOWN ON THE PLANS MAY NOT
BE ACCURATE IN LOCATION, SIZE AND TYPE OF MATERIAL, AND
ARE NOT GUARANTEED TO BE ACCURATE.
7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD -
VERIFY EXISTING STRUCTURES, UTILITIES AND SURVEY
INFORMATION, AND TO TAKE NECESSARY PRECAUTIONS
DURING DEMOLITION AND CONSTRUCTION. THE CONTRACTOR
SHALL FIELD-CHECK ALL EXISTING CONDITIONS AND BE
THOROUGHLY FAMILIAR WITH THE SITE BEFORE ANY WORK
COMMENCES. IN THE EVENT OF UNEXPECTED UTILITY OR
STRUCTURE INTERFERENCE IS ENCOUNTERED, THE
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER.
LIST OF ABBREVIATIONS (NOT ALL WILL BE USED)
ALUM ALUMINUM
ANG AIR NATIONAL GUARD
ASSY ASSEMBLY
AT / FP ANTI TERRORISM / FORCE PROTECTION
BC BOTTOM OF CURB
BCE BASE CIVIL ENGINEER
BIT BITUMINOUS CONCRETE
BLDG BUILDING
BW BOTTOM OF WALL
CB CATCH BASIN
CATV CABLE TELEVISION
CI CAST IRON PIPE
CIC CAST IRON COVER
CLF CHAIN LINK FENCE
CO CLEANOUT
CONC CONCRETE
COTR CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE
DC DEPRESSED CURB
DIA DIAMETER
DMH DRAINAGE MANHOLE
E EASTING
EL ELECTRICAL
EMH ELECTRIC MANHOLE
FAR FEDERAL AVIATION REGULATION
FF FINISH FLOOR
GALV GALVANIZED
GV GAS VALVE
HDPE HIGH-DENSITY POLYETHYLENE PIPE
HMA HOT MIX ASPHALT
HT HEIGHT
HYD HYDRANT
INV INVERT
KSM KILOGRAM / SQUARE METER
LF LINEAR FOOT
LOD LIMIT OF DISTURBANCE
MAX MAXIMUM
MFR MANUFACTURER
MIN MINIMUM
MM MILLIMETERS
N NORTHING
NO NUMBER
NOM NOMINAL
OC OFF CENTER
OD OUTSIDE DIMENSION
POB POINT OF BEGINNING
PIV POST INDICATOR VALVE
PVC POLYVINYL CHLORIDE PIPE
RAD RADIUS
RCP REINFORCED CONCRETE PIPE
SESC SOIL EROSION AND SEDIMENT CONTROL
SMH SANITARY MANHOLE
SRM SUSTAINMENT, RESTORATION & MAINTENANCE
SF SQUARE FOOT
SQ M SQUARE METER
TC TOP OF CURB
TYP TYPICAL
TW TOP OF WALL
UP UTILITY POLE
UD UNDERDRAIN
VIF VERIFY IN FIELD
W/O WITHOUT
0 05/27/16 LP LM 100% SUBMITTAL
ISSUED FOR BID
X
X
X X
X
X
X
X
X X X X X X X
X
X
X
X X
X
X X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X X X
X
X
X
X X
X
X X
X
X
X
X
X
X X
X X
X X X X
X X
X X X X X
LOD
LOD
LO
D
LO
D
L O
DL
O D
LOD
L O D
L O D
L O D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD LOD LOD LOD
LOD LOD LOD LOD
L O D
L O D
LOD
L O D
L O D
LOD
L O D
L O D
LODLODLOD
LOD
X X
X X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
XXXXXXXX
X
X
X
X
X
X X
X
X
X
UTILITY LINE REMOVAL
MISC. STRUCTURE REMOVAL
PVMT / CONC REMOVAL
MISC. FEATURE REMOVAL
LIMIT OF DISTURBANCE
X
REPAIR AND ADD TO FUEL CELL HANGAR
WKVB142002
NEW YORK AIR NATIONAL GUARD
106TH RESCUE WING
GABRESKI AIR NATIONAL GUARD BASE
WEST HAMPTON, NY
79705
WKVB139016
by
1 1312111098765432
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date description
RI
A DRUG AN
LAOIT
A N
LICENSEE NO. 000165
973-884-8701
MORRISTOWN, NEW JERSEY 07960
10 NORTH PARK PLACE, SUITE 330
I:\USAIRNG\79705\CAD\CIVIL\79705-CD101.DWG 5/27/2016 12:15 PM SMCATONE
PRELIMINARY - NOT
FOR CONSTRUCTION
CD101 0
DEMOLITION PLAN
05/01/15
L. GUERIN T. VOORHEES
S. CATONE
BUILDING 370
EXISTING
FUEL CELL HANGAR
HANGAR 'A'
MOEN STREET
REMOVE EXISTING ASPHALT
(TYP.)
REMOVE EXISTING STORM LINE
REMOVE EXISTING
CHAIN-LINK FENCE
SCALE IN FEET
20'10' 40'
N
O
R
T
H
0 05/27/16 LP LM 100% SUBMITTAL
ISSUED FOR BID
REMOVE EXISTING
ASPHALT (TYP.)
REMOVE EXISTING
TOPSOIL (TYP.)
REMOVE EXISTING MANHOLE
REMOVE EXISTING
CHAIN-LINK FENCE (TYP.)
REMOVE EXISTING
BOLLARDS (TYP)
REMOVE EXISTING
SANITARY LINE BELOW
PROPOSED BLDG.
FILL REMAINING LINE AND
ABANDON IN PLACE
REMOVE EXISTING
COMM LINE
REMOVE EXISTING
ELECTRIC LINE
REMOVE EXISTING
GAS LINE
IMPROVEMENTS BY OTHERS
PROJECT WKVB182092
REMOVE
EXISTING
ASPHALT
(TYP.)
REMOVE EXISTING
SIDEWALK
REMOVE EXISTING
BOLLARDS (TYP)
REMOVE EXISTING
BOLLARDS (TYP)
SAWCUT EXISTING
PAVEMENT (TYP)
REMOVE EXISTING
SIDEWALK
REMOVE EXISTING RR TIES
AND CONCRETE
REMOVE EXISTING
FENCE PANEL
REMOVE EXISTING
SIDEWALK
REMOVE EXISTING
FLARED END SECTION.
FILL STORM LINE AND
ABANDON IN PLACE
REMOVE EXISTING SLIDE
GATE, MOTOR AND
KEYPAD. RELINQUISH TO
NY ANG FOR STORAGE
REMOVE EXISTING
ELEC. PANEL
REMOVE EXISTING
POWER LINE
REMOVE EXISTING
ELECTRIC LINES
REMOVE EXISTING
ELEC MANHOLE
REMOVE AND REPLACE SIDEWALK
PANELS AS NEEDED FOR GAS LINE
CONSTRUCTION
REMOVE AND
REPLACE SIDEWALK
PANELS AS NEED
FOR STORM LINE
CONSTRUCTION
REMOVE EXISTING
ELEC LINE
56' ATFP
56' ATFP
LOD BOUNDARY
REMOVE AND
REPLACE SIDEWALK
PANELS AS NEED
FOR ELEC LINE
CONSTRUCTION
SEE G001 AND
CG102 FOR
EXTENDED LOD
BOUNDARY
GENERAL DEMOLITION NOTES:
1. SURVEY INFORMATION WAS PROVIDED BY L. K. MCLEAN ASSOCIATES, P.C.
IN JULY 2015.
2. HORIZONTAL CONTROL IS NEW YORK STATE PLANE COORDINATES, NAD
1983. VERTICAL CONTROL IS NAVD88.
3. IF BENCHMARKS ARE REMOVED, CONTRACTOR SHALL ESTABLISH SIMILAR
TYPE BENCHMARKS IN PROJECT VICINITY FOR FUTURE USE.
4. PRIOR TO ANY DISTURBANCE, THE CONTRACTOR SHALL OBTAIN
COVERAGE UNDER THE NEW YORK SPDES GENERAL PERMIT FOR STORM
WATER DISCHARGES FROM CONSTRUCTION ACTIVITY.
