This document contains responses to bidder questions regarding solicitation number W912PM23Q0031 for shipyard repair services for the dredge Murden. The solicitation requests quotes by July 12, 2023 at 2:00 PM Eastern for up to 30 days of shipyard repair services to complete all required American Bureau of Shipping inspections, repairs, and maintenance. The contractor shall provide all labor, materials, and services. The solicitation is set aside 100% for small businesses with a size standard of 1,300 employees and is issued by the U.S. Army Corps of Engineers Wilmington District. Award will be made to the lowest priced technically acceptable offer. Bidders sought clarification on items like docking block dimensions, pressure washing scope, resilient mount inspection requirements, and availability of long lead time parts.

View the file

Other files for this federal contract opportunity

Other files attached to Murden Shipyard Repair Services, newest first.
File Type Posted
A21 - W912PM23Q0031 Amendment 4 CC.pdf PDF
A22 - Answers to Questions 10.xlsx XLSX spreadsheet
A21 - W912PM23Q0031 Amendment 4.pdf PDF
A22 - Answers to Questions 9.xlsx XLSX spreadsheet
A22 - Answers to Questions 8.xlsx XLSX spreadsheet
A21 - Answers to Questions 7.pdf PDF
A22 - Bidders Questions 6.xlsx XLSX spreadsheet
A22 - Encl-V 702-C130-01-B_ Tank Capacity.pdf PDF
A21 - W912PM23Q0031 Amendment 3 - Conformed Copy.pdf PDF
A21 - W912PM23Q0031 Amendment 3.pdf PDF
A22 - Site Visit Sign-in Sheet (22-JUN-2023).pdf PDF
A22 - Solicitation Questions_Answers 4.pdf PDF
A22 - Solicitation Questions_Answers 3.pdf PDF
A22 -Solicitation Questions_Answers 2.pdf PDF
A22 - Encl-00023 702-D780-01 Electrical System Monitoring Controls Alarms.pdf PDF
A22 - Encl-00018 702-D490-01 Anode Plan.pdf PDF
A22 - Encl-00019-702-D715-01 Short Circuit Analysis.pdf PDF
A21 - W912PM23Q0031 Amendment 2.pdf PDF
A22 - Encl-S00021 702-D730-01 Lighting Receptacle Plan.pdf PDF
A22 - Encl-00016 revised 702-D640-01 Engine Cooling System.pdf PDF
A22 - Solicitation Questions_Answers 1.xlsx XLSX spreadsheet
A22 - Encl-00020 702-D720-01 Electrical System One Line Diagram AC DC.pdf PDF
A22 - Encl-00022 702-D770-01 Navigation Light Arrangement.pdf PDF
A22 - Encl-00017 revised 702-D640-02 Engine Cooling Keel Cooler Arrgt Details.pdf PDF
A21 - W912PM23Q0031 Amendment.pdf PDF
A21 - W912PM23Q0031 Amendment CC.pdf PDF
A22 - Encl-00012 702-C640-02-C Keel Coolers.pdf PDF
A22 - Encl-00013 702-D170-01-0_Docking Plan.pdf PDF
A22 - Encl-00015 TB_43-0144_Painting of Watercraft_9-OCT-1990 (1).pdf PDF
A22 - Encl-00011 702-C620-01-D Thruster Detail.pdf PDF
A22 - Encl-0002 702-C215-01-D Gen Arrangement.pdf PDF
A22 - Encl-0004 702-C301-01-C SHT 1 Mid Ship Framing.pdf PDF
A22 - Encl-0001 702-C205-01-C Outboard Profile.pdf PDF
A21 - NAVFAC_USACE PPQ.PDF PDF
A22 - Encl-00014 Murden Paint Schedule.pdf PDF
A22 - Encl-0005 702-C301-01-C SHT 2 Mid Ship Framing.pdf PDF
A22 - Encl-0007 702-C307-01-F Shell Plating and Framing.pdf PDF
A22 - Encl-00010 702-C415-01-D Doors_Window_Hatches_Manholes.pdf PDF
A22 - Encl-0009 702-C313-01-G MN Deck Structural Plan.pdf PDF
A22 - Encl-0008 702-C313-01-F MN Deck Structural Plan.pdf PDF
A22 - Encl-0006 702-C301-01-C SHT 3 Mid Ship Framing.pdf PDF
A22 - Encl-0003 702-C245-01-C Hold and Machinery Arrangment.pdf PDF
A21 - W912PM23Q0031.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Responses

US ACOE DREDGE MURDENContracting Officer:Email: terri.m.adams@usace.army.mil
Contract Specialist: Terri AdamsPhone: (910) 251-4493
Contract Specialist:
Question #Date of Request:SectionWork Items / CSWT #Para. #Page #Attach. #Contractor QuestionGovernment Response
156/30/23113Upon review of the docking DWG provided by ACOE (Encl 00013 + 702-D170-01-0_Docking + Plan) the KTR requests clarifiation if the government requires a docking block dimensional height. The KTR finds General Note line 2 lists a foot print of 4' x 4' with no blocking height listed. KTR reviewed the DWG details and finds no other measurements provided. Request the government provide any requirement for a docking block height.No requirement is listed, but looking at other dimensions on the drawing, the height appears to be 4' x 4' x 4'. The height really just needs to be high enough for any bottom work to be performed without having to jack the vessel any highter up.
166/30/23718KTR finds the statement of work directs the KTR to pressure wash from the rub rail down. KTR finds two rub rails on the side shell of the vessel; an upper and a lower. For square footage and estimating purposes request the government define which rub rail is pressure washing to include, the upper or lower rub rail?Lower Rub Rail
176/30/231018KTR received answers to bidder questions on 6/28/2023 listed as Answers to Questions 3 for Statement of Work item 00010 Engine Alignment and Installation of New Resilient Mounts. Government response " We only need the Engine resilient mounts inspected." KTR notes no reference for resilient mounts were received to include the criteria for inspection, measurement and any adjustment. Request the government provide all references for Resilient Mount Inspection, Measurment and Adjustments for the MDE and SSDG Resilient Mounts.Prepare a CFR for the Resilient Mounts. If needed we've got (4) mounts onboard (GFE)
186/30/231656KTR requests clarification for the work item as written. Specification states KTR to provide the services of the ABS inspector for 7-3-2/5 ABS Steel Vessel Rules for Special Periodic Survey No. 2 and 7-6-2/3 ABS Steel Vesssel Rules for Machinery Surveys-Survey Requirements/Special Periodical Surveys. Per KTR conversation with ABS inpsector the Special Periodic Survey No.2 was completed in 2020 and is not required. For clarification and pricing purposes request the government clarify the statement of work requiring ABS attendance above/in addition to the items listed in the Statement of Work as follows: Items 0002 Hull Audio Gauging, 0003 Repair Port Chine, 0005 Repair Port Hawespipe and 0006 Hull Repair (Hopper Bottom).Routine ABS survey / KTR will work with ABS to establish new International Load Line markings (to include the raised welding around the load line markings)
196/30/231255KTR notes that the vendors are providing long lead time for the parts to be replaced in the statement of work listed as: Turbo Charger w/kit, current lead time of 66 days ARO each. KTR can update lead time based upon an award. Request the government acknolwedge that the current lead time exceeds the POP for this availability. Request the government review the option to provide the parts as GFE or extend the availability POP due to the material lead time.Turbo's are currently operational / 66 day Lead Time for the new Turbo's --- THIS CLIN WILL BE REMOVED VIA FORTHCOMING AMENDMENT.
206/30/231355KTR notes that the vendors are providing long lead time for the parts to be replaced in the statement of work listed as: Aftercooler, current lead time of 112 days ARO each, Aftercooler O'Ring Kit current lead time of 91 days ARO each, and Water Pump current lead time of 35 days ARO each. KTR can update lead time based upon an award. Request the government acknolwedge that the current lead time for the items listed exceed the availability POP. Request the government review the option to provide the parts as GFE or extend the availability POP due to the material lead time.The Water Pump, After-Cooler and After-Cooler O-ring kit are currently operational --- THIS CLIN WILL BE REMOVED VIA FORTHCOMING AMENDMENT.