W912PL-20-R-0004_Plans_ParkingGarage_Solicitation_VOL2..pdf
PDF 40 MB Posted
- Solicitation number
- W912PL-20-R-0004
About this file
This federal contract opportunity notice provides details for the construction of a new Spinal Cord Injury and Community Living Center (SCI/CLC) Building and Parking Structure project located at the Veterans Affairs Healthcare System campus in San Diego, California. Work includes construction of a 197,000 square foot SCI/CLC expansion building with a 50-bed SCI center, 33-bed CLC, outpatient clinic, and therapy facilities. An 800-car parking structure will also be built. The project has an estimated cost range of $100-250 million and a 1096 calendar day performance period. A competitive request for proposal using best value tradeoff procedures will be issued, resulting in a firm fixed-price contract. The solicitation is expected to be available on October 31, 2019 with proposals due January 21, 2020. The notice is posted on FedBizOpps and all amendments will be issued through this website.
Plans - Parking Garage - Volume 2
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
07/19/2019
Solicitation Number: W912PL20R0004
ABBREVIATIONS
AB ANCHOR BOLT
ADDL ADDITIONAL
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ANC ANCHOR
ARCH ARCHITECT
ASSY ASSEMBLY
B BOTTOM
BC BARRIER CABLE
BFF BELOW FINISH FLOOR
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BMD BOTTOM OF METAL DECK
BOF BOTTOM OF FOOTING
BOT BOTTOM
BP BUTTON PUNCH
BRG BEARING
BSMT BASEMENT
BTWN BETWEEN
C CHANNEL or CAMBER
CFM COLD FORMED METAL
CGS CENTER OF GRAVITY OF
SECTION
CIP CAST-IN-PLACE CONCRETE
CJ CONSTRUCTION JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTERLINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
COND CONDITION
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATION, -ATE
CR CHORD REINF
D DEEP
d b REINFORCING BAR DIAMETER
DBA DEFORMED BAR ANCHOR
DBL DOUBLE
DBO DESIGN BY OTHERS
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DK DECK
DL DEAD LOAD
DTL DETAIL
DTS DIAGONAL TENSION STRAP
DWG DRAWING
E EAST
(E) EXISTING CONDITION
EA EACH
EB EXPANSION BOLT
EE EACH END
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENGR ENGINEER
EOR ENGINEER OF RECORD
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ES EACH SIDE
EW EACH WAY
EXP EXPANSION
EXT EXTERIOR
(F) FUTURE CONDITION
f 'c MIN. ULTIMATE COMPRESSIVE
STRENGTH OF CONCRETE
f 'm MIN. ULTIMATE COMPRESSIVE
STRENGTH OF MASONRY
FDN FOUNDATION
FDS FULL DEPTH STIFFENER
FF FINISH FLOOR or FAR FACE
FG FINISH GRADE
FIN FINISH
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FOS FACE OF STUD
FRMG FRAMING
FS FAR SIDE
FT FOOT or FEET
FTG FOOTING
FTST FINGER TIGHTEN NUT &
STAKE THREADS
FTTW FINGER TIGHTEN NUT &
TACK WELD
G GROUND LEVEL
GA GAGE or GAUGE
GALV GALVANIZED
GR GRADE
HCA HEADED CONCRETE ANCHOR
HDR HEADER
HGR HANGER
HORIZ HORIZONTAL
HS HORIZONTAL SLOT
HSB HIGH-STRENGTH BOLT
HSS HOLLOW STRUCTURAL
SECTION
HT HEIGHT
ID INSIDE DIAMETER
IN INCH
INFO INFORMATION
INT INTERIOR
ISF INSIDE FACE
J JOIST
JH JOIST HANGER
JT JOINT
k KIPS k/f KIPS PER FOOT ksf KIPS PER SQUARE FOOT ksi KIPS PER SQUARE INCH L ANGLE or ANGLE IRON
LB POUND
LL LIVE LOAD
LLBB LONG LEGS BACK TO BACK
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LP LIGHT POLE
LSL LONG-SLOTTED HOLE
LT LIGHT
LW LONG WAY
LWC LIGHT-WEIGHT CONCRETE
MACH MACHINE
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTL METAL
(N) NEW
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
oc ON CENTER
OD OUTSIDE DIAMETER
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
ORIG ORIGINAL
OSF OUTSIDE FACE
OVS OVERSIZE ROUND HOLE
OWJ OPEN WEB JOIST
OWG OPEN WEB GIRDER
PC PRECAST CONCRETE
pcf POUNDS PER CUBIC FOOT
PDF POWER-DRIVEN FASTENER
PEN PENETRATION
PERP PERPENDICULAR
PJP PARTIAL JOINT PENETRATION
PL PLATE or PROPERTY LINE PLCs PLACES plf POUNDS PER LINEAR FOOT
PLYD PLYWOOD
psf POUNDS PER SQUARE FOOT psi POUNDS PER SQUARE INCH PT POST-TENSION, -ED, -ING or
POST-TENSION TENDONS
QTY QUANTITY
R ROOF, RISER or RADIUS REF REFER, or REFERENCE
REINF REINFORCING
REQD REQUIRED
REV REVISED, or REVISION
RM ROOM
RO ROUGH OPENING
S STEP or WELD SIZE or SOUTH
SC SLIP CRITICAL CONNECTION
SCHED SCHEDULE
SCW SLIP CRITICAL CONN w/WELD
SE STRUCTURAL ENGINEER
SECT SECTION
SHT SHEET
SIM SIMILAR
SJ SCORED JOINT
SLBB SHORT LEGS BACK TO BACK
SLTD SLOTTED
SLV SHORT LEG VERTICAL
SOG SLAB ON GRADE
SP STD PIPE or SPACES, SPACING
SPEC SPECIFICATION
SQ SQUARE
SSL SHORT-SLOTTED HOLE
STAG STAGGER
STD STANDARD
STHG SHEATHING
STIF STIFFENER
STL STEEL
STRUCT STRUCTURAL
SW SHORT WAY
SYM SYMMETRICAL
T TOP or TREAD
T&B TOP AND BOTTOM
T&S TEMPERATURE AND SHRINKAGE
THD THREAD or THREADED THK THICK or THICKNESS
TN TOE NAIL
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOS TOP OF STEEL (NOT DECK)
TOW TOP OF WALL
TRANS TRANSVERSE
TSA THREADED STUD ANCHOR
TYP TYPICAL
UNIF UNIFORM
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VIF VERIFY IN FIELD
VS VERTICAL SLOT
VSC VERTICAL SLIDE CLIP
W WIDE FLANGE or WEST w/ WITH
W/C WATER-CEMENT RATIO
w/o WITHOUT
WDO WINDOW
WP WORK POINT
WWF WELDED WIRE FABRIC
XP EXTRA STRONG PIPE
XXP DBL EXTRA STRONG PIPE
> GREATER THAN
< LESS THAN
(x) HEADED STUD QUANTITY
Δ TENDON ELONGATION
THIS LIST IS FOR INFORMATION ONLY - OTHER ABBREVIATIONS MAY BE USED.
ABBREVIATIONS THAT ARE UNCLEAR SHOULD BE BROUGHT TO THE ATTENTION OF THE STRUCTURAL ENGINEER FOR CLARIFICATION.
GENERAL STRUCTURAL NOTES
SECTION 1: GENERAL
1-1 THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE JOB SITE PRIOR TO STARTING CONSTRUCTION AND THE ARCHITECT/ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES OR INCONSISTENCIES
WITH ANY WORK SO INVOLVED.
1-2 ALL PHASES OF THE WORK SHALL CONFORM TO THE MINIMUM STANDARDS OF THE LATEST EDITION OF THE
2012 INTERNATIONAL BUILDING CODE.
1-3 THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. UNLESS OTHERWISE INDICATED, THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE, WORKMEN, AND OTHER PERSONS DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO, BRACING, SHORING FOR CONSTRUCTION EQUIPMENT, SHORING FOR THE BUILDING, FORMS AND SCAFFOLDING, AND SHORING OF
RETAINING WALLS.
1-4 OPENINGS, POCKETS, ETC., SHALL NOT BE PLACED IN SLABS, BEAMS, COLUMNS, WALLS, ETC., UNLESS
SPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS.
1-5 ALL ASTM SPECIFICATIONS NOTED ON THESE DRAWINGS SHALL BE OF THE LATEST REVISION.
1-6 IN ACCORDANCE WITH IBC SECTION 1705, THE OWNER OR OWNER'S AGENT SHALL EMPLOY ONE OR MORE SPECIAL INSPECTORS WHO SHALL PROVIDE INSPECTIONS DURING CONSTRUCTION ON THE FOLLOWING TYPES OF
WORK:
A. CONCRETE
B. SHOTCRETE
C. BOLTS INSTALLED IN CONCRETE
D. POST-INSTALLED ANCHORS
E. REINFORCING STEEL AND PRESTRESSING TENDONS
F. STRUCTURAL WELDING
G. HIGH STRENGTH BOLTING
H. STRUCTURAL MASONRY
I. DRILLED PIERS
J. SPECIAL GRADING, EXCAVATION AND FILLING
INSPECTIONS SHALL BE PROVIDED ON AN ONGOING FULL-TIME BASIS IN AN ORGANIZED AND SYSTEMATIC MANNER IN ORDER TO MINIMIZE POTENTIAL CONSTRUCTION DELAYS REQUIRED TO CORRECT ENCOUNTERED DEFICIENCIES. SEE
SHEET 3SS105 FOR INSPECTION PROGRAM.
1-7 WHERE REQUIRED BY THE BUILDING OFFICIAL OR OTHER PROVISIONS OF IBC SECTION 1704.5, THE OWNER SHALL EMPLOY AN ENGINEER ACCEPTABLE TO THE ENGINEER OF RECORD & BUILDING OFFICIAL TO PERFORM STRUCTURAL OBSERVATION AS DEFINED IN IBC SECTION 202 AND IN COMPLIANCE WITH CBC SECTION 1704.5.
CONSTRUCTION STAGES AND ELEMENTS TO BE OBSERVED:
A. IN-PLACE REINFORCING FOR THE FOLLOWING:
1. FIRST FOOTINGS AND GRADE BEAMS SUPPORTING THE SEISMIC FORCE RESISTING MOMENT FRAME
COLUMNS.
2. FIRST LIFT OF SEISMIC FORCE RESISTING MOMENT FRAME COLUMNS.
3. FIRST POUR OF ELEVATED SLAB AND SEISMIC FORCE RESISTING MOMENT FRAME BEAMS.
1-8 IN THE EVENT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON DRAWINGS OR CALLED FOR IN THE NOTES OR SPECIFICATIONS, THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR CALLED FOR AND SHALL BE REVIEWED BY THE ARCHITECT.
1-9 EXISTING CONDITIONS DEPICTED ON THESE DRAWINGS ARE TO BE FIELD VERIFIED BY THE CONTRACTOR AS THEY ARE UNCOVERED DURING CONSTRUCTION. IN THE EVENT EXISTING CONDITIONS ARE DIFFERENT THAN SHOWN, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND STRUCTURAL ENGINEER IMMEDIATELY AND AWAIT FURTHER
INSTRUCTION BEFORE PROCEEDING WITH CONSTRUCTION.
1-10 PRIOR TO ANY DRILLING, CORING, OR CUTTING OF CAST CONCRETE, THE CONTRACTOR SHALL SUBMIT TO THE STRUCTURAL ENGINEER FOR REVIEW, THE PROPOSED SIZES AND LOCATIONS OF ALL HOLES. THE CONTRACTOR SHALL
TAKE WHATEVER STEPS THAT ARE NECESSARY TO LOCATE AND AVOID ALL REINFORCEMENT.
1-11 FOR TYPICAL DETAILS SEE SHEET 3SS002, 3SS501, 3SS502 & 3SS503.
SECTION 2: FOUNDATION
2-1 FOUNDATION DESIGN BASED ON SOIL INVESTIGATION BY:
REPORT NUMBER: SCS&T No. 150125F DATED: DECEMBER 15, 2010 SCS&T No. 160174F DATED: MARCH 10, 2016
IN COMPLIANCE WITH THE ABOVE REFERENCED GEOTECHNICAL REPORTS:
1. MINIMUM FOOTING WIDTH SHALL BE 1'-6" AND MINIMUM BOTTOM OF FOOTING EMBEDMENT BELOW LOWEST ADJACENT GRADE SHALL BE 1'-6" AND THE CORRESPONDING ALLOWABLE SOIL BEARING PRESSURE IS 5000 psf.
2. ALLOWABLE SOIL BEARING PRESSURE MAY BE INCREASED 250 psf FOR EACH ADDITIONAL FOOT OF WIDTH AND 500 psf FOR EACH ADDITIONAL FOOT OF EMBEDMENT, NOT TO EXCEED A MAXIMUM ALLOWABLE SOIL BEARING PRESSURE OF 7500 psf. THIS VALUE CAN BE INCREASED BY 1/3 WHEN CONSIDERING THE TOTAL OF
ALL LOADS, INCLUDING WIND OR SEISMIC FORCES.
2-2 ALL SITE WORK AND GRADING SHALL BE DONE IN COMPLIANCE WITH THE SOIL INVESTIGATION REPORT.
2-3 THE SOILS ENGINEER SHALL REVIEW ALL DRILLED PIER OPERATIONS AND ALL SITE WORK AND FOOTING EXCAVATIONS BEFORE ANY CONCRETE IS CAST, AND SUBMIT A LETTER OF COMPLIANCE TO THE ARCHITECT.
2-4 THE SOILS ENGINEER SHALL REVIEW ALL BACKFILL MATERIALS PRIOR TO PLACEMENT AND OBSERVE BACKFILL OPERATIONS. A LETTER OF COMPLIANCE SHALL BE SUBMITTED TO THE ARCHITECT STATING THAT FILLS HAVE BEEN CONSTRUCTED PER THE RECOMMENDATIONS OF THE SOILS ENGINEER AND WILL PERFORM SATISFACTORILY.
2-5 DRILLED PIERS: INSTALL PILES WITHIN THE FOLLOWING MAXIMUM TOLERANCES:
A. TOLERANCE FOR LOCATION OF CAISSON CENTERLINE SHALL BE 1 1/2".
B. PLUMBNESS: MAINTAIN 1 INCH IN 10 FEET FROM VERTICAL, OR A MAXIMUM OF 4 INCHES, MEASURED WHEN
THE PILE IS ABOVE GROUND IN LEADS.
2-6 DRILLED PIERS SHALL BE INSTALLED IN ACCORDANCE WITH THE RECOMMENDATIONS IN THE SOILS REPORT AND
IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
2-7 QUANTITY OF PIERS SHOWN ON 3SS101 IS BASED ON ESTIMATIONS OF DEPTH TO FORMATIONAL MATERIAL.
NUMBER OF PIERS REQUIRED MAY INCREASE IF DEPTH TO FORMATIONAL MATERIAL EXCEEDS WHAT IS PRACTICAL FOR
USE OF SHALLOW SPREAD FOOTINGS.
SECTION 3: CONCRETE
3-1 CONCRETE MIXES TO BE DESIGNED BY A RECOGNIZED TESTING LABORATORY AND COPIES OF DESIGN SENT TO THE ARCHITECT. COMPRESSIVE STRENGTH TEST REPORTS SHALL BE SUBMITTED TO THE BUILDING DEPARTMENT AND ARCHITECT. ALL CONCRETE SHALL USE A POLYMER BASED WATER REDUCING ADMIXTURE. ADMIXTURES CONTAINING
CHLORIDES SHALL NOT BE USED.
3-2 PORTLAND CEMENT SHALL CONFORM TO ASTM C150, TYPE II OR II-LOW ALKALI. AGGREGATE FOR STONE CONCRETE SHALL CONFORM TO ASTM C33, AND AGGREGATE FOR LIGHT-WEIGHT CONCRETE SHALL CONFORM TO ASTM C330. AGGREGATE SIZE FOR ALL CONCRETE SHALL CONFORM TO ASTM C33 SIZE NUMBER 57 (1" MAXIMUM SIZE).
AGGREGATE SIZE FOR FOOTINGS AND SLABS-ON-GRADE MAY CONFORM TO ASTM C33 SIZE NUMBER 467 (1 1/2"
MAXIMUM SIZE) AT CONTRACTOR'S OPTION.
3-3 FOR WALLS, SLABS ON GRADE, AND ELEVATED SLABS AND BEAMS, DRY CURING SHRINKAGE AT 28 DAYS SHALL NOT EXCEED 0.045%. SHRINKAGE TESTS SHALL COMPLY WITH ASTM C157, AS MODIFIED BY SEAOC. SPECIFIED SHRINKAGE LIMITS ARE FOR LABORATORY PREPARED AND CURED SPECIMENS. FOR CONCRETE TO BE PLACED IN SLABS ON GRADE AND ELEVATED SLABS AND BEAMS, PROVIDE SHRINKAGE TEST RESULTS 2 WEEKS MINIMUM, PRIOR TO
PLACING CONCRETE.
3-4 ALL REINFORCING BARS, ANCHOR BOLTS, PRESTRESSING TENDONS AND OTHER CONCRETE INSERTS SHALL BE
WELL SECURED IN POSITION PRIOR TO PLACING CONCRETE.
3-5 THE MAXIMUM SLUMP SHALL NOT EXCEED THE FOLLOWING:
A. PRIOR TO THE ADDITION OF A HIGH RANGE WATER REDUCING AGENT: 4" ± 1"
B. AFTER ADDITION OF A HIGH RANGE REDUCING AGENT: 8" ± 1"
3-6 MINIMUM ULTIMATE COMPRESSIVE STRENGTH AT 28 DAYS (UNO) SHALL BE AS FOLLOWS:
(MINIMUM 470 POUNDS OF CEMENTITIOUS MATERIALS PER CUBIC YARD)
A. FOOTINGS & SOG: 3000 psi
B. DRILLED PIERS: 6000 psi
C. UPTURNED FRAME BEAMS
INCLUDING @ GRADE LEVEL: 4000 psi TYPICAL EXCEPT
5000 psi WHERE SHOWN ON FRAME ELEVATIONS
D. COLUMNS: 4000 psi TYPICAL EXCEPT 5000 psi WHERE NOTED ON COLUMN SCHEDULE
E. ELEVATED SLABS &
DOWNTURNED BEAMS: 3000 psi @ 3 DAYS & 4500 psi @ 28 DAYS
F. ALL OTHER CONCRETE: 3000 psi UNO ON PLANS
3-7 ALL CONCRETE FOR ROOF DECKS (ALL DECKS EXPOSED TO WEATHER) SHALL CONTAIN 1.5 POUNDS PER CUBIC YARD OF FIBERMESH 300 SYNTHETIC FIBERS OR AS RECOMMENDED BY THE FIBER MANUFACTURER.
3-8 SAMPLES FOR TESTING SHALL BE REQUIRED AS OUTLINED BY ACI 318-11 SECTION 5.6 EVALUATION AND ACCEPTANCE OF CONCRETE. A SAMPLE SHALL CONSIST OF A MINIMUM OF 4 CYLINDERS, ONE TO BE TESTED AT 7 DAYS, 2 TO BE TESTED AT 28 DAYS AND ONE TO BE TESTED AT 56 DAYS IF AVERAGE REQUIRED STRENGTH AT 28 DAYS IS BELOW ACCEPTABLE LIMITS. FOR POST-TENSIONED MEMBERS, A 3-DAY TEST MAY BE USED IN LIEU OF THE 7-DAY TEST TO FACILITATE STRESSING OPERATIONS. ALL TEST CYLINDERS SHALL BE NUMBERED SEQUENTIALLY AS THEY PERTAIN TO THIS PROJECT. TEST REPORTS SHALL ALSO INCLUDE THE TEST RESULTS FOR SLUMP AND IF APPLICABLE, PERCENTAGE OF
AIR.
3-9 PROJECTING CORNERS OF BEAMS, COLUMNS, ETC. SHALL BE FORMED WITH 3/4" CHAMFER UNLESS DETAILED
OTHERWISE.
3-10 CONDUIT OR PIPE SIZE (OD) SHALL NOT EXCEED 30% OF SLAB THICKNESS UNLESS SPECIFICALLY DETAILED OTHERWISE AND SHALL BE LOCATED IN MIDDLE 1/3 OF SLAB. CLEAR SPACING BETWEEN ADJACENT CONDUITS OR PIPES SHALL BE THREE TIMES THE LARGER O.D. MINIMUM, UNLESS NOTED OTHERWISE ON PLANS. FOR CONDUITS OR PIPES IN
COLUMNS SEE B/3SS311.
3-11 ALL CONCRETE CONSTRUCTION JOINTS SHALL HAVE 1/4" ± AMPLITUDE ROUGHNESS OR KEYED JOINTS, UNLESS
NOTED OTHERWISE.
3-12 LIGHTWEIGHT CONCRETE SHALL HAVE A MAXIMUM DENSITY OF 110 pcf.
3-13 INSULATING CONCRETE SHALL HAVE A MAXIMUM DENSITY OF 110 pcf.
3-14 FLY ASH SHALL CONFORM TO ASTM C618 CLASS F, EXCEPT AS NOTED. FLY ASH SHALL NOT EXCEED 25% OF CEMENTITIOUS MATERIAL BY WEIGHT. FLY ASH USED SHALL NOT EXPERIENCE A LOSS ON IGNITION OF GREATER THAN 2%.
3-15 IF CONCRETE IS PUMPED, PROVIDE HORSES OR OTHER SUITABLE MEANS TO SUPPORT THE HOSE SO THAT IT
DOES NOT RIDE ON THE TENDONS OR ON THE MILD REINFORCING STEEL.
SECTION 5: MASONRY
5-1 BLOCK MASONRY UNITS SHALL BE SINGLE OR DOUBLE OPEN END BOND BEAM UNITS CONFORMING TO ASTM C90, LATEST REVISION. THE FIRST COURSE OF BLOCK FOR BLOCK LIFTS EXCEEDING 5'-0" SHALL HAVE CLEANOUTS
CONSISTING OF DOUBLE OPEN END BOND BEAM BLOCK. SEE DETAIL A/3SS503.
5-2 MINIMUM f 'm = 1500 psi UNO.
5-3 f 'm SHALL BE DETERMINED PER THE IBC SECTION 2105. PROVIDE SUBMITTALS, TESTING AND INSPECTIONS AS
REQUIRED BY ACI 530-11 TABLE 1.19.2.
5-4 IN NO CASE SHALL COMPRESSIVE STRENGTH OF BLOCK UNITS BE LESS THAN 125% OF SPECIFIED f 'm. IN NO CASE SHALL GROUT FOR THE BLOCK UNITS HAVE A COMPRESSIVE STRENGTH LESS THAN 2000 psi AND 125% OF SPECIFIED f 'm AT 28 DAYS. MORTAR SHALL BE TYPE "S" OR "M".
5-5 MINIMUM LAP OF REINFORCING STEEL SHALL BE C/3SS503.
5-6 GROUT POURS SHALL BE TO THE FULL HEIGHT OF THE BLOCK LIFT. MAXIMUM GROUT POUR HEIGHT SHALL COMPLY WITH ACI 530-11 SECTION 1.20. GROUT POURS EXCEEDING 5'-0" IN HEIGHT SHALL CONSIST OF MULTIPLE GROUT LIFTS OF 5'-0" OR LESS IN HEIGHT. CONSOLIDATE AND RECONSOLIDATE EACH GROUT LIFT BY MEANS OF MECHANICAL VIBRATION IN COMPLIANCE WITH ACI 530.1 SECTION 3.5.E. A GROUT LIFT SHALL NOT BE PERMITTED TO
SET PRIOR TO PLACEMENT AND CONSOLIDATION OF SUBSEQUENT GROUT LIFT.
5-7 HORIZONTAL CONSTRUCTION JOINTS BETWEEN GROUT POURS SHALL BE LOCATED 1" ± 1/2" BELOW A MORTAR
JOINT.
5-8 MINIMUM GROUTING: FILL ALL CELLS.
5-9 ALL BOLTS IN MASONRY SHALL BE CENTERED IN CELLS ± 2 INCHES.
SECTION 6: REINFORCING STEEL
6-1 LONGITUDINAL REINFORCING STEEL IN ALL CONCRETE COLUMNS AND BEAMS SHALL BE ASTM A706, GRADE 60.
6-2 ALL OTHER REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60 OR ASTM A706, GRADE 60, UNO.
6-3 REINFORCING STEEL THAT IS TO BE WELDED SHALL BE ASTM A706, GRADE 60. REBAR WELDED TO REBAR SHALL BE
WELDED USING E80XX LOW-HYDROGEN ELECTRODES.
6-4 CLEAR COVERAGE OF CONCRETE OVER OUTER REINFORCING BARS SHALL BE AS FOLLOWS UNO:
A. CAST-IN-PLACE CONCRETE (NONPRESTRESSED):
1. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3"
2. CONCRETE EXPOSED TO EARTH OR WEATHER:
#6 THROUGH #18 BARS: 2"
#5 BAR, W31 OR D31 WIRE, AND SMALLER: 1 1/2"
3. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
SLABS, WALLS, JOISTS:
#14 AND #18 BARS: 1 1/2"
#11 BAR AND SMALLER: 3/4"
BEAMS, COLUMNS:
PRIMARY REINFORCEMENT, TIES, STIRRUPS, SPIRALS: 1 1/2"
B. CAST-IN PLACE CONCRETE (PRESTRESSED) -
PRESTRESSED AND NON-PRESTRESSED REINFORCEMENT, DUCTS, AND END FITTINGS:
1. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3"
2. CONCRETE EXPOSED TO EARTH OR WEATHER:
WALL PANELS, SLABS, JOISTS: 1"
OTHER MEMBERS: 1 1/2"
3. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
SLABS, WALLS, JOISTS: 3/4"
BEAMS, COLUMNS:
PRIMARY REINFORCEMENT: 1 1/2"
TIES, STIRRUPS, SPIRALS: 1 1/2"
6-5 SMOOTH WIRE MESH SHALL CONFORM TO ASTM A1064, AND SHALL BE LAPPED 1 1/2 SPACES (12" MINIMUM).
DEFORMED WELDED WIRE REINFORCEMENT IN SLABS ON GRADE AND FOR STIRRUPS IN BEAMS AND GIRDERS SHALL CONFORM TO ASTM A1064 AND MINIMUM YIELD STRESS f y = 80 ksi. WELDED WIRE IN ELEVATED SLABS SHALL CONFORM TO ASTM A1064 AND MINIMUM YIELD STRESS f y = 60 ksi.
6-6 ALL FIELD BENDING OR STRAIGHTENING OF REINFORCING BARS SHALL BE MADE PER ACI 301 SECTION 3.3.2.8.
6-7 REINFORCING BARS SHALL BE SPLICED AS SHOWN ON DRAWINGS. ANY ADDITIONAL SPLICING SHALL REQUIRE
REVIEW FROM THE ENGINEER.
6-8 MECHANICAL COUPLERS SHALL HAVE AN EVALUATION REPORT DEMONSTRATING COMPLIANCE WITH THE
REQUIREMENTS OF A TYPE 2 CONNECTOR PER THE LATEST EDITION OF ACI 318.
6-9 CONTRACTOR SHALL NOT PLACE ANY REINFORCING UNTIL SHOP DRAWINGS REVIEWED BY THE ENGINEER ARE RECEIVED ON THE JOB. SHOP DRAWINGS SHALL CONSIST OF BOTH "CUT" AND PLACING SHEETS. PLACING SHEETS SHALL CONTAIN ALL INFORMATION NECESSARY TO POSITION ALL REINFORCING STEEL IN THE FIELD WITHOUT HAVING TO REFER TO THE STRUCTURAL DRAWINGS. SHOP DRAWINGS SHALL NOT CONTAIN ANY REPRODUCTIONS OF THE
STRUCTURAL DRAWINGS.
SECTION 7: STRUCTURAL STEEL
7-1 STRUCTURAL STEEL WIDE FLANGE SECTIONS SHALL CONFORM TO ASTM A572 GRADE 50 OR ASTM A992, UNLESS NOTED OTHERWISE. STEEL PLATE AND BARS 3/8” OR GREATER IN THICKNESS SHALL BE ASTM A572, GRADE 50. ALL OTHER STEEL SHALL CONFORM TO ASTM A36 UNLESS NOTED OTHERWISE. ALL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED IN ACCORDANCE WITH THE AISC SPECIFICATIONS AND CODE OF STANDARD PRACTICE AS AMENDED TO
DATE.
7-2 PIPE COLUMNS SHALL CONFORM TO ASTM A53, GRADE B.
7-3 STRUCTURAL TUBES SHALL CONFORM TO ASTM 500, GRADE B.
7-4 ALL BOLTS, NUTS AND WASHERS SHALL CONFORM TO ASTM A490 UNLESS NOTED OTHERWISE ON DRAWINGS.
ANCHOR BOLTS SHALL CONFORM TO ASTM F1554, GRADE 36 UNLESS NOTED OTHERWISE ON DRAWINGS. MACHINE
BOLTS SHALL CONFORM TO ASTM A307.
7-5 INSTALLATION AND INSPECTION OF HIGH STRENGTH BOLTS SHALL CONFORM TO THE REQUIREMENTS OF THE FOURTEENTH EDITION AISC SPECIFICATIONS. CONTACT FACES OF STEEL AT CONNECTIONS WHERE HIGH STRENGTH BOLTS ARE USED SHALL NOT BE PAINTED. HOLES FOR HIGH STRENGTH BOLTS SHALL BE BOLT DIAMETER + 1/16", UNO.
7-6 SLIP CRITICAL (SC) TYPE BOLTS SHALL BE INSTALLED AT ALL MOMENT CONNECTIONS AND WHERE NOTED ON PLANS AND DETAILS. SLIP CRITICAL BOLTS SHALL BE INSTALLED PER THE AISC SPECIFICATIONS AND MANUFACTURERS
RECOMMENDATIONS.
7-7 BEARING (N) TYPE CONNECTIONS SHALL BE USED AT ALL SIMPLE SHEAR CONNECTIONS, UNLESS NOTED
OTHERWISE.
7-8 THE STRUCTURAL STEEL FABRICATOR SHALL FURNISH SHOP AND ERECTION DRAWINGS OF ALL STEEL FOR
ENGINEER REVIEW BEFORE FABRICATION. ALL STEEL FABRICATION TO BE DONE IN A SHOP ACCEPTABLE TO THE BUILDING DEPARTMENT. CONTRACTOR SHALL NOT ERECT ANY STRUCTURAL STEEL UNTIL THE SHOP DRAWINGS REVIEWED BY THE ENGINEER ARE RECEIVED AT THE JOB SITE. SHOP AND ERECTION DRAWINGS SHALL CONTAIN ALL INFORMATION NECESSARY TO ERECT ALL STRUCTURAL STEEL IN THE FIELD WITHOUT HAVING TO REFER TO THE STRUCTURAL DRAWINGS. SHOP DRAWINGS SHALL NOT CONTAIN ANY REPRODUCTIONS OF THE STRUCTURAL
DRAWINGS.
7-9 EXCEPT WHERE ENCASED IN CONCRETE, MASONRY OR SPRAYED-ON FIREPROOFING, ALL STEEL IN UNCONDITIONED SPACES SHALL BE SHOP PAINTED OR HOT-DIPPED GALVANIZED UNLESS NOTED OTHERWISE ON THE
DRAWINGS.
7-10 STRUCTURAL STEEL FRAMING MEMBERS SHALL BE SUPPORTED DURING FIELD WELDING, EXCEPT WELDING OF METAL DECK, STEEL STUDS, ETC. SUPPORTS SHALL REMAIN IN PLACE UNTIL STEEL TEMPERATURE HAS RETURNED TO AIR
TEMPERATURE.
7-11 OPENINGS SHALL NOT BE PLACED IN STEEL MEMBERS UNLESS SPECIFICALLY DETAILED, STEEL MEMBERS SHALL BE SHORED WHEN PERMISSIBLE HOLES ARE CUT WITH A TORCH AFTER STEEL IS ERECTED. THE SHORES SHALL REMAIN IN
PLACE UNTIL STEEL TEMPERATURE HAS RETURNED TO AIR TEMPERATURE.
7-12 STIFFENERS SHALL HAVE THE SAME WIDTH AS THE FLANGES OF THE STEEL MEMBERS UNLESS DETAILED OTHERWISE.
BEARING STIFFENERS SHALL HAVE CLOSE BEARING AGAINST FLANGES.
7-13 BASE PLATES SHALL BE FINISHED PER AISC SPECIFICATIONS, SECTION M2-8. COLUMN ENDS SHALL BE FINISHED
PER CODE OF STANDARD PRACTICE, SECTION 6.2.2.
7-14 HEADED/THREADED STUD AND DEFORMED BAR ANCHORS SHALL BE NELSON STUD ANCHORS (NSA) OR NELSON DEFORMED BAR ANCHORS (DBA). NSA'S AND DBA'S SHALL BE INSTALLED WITH A STUD WELDING GUN ACCORDING TO THE MANUFACTURERS RECOMMENDATIONS. ALTERNATE WELDING PROCESSES MUST BE REVIEWED IN ADVANCE BY THE
ENGINEER.
7-15 ALL WELDS NOT SPECIFIED SHALL BE CONTINUOUS FILLET WELDS. SIZE OF WELD SHALL BE BASED ON AISC
STANDARDS FOR THICKER PART JOINED.
7-16 STRUCTURAL STEEL SHALL BE DELIVERED TO THE JOB SITE FREE OF EXCESSIVE RUST, MILL SCALE, GREASE, ETC. OR
ANY OTHER SUBSTANCE WHICH MAY IMPAIR PROPER ADHESION OF THE FIREPROOFING.
7-17 ALL COMPLETE JOINT PENETRATION GROOVE WELDS SHALL HAVE NON-DESTRUCTIVE TESTING PERFORMED BY EITHER ULTRASONIC TESTING OR RADIOGRAPHY. THE BASIC RATE OF TESTING SHALL BE 100% BUT MAY BE REDUCED AS ALLOWED BY AISC 341-10 SECTIONS J6.2g AND J6.2h.
7-18 BASE METAL THICKER THAN 1 1/2" INCHES, WHEN SUBJECTED TO THROUGH-THICKNESS WELD SHRINKAGE STRAINS, SHALL BE ULTRASONICALLY INSPECTED FOR DISCONTINUITIES AFTER JOINT COMPLETION AS REQUIRED BY AISC 341-10 SECTION J6.2c.
7-19 HEADED CONCRETE ANCHORS (HCA), THREADED STUD ANCHORS (TSA) AND DEFORMED BAR ANCHORS (DBA) SHALL BE AS MANUFACTURED BY NELSON STUD WELDING, INC. OR EQUIVALENT. HCA'S, TSA'S AND DBA'S SHALL BE INSTALLED WITH A STUD WELDING GUN ACCORDING TO THE MANUFACTURERS RECOMMENDATIONS. ALTERNATE
WELDING PROCESSES MUST BE REVIEWED IN ADVANCE BY THE ENGINEER.
7-20 ALL STRUCTURAL STEEL EMBEDS SHALL BE PROVIDED WITH 3/16" DIAMETER NAIL HOLES AT 12" O.C. MAXIMUM SPACING EACH WAY AND 3 HOLES MINIMUM PER EMBED. THESE NAIL HOLES SHALL BE UTILIZED BY THE INSTALLER TO
SECURELY FASTEN THE EMBED TO THE CONCRETE FORMWORK.
7-21 WHERE SHORT SLOTTED HOLES ARE USED IN AN OUTER PLY, A STANDARD WASHER SHALL BE PROVIDED. WHERE HIGH STRENGTH BOLTS ARE USED, SUCH WASHERS SHALL BE HARDENED. THE WASHERS SHALL BE OF SUFFICIENT SIZE
TO COMPLETELY COVER THE HOLE AFTER INSTALLATION.
7-22 WHERE LONG SLOTTED HOLES ARE USED IN AN OUTER PLY, PLATE WASHERS OR A CONTINUOUS BAR WITH STANDARD HOLES, HAVING A SIZE SUFFICIENT TO COMPLETELY COVER THE SLOT AFTER INSTALLATION, SHALL BE PROVIDED. IN HIGH STRENGTH BOLTED CONNECTIONS, SUCH PLATES OR CONTINUOUS BARS SHALL NOT BE LESS THAN 5/16” THICK AND SHALL BE ASTM A36 MATERIAL. IF HARDENED WASHERS ARE REQUIRED FOR USE, THEY SHALL BE
PLACED OVER THE PLATE WASHER OR BAR.
SECTION 8: METAL DECK
8-1 METAL DECK SHALL BE VERCO METAL DECK OR EQUIVALENT. PROVIDE VENT TABS PER MANUFACTURER'S
SPECIFICATIONS WHERE CONCRETE FILL IS PLACED OVER DECK.
8-2 METAL DECK SHALL BE FORMED FROM STEEL SHEETS CONFORMING TO ASTM A653 SS, WITH G90 GALVANIZED COATING. UNITS SHALL BE FASTENED TO ALL FRAMING BY 3/4" DIA. PUDDLE WELDS (1/2" DIA. NET) AT INTERVALS INDICATED ON STRUCTURAL DRAWINGS. SIDELAP OF ADJACENT UNITS SHALL BE CONNECTED AS INDICATED ON
STRUCTURAL DRAWINGS.
8-3 LIGHT GAGE CLOSURE ANGLES SHALL BE PROVIDED BY DECKING CONTRACTOR FOR ALL CONCRETE FILLED
DECKS.
8-4 CONDUIT IN CONCRETE SLABS ON METAL DECK:
A. THE STRUCTURAL ENGINEER SHALL REVIEW PROPOSED CONDUIT LOCATIONS, SIZES AND SPACINGS PRIOR TO
INSTALLATION.
B. THE DIAMETER OF CONDUIT PLACED ON THE TOP OF THE DECKING SHALL NOT EXCEED 1/3 THE THICKNESS OF THE CONCRETE ABOVE THE TOP OF THE DECK. THE SPACING BETWEEN INDIVIDUAL CONDUIT RUNS SHALL BE 6"oc MINIMUM.
C. CONDUIT RUNNING PARALLEL TO THE FLUTES MAY BE PLACED IN THE BOTTOM OF THE FLUTES PROVIDED A MINIMUM OF 1" CLEAR IS MAINTAINED FROM THE RIBBED WEBS (VERTICAL SIDES) AND BETWEEN ADJACENT
PIPES IN THE SAME FLUTE.
8-5 METAL DECKING SHALL BE WELDED USING E60XX ELECTRODES, MINIMUM.
SECTION 20: MISCELLANEOUS
20-1 NON-SHRINK GROUT OR DRY PACK SHALL BE A PREMIXED NON-METALLIC FORMULA HAVING THE FOLLOWING CHARACTERISTICS: NO SHRINKAGE AFTER PLACEMENT OR EXPANSION (ASTM C827) AFTER SET, ONE DAY COMPRESSIVE STRENGTH OF AT LEAST (ASTM C109) 3000 psi AND INITIAL SET TIME OF NOT LESS THAN 45 MINUTES (ASTM C191).
PROVIDE "SUPREME GROUT", FROM U.S. GROUT CORP.; "5 STAR GROUT", FROM BURKE CO.; "324", FROM CLIFFORD HILL, OR EQUIVALENT. MINIMUM f 'c AT 28 DAYS = 5,000 psi.
20-2 THE STRUCTURE HAS BEEN DESIGNED FOR THE FOLLOWING LIVE LOADS:
A. ROOFS: 20 psf REDUCIBLE B. PARKING FLOORS: 40 psf REDUCIBLE, 3000 lb CONCENTRATED C. STAIRS: 100 psf REDUCIBLE D. VEHICLE BARRIER: 6000 lbs PER IBC 1607.7.3
20-3 THE STRUCTURE HAS BEEN DESIGNED FOR THE FOLLOWING LATERAL LOADS:
A. WIND
BASIC WIND SPEED: 110 MPH
RISK CATEGORY: II
EXPOSURE: C
INTERNAL PRESSURE COEFFICIENT: GCpi = ±0.018
SEE SCHEDULE THIS SHEET FOR DESIGN WIND PRESSURES FOR EXTERNAL COMPONENTS AND CLADDING.
B. SEISMIC
SHORT PERIOD SPECTRAL ACCELERATION: SS = 1.199
1-SECOND PERIOD SPECTRAL ACCELERATION: S1 = 0.464
SOIL SITE CLASS: C
SHORT PERIOD SPECTRAL COEFFICIENT: SDS = 0.800
1-SECOND PERIOD SPECTRAL COEFFICIENT: SD1 = 0.413
RISK CATEGORY: II
SEISMIC DESIGN CATEGORY: D
IMPORTANCE FACTOR: I =1.00
RESPONSE MODIFICATION COEFFICIENT:
SPECIAL MOMENT FRAMES: R = 8
ANALYSIS PROCEDURE: MODAL RESPONSE SPECTRUM ANALYSIS
20-4 VERTICAL DEFORMATION COMPATIBILITY BETWEEN FLOORS: DESIGN AND ATTACHMENT OF ELEMENTS TO THE PRIMARY STRUCTURAL SYSTEM SHALL BE CAPABLE OF ACCOMMODATING VERTICAL MEMBER DEFLECTION WITHOUT STRUCTURAL OR COSMETIC DAMAGE. CONNECTIONS TO PRIMARY STRUCTURAL SYSTEM SHALL NOT BE MADE UNTIL ALL STRUCTURAL WORK SHOWN ON THE DRAWINGS IS COMPLETE, UNLESS SPECIFICALLY AUTHORIZED BY THE STRUCTURAL ENGINEER. SUPERIMPOSED LOAD DEFLECTION IS LIMITED TO THE LESSER OF 3/4” OR SPAN/360 FOR
BUILDING EDGE BEAMS AND SPAN/360 FOR ALL OTHER BEAMS.
20-5 LATERAL DEFORMATION COMPATIBILITY BETWEEN FLOORS: DESIGN AND ATTACHMENT OF ELEMENTS TO THE PRIMARY STRUCTURAL SYSTEM SHALL BE GOVERNED BY ASCE 7 - SECTION 12.12.5, 13.5.2, 13.5.3 AND 13.5.4, AND
LIMITED TO THE FOLLOWING:
A. ELASTIC INTER-STORY DRIFT LIMIT: MEMBERS, CONNECTIONS, AND FINISHES SHALL BE CAPABLE OF ACCOMMODATING 3/4” LATERAL INTER-STORY DISPLACEMENT IN ANY DIRECTION WITHOUT STRUCTURAL OR
COSMETIC DAMAGE.
B. INELASTIC INTER-STORY DRIFT LIMIT: MEMBERS, CONNECTIONS, AND FINISHES SHALL BE CAPABLE OF ACCOMMODATING 2” OF LATERAL INTER-STORY DISPLACEMENT IN ANY DIRECTION WITHOUT STRUCTURAL
FAILURE OR COLLAPSE.
D
ES
IG
N
D
EV
EL
O
PM
EN
T
/0 6/
C O
N
ST
RU
C
TI
O
N D
O C
U M
EN
TS
C D
-1
4/
/2
C O
N
ST
RU
C
TI
O
N D
O C
U M
EN
TS
[C D
-2 ] 0
5/
/2
M
ET
AL
S
C
RE
EN
S
F
IN
IS
H F
LO
O
R G
RA
D
E
RE
VI
SI
O N
S
9/
/2
IS
SU
E
FO
R
BI
D
/0 6/
IS
SU
E
FO
R
BI
D
/2 7/
IS
SU
E
FO
R
BI
D
/2 6/
SHEET INDEX
● ● ● ● ● ● ● 3SS001 STRUCTURAL COVER SHEET
● ● ● ● ● ● 3SS002 POST TENSIONING DETAILS & NOTES
● ● ● ● ● ● 3SS005 SPECIAL INSPECTION NOTES
● ● ● ● ● ● 3SS101 B2 LEVEL FOUNDATION PLAN
● ● ● ● ● ● ● 3SS102 B1 LEVEL FRAMING PLAN
● ● ● ● ● ● ● 3SS103 GROUND LEVEL FRAMING PLAN
● ● ● ● ● ● ● 3SS104 SECOND LEVEL FRAMING PLAN
● ● ● ● ● ● ● 3SS105 THIRD LEVEL FRAMING PLAN
● ● ● ● ● ● ● 3SS106 FOURTH LEVEL FRAMING PLAN
● ● ● ● ● ● ● 3SS107 FIFTH (ROOF) LEVEL FRAMING PLAN
● ● ● ● ● ● 3SS110 PARTIAL PLANS
● ● ● ● ● ● 3SS111 PARTIAL PLANS
● ● ● ● ● 3SS301 PILES & CAP PLANS & DETAILS
● ● ● ● ● ● 3SS310 COLUMN SCHEDULE
● ● ● ● ● ● 3SS311 COLUMN DETAILS
● ● ● ● ● ● 3SS315 FRAME COLUMN SCHEDULE
● ● ● ● ● 3SS340 FRAME ELEVATIONS
● ● ● ● ● 3SS341 FRAME ELEVATIONS
● ● ● ● ● 3SS342 FRAME ELEVATIONS
● ● ● ● ● 3SS350 GIRDER ELEVATION & DETAILS
● ● ● ● ● 3SS351 GIRDER ELEVATION & DETAILS
● ● ● ● ● 3SS360 BEAM ELEVATIONS
● ● ● ● ● 3SS361 BEAM ELEVATIONS
● ● ● ● ● 3SS362 BEAM ELEVATIONS
● ● ● ● ● ● 3SS385 BEAM DETAILS
● ● ● ● ● 3SS386 BEAM DETAILS
● ● ● ● ● ● 3SS390 SLAB SECTIONS
● ● ● ● ● ● 3SS391 SLAB SECTIONS
● ● ● ● ● ● 3SS392 SLAB SECTIONS
● ● ● ● ● ● 3SS501 CONCRETE DETAILS
● ● ● ● ● ● ● 3SS502 CONCRETE DETAILS
● ● ● ● ● ● 3SS503 CONCRETE DETAILS
● ● 3SS520 CONCRETE DETAILS
● ● ● ● ● ● 3SS601 STEEL DETAILS
● ● ● ● ● 3SS602 STEEL DETAILS
● ● ● ● ● ● 3SS610 STEEL DETAILS
● ● ● ● ● 3SS611 STEEL DETAILS
● ● ● ● ● 3SS612 STEEL DETAILS
● ● ● ● 3SS613 STEEL DETAILS
a
SECTION 22: DEFERRED SUBMITTAL ITEMS & REQUIREMENTS
22-1 THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING PERMITS FOR ALL DEFERRED SUBMITTAL ITEMS.
22-2 THE CONTRACTOR SHALL PREPARE THE DEFERRED SUBMITTAL DOCUMENTS: CALCULATIONS, SHOP DRAWINGS, MATERIAL SPECIFICATIONS AND DATA SHEETS, ALL OF WHICH SHALL BE WET-STAMPED AND WET-SIGNED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF CALIFORNIA. THE PREPARER OF THE DEFERRED SUBMITTAL
DOCUMENTS IS SOLELY RESPONSIBLE FOR THEIR DESIGN.
22-3 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE ARCHITECT OR ENGINEER OF RECORD, WHO SHALL REVIEW THEM AND RETURN THEM TO THE CONTRACTOR WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THEIR DESIGN AND SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL.
22-4 CULP AND TANNER'S REVIEW OF DEFERRED SUBMITTAL DOCUMENTS IS LIMITED TO VERIFICATION THAT THE DESIGN COMPLIES WITH THE PROJECT DESIGN INTENT, AND THAT THE PRIMARY STRUCTURAL SYSTEM DETAILED ON THE CULP AND TANNER DRAWINGS IS CAPABLE OF SUPPORTING THE IMPOSED LOADS AT CONNECTION POINTS. CULP AND TANNER IS NOT RESPONSIBLE FOR VERIFICATION OF CODE COMPLIANCE OF DEFERRED SUBMITTAL ITEMS.
22-5 THE CONTRACTOR SHALL SUBMIT THE DEFERRED SUBMITTAL DOCUMENTS AND ANY OTHER SUPPORTING DOCUMENTATION REQUIRED TO THE BUILDING DEPARTMENT AND RESOLVE ALL PLAN CHECK CORRECTIONS REQUIRED TO OBTAIN A PERMIT FOR DEFERRED SUBMITTAL ITEMS. FABRICATION AND INSTALLATION OF DEFERRED SUBMITTAL ITEMS SHALL NOT PROCEED UNTIL A PERMIT FOR THE ITEMS HAS BEEN OBTAINED BY THE CONTRACTOR.
22-6 THE CONTRACTOR SHALL COORDINATE ALL DEFERRED SUBMITTAL ITEMS WITH OTHER TRADES, THE ARCHITECT, AND OTHER CONSULTANTS. DESIGN SHALL INCLUDE THE DESIGN OF THE ELEMENT AND ITS CONNECTION TO THE STRUCTURE. EMBEDS REQUIRED BY DEFERRED SUBMITTAL CONTRACTORS SHALL BE FURNISHED, LAID OUT AND
INSTALLED BY THAT SUBCONTRACTOR.
22-7 DEFERRED SUBMITTAL ITEMS SHALL BE DESIGNED TO SPAN HORIZONTALLY AND VERTICALLY TO STRUCTURAL SUPPORT MEMBERS. METAL ROOF DECK AND METAL DECK WITH CONCRETE FILL SHALL NOT BE CONSIDERED STRUCTURAL SUPPORT MEMBERS FOR DEFERRED SUBMITTAL ITEMS UNLESS SPECIFICALLY AUTHORIZED IN WRITING BY
THE ENGINEER OF RECORD.
22-8 ITEMS NOT DESIGNED BY CULP AND TANNER THAT MAY REQUIRE DEFERRED SUBMITTAL BY THE BUILDING
DEPARTMENT INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING:
A. EXTERIOR & INTERIOR METAL STUDS.
B. WINDOW WALL, LOUVER, GLAZING AND SKYLIGHT SYSTEMS.
C. STAIRS, HANDRAILS, GUARDRAILS, CABLE BARRIERS, AND LANDINGS.
D. LIGHT STANDARD POLES, BASES AND ANCHORAGES.
E. SUPPORTS AND CONNECTIONS FOR PIPES, SPRINKLER AND WASTE LINES, DUCTS, CONDUITS, SUSPENDED
CEILINGS, SOFFITS, LIGHTS, CABLE TRAYS, ELECTRICAL, PLUMBING, AND MECHANICAL EQUIPMENT.
F. LADDERS, GATES, AND METAL GRATING.
G. ELEVATORS, ELEVATOR GUIDE RAILS, MACHINE BEAMS AND HOIST BEAMS.
H. ELEVATOR CANOPY.
I. SIGNAGE.
J. PRECAST ELEMENTS.
K. VENEERS, FACADES, AND RELATED ANCHORAGE SYSTEMS.
L. ANY STRUCTURE THAT IS NOT SHOWN ON THE STRUCTURAL DRAWINGS BUT IS REQUIRED BY OTHER
DISCIPLINES, SUCH AS ARCHITECTURAL, MECHANICAL, ELECTRICAL, LANDSCAPE, ETC.
