B08-W912PF26RA011_ATT04-05_SOW_STORM_100.zip

ZIP file 105 MB Posted

Attached to
Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
Solicitation number
W912PF26RA011
Issued by

About this file

This is a Statement of Work (SOW) attachment for a Design-Bid-Build construction project to repair failed stormwater and sanitary sewer systems at Caserma Miotto in Longare, Vicenza, Italy. The project is executed under solicitation W912PF26RA011 by the Department of the Army Materiel Command Army Contracting Command and is unrestricted for full and open competition using a best value continuum tradeoff process.

The core scope of work includes: repairing, extending, and upsizing failed stormwater system piping to meet technical capacity standards; remediating site conditions from recent storm events including severe flooding, soil erosion, and landslide vulnerabilities; decoupling cross-connected sanitary and storm lines to achieve independent discharge and environmental compliance; constructing a new direct connection to the Bisatto River via underground TOC pipe utilizing existing perpetual rights-of-way; installing a mandated stormwater lamination tank beneath a municipal sports field per local Italian regulations (Genio Civile); restoring the impacted municipal training field with new synthetic turf directly over the completed lamination tank; and integrating naturalistic design features including sedimentation tanks, retention ponds, and weir walls to reduce stormwater velocity prior to discharge. Optional work includes asbestos pipe removals, sports field reinstallation, landslide area repairs, and sedimentation pond installation. The solicitation requires both non-price (technical, experience, and past performance) and price proposals. Amendment 0001 (dated 10 August 2026) revised Corporate Experience requirements from five to eight years and clarified Secondary Attribute experience criteria. Amendment 2 (dated 19 August 2026) incorporated the 100% design package and distributed the complete design documentation.

Other files

File Type Posted
B08-W912PF26RA011_AMD0003_CONFORMED_20260821.pdf PDF
B08-W912PF26RA011_ATT11_VINCA_APPROVAL.zip ZIP file
B08-W912PF26RA011_AMD0003_SF30_20260821.pdf PDF
B08-W912PF26RA011_ATT03_SOW_SEWER_100.zip ZIP file
B08-W912PF26RA011_AMD0002_SF30_20260819.pdf PDF
B08-W912PF26RA011_AMD0002_CONFORMED_20260819.pdf PDF
B08-W912PF26RA011_ATT D_BIDSHEET_REV01.xlsx XLSX spreadsheet
B08-W912PF26RA011_ATT01_SOW_REV01_20260818.pdf PDF
B08-W912PF26RA011_ATT07_PPI LOG_20260819.pdf PDF
B08-W912PF26RA011_ATT08_THIRD_PARTY_AGENCY_PKGS.zip ZIP file
B08-W912PF26RA011_ATT10_MODULO MU19 SIGNED.pdf PDF
B08-W912PF26RA011_ATT09_MOU_LICENSES.zip ZIP file
B08-W912PF26RA011_ATT E_SITE VISIT_ROUTE.pdf PDF
B08-W912PF26RA011_ATT G_SITE VISIT_ATTENDANCE_Redacted.pdf PDF
B08-W912PF26RA011_ATT C_PPQ_AMD01.pdf PDF
B08-W912PF26RA011_ATT07_PPI LOG_20260810.pdf PDF
B08-W912PF26RA011_AMD0001_CONFORMED_20260810.pdf PDF
B08-W912PF26RA011_ATT06_THIRD_PARTY_AGENCY_DOCS.zip ZIP file
B08-W912PF26RA011_ATT F_SITE VISIT_PHOTOS.pdf PDF
B08-W912PF26RA011_AMD0001_SF30_20260810.pdf PDF
B08-W912PF26RA011_ATT04_SOW_STORM_1.zip ZIP file
B08-W912PF26RA011_20260729.pdf PDF
B08-W912PF26RA011_ATT B_EXPERIENCE.docx DOCX document
B08-W912PF26RA011_ATT03_SOW_SEWER.zip ZIP file
B08-W912PF26RA011_ATT A_PPI.xlsx XLSX spreadsheet
B08-W912PF26RA011_ATT D_BIDSHEET.xlsx XLSX spreadsheet
B08-W912PF26RA011_ATT C_PPQ.pdf PDF
B08-W912PF26RA011_ATT01_SOW_20260629.pdf PDF
B08-W912PF26RA011_ATT02_SOW_GENERAL.zip ZIP file
B08-W912PF26RA011_ATT05_SOW_STORM_2.zip ZIP file
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .