A22 - Solicitation Questions_Answers 1.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Murden Shipyard Repair Services Federal contract opportunity
Solicitation number
W912PM23Q0031
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

This document contains questions and answers regarding a solicitation for shipyard repair services for the dredge Murden. The U.S. Army Corps of Engineers, Wilmington District is seeking a contractor to provide all labor, materials, and services for up to 30 days of shipyard repair work to complete all required American Bureau of Shipping inspections, repairs, and maintenance. The solicitation number is W912PM23Q0031 and is set aside for small businesses with less than 1,300 employees. Quotes are due by July 12, 2023 at 2:00 PM Eastern Time and must be submitted electronically to the identified contracting staff. The evaluation will consider price and technical factors, with award made to the lowest priced technically acceptable offeror. The document addresses contractor questions on inspection and repair scope details.

View the file

Other files for this federal contract opportunity

Other files attached to Murden Shipyard Repair Services, newest first.
File Type Posted
A22 - Answers to Questions 9.xlsx XLSX spreadsheet
A21 - W912PM23Q0031 Amendment 4 CC.pdf PDF
A22 - Answers to Questions 10.xlsx XLSX spreadsheet
A21 - W912PM23Q0031 Amendment 4.pdf PDF
A22 - Answers to Questions 8.xlsx XLSX spreadsheet
A21 - Answers to Questions 7.pdf PDF
A22 - Bidders Questions 6.xlsx XLSX spreadsheet
A22 - Encl-V 702-C130-01-B_ Tank Capacity.pdf PDF
A21 - W912PM23Q0031 Amendment 3 - Conformed Copy.pdf PDF
A21 - W912PM23Q0031 Amendment 3.pdf PDF
A22 - Site Visit Sign-in Sheet (22-JUN-2023).pdf PDF
A22 - Bidders Questions 5_(3-JUL-2023).xlsx XLSX spreadsheet
A22 - Solicitation Questions_Answers 4.pdf PDF
A22 - Solicitation Questions_Answers 3.pdf PDF
A22 -Solicitation Questions_Answers 2.pdf PDF
A22 - Encl-00023 702-D780-01 Electrical System Monitoring Controls Alarms.pdf PDF
A22 - Encl-00018 702-D490-01 Anode Plan.pdf PDF
A22 - Encl-00019-702-D715-01 Short Circuit Analysis.pdf PDF
A22 - Encl-00017 revised 702-D640-02 Engine Cooling Keel Cooler Arrgt Details.pdf PDF
A21 - W912PM23Q0031 Amendment 2.pdf PDF
A22 - Encl-S00021 702-D730-01 Lighting Receptacle Plan.pdf PDF
A22 - Encl-00016 revised 702-D640-01 Engine Cooling System.pdf PDF
A22 - Encl-00020 702-D720-01 Electrical System One Line Diagram AC DC.pdf PDF
A22 - Encl-00022 702-D770-01 Navigation Light Arrangement.pdf PDF
A21 - W912PM23Q0031 Amendment CC.pdf PDF
A21 - W912PM23Q0031 Amendment.pdf PDF
A22 - Encl-00012 702-C640-02-C Keel Coolers.pdf PDF
A22 - Encl-00013 702-D170-01-0_Docking Plan.pdf PDF
A22 - Encl-00010 702-C415-01-D Doors_Window_Hatches_Manholes.pdf PDF
A22 - Encl-0009 702-C313-01-G MN Deck Structural Plan.pdf PDF
A22 - Encl-0008 702-C313-01-F MN Deck Structural Plan.pdf PDF
A22 - Encl-0006 702-C301-01-C SHT 3 Mid Ship Framing.pdf PDF
A22 - Encl-0003 702-C245-01-C Hold and Machinery Arrangment.pdf PDF
A21 - W912PM23Q0031.pdf PDF
A22 - Encl-00015 TB_43-0144_Painting of Watercraft_9-OCT-1990 (1).pdf PDF
A22 - Encl-00011 702-C620-01-D Thruster Detail.pdf PDF
A22 - Encl-0002 702-C215-01-D Gen Arrangement.pdf PDF
A22 - Encl-0004 702-C301-01-C SHT 1 Mid Ship Framing.pdf PDF
A22 - Encl-0001 702-C205-01-C Outboard Profile.pdf PDF
A21 - NAVFAC_USACE PPQ.PDF PDF
A22 - Encl-00014 Murden Paint Schedule.pdf PDF
A22 - Encl-0005 702-C301-01-C SHT 2 Mid Ship Framing.pdf PDF
A22 - Encl-0007 702-C307-01-F Shell Plating and Framing.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Responses