COMPONENT AND CLADDING WIND PRESSURES @ MEAN ROOF HEIGHT
ZONE
AREA = 10 ft² AREA = 20 ft² AREA = 50 ft² AREA = 100 ft² AREA = 200 ft² AREA = 500 ft²
+p(psf) -p(psf) +p(psf) -p(psf) +p(psf) -p(psf) +p(psf) -p(psf) +p(psf) -p(psf) +p(psf) -p(psf)
1 16.0 -48.8 16.0 -46.1 16.0 -42.4 16.0 -39.9 16.0 -37.1 16.0 -33.4
2 16.0 -76.7 16.0 -73.0 16.0 -67.7 16.0 -64.0 16.0 -60.0 16.0 -55.0
3 16.0 -76.7 16.0 -73.0 16.0 -67.7 16.0 -64.0 16.0 -60.0 16.0 -55.0
4 33.4 -33.4 33.4 -33.4 30.8 -31.6 28.7 -30.3 26.7 -29.0 24.1 -27.2
5 33.4 -61.2 33.4 -61.2 30.8 -54.1 28.7 -48.8 26.7 -43.6 24.1 -36.5
TYP PARAPET 100.4 -56.5 96.6 -56.5 88.6 -52.0 82.8 -48.6 76.7 -45.2 69.0 -40.8
CORNER PAPAPET 100.4 -84.7 96.6 -84.7 88.6 -74.8 82.8 -67.4 76.7 -60.1 69.0 -50.2 a a
2a2a a
2a h
ROOF PLAN WALL ELEVATION
z 1 2
2 33
45 5
POSITIVE
PRESSURE
ADJUSTMENT
FACTORS
z/h FACTOR
0.1 0.79
0.2 0.79
0.3 0.83
0.4 0.87
0.5 0.90
0.6 0.92
0.7 0.94
0.8 0.96
0.9 0.98
1.0 1.00
NOTES:
1. POSITIVE SIGNS SIGNIFY PRESSURES ACTING TOWARD THE EXTERIOR SURFACE. NEGATIVE SIGNS SIGNIFY PRESSURES
ACTING AWAY FROM THE EXTERIOR SURFACE. POSITIVE AND NEGATIVE FORCES DO NOT ACT CONCURRENTLY.
2.
3. PRESSURES IN THE TABLE ABOVE ARE EVALUATED AT THE MEAN ROOF HEIGHT. FOR POSITIVE PRESSURES AT ELEVATIONS LOWER THAN THE MEAN ROOF HEIGHT, IT SHALL BE PERMITTED TO MULTIPLY THE POSITIVE PRESSURES IN THE TABLE ABOVE BY THE ADJUSTMENT FACTORS INDICATED. REDUCTION OF POSITIVE PRESSURES BELOW 16 PSF ARE NOT
PERMITTED.
a (ft) = 21.00
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: 664-401 Office of Facilities
Management Architecture / Engineering / Consulting
Irvine Los Angeles Oakland www.ipd-global.com
2 Faraday, Suite 101, Irvine CA 92618 Phone 949 595 8004 Fax 949 595 8011
XX
55 Independence Circle, Suite 201
Chico, California 95973 530.895.3518
FAX 530.895.3544
www.culpandtanner.com structural engineers
SEISMIC DEFICIENCY -
SCI & CLC HOSPITAL
(949) 250-1500
2355 Main Street Suite 220 Irvine
3350 LA JOLLA VILLAGE DR.
SAN DIEGO, CA 92037
Dec 4 2018 26
3SS001
STRUCTURAL COVER SHEET
09/26/2018 EBA ND07/19/2019
SECTION 10: ENCAPSULATED POST TENSIONING SYSTEM
10-1 PRESTRESSING STEEL:
A. PRESTRESSING STEEL SHALL BE SEVEN-WIRE LOW RELAXATION STRAND, MANUFACTURED IN ACCORDANCE WITH ASTM A-416. STRANDS SHALL BE FREE FROM CORROSION, HAVING A GUARANTEED MINIMUM ULTIMATE TENSILE STRENGTH OF 270 ksi, NOMINAL DIAMETER EQUAL TO 1/2", AND AN AREA EQUAL TO 0.153 SQUARE INCHES.
B. ALL STRANDS SHALL BE ENCASED IN WATERTIGHT SHEATHING OF 0.050" MINIMUM THICKNESS FILLED WITH PT COATING IN ACCORDANCE WITH ACI 423.7-14. FABRICATION SHALL BE DONE IN A PLANT CERTIFIED IN
ACCORDANCE WITH ACI 423.7-14.
C. FOR TYPICAL POST-TENSIONING DETAILS SEE THIS SHEET.
10-2 ANCHORAGE AND TENDON PLACEMENT:
A. ALL ANCHORING HARDWARE SHALL MEET THE MINIMUM REQUIREMENTS SET FORTH IN ACI 318-14, SECTION
25.8. ANCHORAGES SHALL BE PROTECTED AGAINST CORROSION BY ENCAPSULATION AND HAVE A WATERTIGHT
CONNECTION TO THE SHEATHING IN ACCORDANCE WITH ACI 423.7-14.
B. ANCHOR CASTING WITH PLASTIC POCKET FORMER SHALL BE USED AT ALL STRESSING ENDS WHERE ANCHORAGE
MUST BE RECESSED IN CONCRETE IN ORDER TO ACHIEVE REQUIRED COVER.
C. HANDLING, STORAGE AND INSTALLATION OF PT TENDONS SHALL BE IN ACCORDANCE WITH PTI M10.3-16 "FIELD PROCEDURES MANUAL FOR UNBONDED SINGLE STANDS TENDONS". REPAIR DAMAGED SHEATHING PER THE
REQUIREMENTS SET FORTH IN PTI M10.3-16, APPENDIX C.
D. WHERE TENDONS INTERFERE WITH EACH OTHER, ONE TENDON MAY BE MOVED HORIZONTALLY IN ORDER TO AVOID THIS INTERFERENCE. WHERE THERE IS INTERFERENCE BETWEEN TENDONS AND ANY KIND OF CONDUIT OR
REBAR, THE TENDON PROFILE GOVERNS.
E. MAXIMUM TENDON SPACING SHALL NOT EXCEED 48 INCHES UNLESS NOTED OTHERWISE.
F. TENDONS SHALL CLEAR OPENINGS AND DRAINS PER DETAIL D/3SS002.
G. ALL SUPPORT STEEL AND POST-TENSIONING TENDONS SHALL BE FIRMLY SECURED IN FORMS TO OBTAIN
DIMENSIONS AND LOCATIONS SHOWN ON PLACING DRAWINGS.
H. SUFFICIENT BAR CHAIRS SHALL BE PROVIDED AS REQUIRED TO HOLD THE TENDONS IN TRUE VERTICAL POSITION.
TENDONS SHALL BE CHAIRED AT EACH INTERSECTION OF SUPPORT BARS.
I. SUPPORT BARS SHALL BE #4 OR LARGER AND SPACED NOT MORE THAN 4'-0" ON CENTER. LAP CONTINUOUS
SUPPORT BARS 2'-0" MINIMUM. SEE SLAB SECTIONS FOR TYPICAL SUPPORT STEEL LAYOUT.
J. CONCRETE SHALL BE PLACED IN SUCH A MANNER AS NOT TO DISTURB THE TENDON PROFILES. WORKMEN MUST BE CAUTIONED AGAINST WALKING ON TENDONS OR SUPPORT BARS. ANY TENDON DISPLACED DURING CONCRETE PLACEMENT MUST BE RESTORED TO ITS ORIGINAL PROFILE BEFORE CONCRETE SETS.
K. WHERE 4 OR MORE TENDONS ARE ANCHORED WITHIN A WIDTH OF 3'-0" OR LESS, ADDED SLAB REINFORCING PER
DETAILS H/3SS102 & J/3SS102 SHALL BE PROVIDED.
L. BEAM AND GIRDER TENDONS SHALL BE BUNDLED. MEMBER SECTIONS DISPLAYING BUNDLES SHALL BE SHOWN ON
SHOP DRAWINGS FOR APPROVAL.
M. THE PRESTRESSING SUPPLIER SHALL FURNISH TENDON LAYOUT AND SUPPORT BAR SHOP DRAWINGS TO THE ENGINEER PRIOR TO FABRICATION. PLACING SHEETS SHALL CONTAIN ALL INFORMATION NECESSARY TO POSITION ALL PRESTRESSING AND SUPPORT REINFORCING IN THE FIELD WITHOUT HAVING TO REFER TO THE STRUCTURAL DRAWINGS. CONTRACTOR SHALL NOT PLACE ANY PRESTRESSING AND SUPPORT REINFORCING
UNTIL SHOP DRAWINGS REVIEWED BY THE ENGINEER ARE RECEIVED ON THE JOB SITE.
10-3 STRESSING:
A. THE STRESSING OPERATION SHALL BE UNDER THE IMMEDIATE CONTROL OF A PERSON EXPERIENCED IN THIS TYPE OF WORK WHO SHALL CLOSELY CHECK AND RIGIDLY CONTROL ALL OPERATIONS. THE STRESSING OPERATION SHALL BE IN ACCORDANCE WITH PTI M10.3-16 "FIELD PROCEDURES MANUAL FOR UNBONDED SINGLE STRAND TENDONS". THE STRESSING SHALL NOT COMMENCE UNTIL CONCRETE TEST CYLINDERS, CURED UNDER JOB SITE CONDITIONS, HAVE BEEN TESTED AND INDICATE THAT THE CONCRETE HAS REACHED A MINIMUM STRENGTH OF
3000 PSI.
B. ALL PRESTRESSING STEEL SHALL BE STRESSED BY MEANS OF HYDRAULIC JACKS EQUIPPED WITH ACCURATE READING CALIBRATED HYDRAULIC PRESSURE GAUGES. A CALIBRATION SHEET SHALL ACCOMPANY EACH JACK-PUMP COMBINATION. MEASURED ELONGATIONS SHALL BE WITHIN 7% OF CALCULATED ELONGATIONS. IF INCONSISTENCIES BETWEEN THE MEASURED ELONGATION AND THE JACK GAUGE READING OCCUR, THE
JACK-GAUGE-PUMP UNIT SHALL BE RECALIBRATED.
C. THE JACKING FORCE SHALL BE 80% OF THE ULTIMATE FORCE OF THE TENDON (270 X .153 X .80 = 33.0 KIPS).
TENDONS SHALL BE ANCHORED AT 70% OF THE ULTIMATE FORCE OF THE TENDON (270 X .153 X .70 = 28.9
KIPS).
D. FOR POST TENSIONING DESIGN:
1. WOBBLE COEFFICIENT = 0.0012
2. CURVATURE FRICTION COEFFICIENT = 0.07
E. TENDON ELONGATIONS AND IMMEDIATE LOSSES DUE TO FRICTION SHALL BE CALCULATED BY THE POST-TENSIONING CONTRACTOR AND LOSS CALCULATIONS SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER FOR REVIEW. WOBBLE AND CURVATURE FRICTION COEFFICIENTS USED IN FRICTION LOSS CALCULATIONS SHALL BE VERIFIED DURING TENDON STRESSING OPERATIONS AND APPROPRIATE ADJUSTMENTS
TO THE CALCULATED TENDON ELONGATIONS SHALL BE MADE AS REQUIRED.
F. TENDONS STRESSED FROM ONE END ONLY SHALL BE INDICATED ON THE PLACING DRAWINGS. TENDONS THAT ARE STRESSED FROM BOTH ENDS NEED NOT BE STRESSED FROM BOTH ENDS SIMULTANEOUSLY. THESE TENDONS MAY HAVE MORE ELONGATION AT ONE END THAN AT THE OPPOSITE END. ELONGATIONS FROM BOTH ENDS SHALL TOTAL THE ELONGATIONS SHOWN ON PLACING DRAWINGS. TENDONS STRESSED FROM BOTH ENDS
SHALL HAVE FULL GAUGE PRESSURE ATTAINED AT EACH END.
G. STRESSING SEQUENCE SHALL BE AS FOLLOWS:
1. ALL SLAB TENDONS PERPENDICULAR TO LONG SPAN BEAMS.
2. ALL BEAM TENDONS AND BALANCE OF SLAB TENDONS.
3. ALL GIRDER TENDONS.
H. TAKE SAFETY PRECAUTIONS AS NECESSARY: DO NOT PERMIT ANYONE TO BE BEHIND JACKS WHILE STRESSING
TENDONS.
I. NO ANCHORAGE OF ANY TYPE SHALL BE SHOT OR DRILLED IN THE POST-TENSIONED SLAB AFTER CONCRETE IS
PLACED WHERE DAMAGE OR CONTACT MAY OCCUR TO THE POST-TENSIONED TENDON. IT IS THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR TO COORDINATE THE LOCATIONS OF ALL SUCH ANCHORAGES.
10-4 FINISHING AND PROTECTION AFTER STRESSING:
A. FINISHING AND PROTECTION PROCEDURES SHALL BE COMPLETED WITHIN 5 DAYS AFTER STRESSING.
B. MEASURE ELONGATIONS IN ACCORDANCE WITH PTI M10.3-16 "FIELD PROCEDURES MANUAL FOR UNBONDED SINGLE STRAND TENDONS". PRIOR TO CUTTING TENDON TAILS, ELONGATIONS SHALL BE SUBMITTED TO THE
ENGINEER OF RECORD FOR REVIEW WITHIN 1 DAY AFTER STRESSING.
C. AFTER ACCEPTANCE OF STRESSING RECORDS, CUT TENDON TAILS TO THE LENGTH SPECIFIED BY THE PT SUPPLIER TO ACCOMMODATE PROPER SEATING OF THE ENCAPSULATION CAPS BUT NOT LESS THAN 1/2" FROM THE
WEDGES.
D. SEAL TENDONS AND EXPOSED ANCHORS WITH ENCAPSULATION CAPS PER MANUFACTURER'S REQUIREMENTS.
AFTER ENCAPSULATION CAPS HAVE BEEN INSTALLED AND INSPECTED SOLIDLY PACK STRESSING POCKETS WITH NON-SHRINK CEMENTITIOUS GROUT. SACK OUT FACE OF POCKET WITH SAND-CEMENT MIX TO ACHIEVE REQUIRED ARCHITECTURAL FINISH. AT INTERMEDIATE ANCHORAGES ENCAPSULATION ELEMENTS SHALL BE
INSTALLED PER MANUFACTURE'S REQUIREMENTS.
E. WHEN WET WEATHER IS EXPECTED CUT TENDON TAILS AND INSTALL ENCAPSULATION ELEMENTS WITHIN 1 DAY AFTER ACCEPTANCE OF STRESSING RECORDS IN ACCORDANCE WITH PTI M10.3-16 "FIELD PROCEDURES MANUAL FOR UNBONDED SINGLE STRAND TENDONS". IF CUTTING OF THE TENDON TAILS OR COMPLETION OF THE ENCAPSULATION SYSTEM IS DELAYED ADEQUATE PROTECTION SHALL BE PROVIDED TO PREVENT MOISTURE FROM
REACHING THE EXPOSED TENDONS AND ANCHORAGES.
1" MIN
NOTE: PRIOR TO CONCRETE PLACEMENT ANCHORS SHALL BE SECURELY
FASTENED TO FORM w/ NON-CORROSIVE SYSTEM.
ENCAPSULATING HARDWARE
A
AT ENCAPSULATED ANCHORS
NO SCALE TCD7000D
TYPICAL TENDON PROTECTION
2" MIN
1'-0"1/5 OF SPAN LENGTH TYP UNO
EQ
EQ
1' -0
" T
YP
PLAN
SECTION
#4 T&B TIED TO TENDONS
DEAD END ANCHORAGES
STAGGERED AS SHOWN
ENCAPSULATING HARDWARE TYP
C L
O F
SU
PP
O
RT
B
AT ADDED ENCAPSULATED STRANDS
NO SCALE TCD7005A
TYPICAL PT DETAIL
2"
#4 CONT T&B
TIED TO TENDON
TYP @ SLAB EDGE
EQ
EQ
AT
A
N C
H O
RA
G
E
EXPOSED STRAND TO
BE PROTECTED BY
INTERMEDIATE CAP
AND SHEATHING
#4 CONT T&B
TIED TO TENDON TYP
EQ
EQ
POCKET FORMER
#4 CONT T&B
TIED TO TENDON TYP
ANCHOR ATTACHED
TO EDGE FORM
EQ
EQ
INTERMEDIATE ANCHORAGE
DEAD END ANCHORAGE
AT
A
N C
H O
RA
G
E
ENCAPSULATED HARDWARE
ENCAPSULATED HARDWARE
AT
A
N C
H O
RA
G
E
SEE A/SS002
STRESSING END ANCHORAGE
C
TYPICAL ENCAPSULATED PT ANCHORS
NO SCALE TCD7010A 112
1'-0" MIN STRAIGHT
PAST OPENING
6" M
IN
WHERE LIMITS ARE EXCEEDED SEE E/3SS002
MINIMUM RADIUS = 21' -0"
" Y "
SWEEP LENGTH
" X
O
FF
SE
T
" X "
OFFSET
" Y "
SWEEP
MINIMUM SWEEP LENGTHS IN FEET
'-0
" M
IN
R
AD
IU
S
TY
P
SY
M
M
ET
RI
C
AL
A
BO
U
T
C
EN
TE
RL
IN
E
U N
O
SLAB OPNG
0.5'
6.5'
1'
9'
1.5'
11'
2'
13'
2.5'
14' 15.5'
3' 3.5'
17' 18'
4' 4.5'
19' 20'
5' 5.5'
21' 21.5'
6' 6.5'
22'
D
TYPICAL TENDON SWEEPS AND BENDS
NO SCALE TCD7210 14
" X
" Y "
Y/6 Y/6
Y/6
Y/6
Y/6 Y/6
TENDONS IN
SAME PLANE
SECTION "B-B"
SECTION "A-A"
PLAN
"B"
"B"
#3 HAIRPINS
PT TENDONS
HAIRPIN TYP
"A"
"A"
E
TYPICAL FLARE AT PT TENDONS
NO SCALE TCD7205 1
1' -0
" M
IN
SWEEP CABLES TO MAINTAIN
1'-0" MIN EDGE DIMENSION
IF THIS DIM EXCEEDS 1'-6"
OMIT HOOKS @ BACKUP BARS
NO ANCHORAGE IS TO BE PLACED
LESS THAN DISTANCE SHOWN
FROM ANY SLAB EDGE
WITHOUT PRIOR APPROVAL
FROM ENGINEER
DEAD END, INTERMEDIATE
or STRESSING END ANCHORAGES
EOS LAP 24" 2" CLR #4 T&B BACKUP BARS
CLOSEST ANCHORAGE TO ADJACENT EOS
LAP 24"
EOS or CJ
F
AT SLAB CORNERS & CONST JOINTS
NO SCALE TCD7220
TYPICAL ANCHORAGE PLAN LAYOUT
EQ
EQ
EQ
#4 DOWEL w/THREADS
@ SLABS > 7" THICK:
2'-0" MIN FOR 6 TENDONS
(ADD 3" FOR EA ADDITIONAL TENDON)
@ SLABS ≤ 7" THICK:
2'-0" MIN FOR 3 TENDONS
(ADD 6" FOR EA ADDITIONAL TENDON)
3'-0"
1 1/2"
TENDONS TO BLOCKOUT
WHERE OCCUR
SECTION "A-A"
3"
C
LR
TY
P
"A"
"A"
2' -0
" T
YP
LENTON FORMSAVER COUPLER
1'-0" 1'-0" 1'-0"
G
SLAB STRESSING BLOCKOUT PLAN
NO SCALE TCD7300
TYPICAL
2" OFFSET
TYP
ST
RA
N
D S
M
AX
PE
R
BU
N
D
LE
#3 PER J/SSS002
3/8 OF SLAB THICKNESS
3" T
YP
6" T
YP
B
TW
N
BU
N
D
LE
S U
N O
#4 T&B TIED TO TENDONS TYP
#4 T&B
NOTE: REINFORCEMENT TO BE ADDED @ BOTH DEAD & LIVE END ANCHORAGES.
FA
C
E O
F
PT
A N
C H
O
RS
H
TYPICAL FLARE AT SLAB PT ANCHORS
NO SCALE TCD7200 1
1'-0"
TYP
LIMIT OF TENDON BAND
#4 T&B
#4 T&B TIED
TO TENDONS TYP
#3 BTWN ANCHORS &
@ EACH END OF BAND
1'-3" 3/ 4"
C
LR
TY
P
HAIRPINS 1'-0" BEYOND TENDON BAND
TYP EA END
H
3SS002
J
TENDON BANDS AT ANCHORAGE
NO SCALE TCD7100
TYPICAL REINFORCEMENT OF
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: 664-401 Office of Facilities
Management Architecture / Engineering / Consulting
Irvine Los Angeles Oakland www.ipd-global.com
2 Faraday, Suite 101, Irvine CA 92618 Phone 949 595 8004 Fax 949 595 8011
XX
55 Independence Circle, Suite 201
Chico, California 95973 530.895.3518
FAX 530.895.3544
www.culpandtanner.com structural engineers
SEISMIC DEFICIENCY -
SCI & CLC HOSPITAL
(949) 250-1500
2355 Main Street Suite 220 Irvine
3350 LA JOLLA VILLAGE DR.
SAN DIEGO, CA 92037
Dec 4 2018
POST TENSIONING NOTES
3SS002
09/26/2018
3SS002
POST TENSIONING NOTES & DETAILS
09/26/2018 EBA ND
3SS002
09/26/201807/19/2019
SPECIAL INSPECTION NOTES
SECTION 24: STATEMENT OF SPECIAL INSPECTIONS
24-1 SPECIAL INSPECTIONS AND TESTING SHALL BE PERFORMED IN ACCORDANCE WITH THE APPROVED PLANS AND
SPECIFICATIONS, THIS STATEMENT AND IBC SECTIONS 1704 & 1705.
24-2 SEE GENERAL NOTE 1-6 FOR TYPES OF WORK REQUIRING SPECIAL INSPECTIONS.
24-3 SEE THE APPLICABLE TABLE ON THIS SHEET FOR THE FREQUENCY OF INSPECTIONS AND REFERENCE FOR CRITERIA.
INSPECTION FOR STRUCTURAL STEEL SHALL BE IN ACCORDANCE WITH THE QUALITY ASSURANCE INSPECTION REQUIREMENTS OF AISC 360. INTERIM REPORTS AND A FINAL REPORT SHALL BE SUBMITTED TO THE BUILDING OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE IN ACCORDANCE WITH IBC SECTION 1704.2.4.
24-4 THE BUILDING SEISMIC FORCE RESISTING SYSTEM CONSISTS OF HORIZONTALLY SPANNING FLOOR AND ROOF
DIAPHRAGMS SUPPORTED BY SPECIAL MOMENT FRAMES.
24-5 SEE IBC SECTIONS 1705.11 AND 1705.12 FOR ADDITIONAL ITEMS REQUIRING SPECIAL INSPECTION AND TESTING
FOR THE SEISMIC DESIGN CATEGORY SPECIFIED IN GENERAL NOTE 20-3, B.
24-6 CERTIFIED MILL TEST REPORTS SHALL BE SUBMITTED FOR EACH SHIPMENT OF DEFORMED REINFORCING TO BE USED IN BEAMS, COLUMNS AND WALLS WHICH ARE PART OF THE SEISMIC FORCE RESISTING SYSTEMS.
24-7 TESTING CONTAINED IN THE STRUCTURAL STEEL FABRICATORS QUALITY ASSURANCE PLAN SHALL BE AS REQUIRED
BY AISC 341.
24-8 SEISMIC CERTIFICATION OF NON-STRUCTURAL COMPONENTS SHALL COMPLY WITH IBC SECTION 1705.12.3.
24-9 EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF A MAIN WIND OR SEISMIC FORCE RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEMS OR A WIND OR SEISMIC RESISTING COMPONENT LISTED IN NOTE 24-4 SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT. THE CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL CONTAIN ACKNOWLEDGEMENT OF AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED IN SPECIAL
INSPECTION NOTE SECTION 24.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: 664-401 Office of Facilities
Management Architecture / Engineering / Consulting
Irvine Los Angeles Oakland www.ipd-global.com
2 Faraday, Suite 101, Irvine CA 92618 Phone 949 595 8004 Fax 949 595 8011
XX
55 Independence Circle, Suite 201
Chico, California 95973 530.895.3518
FAX 530.895.3544
www.culpandtanner.com structural engineers
SEISMIC DEFICIENCY -
SCI & CLC HOSPITAL
(949) 250-1500
2355 Main Street Suite 220 Irvine
3350 LA JOLLA VILLAGE DR.
SAN DIEGO, CA 92037
Dec 4 2018 28
3SS005
SPECIAL INSPECTION NOTES
09/26/2018 EBA ND
3SS005
PROPOSED PHASE II
STRUCTURE
(NOT A PART)
A A.5
34'-0"
B
29'-0"
C
63'-0"
D
19'-2"
E
63'-0"
F
63'-0"
G H J K L 482'-7"
'-6
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-0
3'
-1 0"
'-6
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-8
'-0
3'
-1 0"
15.7
4' -0
/2
B2 LEVEL FOUNDATION PLAN
1/16" = 1'-0"
R A
M P
U P
EXISTING PHASE I
STRUCTURE
(NOT A PART)
1. SEE 3SS501, 3SS502 & 3SS503 FOR TYPICAL CONCRETE DETAILS.
SEE 3SS601 FOR TYPICAL STEEL DETAILS.
2. "Fx" INDICATES FOOTING MARK - SEE SCHEDULE THIS SHEET.
"Cx" INDICATES CONCRETE COLUMN MARK - SEE SCHED ON 3SS310.
"CFx" INDICATES CONCRETE FRAME COLUMN MARK - SEE SCHED ON 3SS315.
"HSSxxxx" INDICATES HOLLOW STRUCTURAL STEEL COLUMN - SIZE AS NOTED.
"Wxxxxx" INDICATES WIDE FLANGE COLUMN - SIZE AS NOTED "Px" INDICATES PIPE COLUMN - SIZE AS NOTED.
3. SLABS ON GRADE SHALL BE 5" THICK UNO, w/#4 @ 18"oc EW UNO. SEE
GEOTECHNICAL REPORT, ARCHITECT AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION. SLABS ON GRADE SPECIFIED ON THE STRUCTURAL DRAWINGS
ARE DIAPHRAGMS AND PART OF THE LATERAL FORCE RESISTING SYSTEM.
4. HOOK ALL SLAB ON GRADE REINFORCEMENT AT EDGE OF SLAB.
FOUNDATION / GROUND w/SPREADS ONLY
TCN0000
5. REFER TO SOILS REPORT(S) FOR ADDITIONAL INFORMATION.
6. VERIFY ALL TOP OF SLAB, WALL AND STEP ELEVATIONS AND LOCATIONS, AND OPENING
SIZES AND LOCATIONS WITH ARCHITECT.
7. REBAR LENGTHS NOTED ON PLAN DO NOT INCLUDE HOOK LENGTH, IF ANY.
8. PROVIDE MISC CONNECTION ITEMS AT STAIRS, ELEVATORS, EXTERIOR WALL SYSTEMS AND
ELEC & MECH EQUIPMENT AS REQUIRED BY MANUFACTURERS AND ARCHITECT. EXTERIOR
WALL SYSTEMS ARE DESIGNED BY OTHERS.
9. INDICATES #5 SOG DOWELS INTO FOOTING. SEE K/3SS502 FOR ADDL INFO.
(xx) INDICATES QUANTITY OF DOWELS INTO FOOTING.
EVENLY DISTRIBUTE AROUND COLUMN WHERE SOG OCCURS.
NOTES
B
3SS340
H
3SS341
H
3SS341 OH
H
3SS340
B
3SS342
B
3SS341
F12 F12
F12F12
F9.5 F9.5
F9.5 F9.5
F9.5 F9.5
F9.5 F9.5
8' -0
8'
-0
8' -0
8'
-0
F9.5 F9.5
F9.5 F9.5
F12 F12
F12 F12
F11.5
F11.5
F11.5
F11.5
F11.5
F11.5
F11.5
F11.5
F11.5
F14.5
F14.5
F14.5
F14.5
F13
6"C L
FT
G
C
O L
F9
F9
F9
F8
F8
F8
F11
F10
F10
F10F9
C L
C O
L
9"
6" C
L C
O
L 6'-0"6'-0" PIERS PER A/3SS301
F8 F8 F8 F8
F10.5
FOOTING SCHEDULE TCN2000
MARK PLAN SIZE THICKNESS
REINF
EW BOT UNO
F8
F9
F9.5
F10.5
8'-0" SQ
9'-0" SQ
9'-6" SQ
10'-6" SQ
2'-0"
2'-6"
2'-6"
3'-0"
10-#6
11-#6
13-#6
11-#7
NOTES:
1. LOCATE FOOTINGS CENTERED UNDER COLUMN(S) EACH WAY, UNO.
2. PIER CAP CALLOUT
ESTIMATED PIER LENGTH FROM BOTTOM OF FOOTING/PIER
CAP TO BOTTOM OF PIER. FIELD VERIFY ACTUAL PIER LENGTH
NEEDED TO MEET MINIMUM EMBEDMENT REQIREMENTS OF
GEOTECHNICAL REPORT.
MARK PLAN SIZE THICKNESS
REINF
EW BOT UNO
F12 12'-0" SQ 3'-6" 15-#7
F10 10'-0" SQ 2'-6" 12-#7
F11 11'-0" SQ 3'-0" 13-#7
F13 13'-0" SQ 3'-6" 15-#8
F14.5 14'-6" SQ 4'-0" 19-#8 K.3 K.7J.7J.3HG.7G.3 LG KJ.1
29'-6" 16'-9" 16'-9" 29'-6" 16'-9"16'-9"19'-2"16'-9"29'-6"16'-9"
3'-3"
63'-0" 19'-2" 63'-0" 63'-0"
G.4 G.6 G.9 H.9 J.2 J.5 J.6
19'-7" 19'-7" 19'-7" 19'-7" 19'-7"
3'-6" 3'-1"
12'-4" 12'-1" 22'-1"
C
3SS110
SOG TO FTG
DOWELS TYP
SEE NOTE 9
CF1 CF1CF1 CF1 CF1 CF1 CF1 CF1 CF1 CF1
CF1
C3C3C4 C3 C1
(16)
(16)
C3C3C3
(16)(16)
(16)(16)
C4
C1
C1
C5 C1C2C2C1
C1 C2C2
C2C2
C2C2
C5
C5
C5
C5CF1 CF1
CF1 CF1
CF1 CF1
C2C2
C2C2
C7C7
C8
C4
C2
C2
C2
C2
C10
CF1
CF1
CF1
CF1
CF1
CF1
CF1
C1
C1C1A
C3 C3C3
C6C6
C6C6CF3CF2CF2CF2CF2CF3
(16)(16) (16)
(16)(16) (16)
E
3SS503
F
3SS503
E
3SS503
F
3SS503
F
3SS503
L
3SS503
H
3SS503
D
3SS501
CURB PER
ARCH TYP @
LIGHT WELL
F
3SS503
TYP @ CMU
ROOM
UNO
C10
C10
C7
13.8
3' -6
'-2 "13.8
3' -6
'-2
15.8
3' -9
'-1 1"
TOF = -5'-8"
PHASE II STRUCTURE PRECEDES CONSTRUCTION
OF PHASE III, FOOTINGS FOR INFORMATION ONLY
(8)
(8)
CF1A
CF1A
CF1A
CF1A
CF1A
CF1A
CF1A
(12)
(12)
19'-0"
F16 16'-0" SQ 4'-6" 22-#8
F12
E
3SS503
PC4
17'-0"
F11.5 11'-6" SQ 3'-0" 16-#7
F9
F11
F10
F10
F10
5' -0
" P
ER
A
RC
H
11'-0"
PER ARCH
8'-8" PER ARCH
9' -5
PE
R
AR
C H
C.3
J
3SS111
A1
3SS502
L
3SS502
A
3SS502
@ SPANDREL
A1
3SS502
@ SPANDREL
SEE GEOTECH FOR OVEREX
& RECOMPACT REQUIREMENTS
FOR SOIL SUPPORTED SOG.
STRUCTURAL SOG CAN BE
PROVIDED @ CONTRACTOR
OPTION IN LIEU OF OVEREX
& RECOMPACT
3" MIN GAP, TYP
M
3SS502
TYP @
RETAINING
WALL
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.…