B08-W912PF26RA011_ATT D_BIDSHEET_REV01.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
Solicitation number
W912PF26RA011
Issued by

About this file

This is a bidsheet template for a Design-Bid-Build (DBB) construction project to repair failed stormwater and sanitary sewer systems at Caserma Miotto, Longare, Vicenza, Italy. The bidsheet (Revision 01) serves as the pricing submission document for contractors responding to solicitation W912PF26RA011, issued by the Department of the Army Materiel Command Army Contracting Command. The file is structured as an Excel spreadsheet designed to capture detailed cost information organized by work breakdown structure (WBS) elements corresponding to the project's scope, which includes repairing and upsizing stormwater piping, separating cross-connected sanitary and storm lines, constructing a stormwater lamination tank, restoring a municipal sports field with synthetic turf, installing naturalistic design features (sedimentation tanks, retention ponds, weir walls), and establishing a new direct connection to the Bisatto River. The bidsheet template requires contractors to itemize labor, materials, equipment, and overhead costs for each defined work element, with provisions for optional work items including asbestos pipe removal, sports field reinstallation, landslide area repairs, and sedimentation pond installation.

The procurement is unrestricted for full and open competition and utilizes a best value tradeoff evaluation process under the Revolutionary Federal Acquisition Regulation Overhaul (RFAO) 15.1, requiring both technical and price proposals. The bidsheet was distributed as part of Amendment 0002 (dated 19 August 2026) along with the 100% design package and supporting documentation. Contractors must complete this bidsheet in accordance with the Statement of Work (SOW) and design drawings provided in the solicitation attachments. No specific proposal due date, contract award date, or total contract value is indicated in the bidsheet itself; these details are contained in the main RFP documents referenced in the solicitation.

View the file

Other files

File Type Posted
B08-W912PF26RA011_AMD0003_CONFORMED_20260821.pdf PDF
B08-W912PF26RA011_ATT11_VINCA_APPROVAL.zip ZIP file
B08-W912PF26RA011_AMD0003_SF30_20260821.pdf PDF
B08-W912PF26RA011_ATT03_SOW_SEWER_100.zip ZIP file
B08-W912PF26RA011_AMD0002_SF30_20260819.pdf PDF
B08-W912PF26RA011_AMD0002_CONFORMED_20260819.pdf PDF
B08-W912PF26RA011_ATT01_SOW_REV01_20260818.pdf PDF
B08-W912PF26RA011_ATT07_PPI LOG_20260819.pdf PDF
B08-W912PF26RA011_ATT08_THIRD_PARTY_AGENCY_PKGS.zip ZIP file
B08-W912PF26RA011_ATT10_MODULO MU19 SIGNED.pdf PDF
B08-W912PF26RA011_ATT09_MOU_LICENSES.zip ZIP file
B08-W912PF26RA011_ATT04-05_SOW_STORM_100.zip ZIP file
B08-W912PF26RA011_ATT E_SITE VISIT_ROUTE.pdf PDF
B08-W912PF26RA011_ATT G_SITE VISIT_ATTENDANCE_Redacted.pdf PDF
B08-W912PF26RA011_ATT C_PPQ_AMD01.pdf PDF
B08-W912PF26RA011_ATT07_PPI LOG_20260810.pdf PDF
B08-W912PF26RA011_AMD0001_CONFORMED_20260810.pdf PDF
B08-W912PF26RA011_ATT06_THIRD_PARTY_AGENCY_DOCS.zip ZIP file
B08-W912PF26RA011_ATT F_SITE VISIT_PHOTOS.pdf PDF
B08-W912PF26RA011_AMD0001_SF30_20260810.pdf PDF
B08-W912PF26RA011_ATT04_SOW_STORM_1.zip ZIP file
B08-W912PF26RA011_20260729.pdf PDF
B08-W912PF26RA011_ATT B_EXPERIENCE.docx DOCX document
B08-W912PF26RA011_ATT03_SOW_SEWER.zip ZIP file
B08-W912PF26RA011_ATT A_PPI.xlsx XLSX spreadsheet
B08-W912PF26RA011_ATT D_BIDSHEET.xlsx XLSX spreadsheet
B08-W912PF26RA011_ATT C_PPQ.pdf PDF
B08-W912PF26RA011_ATT01_SOW_20260629.pdf PDF
B08-W912PF26RA011_ATT02_SOW_GENERAL.zip ZIP file
B08-W912PF26RA011_ATT05_SOW_STORM_2.zip ZIP file
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Sheet