5. INSTALLATION OF SOIL EROSION MEASURES SHALL BE THE FIRST ITEM OF
WORK BEFORE ANY DEMOLITION OPERATIONS TAKE PLACE.
6. ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY MATERIALS
SHALL BE DISPOSED OF OFF BASE.
7. CONTRACTOR SHALL COORDINATE LIMITS OF SAWCUT AND PAVEMENT
REMOVAL WITH CONTRACTING OFFICER.
8. PAVEMENT DESIGNATED FOR SAWCUT SHALL BE SAWCUT FULL DEPTH.
9. EXISTING PAVEMENT EDGES SHALL BE SAWCUT IN LOCATIONS SHOWN TO
PROVIDE CLEAN EDGE FOR CONSTRUCTION OF PROPOSED PAVEMENT.
10. PAVEMENT REMOVAL LIMITS SHALL BE TO THE NEAREST EXISTING
PAVEMENT JOINT TO THE GREATEST EXTENT POSSIBLE TO PREVENT
PARTIAL PANEL REMOVAL.
11. ANY DAMAGE TO PAVEMENT AREAS DESIGNATED TO REMAIN SHALL BE
REPAIRED OR REMOVED AND REPLACED AT NO ADDITIONAL COST TO
GOVERNMENT. PAVEMENT REPAIRS SHALL BE PERFORMED IN
ACCORDANCE WITH UFC 3-270-03.
12. PAVEMENT AND CONCRETE DEMOLITION SHALL INCLUDE ALL COURSES
TO SUBGRADE AND SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS.
REMOVE OUTER 18" CAREFULLY TO PROTECT EXISTING CONCRETE TO
REMAIN. EXISTING CONCRETE TO REMAIN THAT IS DAMAGED SHALL BE
REMOVED AND REPLACED AT NO ADDITIONAL COST TO THE
GOVERNMENT.
13. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING
DEMOLITION TO PREVENT UNDERMINING OF EXISTING PAVEMENTS TO
REMAIN.
14. EXISTING VEGETATION AND FACILITIES WHICH ARE NOT INDICATED TO BE
REMOVED SHALL BE PROTECTED FROM DEMOLITION OR OTHER
CONSTRUCTION ACTIVITIES.
UTILITY DEMOLITION NOTES:
1. LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE.
CONTRACTOR SHALL VERIFY EXISTENCE AND LOCATION OF ALL UTILITIES
PRIOR TO THE START OF CONSTRUCTION.
2. CONTRACTOR SHALL PROTECT EXISTING UTILITIES TO REMAIN. ANY
DAMAGE TO EXISTING UTILITIES TO REMAIN SHALL BE IMMEDIATELY
REPAIRED AT CONTRACTOR'S EXPENSE.
3. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER
PRIOR TO REMOVAL OF EXISTING UTILITIES IN SERVICE. RELOCATED
UTILITIES SHALL BE CONSTRUCTED BEFORE REMOVAL OF EXISTING
UTILITIES TO ENSURE UNINTERRUPTED SERVICE TO THE FACILITIES SERVED
BY THE UTILITY. ALL RELOCATIONS SHALL BE COORDINATED WITH THE
CLIENT REPRESENTATIVE.
4. UTILITY CAPPING METHODS SHALL BE IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS FOR SPECIFIC PIPE MATERIAL IN
SERVICE. ALL CAPPING SHALL BE INSPECTED AND APPROVED BY THE
CLIENT REPRESENTATIVE.
5. ALL STRUCTURES, VALVES, ETC. TO REMAIN SHALL BE PROTECTED AND
ADJUSTED TO FINISH GRADE.
REMOVE EXISTING
RETAINING WALLS, TOPSOIL,
AND LANDSCAPING
SAWCUT EXISTING
PAVEMENT AS NEEDED
FOR SANITARY LINE
CONSTRUCTION
REMOVE EXISTING ASPHALT
(TYP.)
REMOVE EXISTING
ELEC HANDHOLE
LEGEND
REMOVE EXISTING
PLANTER AND SHRUB
REMOVE AND
REPLACE SIDEWALK
PANELS AS NEED FOR
SANITARY LINE
CONSTRUCTION
REMOVE EXISTING
PLANTER
LOD
AutoC…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .