About this file

Amendment 0002

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

a) The purpose of this amendment is to provide changes to the solicitation resulting from ProjNet Inquiries.

b) As a result of this amendment, the date and time for receipt of proposals has been extended to 5 May 2015, 2:00 PM EST.

c) All other terms and conditions remain unchanged.

d) Please see SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

J 1 28

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Apr-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-15-R-0009

X 9B. DATED (SEE ITEM 11)

24-Mar-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Apr-2015

CODE

U S ARMY CORPS OF ENGINEERS

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM-14-R-0005

W912PM-15-R-0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 28-Apr-2015 02:00 PM to 05-May-2015 02:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0002

The CLIN extended description has changed from Electrical Plants & Systems at Military Ocean Terminal at Sunny Point (MOTSU) Southport, NC - Base Period to Electrical Systems at Military Ocean Terminal at Sunny Point (MOTSU) Southport, NC - Base Period.

CLIN 0004

The CLIN extended description has changed from Sewage Plants & Systems at Military Ocean Terminal at Sunny Point (MOTSU)Southport, NC - Base Period to Sewage Systems at Military Ocean Terminal at Sunny Point (MOTSU)Southport, NC - Base Period.

CLIN 1002

The CLIN extended description has changed from Electrical Plants & Systems at Military Ocean Terminal at Sunny Point (MOTSU) Southport, NC - Option Year 1 to Electrical Systems at Military Ocean Terminal at Sunny Point (MOTSU) Southport, NC - Option Year 1.

CLIN 1004

at Sunny Point (MOTSU)Southport, NC - Option Year 1 to Sewage Systems at Military Ocean Terminal at Sunny Point (MOTSU)Southport, NC - Option Year 1.

SUBCLIN 1010AA

The pricing detail quantity has increased by 948.00 from 12.00 to 960.00.

The unit of issue has changed from Months to Hours.

The option status has changed from No Status to Option.

CLIN 2002

The CLIN extended description has changed from Electrical Plants & Systems at Military Ocean Terminal at Sunny Point (MOTSU) Southport, NC - Option Year 2 to Electrical Systems at Military Ocean Terminal at Sunny Point (MOTSU) Southport, NC - Option Year 2.

CLIN 2004

at Sunny Point (MOTSU)Southport, NC - Option Year 2 to Sewage Systems at Military Ocean Terminal at Sunny Point (MOTSU)Southport, NC - Option Year 2.

CLIN 3002

The CLIN extended description has changed from Electrical Plants & Systems at Military Ocean Terminal at Sunny Point (MOTSU) Southport, NC - Option Year 3 to Electrical Systems at Military Ocean Terminal at Sunny Point (MOTSU) Southport, NC - Option Year 3.

CLIN 3004

at Sunny Point (MOTSU)Southport, NC - Option Year 3 to Sewage Systems at Military Ocean Terminal at Sunny Point (MOTSU)Southport, NC - Option Year 3.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been added by full text:

PAST PERFORMANCE

Amendment 2

USACE PAST PERFORMANCE QUESIONNAIRE (PPQ)

“The Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 2 – Performance Risk. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires should be submitted with your proposal to the Contracting Officer as specified below. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Karri Mares, Contracting Officer via email at karri.l.mares@usace.army.mil at 10 days prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Also include performance recognition documents received within the last five (5) years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System

(PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO

BEST REFLECT YOUR EVALUATION OF THE

CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub- element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner.

There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST

REFLECTS YOUR EVALUATION OF THE CONTRACTOR’S

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports,

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back- up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping safety correction of noted

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

b) Compliance with contractual terms/provisions (explain if specific E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

The following have been modified:

SOLICITATION PROVISIONS SECT L

SECTION II

SOLICITATION PROVISIONS

(The below Sections L.1. thru L.2. will be included in the solicitation (Section L), titled “Instructions, Conditions, and Notices to Offerors” in the solicitation. They are numbered L.1 thru L.2 in this Source Selection Plan as they will be numbered in Section L of the solicitation.)

L.1. Proposal Submission and Format Information.

A. This solicitation is for one (1) U. S. Army Corps of Engineers, Wilmington District Project location (Military Ocean Terminal at Sunny Point, Southport, North Carolina).

B. The proposal(s) shall be submitted using the sequence and format provided below.

Volume I - Technical Proposal Original and 5 copies

Volume II - Performance Risk Proposal Original and 5 copies Volume III – Price Proposal Original and 5 copies

Volume IV – Solicitation, Offer and Award Documents, Certification, Offer and Representations Original and 5 copies

C. Each proposal shall be submitted in a 3 ring binder. The proposal shall not be permanently bound. If catalog cut sheets are included in the proposal, the offeror shall highlight data specific to the equipment and/or components/model number intended for this requirement.

Original catalog cut sheets are to be provided in the “original copy” proposal. To reduce the size of proposals, offerors will confine their submissions to essential matters sufficient to define their offer and to provide an adequate basis for evaluation.

D. Offerors shall attach a binder cover sheet to the outer cover of each volume, which clearly identifies each volume by name and copy number (i.e. Volume I – Technical, Copy 2 of 5), Request for Proposal (RFP) number, date of submission, project location, and offeror’s name.

This information shall also be placed on the edge of the binder where it can be seen when placed in a vertical position in a storage cabinet. Use tab indexing to identify all sections within a particular proposal volume. Do not include writing on the tab index page other than that required to identify the particular section.

E. With the exception of spreadsheets for the price volume, copies of the proposal shall prepared on standard 8-1/2” x 11” white paper in portrait orientation or folded to fit 8-1/2” x 11” portrait orientation inside the binder. Spreadsheets shall be no larger than 8-1/2” x 14” in a landscape orientation. The proposal pages shall be numbered, printed on two sides, and punched with a 3-hole punch along the left margin. Each page must have a one inch margin at the top, the bottom and on each side. Page numbers, notations of proprietary information, and any other identifying information printed on each page are excluded from the margin requirement. Text font must be no smaller than 11 point but text included on figures and/or matrices may be reduced to 8 point. Larger format drawings or tables may be added by folding them to fit within the binder.

F. In order to reduce proposal size, the offeror shall confine the proposal to evaluation factors and sub-factors listed, and shall limit detail to that sufficient to define the proposal and provide an adequate basis for evaluation.

G. Each technical proposal shall contain no company indentifying information such as but not limited to company letter head, company logos or company addresses. All company identifying information shall be provided on an easily removable cover sheet. Before going to the technical evaluation team for review, each companies cover sheet will be replaced with an assigned number.

H. Price information shall not be included in the Technical Proposal so that evaluation can be made without regard to price.

I. Proposal revisions shall be submitted as page replacements with revised text readily identifiable. Revised pages shall be submitted on colored paper with revisions identified with a bar to the right of the changed verbiage. Revised pages shall be numbered, dated, and submitted in the number of copies noted in paragraph L.1.b. above. The Price Proposal Compact Disk (CD) shall be numbered and dated with revised text readily identifiable.

J. Tab Indexing.

1. Volume I – Technical Proposal - The Technical Proposal should be arranged to have required information on evaluation factors displayed in tabbed sections of the 3-ring binder or binders in the following manner:

Tab 1 Technical Merit(Factor 1) Tab 1.aManagement Staff (Sub-factor 1.a) Tab 1.b Contract Employees Licenses/Certifications (Sub-factor 1.b) Tab 1.cContractor Equipment (Sub-factor 1.c) Tab 1.d Level I Preventative Maintenance Approach (Sub-factor 1.d) Tab 1.eLevel II Service Orders Approach (Sub-factor 1.e)

2. Volume II – Performance Risk Proposal (Factor 2) – The Performance Risk Proposal should be arranged to have required information displayed in tabbed sections of the 3-ring binder or binders in the following manner:

Tab 1 Section 1 – Contract Descriptions

Tab 2.aSection 2.a - Past Performance Tab 2.b Section 2.b - Safety Record Tab 2.cSection 2.c – Environmental Compliance Record

Tab 3 Section 3 – Subcontractors Tab 4 Section 4 – New Corporate Entities

3. Volume III – Price Proposal (Factor 3). The Price Proposal shall be arranged to have required information displayed in tabbed sections of the 3-ring binder or binders in the following manner:

Tab 1 Completed “Summary of Price for Base and Option Years”

(Form in Section B) Tab 2 Completed “Summary of Prices by Year by Specific Task”

Tab 3 Compact Disc (CD) to support all Price Proposal **AMENDMENT 0002**

(NOTE – Forms listed above are in Section B of the solicitation)

4. Volume IV – Offer and Representations. The 3-ring binder shall be tabbed in the following manner:

Tab 1 Standard Form (SF) 1449 (Solicitation, Offer and Award)

Tab 2 Section B – “Supplies or Services and Prices”

Tab 3 Section K (Representations, Certifications and

Other Statements of Offerors)

Tab 4 Banking Institution (Requested for pre-award verification: Name, Address, Point of Contact, Fax and Phone Number)

L.2. PROPOSAL CONTENT

Volume I of the Proposal - Technical Merit Factor 1 - Technical (Volume I of the Proposal)

1. Subfactor 1.a. – Management Staff. The offeror shall clearly demonstrate their approach to each of the following management functions:

***AMENDMENT 0002***

NOTE: The technical proposal shall contain no company indentifying information such as but not limited to company letter head, company logos or company addresses. All company identifying information shall be provided on an easily removable cover sheet. Before going to the technical evaluation team for review, each companies cover sheet will be replaced with an assigned number.

(i) Organizational Structure. An organizational chart including listing of all sub contractors. Identify existing managerial and supervisory ability and duties in the PWS specified fields, listing the years of experience in required fields, in particular the Project Manager and alternate, Contract Quality Control (CQC) System Manager, and Site Safety & Health Officer (SSHO). The Project Manager shall have a minimum of five (5) years of experience related to that field of work experience. The CQC System Manager shall have a minimum of ten (10) years experience in related work, OR possess a valid Professional Engineer’s License, issued by the North Carolina Board of Examiners for Engineers & Surveyors, and have a minimum of five

(5) years experience in related work. The SSHO is required to have five (5) years of construction industry safety experience OR three (3) years if he/she possesses either a Certified Safety Professional (CSP) or safety and heath degree. The offeror shall provide Qualification Statements for the Project Manager and alternate, CQC System Manager, and the SSHO.

Statements should indicate knowledge, skills, and abilities required to hold positions in addition to personnel histories and resumes. Discuss management controls and supervision of the subcontractors and internal teaming efforts.

Soundness of CQC approach. The proposal should indicate the methodology by which the CQC mission is fulfilled. The approach should emphasize prevention as opposed to reaction.

The organizational experience of the offeror and its proposed major subcontractors, those who will perform at least 10% of the effort, will be part of the Management Approach but shall be provided on the information sheets submitted as part of the Performance Risk Factor. Degree of subcontracted work. The proposal should indicate the anticipated subcontractor performance of the contract requirements.

(ii) Knowledge of Government and Industry Practices. Provide a detailed discussion to demonstrate the offeror’s management experience, knowledge and understanding of Government (DoD and DA) and Industry Practices. Including a listing of affiliations with relevant professional associations.

(iii) Management Capability: Management control and supervision of Manpower, suppliers and vendors of Equipment and Materials. Provide a detail discussion of the preventive maintenance program for equipment and tools along with housekeeping procedures. In addition, identify and discuss the management capability to support varying workloads and manpower requirements, approach to minimizing employee turnover. Supervisor to worker ratio. Identify and discuss training programs for schooling and recertification training of employees.

(iv) Quality Control Methods: Discuss relevant work processes, Price control methods, procedures, and technical approach, as well as the nature, difficulties, corrective actions, and risks management associated with performing the kind of work that will be required. Identify established techniques for managing work for quality performance and procedures that will adequately recognize substandard performance. Identify the means and experience with automation systems, familiarity with project specific software tools as well as exposure to Government programs. Identify the clerical means used for managing equipment, technical library and related resources.