US ACOE DREDGE MURDENContracting Officer:Email:
Contract Specialist: Terri AdamsPhone: terri.m.adams@usace.army.mil
Contract Specialist:(910) 251-4493
Question #Date of Request:SectionWork Items/CSWT #Para. #Page #:Attach. #Contractor QuestionGovernment Response
16/14/23Solicitation1.848Paragraph indicates that "The contractor shall provide a 24 hour watch service to respond to any emergencies/alarms on the vessel while in the contractor's possession." Is the watch service to remain onboard 24 hours per day while in the contraxtor's possession? Or is an hourly roving watch sufficient to meet this requirement?Roving watch is fine.
26/14/231255The level of effort to replace lagging as listed in the specification can only be determined once a lagging inspection is complete. The contractor requests to submit a report of findings after inspection and recommended repairs to be funded upon approval against the 00018 item.Correct.
36/14/23250For estimating and pricing purposes the Contractor requests the government provide a defined quantity of audio gauge readings to be taken in support of the ABS Annual Hull Survey.up to 1000 readings spaced equidistant
46/14/23452For estimating and pricing purposes the Contractor requests the government provide a defined quantity of audio gauge readings to be taken in each bow thruster tunnel /tube.Up to 100 per tube.
56/14/23552The contractor requests clarification on the work item scope. What is the material type being inspected?Hull section and support steel
66/14/23552What is the method of inspection (visual, Liquid Penetrant, Radiological Testing, Magnetic Particle Testing) to be used to inspct the hawse pipes?This is not pipe. This is the hull and structural steel in the Hawespipe area.
76/14/23552The level of effort to repair the hawse pipe can only be determined after inspection. The contractor requests to submit a report of findings after inspection and recommended repairs to be funded upon approval against the 00019 item.Understand that the inspection will determine the repair costs. The repair should be charged against item 5 after contractor receives approved CFR back from GOV.
86/14/23855The contractor requests that the government provide all AC and DC electrical drawings.attachments
96/14/23955The level of effort to complete any repairs for the door can only be determined once the door inspections are complete. The contractor requests to submit a report of findings after inspection with recommended repairs to be funded upon approval against the 00019 item.Understand that the inspection will determine the repair costs. The repair should be charged against item 9 after contractor receives approved CFR back from GOV.
106/14/231055The level of effort to modify exhaust piping and replace lagging as listed in the specification can only be determined once the base work resilient mount replacement and alignment is complete. The contractor requests to submit a report of findings after base work mount replacement and alignment to be funded upon approval against the 00018 item.Correct.
116/14/231155Does the government have a complete list of the vessel zinc anode locations for inspections to include quantity, size, anode type?attachments
126/14/231355The level of effort to replace lagging as listed in the specification can only be determined once the inspection is complete. The contractor requests to submit a report of findings after inspection and recommended repairs to be funded upon approval against the 00018 item.Correct.
136/14/231755The Contractor is requesting fluid capacity for each keel cooler system and the type of coolant to be used for each system replinishment.The type of fluid is containted in the description of item 17 and there are two attachments for this question that further defines the quantity.
146/14/23Solicitation17In review of the solicitation the contractor finds listed in the Technical Criteria second sentence "The Offerer Shall Be an ABS Certified Shipyard" The contractor finds this requirement applicable for new vessel constructuction shipyards. The Contractor is a repair shipyard not a new construction shipyard and therefore is not an ABS certified shipyard. As per your listed Statement of Work 00016 the contractor contracts ABS per specification requiremenents for inspection and oversight of required repairs. The Contractor requests that the government review the requirement for a ABS Certified Shipyard, and requests the requirement be deleted.To define ABS Certified Shipyard, the GOV means that the shipyard must have ABS certified welders and, if needed, ABS certified propeller repair. The ABS inspection is a separate requirement.

File details come from the government source that posted it. Updated .