DBB STORM & SANITARY SEWER REPAIR

CASERMA MIOTTO

W912PF26RA011 ATTACHMENT D

DIRECT COST BID SHEET

OFFEROR NAME:

INSTRUCTIONS TO OFFERORS
1Offerors must complete all blue shaded fields. Prices must be proposed in Euros (€).
2Part 1 Direct Costs: Provide the Direct Cost only (e.g., labor, materials, equipment) for each Definable Feature of Work. Do not include profit, home office overhead, field office overhead, or bond costs in this section.
3Part 2 Daily Rates: Provide the unburdened daily rate for the identified positions. This rate is evaluated for reasonableness but is not included in the Total Evaluated Price (TEP) for tradeoff purposes.
4SF 1442 Total Pricing: Offerors shall take the direct costs from Part 1, apply all applicable indirect costs, overheads, and profit, and enter the final, fully burdened total price for each CLIN (0001, 0002, 0004-0006) directly onto the SF 1442 schedule. For CLIN 0003 (SLINs 0003AA, 0003AB, 0003AC), enter the fully burdened Unit Price.

PART 1: DIRECT COSTS FOR DEFINABLE FEATURES OF WORK

(Note: Provide Direct Costs ONLY in this section. Do not include overhead or profit)

CLINDescription / Definable Feature of WorkQtyUnitUnit Price (€)Cost Sum (€)
0001BASE: Storm Water System Repairs
Lamination Tanks and Various Structural Works1JobN/A€ - 0
Retaining Walls and Temporary Perimeter Fence1JobN/A€ - 0
TOC1JobN/A€ - 0
Wellpoint System1JobN/A€ - 0
Storm Sewer Line Site Civil/Mechanical Utilities1JobN/A€ - 0
Natural Ditch1JobN/A€ - 0
Concrete Channel & Motor Pool1JobN/A€ - 0
Lift Station #11JobN/A€ - 0
Lift Station #21JobN/A€ - 0
1st Flush System1JobN/A€ - 0
CLIN 0001 Total Direct Cost€ - 0

0002 BASE: Sanitary Sewer Lines Repairs 1 Job N/A € - 0

0003OPTION #1: Asbestos Water Pipe Removal and Disposal
0003AAAsbestos Removal (if exercised Days 1 - 365)100LM€ - 0€ - 0
0003ABAsbestos Removal (if exercised Days 366 - 730)100LM€ - 0€ - 0
0003ACAsbestos Removal (if exercised Days 731 - Completion )100LM€ - 0€ - 0
CLIN 0003 Total Direct Cost€ - 0
0004OPTION #2: Reinstallation of Existing Sport Field
Synthetic Turf Sportfield1JobN/A€ - 0
CLIN 0004 Total Direct Cost€ - 0
0005OPTION #3: Repair of Landslides Areas
Naturalistic Sliding Interventions1JobN/A€ - 0
Landscaping Mitigation Works1JobN/A€ - 0
CLIN 0005 Total Direct Cost€ - 0

0006 OPTION #4: Sedimentation Pond Installation 1 Job N/A € - 0

PART 2: UNBURDENED DAILY RATES

(Note: These rates must be unburdened base daily rates).

PositionsEstimated QtyUnitUnburdened Daily Rate (€)
Project Manager1010Day€ - 0
Quality Control Manager (QCM)1010Day€ - 0
Site Safety & Health Officer (SSHO)1010Day€ - 0
Site Superintendent1010Day€ - 0

File details come from the government source that posted it. Updated .