2. Subfactor 1.b. – Contract Employees Licenses / Certifications / Registrations. The offeror shall clearly demonstrate that contract employees have the required licenses/certifications/registrations for the State of North Carolina to meet the following requirements (If licenses/certifications/registrations are unavailable, provide documentation in narrative format on how the offeror intends to fill positions):

i. Pest Control Personnel License

ii. Pest Control Applicator License

iii. Wastewater Treatment Facility Operator Certification, Class II or higher

iv. Water Treatment Facility Operator Certification, C-Well or higher

v. Boiler/Heating Equipment Operator License

vi. Electrical License

vii. Plumbing License, Master Plumber

viii. Heavy Equipment Operator License

ix. HVAC Systems Operator License

x. State Motor Vehicle Operator License

xi. Fire Alarm Certification, Fire Alarm Level IV

xii. Water Distribution Operator, Class C

3. Subfactor 1.c. – Contractor Equipment. The offeror shall clearly demonstrate the equipment to be used to perform the requirements of this solicitation. The offeror shall indicate the approach to continuing maintenance services without interruption during periods of contractor equipment breakdowns. Contractor owned or obtained equipment must me the Safety Requirements in EM 385-1-1.

4. Subfactor 1.d. - Level I Preventative Maintenance Approach. The offeror should clearly demonstrate their approach to the following:

(i) Mobilization and start up. The proposal should indicate the timeliness of beginning Operation and Maintenance services following contract award for Level I requirements.

(ii) The proposal should indicate the approach to performing all Level I Maintenance

Services.

5. Subfactor 1.e. – Level II Service Order Approach. The offeror shall clearly demonstrate their approach to the following:

(i) Mobilization and response. The proposal should indicate the timeliness of beginning Operation and Maintenance services following contract award for Level II requirements.

(ii) The proposal should indicate the approach to performing all Level II Service Orders.

The proposal shall differentiate the approach to Priority I Service Orders and Response versus Priority 2 and 3 Service Orders and Response.

2. Volume II of the Proposal – Performance Risk Factor 2 – Performance Risk (Volume II of the Proposal

Offerors shall submit a list of no more than five (5) Government contracts (prime and major subcontracts {in performance or awarded} during the past five(5) years, which are relevant to the efforts required by this solicitation.( The five (5) year period is five (5) years before the date of issue of this solicitation. Relevancy is defined as something that has a logical connection with the matter under consideration, e.g., similar project size and type of work. It is the offeror’s responsibility to establish relevancy.) Data concerning the prime offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. This volume shall be organized into the following sections:

(1) Section 1 – Contract Descriptions. This section shall include the following information in the following format:

(a) Contractor/Subcontractor place of performance, CAGE Code and DUNS

Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers).

(b) Government contracting activity, and current address, Procuring Contracting

Officer's name, e-mail address, telephone and fax numbers.

(c) Government’s technical representative/COR, and current e-mail address, telephone and fax numbers.

(d) Government contract administration activity and the Administrative

Contracting Officer's name, and current e-mail address, telephone and fax numbers.

(e) Government contract administration activity's Pre-Award Monitor's name, and current e-mail address, telephone and fax numbers.

(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, include Delivery Order Numbers also.

(g) Contract Type (specific type such as Fixed Price (FP), Price Reimbursement

(CR), Time & Materials (T&M), etc.) In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc)).

(h) Awarded price/Price.

(i) Final or projected final price/Price.

(j) Original delivery schedule, including dates of start and completion of work.

(k) Final, or projected final, delivery schedule, including dates of start and completion of work.

(2) Section 2.a – Past Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1 (Contract Descriptions) describing the objectives achieved and detailing how the effort is relevant to the requirements of this solicitation.

(2.a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for Waiver shall be addressed with respect to causes and corrective actions. The offerors shall also provide a copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the offeror or proposed subcontractor. The offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

(2.b) Section 2.b – Safety Record The offerors shall indentify any OSHA Safety violations within the last five (5) years (Performance Risk) by type and identify corrective action(s) and the result(s) of the violation and implementation of the corrective action(s).

(i) Programs and Manuals: Provide a detailed description of the Offers safety programs. Due to the nature and the location of the work, identify any site-specific requirements and experiences. Relate any past experiences that illustrates the offers successful implementation of these programs.

(ii) Awards and Certification: List all awards and certifications relating to safety performance records. The offeror shall clearly specify the reason for the award or certification, the issue date, and a point of contact (voice and fax telephone numbers and e-mail address).

(iii) Violations/Citations/Accidents/Fines: Identify any contracts within the last five (5) years that were in violation (Notice of Violations), citations, accidents or fines regarding safety performance. The offeror shall summarize the circumstances under which the violation (Notice of Violations), citations, accidents or fines occurred to include the date and a point of contact (voice and fax telephone numbers and e-mail address).

(2.c) Section 2.c – Past Environmental Compliance Record The offerors shall indentify any Environmental Compliance violations within the last five (5) years (Performance Risk) by type and identify corrective action(s) and the results of the violation(s) and implementation of the corrective action(s).

(i) Programs and Manuals: Provide a detailed description of the Offers environmental compliance programs. Due to the nature and the location of the work, identify any site-specific requirements and experiences. Relate any past experiences that illustrates the offers successful implementation of these programs.

(ii) Awards and Certification: List all awards and certifications relating to environmental conformance records. The offeror shall clearly specify the reason for the award or certification, the issue date, and a point of contact (voice and fax telephone numbers and e-mail address).

(iii) Violations/Citations/Accidents/Fines: Identify any contracts within the last five (5) years that were in violation (Notice of Violations), citations, accidents or fines regarding environmental conformance performance. The offeror shall summarize the circumstances under which the violation (Notice of Violations), citations, accidents or fines occurred to include the date and a point of contact (voice and fax telephone numbers and e-mail address).

(3) Section 3 – Subcontracts. Offerors shall provide an outline of how the effort required by the solicitation will be assigned for performance within the offeror’s corporate entity and among the proposed subcontractors. The information provided for the prime offeror and each proposed major subcontractor must include the entire company name, company address, CAGE Code, DUNS Number and type of work to be performed by citing the applicable Technical Provision (TP). This includes all subcontractors who will be providing critical services or whose subcontract is for more than _10__% of the total proposed price.

(4) Section 4 – New Corporate Entities. New corporate entities may submit data on prior contracts involving its officers and employees. However, in addition to the other requirements in this section, the offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above.

(5) Performance Risk Assessment Questionnaire.

a. For all contracts identified in Section 1, (Contract Descriptions) Performance Risk

Assessment Questionnaire (located in Section L) must be completed and submitted. The offeror shall complete Part I of the Performance Risk Assessment Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract.

b. The POC's shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Officer no later than the date and time for receipt of proposals, to:

karri.l.mares@usace.army.mil

U. S. Army Corps of Engineers Wilmington District Contracting Office Attn: Karri Mares, Contracting Officer (910-251-4863) (Reference W912PM-15-R-0009) 69 Darlington Avenue Wilmington, NC 28403

c. The offeror shall also e-mail to the Contracting Officer a list of all the POC’s who were sent a questionnaire. The Government must receive this list no later than the date of time for receipt of proposals. The POC List shall be submitted in Word for Windows Table Format to include the following fields: Solicitation Number; Company Name; Contract Number; Government Agency; POC Last Name, First Name; POC Title;

POC Telephone Number; POC E-Mail Address; Date E-Mailed to POC (month/day/year).

***AMENDMENT 0002*** - Added the following:

3. Volume III of the Proposal – Price

(1) Information to the Offeror

a. Price spreadsheets. Price spreadsheets must be prepared in Microsoft Excel format, version 2010 or compatible version. Size of spreadsheet should be no larger than 8-1/2” x 14”. Hard copy spreadsheets are to be submitted with the price proposal.

b. Compact Disk. In addition to the hard copy cost spreadsheet, an electronic copy of Volume III – Price shall be submitted on Windows compatible Compact Disc (CD). Text portions of this volume, as submitted on CD, shall be prepared in Microsoft Word, version 2007 or compatible version, in portrait orientation. Spreadsheets shall be prepared in Microsoft Excel, version 2007 or compatible version. All CDs shall be clearly labeled, and each label shall state the offeror’s name, solicitation number, name of project (MOTSU Land), date of submission, and the volume name and number that is contained on the CD. If more than one CD is required, the diskettes shall be labeled as CD “x” of “y” (e.g. CD 1 of 2). Files submitted on the CD shall be named representatively of their contents and shall be easily identifiable as to their contents.

c. Fixed Prices: The offeror is to use the Government provided technical provisions found in Section C for preparing price proposal.

(2) The Price Proposal shall include

a. Tab 1 Completed “Summary of Price for Base and Option Years”

b. Tab 2 Completed “Summary of Prices by Year by Specific Task”

c. Tab 3 Compact Disc (CD) to support all Price Proposal

4. Volume IV of the Proposal - Offer and Representations

The offeror shall complete and submit with the proposal (Offer and Representations)

1. Standard Form (SF) 1449 - Solicitation, Offer and Award.

(The OFFER section must be fully completed by offeror)

2. Section B – “Supplies or Services and Prices”

3. Section K - Representations, Certifications and Other Statements of Offerors (either fill out section K or submit SAM registration showing reps and certs)

4. Banking Institution: Provide current Banking Institution (requested for pre-award verification). Name, Address, Point of Contact, Fax and Phone Number

52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (APR 2014)

(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.

(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--

(1) The solicitation number;

(2) The time specified in the solicitation for receipt of offers;

(3) The name, address, and telephone number of the offeror;

(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;

(5) Terms of any express warranty;

(6) Price and any discount terms;

(7) "Remit to" address, if different than mailing address;

(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);

(9) Acknowledgment of Solicitation Amendments;

(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and

(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.

(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 60 calendar days 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.

(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.

(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions or commercial items for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.

(f) Late submissions, modifications, revisions, and withdrawals of offers:

(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.

(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--

(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or

(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(C) If this solicitation is a request for proposals, it was the only proposal received.

(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers.

Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.

(g) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.

(h) Multiple awards. The Government may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specifies otherwise in the offer.

(i) Availability of requirements documents cited in the solicitation. (1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--GSA Federal Supply Service Specifications Section, Suite 8100, 470 East L'Enfant Plaza, SW, Washington, DC 20407, Telephone (202) 619-8925, Facsimile (202) 619-8978.

(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision.

Additional copies will be issued for a fee.

(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:

(i) ASSIST (https://assist.dla.mil/online/start/).

(ii) Quick Search (http://quicksearch.dla.mil/).

(iii) ASSISTdocs.com (http://assistdocs.com).

(3) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by--

(i) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);

(ii) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or

(iii) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone

(215) 697-2667/2179, Facsimile (215) 697-1462.

(4) Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance.

(j) Data Universal Numbering System (DUNS) Number. (Applies to all offers exceeding $3,000, and offers of $3,000 or less if the solicitation requires the Contractor to be registered in the System for Award Management (SAM) database. The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS +4” followed by the DUNS or DUNS +4 number that identifies the offeror's name and address. The DUNS +4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the offeror to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see FAR Subpart 32.11) for the same concern. If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one. An offeror within the United States may contact Dun and Bradstreet by calling 1-866-705-5711 or via the internet at http://fedgov.dnb.com/webform. An offeror located outside the United States must contact the local Dun and Bradstreet office for a DUNS number. The offeror should indicate that it is an offeror for a Government contract when contacting the local Dun and Bradstreet office.

(k) System for Award Management. Unless exempted by an addendum to this solicitation, by submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance and through final payment of any contract resulting from this solicitation. If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror. Offerors may obtain information on registration and annual confirmation requirements via the SAM database accessed through https://www.acquisition.gov.

(l) Debriefing. If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(1) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.

(2) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(3) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(4) A summary of the rationale for…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .